ML20137Z387 | 22 April 1997 | Summary of 970407 Meeting W/W in Rockville,Md to Provide W Feedback on Status of Review of Ssar Sections 9.5.1,9A & Fire Protection Analysis.List of Meeting Attendees & Meeting Handout Encl | Safe Shutdown Fire Barrier Emergency Lighting |
ML20138E404 | 29 April 1997 | Summary of 970313 Meeting W/Westinghouse in Rockville,Md Re Overall Conclusions from AP600 Notrump Computer Code Final V&V & Addl Documentation Which Will Be Included in Revised Final V&V Rept | Boric Acid |
ML20138E453 | 30 April 1997 | Summary of 970421 Meeting W/Westinghouse Electric Corp in Rockville,Md Re Status of Review of Ssar Fire Protection Analysis and Section 9.5.1 & 9A.List of Attendees Encl | Safe Shutdown Fire Barrier Emergency Lighting |
ML20138L037 | 12 February 1997 | Summary of 961205-06 Meeting W/W in Rockville,Md to Discuss & Resolve Remaining Unresolved Piping & Pipe Support Design Open Items Identified in Section 3.12 of NRC AP600 Draft SE Rept.List of Attendees & Items Discussed at Meeting Encl | Earthquake |
ML20138M639 | 21 February 1997 | Summary of 970220 Telcon Between J Winters,D Lindgren & G Isrealson of Westinghouse & C Li & D Jackson of NRC to Discuss Unresolved Open Items Related to Ssar Chapter 11 Detailed in 970131 NRC Ltr | |
ML20140B425 | 4 June 1997 | Summary of 970519 Meeting W/Westinghouse Re AP600 Fire Protection Issues | Safe Shutdown |
ML20140G454 | 12 June 1997 | Summary of 970520 Meeting W/Westinghouse in Monroeville,Pa Re AP600 Containment Hydrogen Control Sys.List of Attendees & Action Items Identified During Meeting Encl | |
ML20140H519 | 5 March 1997 | Summary of 438th Meeting of ACRS on 970206-08 Re Human Performance Program Plan,Nuclear Safety Research & Regulatory Reform | Probabilistic Risk Assessment |
ML20140H537 | 22 January 1997 | Summary of 437th Meeting of ACRS on 961205-07 Re ACRS Review of Gls,Bulletins & Info Requests Issued on Expedited Basis | Probabilistic Risk Assessment Nondestructive Examination |
ML20140H573 | 4 April 1997 | Summary of 439th Meeting of ACRS on 970306-08 Re Release of AP600 Test Data from Rosa Test Facility,Rept Entitled, Recommendations to Improve Senior Mgt Meeting Process & Independent Safety Assessment of Myaps | Probabilistic Risk Assessment |
ML20140H734 | 7 May 1997 | Summary of 970418 Meeting W/Util Re Schedule for AP600 Design.List of Attendees & Matls Used in Presentation Encl | Safe Shutdown Stroke time Anticipated operational occurrence Probabilistic Risk Assessment Squib Fire Protection Program |
ML20140H797 | 9 May 1997 | Summary of 970415 Meeting W/Listed Attendees in Rockville,Md Re Issues Associated W/Lower Head Integrity Under in-vessel Steam Explosion Loads for AP600 | |
ML20141A504 | 4 April 1997 | Summary of ACRS Subcommittee on Planning & Procedures Meeting on 970402 in Rockville,Md to Discuss Matters Re Conduct of ACRS Business | Fitness for Duty Probabilistic Risk Assessment |
ML20141A628 | 9 May 1997 | Summary of 970417-18 Meeting W/Westinghouse in Rockville,Md Re Passive Containment Cooling Sys & Wgothic Computer Code for AP600 Reactor Design.List of Attendees & Handouts Provided by Westinghouse Encl | |
ML20141B245 | 14 May 1997 | Summary of 970505 Meeting W/W in Rockville,Md to Discuss Status Review of Ssar Section 9.5.1 & 9A.List of Meeting Participants & Draft Ssar Markups Encl | Safe Shutdown |
ML20141B249 | 13 May 1997 | Summary of 970415 Meeting W/W in Rockville,Md to Discuss Issues Associated w/AP600 Pra.List of Attendees & Handouts Encl | Mission time Probabilistic Risk Assessment Squib |
ML20141C497 | 23 June 1997 | Summary of 970609 Meeting W/W in Rockville,Md to Discuss Open Item Tracking Sys Issues Involving Instrumentation & Control Section of AP600 TSs Section 3.3.Highlights from Meeting & Summary of Results Listed | Squib |
ML20141D036 | 15 May 1997 | Summary of 970513 Meeting W/W to Discuss Safeguards Issues on AP600 Design.List of Attendees Encl | |
ML20141D432 | 23 June 1997 | Summary of 970425 Meeting W/Westinghouse in Rockville,Md Re Resolution of Open Items for Reactor Sys AP600 Pirt/Scaling Closure rept,(WCAP-14727).List of Attendees,Meeting Agenda & Westinghouse Meeting Presentation Matl Encl | |
ML20141G380 | 15 May 1997 | Summary of 970414-18 Meeting W/W in Monroeville,Pa to Discuss W Ssar Sections 3.7 & 3.8 Re Design & Analysis of Structural Modules,Review Structural Design Calculations & Resolve Remaining Dser Open Items.List of Attendees Encl | Safe Shutdown Safe Shutdown Earthquake |
ML20141G542 | 15 May 1997 | Summary of 970422 Meeting W/W in Rockville,Md to Discuss Design Certification Issues for AP600.List of Meeting Attendees Encl | Ultimate heat sink Stroke time Anticipated operational occurrence Safe Shutdown Earthquake Post Accident Monitoring Condition Adverse to Quality Earthquake Fire Protection Program |
ML20147H006 | 25 March 1997 | Summary of 970306 Meeting W/W in Rockville MD to Discuss Revised WCAP14845,14812 & Wgothic Computer Code & PCS Design Issue Closure Process.List of Meeting Participants Encl | |
ML20147H014 | 25 March 1997 | Summary of 970303 Meeting W/W in Rockville MD to Discuss Siting of AP600 on Shallow Soil Sites & Design of Basement. List of Attendees,Meeting Agenda,Staff Handouts & W Handouts Encl | Ultimate heat sink Safe Shutdown Earthquake Probabilistic Risk Assessment |
ML20148B749 | 3 January 1997 | Summary of 961204 Meeting in Rockville,Md to Review Chapters 4,5,9 & 11 of AP600 Std SAR | Safe Shutdown Probabilistic Risk Assessment Fire Protection Program |
ML20149E947 | 3 August 1994 | Summary of 940727-28 Meeting W/Westinghouse in Monroeville, PA to Discuss Issues Pertaining to Reactor Vessel Internals for AP600 Design.List of Attendees in Encl 1 | Flow Induced Vibration |
ML20149J218 | 16 June 1997 | Summary of 970416-18 Meeting W/Westinghouse in Monroeville, MD Re AP600 Piping Design Analysis.Meeting Attendees Listed in Encl 1 | Safe Shutdown Non-Destructive Examination Safe Shutdown Earthquake Hydrostatic Nondestructive Examination Finite Element Analysis Earthquake |
ML20149L125 | 20 February 1996 | Summary of 960118 Meeting W/Westinghouse Electric Corp in Rockville,Md Re PRA for AP600 Design.Meeting Attendees Listed in Encl 1 | Reactor Vessel Water Level Probabilistic Risk Assessment |
ML20151J608 | 31 July 1997 | Summary of 970709 Meeting W/Westinghouse in Rockville,Md Re Discuss Design Certification Issues for AP600.List of Attendees & Handouts Encl | Safe Shutdown Ultimate heat sink Safe Shutdown Earthquake Fire Protection Program |
ML20151J650 | 31 July 1997 | Summary of 970723 Telcon W/W to Discuss 970709 Submittal of NSD-NRC-97-5227 Re Site Parameters.List of Attendees & Comments Prior to Telcon Encl | Safe Shutdown Safe Shutdown Earthquake Earthquake |
ML20197B909 | 6 March 1998 | Summary of 971218 Meeting W/Westinghouse in Rockville,Md Re Open Issues Remaining on Analyses of Radiological Consequences of Design Basis Accidents for AP600 Design. List of Attendees & Handouts Provided at Meeting Encl | |
ML20198A186 | 18 December 1997 | Summary of 971117 Meeting W/Westinghouse in Rockville,Md Re Design Certification Schedule for AP600.List of Attendees & Handouts Provided During Meeting Encl | Safe Shutdown Coatings B.5.b Mitigating Strategies |
ML20198H542 | 11 September 1997 | Summary of 970828 Telcon W/W Re Proposed Design Changes to AP600 MCR Habitability Sys.List of Participants & Preliminary Sketch of Modified Design & Associated Temperature Response Encl | Loop seal Grab sample |
ML20198H562 | 7 January 1998 | Summary of 971218 Meeting W/Westinghouse in Rockville,Md to Discuss Design Certification Schedule for AP600 Review | Coatings |
ML20198Q147 | 13 January 1998 | Summary of 971104 Meeting W/Westinghouse in Rockville,Md Re AP600 Nuclear Island Basemat Design,Configuration of Shear Stirrups & Shear Capacity of Deep Slabs.List of Attendees & Handouts Encl | |
ML20198R660 | 30 October 1997 | Summary of 971109 Telcon W/Westinghouse to Discuss RAI Responses Related to TS & Sys Level Testing | Squib |
ML20198R926 | 30 October 1997 | Summary of 971009 Meeting W/Westinghouse in Rockville,Md Re Design Certification Schedule for AP600.List of Attendees & Handouts Encl | Safe Shutdown |
ML20199B121 | 6 November 1997 | Summary of 971029 Meeting W/Westinghouse in Rockville,Md to Discuss Problems & Progress Affecting AP600 Review Schedule. List of Attendees Encl | |
ML20203A899 | 11 February 1998 | Summary of 980120 & 21 Meeting W/Westinghouse to Discuss AP600 Structural Calculations to Resolve FSER Open Items. List of Participants & Handouts Encl | |
ML20203H869 | 19 February 1998 | Summary of 980211 Meeting W/W in Rockville,Md Re W Opportunity to Respond to NRC Insp Rept 99900404/97-02,dtd 980128.List of Attendees & Meeting Handouts Encl | |
ML20206S252 | 14 May 1998 | Summary of 451st ACRS Meeting on 980402-04 in Rockville,Md Re Items Listed in Attached Agenda | Probabilistic Risk Assessment |
ML20206S265 | 23 February 1998 | Summary of 980203-04 ACRS Subcommittee on Advanced Reactor Designs Open Meeting in Rockville,Md Re Review of Chapters 1,4,5,7,8,11,13 & 18 of AP600 Ssar & AP600 Test & Analysis Program | Safe Shutdown Loop seal Coatings |
ML20206S336 | 22 June 1998 | Summary of 980611-12 Open ACRS Thermal Hydraulic & Severe Accident Phenomena Subcommittee Meeting in Rockville,Md Re Continuance of Review of Results of W Test & Analysis Program in Support of AP600 Design Certification | |
ML20206S350 | 26 June 1998 | Summary of 980617-18 ACRS Advanced Reactor Designs Subcommittee Meeting in Rockville,Md Re Review of Advance FSER Chapters 4,5,7,8,11,13 & 18,level 1 AP600 Pra,Itaac & Associated ACRS Open Questions | Probabilistic Risk Assessment Squib |
ML20206S372 | 29 July 1998 | Summary of 980707 ACRS Advanced Reactor Designs Subcommittee Meeting in Rockville,Md Re Info on AP600 Test & Analysis Program & Responses to ACRS Questions Asked During Previous Meetings | Safe Shutdown Probabilistic Risk Assessment |
ML20206S567 | 30 May 1998 | Summary of ACRS Advanced Reactor Designs Subcommittee 980513-15 Meeting in Rockville,Md Re Review of AP600 Standard SAR & Associated Advanced FSER Chapters 3,6,14,16 & 17 | Probabilistic Risk Assessment Squib |
ML20206S683 | 1 September 1998 | Summary of 453rd ACRS Meeting on 980603-05 in Rockville,Md Re Appropriate Action on Items Listed in Attached Agenda | Fire Barrier Anticipated operational occurrence Probabilistic Risk Assessment Backfit |
ML20210M736 | 19 August 1997 | Summary of 970807 Meeting W/W in Rockville,Maryland Re AP600 MCR Habitability Sys Operational Parameters of Air Flow rates,CO2 Levels,Temperature & Humidity Needed to Establish Personnel Habitability of Design | |
ML20210Q122 | 22 August 1997 | Summary of 970807 Meeting W/Westinghouse Re Proposed Containment Spray Design for AP600 Design.List of Attendees & Slides Encl | |
ML20210Q756 | 22 August 1997 | Summary of 970808 Meeting W/Westinghouse Electric Corp in Monroeville,Pa Re Fire Protection Issues for AP600 Design. List of Attendees,Agenda & Slides Presented by Westinghouse Encl | Hot Short Safe Shutdown Mission time Fire Barrier Probabilistic Risk Assessment |
ML20210Q764 | 28 August 1997 | Summary of 970826 Telcon W/Westinghouse Re AP600 Emergency Response Guidelines.Summary of Actions from Telcon Listed. List of Telcon Participants Encl |