ML06174011522 June 2006NRC Staff Answer Opposing Massachusetts Attorney General'S Request for Hearing and Petition for Leave to Intervene and Petition for BackfitAging Management
License Renewal
Earthquake
Fuel cladding
Backfit
Affidavit
ML06174034616 June 2006Pilgrim- Request of the Town of Plymouth to Participate as of Right Under 2.315(c)Backfit
ML06174034916 June 2006Pilgrim - Letter from D. Curran to Judge Young Providing Recent Decision by U.S. Court of Appeals for the Ninth CircuitProbabilistic Risk Assessment
Earthquake
ML06178012516 June 2006Pilgrim - Email from S. Hollis to Judge Young Participation in Pilgrim Proceeding and Notice of Appearance
ML06178061322 June 2006Entergy'S Answer to Vermont Department of Public Service Notice of Intention to Participate and Petition to InterveneSafe Shutdown
Aging Management
License Renewal
ML06178061622 June 2006Entergy'S Answer to the Massachusetts Attorney General'S Request for a Hearing, Petition for Leave to Intervene, and Petition for Backfit OrderAging Management
Design basis earthquake
License Renewal
Earthquake
Fuel cladding
Backfit
ML06178061922 June 2006Entergy'S Answer to New England Coalition'S Petition for Leave to Intervene, Request for Hearing, and Contentions, with Attachments 1 - 3Non-Destructive Examination
Grab sample
Coatings
Incorporated by reference
Aging Management
Seismically rugged
Moisture barrier
License Renewal
Flow Induced Vibration
Power Uprate
ML06178063416 June 2006Pilgrim - Unopposed Motion for Extension of Time to Reply to NRC Staff Response to Hearing Request, Filed by D. Curran, Counsel for Massachusetts Attorney General
ML06179013422 June 2006Pilgrim - Entergy'S Answer to Massachusetts Attorney General'S Request for a Hearing, Petition for Leave to Intervene, and Petition for Backfit OrderAging Management
Design basis earthquake
License Renewal
Earthquake
Fuel cladding
Backfit
ML06184021626 June 2006Pilgrim - Entergy'S Answer to the Request for Hearing and Petition to Intervene by Pilgrim Watch and Notice of Adoption of ContentionCondition Adverse to Quality
Aging Management
Design basis earthquake
License Renewal
Earthquake
Chernobyl
Fuel cladding
Backfit
Siren
ML06187022529 June 2006Pilgrim - Massachusett'S Attorney General'S Reply to Entergy'S and NRC Staff'S Responses to Hearing Request and Petition to InterveneProbabilistic Risk Assessment
Incorporated by reference
Design basis earthquake
License Renewal
Earthquake
Fuel cladding
Backfit
Affidavit
ML06187049729 June 2006New England Coalition, Inc.'S Reply to Entergy and NRC Staff Answers to Petition for Leave to Intervene, Request for Hearing, and Contentions, with Exhibits 1 and 2Coatings
Aging Management
Turbine Missile
ML06188019930 June 20062006/06/30-Massachusett's Attorney General'S Reply to Entergy'S and NRC Staff'S Responses to Hearing Request and Petition to Intervene with Respect to Vermont Yankee License Renewal ProceedingProbabilistic Risk Assessment
Incorporated by reference
Design basis earthquake
License Renewal
Earthquake
Fuel cladding
Backfit
Affidavit
ML0619301616 July 2006Letter from Sarah Hofmann to Administrative Judges Enclosing a Corrected Copy of the Vermont Department of Public Service Reply to Answers of Applicant and NRC Staff to Notice of Intention to Participate in Petition and InterveneFire Barrier
Coatings
Aging Management
Moisture barrier
Fuel cladding
ML06208017121 July 2006Pilgrim - Massachusetts Attorney General'S Brief Regarding Relevance to This Proceeding of Regulatory Guide'S Definition of New and Significant Information.License Renewal
Backfit
ML06208058921 July 2006Pilgrim - Entergy'S Brief on New and Significant Information in Response to Licensing Board Order of July 14, 2006Tornado Missile
Design basis earthquake
License Renewal
Fuel cladding
Environment Report
Backfit
ML06213044626 July 2006Pilgrim - Massachusetts Attorney General'S Reply Brief Regarding Relevance to This Proceeding of Regulatory Guide'S Definition of New and Significant Information.License Renewal
Earthquake
Backfit
ML06215052728 July 20062006/07/28-Letter from David R. Lewis to Administrative Judges Enclosing Two Documents Relevant to Proposed Contentions in the Vermont Yankee License Renewal ProceedingGrab sample
Fire Barrier
Aging Management
Moisture barrier
License Renewal
Fire Protection Program
Dissimilar Metal Weld
Power Uprate
ML0621604413 July 2006Pilgrim - Pilgrim Watch Reply to Nrc'S and Entergy'S Answers to Notice of Adoption of Contention by Pilgrim WatchBackfit
ML0621604493 July 2006Pilgrim - Pilgrim Watch Reply to Entergy Answer to Request for Hearing and Petition to Intervene by Pilgrim WatchAging Management
ML0622101004 August 2006Pilgrim - Massachusetts Attorney General'S Motion for Disqualification of Judge Nicholas Trikouros
ML0622705827 August 2006Nec'S Late Contention or, Alternatively, Request for Leave to Amend or File a New Contention
ML06229046817 August 2006Vermont Yankee - NRC Staff Answer Opposing Nec'S Late Contention, or Alternatively, Request for Leave to Amend or File a New ContentionIncorporated by reference
ML06230007110 August 2006New England Coalition'S Notice of Withdrawal of Its Contention Regarding Inadequate Analysis of the Vermont Yankee Alternate Cooling System Performance Under Conditions of Extended Power Uprate
ML06234009814 August 2006Pilgrim- Entergy'S Response to Motions for Disqualification of Judge Nicholas TrikourosBackfit
ML06235013817 August 2006Entergy'S Answer to New England Coalition'S Late Contention
ML06244003625 August 2006New England Coalition Inc.'S (NEC) Reply to Entergy and NRC Staff Answers to Nec'S Late Contention, or Alternatively, Request for Leave to Amend or File a New Contention
ML06312006230 October 2006State of New Hampshire'S Notice of Intent to Participate as Interested State
ML0631700523 November 2006Pilgrim - Town of Duxbury Request and Notice of Intent to Participate in HearingAging Management
ML0631903116 November 2006Pilgrim - Notice of the Town of Plymouth of Participation in Certain ContentionsAging Management
ML0634803758 December 2006Pilgrim- Entergy'S Comments on Proposed Schedule
ML0707301916 March 2007Pilgrim - Letter to Judge Cole from S. Uttal, OGC Providing (Cd) Version of Safety Evaluation Report with Open Items
ML07080021715 March 2007Pilgrim - Entergy'S Third Supplemental Disclosure
ML07117026016 April 2007Pilgrim - Entergy'S Fourth Supplemental Disclosure
ML07117026718 April 2007Pilgrim - Second Disclosure Statement by Pilgrim Watch
ML07150029924 May 2007Pilgrim - Entergy'S Opposition to Pilgrim Watch Request to Extend Time to Respond to Summary Disposition of Pilgrim Watch Contention 3
ML07152016822 May 2007Pilgrim - Notice of Appearance of Mary Elizabeth Lampert
ML0716303955 June 2007Pilgrim - Entergy'S Sixth Supplemental Disclosure
ML07180005928 June 2007Pilgrim - NRC Staff Response to Entergy'S Motion for Summary Disposition of Pilgrim Watch Contention 1Aging Management
ML07184056829 June 2007Pilgrim - Pilgrim Watch'S Answer Opposing Entergy'S Motion for Summary Disposition of Pilgrim Watch Contention 3License Renewal
Chernobyl
Backfit
Siren
Affidavit
ML0719201915 July 2007New England Coalition, Inc.'S Third Supplemental Disclosure Pursuant to 10 C.F.R. 2.336
ML0719202565 July 2007Entergy'S Eighth Supplemental Disclosure
ML07205014517 July 2007Pilgrim - Pilgrim Watch'S Answer Opposing Entergy'S Motion to Strike Portions of Pilgrim Watch'S Answer Opposing Entergy'S Motion for Summary Disposition of Pilgrim Watch Contention 3Probabilistic Risk Assessment
Backfit
ML07213022526 July 2007Pilgrim - Pilgrim Watch'S Answer Opposing NRC Staff'S Support of Entergy'S Motion to Strike Portions of Pilgrim Watch'S Answer Opposing Entergy'S Motion for Summary Disposition of Contention 3Probabilistic Risk Assessment
Backfit
ML07219019130 July 2007Pilgrim Watch'S Answer Opposing NRC Staff'S Motion Requesting That Pilgrim Watch'S Answer Opposing NRC Staff Support of Entergy'S Motion to Strike Pilgrim Watch'S Answer to Entergy'S Summary Disposition Motion Not Be Considered by the Board
ML0725309004 September 2007New England Coalition, Inc.'S (NEC) Motion to File a Timely New or Amended ContentionUnanalyzed Condition
Weld Overlay
Hydrostatic
Finite Element Analysis
Aging Management
Dissimilar Metal Weld
ML07262054018 September 2007Motion to Intervene of Local 369, Utility Workers Union of America, AFL-CIO
ML07269015920 September 2007Entergy Nuclear Operations Inc. Answer Opposing Intervention Petition of Local 369, Utility Workers Union of America, AFL-CIO
ML0728905719 October 2007New England Coalition, Inc.'S (NEC) Reply to Entergy'S Answer to Nec'S Motion to File a Timely New or Amended Contention