Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML061740115 | 22 June 2006 | NRC Staff Answer Opposing Massachusetts Attorney General'S Request for Hearing and Petition for Leave to Intervene and Petition for Backfit | Aging Management License Renewal Earthquake Fuel cladding Backfit Affidavit |
ML061740346 | 16 June 2006 | Pilgrim- Request of the Town of Plymouth to Participate as of Right Under 2.315(c) | Backfit |
ML061740349 | 16 June 2006 | Pilgrim - Letter from D. Curran to Judge Young Providing Recent Decision by U.S. Court of Appeals for the Ninth Circuit | Probabilistic Risk Assessment Earthquake |
ML061780125 | 16 June 2006 | Pilgrim - Email from S. Hollis to Judge Young Participation in Pilgrim Proceeding and Notice of Appearance | |
ML061780613 | 22 June 2006 | Entergy'S Answer to Vermont Department of Public Service Notice of Intention to Participate and Petition to Intervene | Safe Shutdown Aging Management License Renewal |
ML061780616 | 22 June 2006 | Entergy'S Answer to the Massachusetts Attorney General'S Request for a Hearing, Petition for Leave to Intervene, and Petition for Backfit Order | Aging Management Design basis earthquake License Renewal Earthquake Fuel cladding Backfit |
ML061780619 | 22 June 2006 | Entergy'S Answer to New England Coalition'S Petition for Leave to Intervene, Request for Hearing, and Contentions, with Attachments 1 - 3 | Non-Destructive Examination Grab sample Coatings Incorporated by reference Aging Management Seismically rugged Moisture barrier License Renewal Flow Induced Vibration Power Uprate |
ML061780634 | 16 June 2006 | Pilgrim - Unopposed Motion for Extension of Time to Reply to NRC Staff Response to Hearing Request, Filed by D. Curran, Counsel for Massachusetts Attorney General | |
ML061790134 | 22 June 2006 | Pilgrim - Entergy'S Answer to Massachusetts Attorney General'S Request for a Hearing, Petition for Leave to Intervene, and Petition for Backfit Order | Aging Management Design basis earthquake License Renewal Earthquake Fuel cladding Backfit |
ML061840216 | 26 June 2006 | Pilgrim - Entergy'S Answer to the Request for Hearing and Petition to Intervene by Pilgrim Watch and Notice of Adoption of Contention | Condition Adverse to Quality Aging Management Design basis earthquake License Renewal Earthquake Chernobyl Fuel cladding Backfit Siren |
ML061870225 | 29 June 2006 | Pilgrim - Massachusett'S Attorney General'S Reply to Entergy'S and NRC Staff'S Responses to Hearing Request and Petition to Intervene | Probabilistic Risk Assessment Incorporated by reference Design basis earthquake License Renewal Earthquake Fuel cladding Backfit Affidavit |
ML061870497 | 29 June 2006 | New England Coalition, Inc.'S Reply to Entergy and NRC Staff Answers to Petition for Leave to Intervene, Request for Hearing, and Contentions, with Exhibits 1 and 2 | Coatings Aging Management Turbine Missile |
ML061880199 | 30 June 2006 | 2006/06/30-Massachusett's Attorney General'S Reply to Entergy'S and NRC Staff'S Responses to Hearing Request and Petition to Intervene with Respect to Vermont Yankee License Renewal Proceeding | Probabilistic Risk Assessment Incorporated by reference Design basis earthquake License Renewal Earthquake Fuel cladding Backfit Affidavit |
ML061930161 | 6 July 2006 | Letter from Sarah Hofmann to Administrative Judges Enclosing a Corrected Copy of the Vermont Department of Public Service Reply to Answers of Applicant and NRC Staff to Notice of Intention to Participate in Petition and Intervene | Fire Barrier Coatings Aging Management Moisture barrier Fuel cladding |
ML062080171 | 21 July 2006 | Pilgrim - Massachusetts Attorney General'S Brief Regarding Relevance to This Proceeding of Regulatory Guide'S Definition of New and Significant Information. | License Renewal Backfit |
ML062080589 | 21 July 2006 | Pilgrim - Entergy'S Brief on New and Significant Information in Response to Licensing Board Order of July 14, 2006 | Tornado Missile Design basis earthquake License Renewal Fuel cladding Environment Report Backfit |
ML062130446 | 26 July 2006 | Pilgrim - Massachusetts Attorney General'S Reply Brief Regarding Relevance to This Proceeding of Regulatory Guide'S Definition of New and Significant Information. | License Renewal Earthquake Backfit |
ML062150527 | 28 July 2006 | 2006/07/28-Letter from David R. Lewis to Administrative Judges Enclosing Two Documents Relevant to Proposed Contentions in the Vermont Yankee License Renewal Proceeding | Grab sample Fire Barrier Aging Management Moisture barrier License Renewal Fire Protection Program Dissimilar Metal Weld Power Uprate |
ML062160441 | 3 July 2006 | Pilgrim - Pilgrim Watch Reply to Nrc'S and Entergy'S Answers to Notice of Adoption of Contention by Pilgrim Watch | Backfit |
ML062160449 | 3 July 2006 | Pilgrim - Pilgrim Watch Reply to Entergy Answer to Request for Hearing and Petition to Intervene by Pilgrim Watch | Aging Management |
ML062210100 | 4 August 2006 | Pilgrim - Massachusetts Attorney General'S Motion for Disqualification of Judge Nicholas Trikouros | |
ML062270582 | 7 August 2006 | Nec'S Late Contention or, Alternatively, Request for Leave to Amend or File a New Contention | |
ML062290468 | 17 August 2006 | Vermont Yankee - NRC Staff Answer Opposing Nec'S Late Contention, or Alternatively, Request for Leave to Amend or File a New Contention | Incorporated by reference |
ML062300071 | 10 August 2006 | New England Coalition'S Notice of Withdrawal of Its Contention Regarding Inadequate Analysis of the Vermont Yankee Alternate Cooling System Performance Under Conditions of Extended Power Uprate | |
ML062340098 | 14 August 2006 | Pilgrim- Entergy'S Response to Motions for Disqualification of Judge Nicholas Trikouros | Backfit |
ML062350138 | 17 August 2006 | Entergy'S Answer to New England Coalition'S Late Contention | |
ML062440036 | 25 August 2006 | New England Coalition Inc.'S (NEC) Reply to Entergy and NRC Staff Answers to Nec'S Late Contention, or Alternatively, Request for Leave to Amend or File a New Contention | |
ML063120062 | 30 October 2006 | State of New Hampshire'S Notice of Intent to Participate as Interested State | |
ML063170052 | 3 November 2006 | Pilgrim - Town of Duxbury Request and Notice of Intent to Participate in Hearing | Aging Management |
ML063190311 | 6 November 2006 | Pilgrim - Notice of the Town of Plymouth of Participation in Certain Contentions | Aging Management |
ML063480375 | 8 December 2006 | Pilgrim- Entergy'S Comments on Proposed Schedule | |
ML070730191 | 6 March 2007 | Pilgrim - Letter to Judge Cole from S. Uttal, OGC Providing (Cd) Version of Safety Evaluation Report with Open Items | |
ML070800217 | 15 March 2007 | Pilgrim - Entergy'S Third Supplemental Disclosure | |
ML071170260 | 16 April 2007 | Pilgrim - Entergy'S Fourth Supplemental Disclosure | |
ML071170267 | 18 April 2007 | Pilgrim - Second Disclosure Statement by Pilgrim Watch | |
ML071500299 | 24 May 2007 | Pilgrim - Entergy'S Opposition to Pilgrim Watch Request to Extend Time to Respond to Summary Disposition of Pilgrim Watch Contention 3 | |
ML071520168 | 22 May 2007 | Pilgrim - Notice of Appearance of Mary Elizabeth Lampert | |
ML071630395 | 5 June 2007 | Pilgrim - Entergy'S Sixth Supplemental Disclosure | |
ML071800059 | 28 June 2007 | Pilgrim - NRC Staff Response to Entergy'S Motion for Summary Disposition of Pilgrim Watch Contention 1 | Aging Management |
ML071840568 | 29 June 2007 | Pilgrim - Pilgrim Watch'S Answer Opposing Entergy'S Motion for Summary Disposition of Pilgrim Watch Contention 3 | License Renewal Chernobyl Backfit Siren Affidavit |
ML071920191 | 5 July 2007 | New England Coalition, Inc.'S Third Supplemental Disclosure Pursuant to 10 C.F.R. 2.336 | |
ML071920256 | 5 July 2007 | Entergy'S Eighth Supplemental Disclosure | |
ML072050145 | 17 July 2007 | Pilgrim - Pilgrim Watch'S Answer Opposing Entergy'S Motion to Strike Portions of Pilgrim Watch'S Answer Opposing Entergy'S Motion for Summary Disposition of Pilgrim Watch Contention 3 | Probabilistic Risk Assessment Backfit |
ML072130225 | 26 July 2007 | Pilgrim - Pilgrim Watch'S Answer Opposing NRC Staff'S Support of Entergy'S Motion to Strike Portions of Pilgrim Watch'S Answer Opposing Entergy'S Motion for Summary Disposition of Contention 3 | Probabilistic Risk Assessment Backfit |
ML072190191 | 30 July 2007 | Pilgrim Watch'S Answer Opposing NRC Staff'S Motion Requesting That Pilgrim Watch'S Answer Opposing NRC Staff Support of Entergy'S Motion to Strike Pilgrim Watch'S Answer to Entergy'S Summary Disposition Motion Not Be Considered by the Board | |
ML072530900 | 4 September 2007 | New England Coalition, Inc.'S (NEC) Motion to File a Timely New or Amended Contention | Unanalyzed Condition Weld Overlay Hydrostatic Finite Element Analysis Aging Management Dissimilar Metal Weld |
ML072620540 | 18 September 2007 | Motion to Intervene of Local 369, Utility Workers Union of America, AFL-CIO | |
ML072690159 | 20 September 2007 | Entergy Nuclear Operations Inc. Answer Opposing Intervention Petition of Local 369, Utility Workers Union of America, AFL-CIO | |
ML072890571 | 9 October 2007 | New England Coalition, Inc.'S (NEC) Reply to Entergy'S Answer to Nec'S Motion to File a Timely New or Amended Contention | |
ML073540373 | 14 December 2007 | Entergy'S Eighth Supplemental Disclosure |