Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML19210E614 | 29 November 1979 | Forwards Amend 101,Revision 8 to Industrial Security Plan. Plan Withheld (Ref 10CFR2.790) | |
ML19210E625 | 2 November 1979 | Responds to NRC 791002 Ltr Re Violations Noted in IE Insp Repts 50-546/79-09 & 50-547/79-09.Corrective Actions:All Nuclear safety-related Const Stopped.Organization & Procedures Being re-evaluated | |
ML19210E903 | 6 November 1979 | Comments on House Testimony Re Difficulty in Evacuation of Large Population Ctrs in Event of Nuclear Accident.Facility Should Be Considered for Shutdown,Due to Proximity to Louisville,Ky | |
ML19211A100 | 4 September 1979 | Submits Addl Items to Be Considered in Review of 790629 Request for Suspension or Revocation of Cps.Requests Hearing | |
ML19211A281 | 13 December 1979 | Forwards Comments on Proposed Revision 2 to Reg Guide 1.97. Guide Should Allow ex-containment,post-accident Monitors on Plants Having Secondary Containment Bldgs.Util Will Attend 791214 Meeting | |
ML19211A949 | 14 December 1979 | Forwards Appeal Re NRC Review of Director'S Decision Under 10CFR2.206 | |
ML19211C577 | 24 October 1979 | Requests Response to 791009 Ltr Re Concerns About Facility Const Problems | |
ML19211C793 | 16 October 1979 | Forwards Gw Geisen 790913 Ltr Re Proximity of Facility to Blasting Activities in Proposed Limestone Operations. Requests Comments | Hydrostatic |
ML19211D152 | 11 January 1980 | Forwards Amend 102 to FSAR | |
ML19211D274 | 7 January 1980 | Requests NRC Approval of Surface Water Intake for Radiological Monitoring Program.Louisville Water Co 791204 Ltr Identifies Be Payne Water Treatment Plant on Oh River as Location to Conduct Preoperational Monitoring | |
ML19224C634 | 8 June 1979 | Forwards Applicant Testimony Re Contentions 14,15 & 16 Concerning Cable Trays,Mfg of Control Rods & Control Rod Seals.Prof Qualifications of Ww Schwiers,Fl Banta & Vw Pence Encl | Incorporated by reference |
ML19224C916 | 25 May 1979 | Responds to IE Bulletin 79-04.No 1500 Psi pressure-rated Velan Swing Check Valves Installed or Scheduled to Be Installed | |
ML19224D045 | 29 June 1979 | Requests Suspension & Revocation of Facility CP & Reopening of Safety Hearings | |
ML19224D052 | 29 June 1979 | Notifies of RO on 790601:possible Damage to Unit 1 Containment Liner.Visual Insp Indicates Deformation in Liner at Bottom of Pour.Demension Measurements Taken by Chicago Bridge & Iron | |
ML19224D284 | 24 May 1979 | Ack Unofficial Granting of Extension Requested in 790503 Ltr.Response to IE Bulletin 79-03 Is Now Due 120 Days After 790511 | |
ML19224D479 | 10 May 1979 | Requests Limited Appearance at Hearing Scheduled for 790522 Re Licensing of Facility | |
ML19224D563 | 5 July 1979 | Interim Deficiency Rept Re Concrete Void Discovered on 790604 in Auxiliary Bldg Slab.New Repair Procedures Have Been Approved But Not Yet Performed.Final Rept Will Follow | |
ML19224D572 | 6 July 1979 | Updates Status of 790608 RO 1 & RO 2,in Response to NRC 790626 Ltr.Ro 2 Is Voided.Further Infor Re RO 1 Welding Qualifications to Be Sent 790801 | |
ML19224D616 | 25 May 1979 | Forwards Documentation & Info in Response to IE Bulletins 78-12,12A & 12B Re Atypical Weld Matl in Reactor Pressure Vessel Welds.Ge Investigation Concludes Identified Weld Deposits Unlikely | |
ML19224D621 | 24 April 1979 | Forwards Rept Re IE Bulletins 79-12 & 12A.W/o Encl | |
ML19225A417 | 25 May 1979 | Responds to IE Bulletin 79-07 Re Seismic Analysis of safety-related Piping.Forwards Sargent & Lundy 790518 Ltr Re Bulletin.Facility Seismic Analysis Programs Do Not Employ Algebraic Techniques Described in Bulletin | |
ML19225A556 | 6 July 1979 | Final Deficiency Rept Re Socket Welded Fittings in Unit 1 Rcs.Caused by Lack of Procedural Controls Over Fabrication & Installation of Pipe Lines.Lines Removed & Refabricated | |
ML19225B080 | 19 July 1979 | Forwards Certificate of Svc of FSAR Revision 59 | |
ML19241A821 | 6 June 1979 | Responds to IE Bulletin 79-07.Identified Computer Codes Not Used for Seismic Analysis of GE Piping Sys | |
ML19241A914 | 14 May 1979 | Forwards Cincinnati Gas & Electric Objections to Certain of Intervenor Miami Valley Power Project 790420 Third Set of Interrogatories & Cincinnati Gas Motion for Protective Order.Responses to Remaining Questions Will Be Forwarded | |
ML19241A964 | 11 December 1978 | Comments on Consequences of in-depth Investigation in Response to Jg Keppler 781204 Ltr Re Allegations Concerning Cable Trays.Affidavit & Certificate of Svc Encl | |
ML19241B412 | 13 July 1979 | Forwards Revision 59 to Fsar,Consisting of Responses to Second Round Questions,Submitted as Amend 94 to OL Application | |
ML19241B965 | 22 June 1979 | FOIA Request for All Submitted Info Re Const or Operation of Plant | |
ML19241C224 | 13 July 1979 | Forwards Revision 13 to Fire Protection Evaluation Rept, Consisting of Three Revised Pages & Supplemental Rept, Fire Protective Cable Tray Fire Test | Safe Shutdown Fire Barrier |
ML19242A646 | 27 July 1979 | Responds to 790605 Ltr Transmitting Draft Nonradiological Ets.Draft of Environ Program Procedures Document Will Be Submitted for Review by 790914 | |
ML19242A720 | 21 June 1979 | Responds to NRC 790516 Ltr Re Violations Noted in IE Insp Rept 50-358/79-06.Corrective Actions:Faulty HPCS & LPCS Equipment Being Modified & Insp Procedures Being Revised. Compliance Will Be Achieved by 790629 | |
ML19242B434 | 2 July 1979 | Responds to IE Bulletins 79-12,12A & 12B.Weld Matl Data & Other Relevant Info Included in C-E Generic Rept, Atypical Weld Matl in Reactor Pressure Vessel Welds, Sent to NRC on 790608 | |
ML19242B453 | 28 June 1979 | Responds to IE Bulletin 79-04.Identifies Three Sets of Velan Globe Valves That Showed Incorrect Weights.Will Perform Formal Piping Analysis | |
ML19242C582 | 29 May 1979 | Responds to IE Bulletin 79-04.Referenced Velan Valves Are Not Used in Category I Piping | |
ML19242D471 | 5 July 1979 | Expresses Concern Re Cement Pouring Problems at Facility. Suggests Complete Investigation | |
ML19242D488 | 10 July 1979 | Press Release Re Series of Situations at Facility That Could Adversely Affect Health & Safety | |
ML19242D627 | 30 May 1979 | Submits Suggestions Re Need for More Operator Training in Handling Casualty conditions,in-plant Casualty Training During Refueling,& Utilization of Emergency Teams During Extreme Casualty Conditions | |
ML19246A972 | 25 May 1979 | Responds to IE Bulletins 78-12,12A & 12B.Assumes Response Date Will Be Moved to 790913 in Order to Provide Pressure Vessel Vendor Time to Submit Generic Rept | |
ML19246B018 | 18 May 1979 | Requests Hearing Appearance | |
ML19246B020 | 18 May 1979 | Requests to Make Limited Appearance Statement at 790523 Hearing | |
ML19246B432 | 16 April 1979 | Requests Briefing Be Arranged on 790501 or 02 Re Safe Operation of Nuclear Power Plants in Oh | |
ML19246B434 | 12 April 1979 | Requests Comments,In View of TMI Incident,Re Adequacy of Facility Staff Training,Safety & Emergency Procedures & Plant Design.Also Seeks Info Re Sys & Safety Reviews Planned for Facilities in Oh | |
ML19246B575 | 15 May 1979 | Forwards Affidavits of Pr Anderson,Am Hill,Wr Kelley, Wh Zimmer & RP Wiwi,Copies of Which Were Included W/Applicant 790423 Suppl Motion for Summary Disposition. Typographical Errors Corrected | |
ML19247A321 | 15 June 1979 | Responds to IE Bulletin 79-09.GE AK-2-50 Circuit Breakers Are Planned for Use in safety-related Sys as Battery Disconnect Circuit Breakers.Potential Failure Mode in IE Bulletin 79-09 Does Not Apply to Planned Use | |
ML19247A379 | 14 June 1979 | Expresses Concern Over Potentially Serious Const Deficiencies at Facilities.Requests NRC Intervention to Stop Const & Initiate Thorough & Comprehensive Investigation | |
ML19247A401 | 30 July 1979 | Forwards Amend 12 to Containment Design Assessment Rept. Amend Consists of App F, Containment Structure Assessment for LOCA Jet Impingement & Pool Swell Loads. | |
ML19247B865 | 20 July 1979 | Responds to IE Bulletin 79-11.Evaluation of Faulty Overcurrent Trip Devices in Circuit Breakers for Engineered Safety Sys Is Complete.No Westinghouse Type DB Circuit Breakers Are Currently in Use or Planned for Use | |
ML19248C820 | 24 May 1979 | Expresses Concern Re Nuclear Dangers.Opposes Westinghouse Export of Reactor to Philippines | |
ML19249A258 | 13 August 1979 | Expresses Concern Re Questionable Quality of Facility Const. Lists Problems & Suggests Issues to Be Examined Prior to Permitting Const to Resume.Doubts Facility Is Needed. Believes Licensee Shareholders Should Pay for Errors | |
ML19249A266 | 21 August 1979 | Requests Safety Hearings Be Reopened at Once,Cp Be Revoked & Congressional Investigation Initiated |