ML14167A298 | 2 April 2014 | Draft Outlines (Folder 2) | Reactor Vessel Water Level Locked High Radiation Area |
ML14167A312 | 7 May 2014 | NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2) | |
ML14167A323 | 5 May 2014 | NRC Comments on Draft Licensee-Developed Exam (Written) (Folder 2) | |
ML14167A368 | 2 April 2014 | Draft Written Exam (Folder 2) | Reactor Vessel Water Level Ultimate heat sink VT-2 Locked High Radiation Area Overtravel Fuel cladding Continuous fire watch Power change Unidentified leakage Unidentified leak |
ML14167A384 | 2 April 2014 | Draft Operating Exam (Sections a, B, and C) (Folder 2) | Half scram VT-2 Job Performance Measure Fire Watch |
ML14311A662 | 3 November 2014 | September 10, 2014, NRC Generic Fundamentals Examination Results - Oyster Creek Nuclear Generating Station Cover Letter | Generic Fundamentals Examination |
ML15016A146 | 4 June 2014 | Miscellaneous Exam Material (Folder 1) | |
ML15016A152 | 13 May 2014 | Final Outlines (Folder 3) | Reactor Vessel Water Level Locked High Radiation Area |
ML16026A581 | 26 January 2016 | Initial Operator Licensing Operating Test and Written Examination Approval - Oyster Creek Nuclear Generating Station | |
ML16064A171 | 10 February 2016 | Final Operating Exam (Sections a, B, and C) (Folder 3) | Half scram Stroke time Job Performance Measure Overtravel Earthquake Hardened vent |
ML16064A177 | 10 February 2016 | Final Written Examination with Answer Key (401-5 Format) (Folder 3) | Safe Shutdown Shutdown Margin Half scram Ultimate heat sink Grab sample Offsite Dose Calculation Manual Emergency Lighting Locked High Radiation Area Double blade guide Scram Discharge Volume Severe Accident Management Guideline Overtravel Control of Heavy Loads Offsite Circuit |
ML17018A282 | 17 January 2017 | Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2017 | Generic Fundamentals Examination |
ML17156A550 | 5 June 2017 | Requalification Program Inspection - Oyster Creek Nuclear Generating Station | |
ML17216A172 | 10 February 2016 | Draft Operating Exam (Sections a, B and C) (Folder 2) | Safe Shutdown Shutdown Margin Half scram Stroke time Time to boil Temporary Modification Job Performance Measure Surveillance Frequency Control Program Scram Discharge Volume Overtravel Earthquake Hardened vent Fuel cladding Power change Unidentified leakage Unidentified leak Failure to Scram |
ML17216A174 | 10 February 2016 | Draft Written Exam (Folder 2) | Safe Shutdown Shutdown Margin Half scram Ultimate heat sink Grab sample Offsite Dose Calculation Manual Emergency Lighting Locked High Radiation Area Double blade guide Scram Discharge Volume Severe Accident Management Guideline Overtravel Control of Heavy Loads Offsite Circuit |
ML17261B060 | 16 February 2016 | Final QA Related Forms (Folder 1) | Job Performance Measure |
ML17261B165 | 10 February 2016 | Final Outlines (Folder 3) | Shutdown Margin Hardened vent Offsite Circuit |
ML17261B167 | 10 February 2016 | Draft - Outlines (Folder 2) | Locked High Radiation Area Hardened vent Offsite Circuit |
ML17261B168 | 10 February 2016 | NRC Comments on Draft Licensee-Developed Exam (Written) (Folder 2) | |
ML17261B169 | 10 February 2016 | NRC Comments of Draft Licensee-Developed Exam (Operating) (Folder 2) | |
ML18005A420 | 3 January 2018 | Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 | Generic Fundamentals Examination |
RA-08-009, Draft - Outlines (Folder 2) (Facility Ltr. Dtd. - 01/16/08), Submittal of Initial Operator Licensing Examination Outline | 16 January 2008 | Draft - Outlines (Folder 2) (Facility Ltr. Dtd. - 01/16/08), Submittal of Initial Operator Licensing Examination Outline | Stroke time |
RS-09-109, Response to NRC Regulatory Issue Summary 2009-11, Preparation & Scheduling of Operator Licensing Exams. | 13 August 2009 | Response to NRC Regulatory Issue Summary 2009-11, Preparation & Scheduling of Operator Licensing Exams. | Generic Fundamentals Examination |
RS-12-114, (EGC) - Response to NRC Regulatory Issue Summary 2012-07, Preparation and Scheduling of Operator Licensing Examinations | 5 July 2012 | (EGC) - Response to NRC Regulatory Issue Summary 2012-07, Preparation and Scheduling of Operator Licensing Examinations | Generic Fundamentals Examination |
RS-16-156, Response to NRC Regulatory Issue Summary 2016-09, Preparation and Scheduling of Operator Licensing Examinations | 18 July 2016 | Response to NRC Regulatory Issue Summary 2016-09, Preparation and Scheduling of Operator Licensing Examinations | Generic Fundamentals Examination |
RS-17-070, Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations | 3 May 2017 | Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations | Generic Fundamentals Examination |