Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML19050A4035 February 2019Emergency Plan Procedure IPEC-EP-19-01, Rev. 23Safe Shutdown
Health Physics Network
High Radiation Area
Grab sample
Offsite Dose Calculation Manual
Cyber Security
FLEX
Pressure and Temperature Limits Report
Surveillance Frequency Control Program
Process Control Program
Severe Accident Management Guideline
Safeguards Contingency Plan
Earthquake
Maintenance Rule Program
Deep Dose Equivalent
Fuel cladding
Minimum staff
Fire Protection Program
Power change
Siren
ML19218A11117 July 2019IPEC Emergency Plan Implementing Procedures - Site Assembly, Accountability & Relocation of Personnel Offsite
ML19233A03612 August 2019Revision 14 to IP-EP-320, Radiological Field Monitoring
ML19281A8641 October 2019IPEC Emergency Plan Implementing ProceduresMet Tower
Deep Dose Equivalent
ML19284A7984 October 2019Entergy Corp., IPEC Emergency Planning Procedure, IP-EP-AD-13
ML19284A8018 October 2019IPEC IP-EP-AD13, Rev. 20, Emergency Action Level Technical Bases.Safe Shutdown
High winds
Reactor Vessel Water Level
High Radiation Area
Ultimate heat sink
Offsite Dose Calculation Manual
Internal Flooding
Operating Basis Earthquake
Safeguards Contingency Plan
Earthquake
Fuel cladding
Pressure Boundary Leakage
Recently irradiated fuel
Unidentified leakage
ML19289B1407 October 2019IPEC Emergency Plan Procedures IP-EP-120, Rev. 13, IP-EP-210, Rev. 25, IP-EP-AD13, Rev. 20, EP-IP-02, Rev. 24
ML20063H54720 February 2020IPEC Emergency Plan Implementing ProceduresSafe Shutdown
ML20066F4853 March 2020IP-EP-430, Revision 16, Site Assembly, Accountability & Relocation of Personnel Offsite
ML20070L9846 March 2020Emergency Plan Implementing Procedure IP-EP-260, Revision 11
ML20157A12814 May 2020IP-EP-510, Revision 8, Meteorological, Radiological, & Plant Data Acquisition SystemMet Tower
ML20188A22924 June 2020Rev. 4 to Emergency Plan Implementing Procedure IP-EP-350
ML20321A0053 November 2020Procedure Transmittals EP-19-0025, EP-19-0032, EP-20-0020, EP-20-0024, EP-20-0025Safe Shutdown
High Radiation Area
Ultimate heat sink
Offsite Dose Calculation Manual
Cyber Security
FLEX
Process Control Program
Severe Accident Management Guideline
Maintenance Rule Program
Minimum staff
Fire Protection Program
ML21144A10510 May 2021Emergency Plan Implementing Procedures. Includes IP-EP-AD1, Revision 8, IP-EP-AD6, Revision 36, IP-EP-AD40, Revision 14, IP-1055, Revision 20, IP-EP-120, Revision 15, IP-EP-210, Revision 28Safe Shutdown
Time of Discovery
Health Physics Network
High winds
High Radiation Area
Ultimate heat sink
Met Tower
Cyber Security
Emergency Lighting
Significance Determination Process
Earthquake
Pressure Boundary Leakage
Continuous fire watch
Fire Watch
Grace period
ML21144A19412 May 2021IPEC Emergency Plan (PSEP)Safe Shutdown
Health Physics Network
High Radiation Area
Grab sample
Offsite Dose Calculation Manual
Cyber Security
FLEX
Process Control Program
Safeguards Contingency Plan
Earthquake
Deep Dose Equivalent
Fuel cladding
Minimum staff
Fire Protection Program
Power change
Siren
ML21145A07317 May 2021Emergency Plan Implementing Procedures. Includes IP-EP-240, Revision 8, IP-EP-241, Revision 7, IP-EP-251, Revision 8, IP-EP-260, Revision 12, IP-EP-270, Revision 3, IP-EP-310, Revision 21, IP-EP-320, Revision 15, IP-EP-330, Revision 12Fitness for Duty
Met Tower
Deep Dose Equivalent
ML22242A13230 August 2022Submittal of Emergency Plan Document ChangeSafe Shutdown
High Radiation Area
Severe Accident Management Guideline
Minimum staff
Fire Protection Program
ML99363006216 December 1999Revised Appendix D to Emergency Procedure Document Indian Point Units 1 and 2 Implementation Procedures Appendices
NL-02-068, Transmittal of Revised Emergency Plan Implementing Procedures TOC (Revised 04/11/2002), IP-1023 (Revision 18), IP-1027 (Revision 16) & IP-1050 (Revision 3) for Indian Point Nuclear Generating Station7 May 2002Transmittal of Revised Emergency Plan Implementing Procedures TOC (Revised 04/11/2002), IP-1023 (Revision 18), IP-1027 (Revision 16) & IP-1050 (Revision 3) for Indian Point Nuclear Generating StationFitness for Duty
NL-11-065, 2-ECA-0.0, Rev. 7, Loss of All AC Power.29 April 20112-ECA-0.0, Rev. 7, Loss of All AC Power.
NL-11-065, 3-ECA-0.0, Rev. 5, Loss of All AC Power.4 May 20113-ECA-0.0, Rev. 5, Loss of All AC Power.Safe Shutdown
Boric Acid
NL-11-065, Indian Point, Units 2 & 3, NEI 99-01, Revision 5, Methodology for Development of Emergency Action Levels, February 2008.27 May 2011Indian Point, Units 2 & 3, NEI 99-01, Revision 5, Methodology for Development of Emergency Action Levels, February 2008.
NL-12-025, Supplement to Response to Request for Additional Information Regarding Emergency Action Level Changes16 March 2012Supplement to Response to Request for Additional Information Regarding Emergency Action Level ChangesSafe Shutdown
High winds
Reactor Vessel Water Level
High Radiation Area
Ultimate heat sink
Offsite Dose Calculation Manual
Internal Flooding
Probabilistic Risk Assessment
Operating Basis Earthquake
Safeguards Contingency Plan
Earthquake
Fuel cladding
Pressure Boundary Leakage
Recently irradiated fuel
Power change
Unidentified leakage
NL-14-132, Response to 03/12/2012, Request for Information Pursuant to Title 10 of the Code of Federal Regulation 50.54(f) Regarding Recommendations of the Near-Term Task Force (NTTF) Review of Insights from the Fukushima Dia-ichi.3 November 2014Response to 03/12/2012, Request for Information Pursuant to Title 10 of the Code of Federal Regulation 50.54(f) Regarding Recommendations of the Near-Term Task Force (NTTF) Review of Insights from the Fukushima Dia-ichi.Safe Shutdown
High Radiation Area
Ultimate heat sink
FLEX
Fukushima Dai-Ichi
Severe Accident Management Guideline
NL-15-154, Submittal of Emergency Plan Document Change,15 December 2015Submittal of Emergency Plan Document Change,Safe Shutdown
High Radiation Area
Severe Accident Management Guideline
Minimum staff
NL-16-028, Submittal of Corporate Emergency Planning Procedures, Including Revision 2 to EN-EP-609, Revision 2 to EN-EP-610, and Revision 2 to EN-EP-61124 February 2016Submittal of Corporate Emergency Planning Procedures, Including Revision 2 to EN-EP-609, Revision 2 to EN-EP-610, and Revision 2 to EN-EP-611Fitness for Duty
Health Physics Network
FLEX
Severe Accident Management Guideline
NL-19-019, On-Shift Staffing Analysis, Revision 19-01 and Evaluation7 February 2019On-Shift Staffing Analysis, Revision 19-01 and EvaluationSafe Shutdown
High Radiation Area
Severe Accident Management Guideline
Minimum staff