Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
CNRO-2009-00006, Entergy Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(e) Notification of Application of Approved Appendix B to 10CFR72 Subpart G13 April 2009Entergy Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(e) Notification of Application of Approved Appendix B to 10CFR72 Subpart GSafe Shutdown
Non-Destructive Examination
Coatings
Temporary Modification
Process Control Program
Fire Protection Program
Grace period
ENOC-09-00009, Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions27 April 2009Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour RestrictionsSafe Shutdown
Fitness for Duty
ENOC-09-00015, Request for Extension of Orders Approving Transfer of Control of Licenses15 May 2009Request for Extension of Orders Approving Transfer of Control of Licenses
ENOC-09-00021, Units 1, 2 & 3; James A. FitzPatrick; Vermont Yankee; Palisades; and Big Rock Point - Request for Extension of Orders Approving Transfer of Control of Licenses29 May 2009Units 1, 2 & 3; James A. FitzPatrick; Vermont Yankee; Palisades; and Big Rock Point - Request for Extension of Orders Approving Transfer of Control of Licenses
IR 05000255/200900214 May 2009IR 05000255-09-002, on 01/01/2009 - 3/31/2009, Palisades Nuclear Plant; Integrated Inspection Report, Problem Identification and Resolution, Other ActivitiesBoric Acid
Loop seal
High Radiation Area
Water Inventory Control
Internal Flooding
Temporary Modification
Significance Determination Process
Job Performance Measure
Foreign Material Exclusion
Fire Protection Program
Overexposure
IR 05000255/200930130 June 2009Er 05000255/09-301 (DRS) on 06/01/09 - 06/09/09 for PalisadesBoric Acid
Significance Determination Process
Job Performance Measure
ML0907700347 April 2009Safety Evaluation, Relief Request to Perform Volumetric Leak Path Assessment of Reactor Pressure Vessel Upper Head Penetration NozzleHigh Radiation Area
Locked High Radiation Area
ML09084047313 April 2009Summary of Pre-Application Meeting with Entergy Nuclear Operations, Inc., Palisades, to Discuss Spent Fuel Criticality Amendment
ML0909101447 April 2009Y020090049 - Thomas Gurdziel Ltr Entergy/Palisades Containment Events
ML09096014817 April 2009(Pnp) - Summary of Telephone Conference Call Held on March 17, 2009, Between the U.S. Nuclear Regulatory Commission and Entergy Operations, Inc. Regarding Progress on National Fire Protection Association (NFPA) Standard 805 ...Enforcement Discretion
Probabilistic Risk Assessment
Fire Protection Program
ML09106024815 April 2009Annual Non-Radiological Environmental Operating Report
ML0910607627 May 200904/07/09 Summary of Conference Call with Palisades Nuclear Plant Regarding the Spring 2009 Steam Generator Inspections
ML09107066413 May 2009Report on Results of Staff Audit of Chemical Effects Related Actions to Address Generic Letter 2004-02Grab sample
Coatings
ML09120049829 April 2009Notice of Public Meeting to Discuss the 2008 End-Of-Cycle Plant Performance Assessment of Palisades Nuclear Plant
ML09120050529 April 2009Notice of Public Meeting to Discuss End-of-Cycle Assessment of Palisades Nuclear Plant Performance for the 2008 Calendar Year
ML09120067529 April 2009Palisade - Submittal of 2008 Personnel Exposure and Monitoring Report
ML09125049715 May 2009Summary of Telephone Conference Call Held on April 23, 2009, Between the U.S. Nuclear Regulatory Commission and Entergy Operations, Inc. Regarding Progress on National Fire Protection Association (NFPA) Standard 805 Transition ActivitiesEnforcement Discretion
Fire Protection Program
ML0912602911 May 2009U.S. Dept of Homeland Security, Revised Emergency Operations Plan for Allegan County, Mi, Dated September 11, 2008/Letter
ML09132005912 May 2009Entergy - Acceptance Review for License Amendment Request (TAC Nos. ME1198 - ME1207)
ML09134067814 May 2009Submittal of 2008 Radiological Environmental Operating ReportGrab sample
Offsite Dose Calculation Manual
Annual Radiological Environmental Operating Report
ML09135018114 May 2009Supplement to License Amendment Request: Changes to Technical Specification Administrative Controls SectionShutdown Margin
ML09135020314 May 2009Palisades - 60-Day Reports Per Bulletin 2004-01 and CAL NRR-07-023 Pressurizer Inspection ResultsBoric Acid
Nondestructive Examination
Liquid penetrant
ML09139066915 May 2009Ltr. 05/14/2009 Palisades Re Non-Public Meeting to Discuss the 2008 End-of-Cycle Plant Security Performance Assessment
ML09140020320 May 2009Submittal of Annual Report of Changes in Emergency Core Cooling System Models and 30-Day Report for Large and Small Break LOCA
ML09140020814 May 2009Notice of Closed Meeting with Palisades to Discuss the 2008 End-of-Cycle Plant Security Performance Assessment
ML09146056319 May 2009Ltr. 05/19/2009 Palisades Re Operator Licensing Examination Approval
ML09146065426 May 2009EOC Slides for 5/26/09 Meeting
ML09147015918 May 20092009 Steam Generator Tube Converted Data
ML09147048327 May 2009Acceptance Review for Entergy'S Request to Extend Effectiveness of July 28, 2008, Orders
ML0915405772 June 2009Summary of the May 26, 2009, Public Meeting to Discuss the 2008 Palisades End-of-Cycle Performance Assessment
ML09155067518 June 2009Entergy Nuclear Palisades, Llc'S Status of Decommissioning Funding Assurance for Palisades Nuclear Plant
ML09168028025 May 20092009 Palisades Initial License Examination Administered SRO and RO Written Exam and Answer KeySafe Shutdown
Boric Acid
Post Accident Monitoring
Severe Accident Management Guideline
Fuel cladding
ML09170033616 June 2009Ltr. 06/16/09 Palisades DRS 95002 RFI OUO - Cover Letter
ML09176068625 June 2009Relaxation of Confirmatory Order. Ltr. to Christopher J. Schwarz from Cynthia Carpenter
ML0917607101 June 2009Request to Relax a Confirmatory Order Condition
ML09178000226 June 2009Re NRC Office of Investigations Report No. 3-2008-023
ML09182027530 June 2009Palisades, Follow-up Supplemental Response to NRC Generic Letter 2004-02Safe Shutdown
Boric Acid
High Radiation Area
Mission time
Stroke time
Safe Shutdown Earthquake
Coatings
Operating Basis Earthquake
Temporary Modification
Locked High Radiation Area
Design basis earthquake
Foreign Material Exclusion
Earthquake
Fuel cladding
ML0918306098 June 2009Non-concurrence on Final Task Interface Agreement - Reevaluation of Implementation of Limiting Condition for Operation 3.0.4a, Mode Change Limitations, at Palisades Nuclear Plant (TIA2009-005)Non-Concurrence Process
Backfit
ML09183061610 June 2009Non-concurrence on Final Task Interface Agreement - Reevaluation of Implementation of Limiting Condition for Operation 3.0.4a, Mode Change Limitations, at Palisades Nuclear Plant (TIA2009-005)Non-Concurrence Process
ML0920905831 June 20092009 Palisades Nuclear Plant Initial Examination Outline Submittal
ML0920905961 June 20092009 Palisades Nuclear Plant Initial Examination Proposed Exam Files
ML0920906041 June 20092009 Palisades Nuclear Plant Initial Examination Administrative Files
ML0920906121 June 20092009 Palisades Initial License Examination Exam Handouts Provided for Candidates
ML10069043125 May 20092009 Palisades Proposed Admin JPMsMet Tower
Job Performance Measure
Fuel cladding
ML10069045925 May 20092009 Palisades Proposed Control Room JPMsJob Performance Measure
ML10069046125 May 20092009 Palisades Proposed In-Plant JPMsSafe Shutdown
Arc flash
Job Performance Measure
ML10069046425 May 20092009 Palisades Proposed ScenariosBoric Acid
Pressure Boundary Leakage
Downpower
ML10069046625 May 20092009 Palisades Proposed Written ExamSafe Shutdown
Boric Acid
Post Accident Monitoring
Severe Accident Management Guideline
Fuel cladding
ML10069047325 May 20092009 Palisades Initial License Examination Administered Admin JPMsMet Tower
Job Performance Measure
Fuel cladding
ML10069047525 May 20092009 Palisades Initial License Examination Administered Control Room JPMsJob Performance Measure