Category:Letter
MONTHYEARML24022A1172024-01-23023 January 2024 Acceptance of Requested Licensing Action Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations ML24012A2422024-01-16016 January 2024 Acceptance of Requested Licensing Action License Transfer Request ML23236A0042023-12-27027 December 2023 Issuance of Amendment 274 Re Changes to Perm Defueled Emergency Plan and Perm Defueled Emergency Action Level Scheme ML23355A1242023-12-26026 December 2023 Withdrawal of an Amendment Request Re License Amendment Request to Revise License Condition to Eliminate Cyber Security Plan Requirements ML23192A0772023-12-26026 December 2023 Letter Exemption from the Requirements of 10 CFR 140.11(a)(4) Concerning Offsite Primary and Secondary Liability Insurance ML23191A5222023-12-22022 December 2023 Exemption Letter from the Requirements of 10 CFR 50.54(W)(1) Concerning Onsite Property Damage Insurance (EPID - L-2022-LLE-0032) ML23263A9772023-12-22022 December 2023 Exemption from Certain Emergency Planning Requirements and Related Safety Evaluation ML23354A2602023-12-21021 December 2023 Reference Simulator Inspection Request for Information L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 PNP 2023-030, License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations2023-12-14014 December 2023 License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations PNP 2023-035, Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements2023-12-12012 December 2023 Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements PNP 2023-028, Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments2023-12-0606 December 2023 Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23291A4402023-11-0303 November 2023 Acceptance of Requested Licensing Action Request for Exemption from 10 CFR 50.82(a)(2) to Support Reauthorization of Power Operations IR 05000255/20230032023-10-0404 October 2023 NRC Inspection Report No. 05000255/2023003(DRSS)-Holtec Decommissioning International, LLC, Palisades Nuclear Plant ML23275A0012023-10-0202 October 2023 Request for Withholding Information from Public Disclosure for Palisades Nuclear Plant PNP 2023-025, Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.822023-09-28028 September 2023 Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.82 PNP 2023-026, Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations2023-09-28028 September 2023 Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations PNP 2023-023, Special Report High Range Noble Gas Monitor Inoperable2023-08-0909 August 2023 Special Report High Range Noble Gas Monitor Inoperable ML23215A2302023-08-0303 August 2023 Notice of Organization Change - Chief Nuclear Officer IR 05000255/20230022023-07-19019 July 2023 NRC Inspection Report 05000255/2023002 DRSS-Holtec Decommissioning International, LLC, Palisades Nuclear Plant ML23087A0362023-05-0202 May 2023 PSDAR Review Letter ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment PNP 2023-018, 2022 Annual Non-Radiological Environmental Operating Report2023-04-25025 April 2023 2022 Annual Non-Radiological Environmental Operating Report L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 PNP 2023-007, and Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports2023-04-19019 April 2023 and Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports PNP 2023-008, 2022 Radiological Environmental Operating Report2023-04-18018 April 2023 2022 Radiological Environmental Operating Report L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations PNP 2023-002, 6 to Updated Final Safety Analysis Report2023-03-31031 March 2023 6 to Updated Final Safety Analysis Report ML23088A0382023-03-29029 March 2023 Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance PNP 2023-006, Report of Changes to Security Plan, Revision 202023-03-29029 March 2023 Report of Changes to Security Plan, Revision 20 PNP 2023-012, Presentation on Regulatory Path to Reauthorize Power Operations2023-03-16016 March 2023 Presentation on Regulatory Path to Reauthorize Power Operations ML23038A0982023-03-15015 March 2023 Request for Withholding Information from Public Disclosure ML23095A0642023-03-14014 March 2023 American Nuclear Insurers, Notice of Cancellation Rescinded PNP 2023-001, Regulatory Path to Reauthorize Power Operations2023-03-13013 March 2023 Regulatory Path to Reauthorize Power Operations PNP 2023-004, Report of Changes to Palisades Nuclear Plant Technical Specification Bases2023-03-0808 March 2023 Report of Changes to Palisades Nuclear Plant Technical Specification Bases PNP 2023-005, Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report2023-03-0101 March 2023 Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML23052A1092023-02-17017 February 2023 FEMA Letter to NRC, Proposed Commission Paper Language for Palisades Nuclear Plant Emergency Plan Decommissioning Exemption Request ML23032A3992023-02-0101 February 2023 Regulatory Path to Reauthorize Power Operations IR 05000255/20220032022-12-28028 December 2022 NRC Inspection Report No. 05000255/2022003(DRSS); 07200007/2022001 (Drss) Holtec Decommissioning International, LLC, Palisades Nuclear Plant L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 PNP 2022-037, Report of Changes to Security Plan, Revision 192022-12-14014 December 2022 Report of Changes to Security Plan, Revision 19 ML22321A2852022-11-17017 November 2022 LLC Master Decommissioning Trust Agreement for Palisades Nuclear Plant IR 05000255/20224012022-11-0909 November 2022 Decommissioning Palisades Nuclear Plant - Decommissioning Security Inspection Report 05000255/2022401 PNP 2022-036, Response to Request for Additional Information Regarding License Amendment Request for Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme2022-11-0808 November 2022 Response to Request for Additional Information Regarding License Amendment Request for Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme PNP 2022-035, International - Notification of Commitment Cancellations for Remaining Activities Related to Beyond-Design-Basis Seismic Hazard Reevaluations2022-11-0202 November 2022 International - Notification of Commitment Cancellations for Remaining Activities Related to Beyond-Design-Basis Seismic Hazard Reevaluations PNP 2022-024, Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance2022-10-26026 October 2022 Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance PNP 2022-026, Request for Exemption from 10 CFR 50.54(w)(1) Concerning Onsite Property Damage Insurance2022-10-26026 October 2022 Request for Exemption from 10 CFR 50.54(w)(1) Concerning Onsite Property Damage Insurance ML22292A2572022-10-25025 October 2022 Permanently Defueled Emergency Plan License Amendment RAI Letter 2024-01-23
[Table view] Category:Technical Specification
MONTHYEARPNP 2023-030, License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations2023-12-14014 December 2023 License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations ML22102A2482022-04-14014 April 2022 Request for Additional Information Regarding License Amendment Request for Permanently Defueled Technical Specifications ML21152A1112021-06-0101 June 2021 Proposed Changes (mark-up) to Palisades Plant - Appendix a Technical Specifications, and Appendix B Environmental Protection Plan Pages ML21152A1132021-06-0101 June 2021 Palisade Nuclear Plant - Proposed Technical Specifications Bases Changes RS-19-039, Fleet License Amendment Request - Common Language for Technical Specification High Radiation Area Administrative Controls2019-06-26026 June 2019 Fleet License Amendment Request - Common Language for Technical Specification High Radiation Area Administrative Controls PNP 2019-017, Submittal of Changes to Technical Specifications Bases2019-03-21021 March 2019 Submittal of Changes to Technical Specifications Bases PNP 2018-052, Supplement to License Amendment Request -Application to Revise Technical Specifications to Adopt TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control- Risk Informed Technical Specification Task Force.2018-11-16016 November 2018 Supplement to License Amendment Request -Application to Revise Technical Specifications to Adopt TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control- Risk Informed Technical Specification Task Force. ML18270A3222018-09-27027 September 2018 Attachment 1: Description and Evaluation of Technical Specifications Changes ML18270A3242018-09-27027 September 2018 Attachment 3: Proposed Changes and Appendix a Technical Specifications Pages ML18270A3252018-09-27027 September 2018 Attachment 4: Page Change Instructions and Revised Pages, and Appendix a Technical Specifications ML18270A3262018-09-27027 September 2018 Attachment 5: Proposed Technical Specification Bases Changes PNP 2017-067, Submittal of Changes to Palisades Nuclear Plant Technical Specifications Bases2017-11-0808 November 2017 Submittal of Changes to Palisades Nuclear Plant Technical Specifications Bases PNP 2016-046, License Amendment Request for Editorial and Administrative Changes to Technical Specifications2016-11-0909 November 2016 License Amendment Request for Editorial and Administrative Changes to Technical Specifications PNP 2014-088, Report to NRC of Changes to Technical Specifications Bases2014-09-15015 September 2014 Report to NRC of Changes to Technical Specifications Bases PNP 2014-042, License Amendment Request - Application to Revise Technical Specifications to Adopt TSTF-426, Revise or Add Actions to Preclude Into LCO 3.0.3 - RITSTF Initiatives 6b & 6c, Using the Consolidated Line Item Improvement Process2014-06-11011 June 2014 License Amendment Request - Application to Revise Technical Specifications to Adopt TSTF-426, Revise or Add Actions to Preclude Into LCO 3.0.3 - RITSTF Initiatives 6b & 6c, Using the Consolidated Line Item Improvement Process PNP 2012-097, Report to NRC of Changes to Technical Specifications Bases2012-11-0909 November 2012 Report to NRC of Changes to Technical Specifications Bases PNP 2011-032, Report to NRC of Changes of Technical Specifications Bases2011-04-25025 April 2011 Report to NRC of Changes of Technical Specifications Bases PNP 2011-018, Regarding License Amendment Request to Extend the Containment Type a Leak Rate Test Frequency to 15 Years2011-04-0606 April 2011 Regarding License Amendment Request to Extend the Containment Type a Leak Rate Test Frequency to 15 Years ML1020105792010-07-20020 July 2010 License Amendment Request for Emergency Diesel Generator Fuel Oil and Lube Oil Systems ML0930604142009-11-0202 November 2009 Report of Changes to Technical Specifications Bases ML0913501812009-05-14014 May 2009 Supplement to License Amendment Request: Changes to Technical Specification Administrative Controls Section ENOC-09-00009, Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions2009-04-27027 April 2009 Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions ML0901602382009-02-0606 February 2009 Issuance of Amendment Spent Fuel Pool Region I Storage Requirements ML0827404452008-11-20020 November 2008 Issuance of Amendment Eliminate License Condition 2.F ML0822703122008-08-14014 August 2008 Report of Changes to Technical Specifications Bases ML0723203952007-08-16016 August 2007 Report of Changes to Technical Specifications Bases ML0722201032007-07-25025 July 2007 Submittal of Technical Specifications Bases Changes ML0718002162007-06-28028 June 2007 License Amendment Request: Replacement of Containment Sump Buffer ML0714501052007-05-31031 May 2007 Technical Specifications Pages Re Programs and Manuals for Steam Generator ML0631803592006-11-0606 November 2006 License Amendment Request: Realistic Large Break Loss-of-Coolant Accident ML0628303852006-09-25025 September 2006 Alternative Source Term- Proposed License Amendment ML0623000332006-08-17017 August 2006 Report of Changes to Technical Specifications Bases ML0524102132005-08-22022 August 2005 Report of Changes to Technical Specifications Bases ML0425904452004-09-0202 September 2004 Report of Changes to Technical Specifications Bases ML0421604082004-08-0202 August 2004 Tech Spec Pages for Amendment No. 217 Regarding the Relocating of the Primary Coolant System Pressure, Cold-Leg Temperature and Flow Departure from Nucleate Boiling Limits to the Core Operating Limits Report ML0404204242004-01-30030 January 2004 Application for Technical Specification Improvement to Eliminate Requirements for Hydrogen Recombiners and Hydrogen/Oxygen Monitors Using the Consolidated Line Item Improvement Process ML0330001112003-10-17017 October 2003 Report of Changes to Technical Specifications Bases ML0328900502003-10-0606 October 2003 License Amendment Request: Increase Rated Thermal Power, Response to Request for Additional Information ML0316110532003-06-0303 June 2003 License Amendment Request: Increase Rated Thermal Power ML0303805792003-01-22022 January 2003 Technical Specifications and Bases ML0231701012002-10-31031 October 2002 Report of Changes to Technical Specifications Bases ML0207201012002-03-0101 March 2002 License Amendment Request, Surveillance Requirement Frequency for Containment Spray Nozzle Inspections ML0205901512002-02-26026 February 2002 Amendment No. 207 Retechnical Specification on Spent Fuel Pool Boron Concentration ML18344A3791978-06-15015 June 1978 Proposed Technical Specification Changes on Power Distribution Limits ML18353B1461978-03-0909 March 1978 Iodine Removal System - Proposed Technical Specification Changes ML18353A8671978-02-22022 February 1978 Letter Proposed Technical Specifications Change on Heatup and Cooldown Curves for Cycle 3 Operation ML18353A8741978-02-21021 February 1978 Letter Proposed Technical Specifications Change on Steam Generator Operating Allowance ML18347A1881978-01-0303 January 1978 Proposed Technical Specifications Changes Relating to Overpressure Protection System ML18353B1451977-11-11011 November 1977 Transmittal of Technical Specification - Deletion of Annual Operating Report ML18353B1471977-11-10010 November 1977 Proposed Technical Specification Changes for Steam Generator Inservice Inspection 2023-12-14
[Table view] Category:Bases Change
MONTHYEARML21152A1132021-06-0101 June 2021 Palisade Nuclear Plant - Proposed Technical Specifications Bases Changes PNP 2019-017, Submittal of Changes to Technical Specifications Bases2019-03-21021 March 2019 Submittal of Changes to Technical Specifications Bases ML18270A3242018-09-27027 September 2018 Attachment 3: Proposed Changes and Appendix a Technical Specifications Pages ML18270A3222018-09-27027 September 2018 Attachment 1: Description and Evaluation of Technical Specifications Changes ML18270A3252018-09-27027 September 2018 Attachment 4: Page Change Instructions and Revised Pages, and Appendix a Technical Specifications ML18270A3262018-09-27027 September 2018 Attachment 5: Proposed Technical Specification Bases Changes PNP 2017-067, Submittal of Changes to Palisades Nuclear Plant Technical Specifications Bases2017-11-0808 November 2017 Submittal of Changes to Palisades Nuclear Plant Technical Specifications Bases PNP 2016-046, License Amendment Request for Editorial and Administrative Changes to Technical Specifications2016-11-0909 November 2016 License Amendment Request for Editorial and Administrative Changes to Technical Specifications PNP 2014-088, Report to NRC of Changes to Technical Specifications Bases2014-09-15015 September 2014 Report to NRC of Changes to Technical Specifications Bases PNP 2014-042, License Amendment Request - Application to Revise Technical Specifications to Adopt TSTF-426, Revise or Add Actions to Preclude Into LCO 3.0.3 - RITSTF Initiatives 6b & 6c, Using the Consolidated Line Item Improvement Process2014-06-11011 June 2014 License Amendment Request - Application to Revise Technical Specifications to Adopt TSTF-426, Revise or Add Actions to Preclude Into LCO 3.0.3 - RITSTF Initiatives 6b & 6c, Using the Consolidated Line Item Improvement Process PNP 2012-097, Report to NRC of Changes to Technical Specifications Bases2012-11-0909 November 2012 Report to NRC of Changes to Technical Specifications Bases PNP 2011-032, Report to NRC of Changes of Technical Specifications Bases2011-04-25025 April 2011 Report to NRC of Changes of Technical Specifications Bases ML1020105792010-07-20020 July 2010 License Amendment Request for Emergency Diesel Generator Fuel Oil and Lube Oil Systems ML0930604142009-11-0202 November 2009 Report of Changes to Technical Specifications Bases ML0913501812009-05-14014 May 2009 Supplement to License Amendment Request: Changes to Technical Specification Administrative Controls Section ML0822703122008-08-14014 August 2008 Report of Changes to Technical Specifications Bases ML0723203952007-08-16016 August 2007 Report of Changes to Technical Specifications Bases ML0722201032007-07-25025 July 2007 Submittal of Technical Specifications Bases Changes ML0623000332006-08-17017 August 2006 Report of Changes to Technical Specifications Bases ML0524102132005-08-22022 August 2005 Report of Changes to Technical Specifications Bases ML0425904452004-09-0202 September 2004 Report of Changes to Technical Specifications Bases ML0330001112003-10-17017 October 2003 Report of Changes to Technical Specifications Bases ML0303805792003-01-22022 January 2003 Technical Specifications and Bases ML0231701012002-10-31031 October 2002 Report of Changes to Technical Specifications Bases ML0207201012002-03-0101 March 2002 License Amendment Request, Surveillance Requirement Frequency for Containment Spray Nozzle Inspections ML18353B1461978-03-0909 March 1978 Iodine Removal System - Proposed Technical Specification Changes ML18353A8671978-02-22022 February 1978 Letter Proposed Technical Specifications Change on Heatup and Cooldown Curves for Cycle 3 Operation ML18353A8741978-02-21021 February 1978 Letter Proposed Technical Specifications Change on Steam Generator Operating Allowance ML18353B1451977-11-11011 November 1977 Transmittal of Technical Specification - Deletion of Annual Operating Report ML18348A7721977-09-19019 September 1977 Transmittal of Proposed Technical Specification Changes ML18353A8891977-05-17017 May 1977 Letter Request for Change to Technical Specifications on Minimum Qualification Requirements for Radiation Protection Manager (Health Physicist) ML18348A6861977-05-17017 May 1977 Letter Request for Change to Technical Specifications on Minimum Qualification Requirements for Radiation Protection Manager (Health Physicist) ML18353A8681977-03-0101 March 1977 Letter Technical Specifications Changes for Inservice Inspection and Testing Requirements 2021-06-01
[Table view] |
Text
Entergy Nuclear Operations, Inc.
Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043 Tel269 764 2000 Christopher J. Schwarz Site Vice President May 14,2009 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
SUBJECT:
Supplement to License Amendment Request: Changes to Technical Specification Administrative Controls Section Palisades Nuclear Plant Docket 50-255 License No. DPR-20
References:
- 1. Entergy Nuclear Operations, Inc. letter to NRC, dated August 28,2008, License Amendment Request: Changes to Technical Specification Administrative Controls Section
- 2. NRC electronic mail to Entergy Nuclear Operations, Inc., dated March 18, 2009, Palisades LAR - Administrative Changes - MD9560
Dear Sir or Madam:
Entergy Nuclear Operations, Inc. submitted, in Reference 1, a Palisades Nuclear Plant license amendment request (LAR) for Nuclear Regulatory Commission review and approval pursuant to 10 CFR 50.90. The LAR proposed, in part, to implement Technical Specifications Task Force (TSTF) Improved Technical Specifications Change Traveler TSTF-363-A. TSTF-363-A would allow references to approved topical reports in the Technical Specifications (TS) to be cited using the report number and title and eliminate revision numbers and dates from the topical report list. The COLR would include complete identification for each of the TS referenced topical reports used to prepare the COLR (i.e., report number, title, revision, date, and any supplements).
Reference 2 identified that a statement, on the contents of the COLR, required to fully implement TSTF-363-A was omitted in the submitted LAR (Reference 1). , to this letter, provides revised TS Section 5.6.5 pages incorporating the omitted statement concerning COLR content. Additionally, the dates and revisions of the topical reports listed in TS Sections 5.6.5b.6., 5.6.5b.17., and 5.6.5b.18 have been removed in accordance with TSTF-363-A. Attachment 2 provides the annotated pages for TS 5.6.5 showing the proposed changes.
The proposed changes to TS Section 5.3.1 (TS page 5.0-4) cited in Reference 1 are
Document Control Desk Page 2 not affected by this supplement. This supplement does not alter the significant hazards consideration or the environmental considerations previously provided in Reference 1.
A copy of this request has been provided to the designated representative of the State of Michigan.
Summarv of Commitments This letter identifies no new commitments and no revisions to existing commitments.
I declare under penalty of perjury that the forgoing is true and correct. Executed on May 14,2009.
Attachments: 1. License Amendment Request: Changes to Technical Specifications Administrative Controls Section: Revised Technical Specifications Pages
- 2. License Amendment Request: Changes to Technical Specifications Administrative Controls Section: Mark-up of Technical Specifications Pages cc: Administrator, Region Ill, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC
ATTACHMENT I LICENSE AMENDMENT REQUEST: CHANGES TO TECHNICAL SPECIFICATIONS ADMINISTRATIVE CONTROLS SECTION REVISED TECHNICAL SPECIFICATIONS PAGES 5.0-25, 5.0-26, AND 5.0-27 3 Pages Follow
Reporting Requirements 5.6 5.6 Reporting Requirements 5.6.4 (Deleted)
CORE OPERATING LIMITS REPORT (COLR)
- a. Core operating limits shall be established prior to each reload cycle, or prior to any remaining portion of a reload cycle, and shall be documented in the COLR for the following:
3.1. I Shutdown Margin 3.1.6 Regulating Rod Group Position Limits 3.2.1 Linear Heat Rate Limits 3.2.2 Radial Peaking Factor Limits 3.2.4 AS1 Limits 3.4.1 DNB Limits
- b. The analytical methods used to determine the core operating limits shall be those previously reviewed and approved by the NRC, specifically those described in the following documents: I
- 1. EMF-96-029(P)(A) Volumes 1 and 2, "Reactor Analysis System for PWRs," Siemens Power Corporation.
(LCOs 3.1.1, 3.1.6, 3.2.1, 3.2.2, & 3.2.4)
- 2. . ANF-84-73 Appendix B (P)(A), "Advanced Nuclear Fuels Methodology for Pressurized Water Reactors: Analysis of Chapter 15 Events," Advanced Nuclear Fuels Corporation. (Bases report not approved) (LCOs 3.1.1, 3.1.6, 3.2.1, 3.2.2, & 3.2.4)
- 3. XN-NF-82-21(P)(A), "Application of Exxon Nuclear Company PWR Thermal Margin Methodology to Mixed Core Configurations," Exxon Nuclear Company.
(LCOs 3.2.1, 3.2.2, & 3.2.4)
- 4. EMF-84-093(P)(A), "Steam Line Break Methodology for PWRs, "Siemens Power Corporation.
(LCOs 3.1.1, 3.1.6, 3.2.1, 3.2.2, & 3.2.4)
- 5. XN-75-32(P)(A) Supplements 1 through 4, "Computational Procedure for Evaluating Fuel Rod Bowing," Exxon Nuclear Company. (Bases document not approved)
(LCOs 3.1.6, 3.2.1, 3.2.2, & 3.2.4)
Palisades Nuclear Plant 5.0-25 Amendment No. W ,24-7, m,
Reporting Requirements 5.6 5.6 Reporting Requirements COLR (continued)
- 6. EMF-2310 (P)(A), Framatome ANP, Inc., "SRP Chapter 15 Non- 1 LOCA Methodology for Pressurized Water Reactors." (LCOs 3.1.6, 3.2.1, 3.2.2, & 3.2.4)
- 7. XN-NF-78-44(NP)(A), "A Generic Analysis of the Control Rod Ejection Transient for Pressurized Water Reactors," Exxon Nuclear Company. (LCOs 3.1.6, 3.2.1, & 3.2.2)
- 8. ANF-89-151(P)(A), "ANF-RELAP Methodology for Pressurized Water Reactors: Analysis of Non-LOCA Chapter 15 Events,"
Advanced Nuclear Fuels Corporation.
(LCOs 3.1.6, 3.2.1, 3.2.2, & 3.2.4)
- 9. EMF-92-153(P)(A) and Supplement 1, "HTP: Departure from Nucleate Boiling Correlation for High Thermal Performance Fuel,"
Siemens Power Corporation. (LCOs 3.2.1 , 3.2.2, & 3.2.4)
- 10. XN-NF-621(P)(A), "Exxon Nuclear DNB Correlation for PWR Fuel Designs," Exxon Nuclear Company. (LCOs 3.2.1, 3.2.2, & 3.2.4)
- 11. XN-NF-82-06(P)(A) and Supplements 2, 4, and 5, "Qualification of Exxon Nuclear Fuel for Extended Burnup," Exxon Nuclear Company. (LCOs3.1.6, 3.2.1, 3.2.2, &3.2.4)
- 12. ANF-88-133(P)(A) and Supplement 1, "Qualification of Advanced Nuclear Fuels' PWR Design Methodology for Rod Burnups of 62 GWDIMTU," Advanced Nuclear Fuels Corporation.
(LCOs 3.1.6, 3.2.1, 3.2.2, & 3.2.4)
- 13. XN-NF-85-92(P)(A), "Exxon Nuclear Uranium DioxideIGadolinia Irradiation Examination and Thermal Conductivity Results," Exxon Nuclear Company. (LCOs 3.1.6, 3.2.1, 3.2.2, & 3.2.4)
Palisades Nuclear Plant 5.0-26 Amendment No. W ,N ,
Reporting Requirements 5.6 5.6 Reporting Requirements 5.6.5 COLR (continued)
- 14. EMF-92-116(P)(A), "Generic Mechanical Design Criteria for PWR Fuel Designs," Siemens Power Corporation.
(LCOs 3.1.6, 3.2.1, 3.2.2, & 3.2.4)
- 15. EMF-2087(P)(A), "SEMIPWR-98: ECCS Evaluation Model for PWR LBLOCA Applications," Siemens Power Corporation.
(LCOs 3.1.6, 3.2.1, & 3.2.2)
- 16. ANF-87-150 Volume 2, "Palisades Modified Reactor Protection System Report: Analysis of Chapter 15 Events," Advanced Nuclear Fuels Corporation. [Approved for use in the Palisades design during the NRC review of license Amendment 118, November 15, 19881 (LCOs 3.1.6, 3.2.1, 3.2.2, &3.4.1)
- 17. EMF-1961(P)(A), Siemens Power Corporation, "Statistical I Setpoint/Transient Methodology for Combustion Engineering Type Reactors." (LCOs 3.1.6, 3.2.1, 3.2.2, 3.2.4, & 3.4.1)
- 18. EMF-2328 (P)(A), Framatome ANP, Inc., "PWR Small Break 1 LOCA Evaluation Model, S-RELAP5 Based." (LCOs 3.1.6, 3.2.1,
& 3.2.2)
- 19. BAW-2489P, "Revised Fuel Assembly Growth Correlation for Palisades." (LCOs 3.1.6, 3.2.1, 3.2.2, & 3.2.4)
- 20. EMF-2103(P)(A), "Realistic Large Break LOCA Methodology for Pressurized Water Reactors." (LCOs 3.1.6, 3.2.1, & 3.2.2)
- 21. BAW-10240(P)-A, "lncorporation of M5 Properties in Framatome ANP Approved Methods." (LCOs 3.1.6, 3.2.1, 3.2.2, 3.2.4, & 3.4.1)
The COLR will contain the complete identification for each of the Technical Specifications referenced topical reports used to prepare the COLR (i.e., report number, title, revision, date, and any supplements).
- c. The core operating limits shall be determined such that all applicable limits (e.g., fuel thermal mechanical limits, core thermal hydraulic limits, Emergency Core Cooling Systems limits, nuclear limits such as shutdown margin, transient analysis limits, and accident analysis limits) of the safety analysis are met.
- d. The COLR, including any mid cycle revisions or supplements, shall be provided, upon issuance for each reload cycle, to the NRC.
Palisades Nuclear Plant 5.0-27 Amendment No. ~ , .217,222,
~ , ~ ,
a, w,
ATTACHMENT 2 LICENSE AMENDMENT REQUEST: CHANGES TO TECHNICAL SPECIFICATIONS ADMINISTRATIVE CONTROLS SECTION MARK-UP OF TECHNICAL SPECIFICATIONS PAGES 5.0-25, 5.0-26, AND 5.0-27 (showing proposed changes)
(additions are highlighted and deletions are strikethrough) 3 Pages Follow
Reporting Requirements 5.6 5.6 Reporting Requirements 5.6.4 (Deleted)
I CORE OPERATING LIMITS REPORT (COLR)
- a. Core operating limits shall be established prior to each reload cycle, or prior to any remaining portion of a reload cycle, and shall be documented in the COLR for the following:
3.1.1 Shutdown Margin 3.1.6 Regulating Rod Group Position Limits 3.2.1 Linear Heat Rate Limits 3.2.2 Radial Peaking Factor Limits 3.2.4 AS1 Limits 3.4.1 DNB Limits
- b. The analytical methods used to determine the core operating limits shall be those previously reviewed and approved by the NRC, specifically those described in the following documents:
- 1. EMF-96-029(P)(A) Volumes 1 and 2, "Reactor Analysis System for PWRs," Siemens Power Corporation.
(LCOs 3.1.1, 3.1.6, 3.2.1, 3.2.2, & 3.2.4)
- 2. ANF-84-73 Appendix B (P)(A), "Advanced Nuclear Fuels Methodology for Pressurized Water Reactors: Analysis of Chapter 15 Events," Advanced Nuclear Fuels Corporation. (Bases report not approved) (LCOs 3.1.1, 3.1.6, 3.2.1, 3.2.2, & 3.2.4)
- 3. XN-NF-82-21(P)(A), "Application of Exxon Nuclear Company PWR Thermal Margin Methodology to Mixed Core Configurations," Exxon Nuclear Company.
(LCOs 3.2.1, 3.2.2, & 3.2.4)
- 4. EMF-84-093(P)(A), "Steam Line Break Methodology for PWRs, "Siemens Power Corporation.
(LCOs 3.1.1, 3.1.6, 3.2.1, 3.2.2, & 3.2.4)
- 5. XN-75-32(P)(A) Supplements 1 through 4, "Computational Procedure for Evaluating Fuel Rod Bowing," Exxon Nuclear Company. (Bases document not approved)
(LCOs 3.1.6, 3.2.1, 3.2.2, & 3.2.4)
Palisades Nuclear Plant 5.0-25 Amendment No. 4433,247,220
Reporting Requirements 5.6 5.6 Reportins Requirements COLR (continued)
- 6. EMF-2310 (P)(A), Re&bw& Framatome ANP, Inc., !&y-XK&
"SRP Chapter 15 Non-LOCA Methodology for Pressurized Water Reactors." (LCOs 3.1.6, 3.2.1, 3.2.2, & 3.2.4)
- 7. XN-NF-78-44(NP)(A), "A Generic Analysis of the Control Rod Ejection Transient for Pressurized Water Reactors," Exxon Nuclear Company. (LCOs 3.1.6, 3.2.1, & 3.2.2)
- 8. ANF-89-151 (P)(A), "ANF-RELAP Methodology for Pressurized Water Reactors: Analysis of Non-LOCA Chapter 15 Events,"
Advanced Nuclear Fuels Corporation.
(LCOs 3.1.6, 3.2.1, 3.2.2, & 3.2.4)
- 9. EMF-92-153(P)(A) and Supplement 1, "HTP: Departure from I
Nucleate Boiling Correlation for High Thermal Performance Fuel,"
Siemens Power Corporation. (LCOs 3.2.1, 3.2.2, & 3.2.4)
- 10. XN-NF-621(P)(A), "Exxon Nuclear DNB Correlation for PWR Fuel Designs," Exxon Nuclear Company. (LCOs 3.2.1, 3.2.2, & 3.2.4)
- 11. XN-NF-82-06(P)(A) and Supplements 2, 4, and 5, "Qualification of Exxon Nuclear Fuel for Extended Burnup," Exxon Nuclear Company. (LCOs 3.1.6, 3.2.1, 3.2.2, & 3.2.4)
- 12. ANF-88-133(P)(A) and Supplement 1, "Qualification of Advanced Nuclear Fuels' PWR Design Methodology for Rod Burnups of 62 GWDIMTU," Advanced Nuclear Fuels Corporation.
(LCOs 3.1.6, 3.2.1, 3.2.2, & 3.2.4)
- 13. XN-NF-85-92(P)(A), "Exxon Nuclear Uranium DioxideIGadolinia Irradiation Examination and Thermal Conductivity Results," Exxon Nuclear Company. (LCOs 3.1.6, 3.2.1, 3.2.2, & 3.2.4)
Palisades Nuclear Plant 5.0-26 Amendment No. a, 209
Reporting Requirements 5.6 5.6 Reporting Requirements 5.6.5 COLR (continued)
- 14. EMF-92-116(P)(A), "Generic Mechanical Design Criteria for PWR Fuel Designs," Siemens Power Corporation.
(LCOs 3.1.6, 3.2.1, 3.2.2, & 3.2.4)
- 15. EMF-2087(P)(A), "SEMIPWR-98: ECCS Evaluation Model for PWR LBLOCA Applications," Siemens Power Corporation.
(LCOs 3.1.6, 3.2.1, 83.2.2)
- 16. ANF-87-150 Volume 2, "Palisades Modified Reactor Protection System Report: Analysis of Chapter 15 Events," Advanced Nuclear Fuels Corporation. [Approved for use in the Palisades design during the NRC review of license Amendment 118, November 15, 19881 (LCOs 3.1.6, 3.2.1, 3.2.2, & 3.4.1)
- 17. EMF-1961(P)(A), FkwMw-&Siemens Power Corporation, &&
2 W & "Statistical Setpointrrransient Methodology for Combustion Engineering Type Reactors." (LCOs 3.1.6, 3.2.1, 3.2.2, 3.2.4, &
3.4.1)
- 18. EMF-2328 (P)(A), ~ F r a m a t o m ANP, e Inc., !vhdG%&
"PWR Small Break LOCA Evaluation Model, S-RELAP5 Based."
(LCOs 3.1.6, 3.2.1, & 3.2.2)
- 19. BAW-2489P, "Revised Fuel Assembly Growth Correlation for Palisades." (LCOs 3.1.6, 3.2.1, 3.2.2, & 3.2.4)
- 20. EMF-2103(P)(A), "Realistic Large Break LOCA Methodology for Pressurized Water Reactors." (LCOs 3.1.6, 3.2.1, & 3.2.2)
- 21. BAW-10240(P)-A, "Incorporation of M5 Properties in Framatome ANP Approved Methods." (LCOs 3.1.6, 3.2.1, 3.2.2, 3.2.4, &
3.4.1)
The COLR hill contain the complete identificationfor each of the Technical Specifications referenced topical reports used to prepare the COLR (i.e.. report number, title, revision, date. and any supplements).
- c. The core operating limits shall be determined such that all applicable limits (e.g., fuel thermal mechanical limits, core thermal hydraulic limits, Emergency Core Cooling Systems limits, nuclear limits such as shutdown margin, transient analysis limits, and accident analysis limits) of the safety analysis are met.
- d. The COLR, including any mid cycle revisions or supplements, shall be provided, upon issuance for each reload cycle, to the NRC.
Palisades Nuclear Plant 5.0-27 Amendment No. %#,W,i?88,212; 22-2, 229,234