Summary of the May 26, 2009, Public Meeting to Discuss the 2008 Palisades End-of-Cycle Performance Assessment
ML091540577
Person / Time
Site: Palisades  Entergy icon.png
Issue date: 06/02/2009
From: Jack Giessner
Reactor Projects Region 3 Branch 4
To:
References
Download: ML091540577 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 June 2, 2009 LICENSEE: Entergy Nuclear Operations, Inc.

FACILITY: Palisades Nuclear Plant

SUBJECT:

SUMMARY

OF THE MAY 26, 2009, PUBLIC MEETING TO DISCUSS THE 2008 PALISADES END-OF-CYCLE PERFORMANCE ASSESSMENT On May 26, 2009, the Nuclear Regulatory Commission (NRC) held a public meeting at Lake Michigan College in South Haven, Michigan. The meeting was between NRC Region III management and Entergy representatives to discuss the NRCs assessment of the safety performance of Palisades Nuclear Plant for the period from January 1, 2008, through December 31, 2008. The meeting notice and NRC presentation can be found in the Agencywide Documents Access and Management System (ADAMS) as ML091200505 and ML091460654, respectively. A list of principal NRC and licensee meeting participants can be found in the Enclosure.

The NRC began the meeting with an overview of the NRCs Mission, the Reactor Oversight Process (ROP), national ROP results, and the Action Matrix in general. This was followed by a discussion of the NRCs assessment of the performance of Palisades Nuclear Plant in calendar year 2008, which was documented in the March 4, 2009, End-Of-Cycle assessment letter, as ADAMS ML090630130. The NRC also discussed plans for an inspection of the actions taken by the site to address the White finding in the Occupational Radiation Safety cornerstone. As part of this regulatory performance meeting, Entergy responded to the NRCs assessment and provided actions to improve human performance at the site. Cynthia Pederson, Director of the Division of Reactor Projects, provided closing remarks on Palisades performance. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials.

/RA by Robert M. Lerch for/

John B. Giessner, Chief Branch 4 Division of Reactor Projects Docket No. 50-255;72-007 License No. DPR-20

Enclosure:

As Stated DISTRIBUTION See next page

LICENSEE: Entergy Nuclear Operations, Inc.

FACILITY: Palisades Nuclear Plant

SUBJECT:

SUMMARY

OF THE MAY 26, 2009, PUBLIC MEETING TO DISCUSS THE 2008 PALISADES END-OF-CYCLE PERFORMANCE ASSESSMENT On May 26, 2009, the Nuclear Regulatory Commission (NRC) held a public meeting at Lake Michigan College in South Haven, Michigan. The meeting was between NRC Region III management and Entergy representatives to discuss the NRCs assessment of the safety performance of Palisades Nuclear Plant for the period from January 1, 2008, through December 31, 2008. The meeting notice and NRC presentation can be found in the Agencywide Documents Access and Management System (ADAMS) as ML091200505 and ML091460654, respectively. A list of principal NRC and licensee meeting participants can be found in the Enclosure.

The NRC began the meeting with an overview of the NRCs Mission, the Reactor Oversight Process (ROP), national ROP results, and the Action Matrix in general. This was followed by a discussion of the NRCs assessment of the performance of Palisades Nuclear Plant in calendar year 2008, which was documented in the March 4, 2009, End-Of-Cycle assessment letter, as ADAMS ML090630130. The NRC also discussed plans for an inspection of the actions taken by the site to address the White finding in the Occupational Radiation Safety cornerstone. As part of this regulatory performance meeting, Entergy responded to the NRCs assessment and provided actions to improve human performance at the site. Cynthia Pederson, Director of the Division of Reactor Projects, provided closing remarks on Palisades performance. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials.

/RA by Robert M. Lerch for/

John B. Giessner, Chief Branch 4 Division of Reactor Projects Docket No. 50-255;72-007 License No. DPR-20

Enclosure:

As Stated DISTRIBUTION See next page DOCUMENT NAME: G:\Branch TSS\ALL EOC\EOC CY 2008\EOC Letters\EOC Meeting Summaries\Palisades EOC 08 Public Meeting Summary.doc G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME DBetancourt:dtp JGiessner

  • RML for DATE 06/02/09 06/02/09 OFFICIAL RECORD COPY

Letter to Entergy Nuclear Operations, Inc. from J. Giessner dated June 2, 2009

SUBJECT:

SUMMARY

OF THE MAY 26, 2009, PUBLIC MEETING TO DISCUSS THE 2008 PALISADES END-OF-CYCLE PERFORMANCE ASSESSMENT cc w/encl: Mr. Christopher J. Schwarz Vice President, Operations Senior Vice President Vice President Oversight Senior Manager, Nuclear Safety & Licensing Senior Vice President and COO Assistant General Counsel Manager, Licensing W. DiProfio W. Russell G. Randolph Supervisor, Covert Township Office of the Governor T. Strong, Chief, State Liaison Officer Michigan Department of Environmental Quality Michigan Office of the Attorney General Mayor of Bangor City Manager of Bangor Mayor of Hartford City Manager of Hartford Mayor of South Haven City Manager of South Haven Administrator, Allegan County Allegan County Sheriff Allegan County Emergency Management Coordinator County Coordinator Berrien County Sheriff Director, Berrien County Emergency Management Agency Chairman, Van Buren County Board Van Buren County Sheriff Director, Van Buren County Emergency Management Agency Mayor of Watervliet Mayor of Coloma G. Mortensen, INPO

Letter to Entergy Nuclear Operations, Inc. from J. Giessner dated June 2, 2009

SUBJECT:

SUMMARY

OF THE MAY 26, 2009, PUBLIC MEETING TO DISCUSS THE 2008 PALISADES END-OF-CYCLE PERFORMANCE ASSESSMENT DISTRIBUTION:

Tamara Bloomer RidsNrrDorlLpl3-1 RidsNrrPMPalisades Resource RidsNrrDirsIpab Resource Patrick Hiland Kenneth Obrien Jared Heck Allan Barker DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource

PUBLIC MEETING PRINCIPAL ATTENDEES May 26, 2009 Entergy Nuclear Operations, Inc.

C. Schwarz, Site Vice President T. Kirwin, Plant Manager A. Blind, Interim Engineering Director M. Savage, Entergy E. Weinkam, Entergy D. Malone, Entergy Nuclear Regulatory Commission C. Pederson, Director, Division of Reactor Projects, RIII J. Giessner, Branch Chief, Division of Reactor Projects, RIII J. Ellegood, Senior Resident Inspector, Palisades T. Taylor, Resident Inspector, Palisades C. Lipa, Chief, Decommission Branch, RIII S. Bakhsh, Health Physicist, Decommissioning Branch, RIII J. Cassidy, Senior Health Physicist, Division of Reactor Safety, RIII V. Mitlyng, Senior Public Affairs Officer, RIII P. Chandrathil, Public Affairs Officer, RIII M. Chawla, Project Manager, NRR Other Attendees T. Erdman, Van Buren County Commissioner T. Green, BCP Engineers K. Barnes, Dont Waste Michigan B. Geister, Michigan Land Trustees M. Kaufuam, Michigan Land Trustees C. Lowe, Dont Waste Michigan T. Gurdziel (by phone)