IR 05000483/2002005 | 15 October 2002 | IR 05000483-02-005; on 07/07-10/05/2002; Union Electric Co; Callaway Plant Integrated Resident & Regional Report | Ultimate heat sink Fire Barrier Temporary Modification Significance Determination Process Siren |
IR 05000483/2002009 | 1 October 2002 | IR 05000483-02-009, Errata to 08/12/2002-08/16/2002 Supplemental Inspection Report | |
ML022740090 | 10 October 2002 | STARS-Meeting with Strategic Teaming and Resource Sharing-Integrated Regulatory Affairs Group (Stars-IRAG) for the Licrensees of Callaway, Comanche Peak, Diablo Canyon, Palo Verde, South Texas and Wolf Creek Plants | |
ML022820599 | 11 October 2002 | Notice of Consideration/Issuance of Amendment to Change Technical Specification 5.5.9 | |
ML022880523 | 4 November 2002 | Withholding from Public Disclosure, Steam Generator Tube Surveillance Program, TAC MB6478, CAW-02-1558 | |
ML022900119 | 8 October 2002 | Transmittal of Replacement Page 3.3-17 of the Technical Specification for Amendment 151 | |
ML022900224 | 7 October 2002 | Tech Spec Pages to Amendment 151, Tech Spec Bases and FSAR Ch 16 Tech Spec | |
ML022940163 | 14 October 2002 | Emergency Plan Implementing Procedure EIP-ZZ-00231, Revision 014 | High winds Tornado Missile Protection |
ML023010578 | 17 October 2002 | Response to NRC Letter Dated 09/19/02 | |
ML023020309 | 22 October 2002 | Emergency Plan Implementing Procedure EIP-ZZ-00231 Rev. 015, Response to Severe Thunderstom/High Winds/Tornado Watches & Warnings | High winds Tornado Missile Protection |
ML023090541 | 1 November 2002 | Generic Fundamentals Examination Results | Generic Fundamentals Examination |
ML023110103 | 25 October 2002 | Comment from D. R. Woodlan on DG-1099, Anchoring Components and Structural Supports in Concrete. | Backfit |
ML023120024 | 7 November 2002 | Meeting Handouts - Meeting with Strategic Teaming and Resources Sharing - Integrated Regulatory Affairs Group | Missed surveillance Recently irradiated fuel |
ML023160258 | 11 October 2002 | Callaway Meeting Summary Two Performance Deficiencies Previously Identified & Inspected | Condition Adverse to Quality Foreign Material Exclusion |
ML023170012 | 13 November 2002 | Response to NRC Bulletin 2002-02 Reactor Pressure Vessel Head & Vessel Head Penetration Nozzle Inspection Programs. | |
ML023240196 | 2 November 2002 | October 2002 Monthly Operating Report for Callaway Plant Unit 1 | |
ML023260148 | 21 November 2002 | RAI, Bulletin 2002-01 Reactor Pressure Vessel Head Degradation & Reactor Coolant Pressure Boundary Integrity, 15-Day & 60-Day Responses | Boric Acid VT-2 Pressure Boundary Leakage |
ML023330457 | 27 November 2002 | Transmittal of RAI Responses for WCAP-15622, Risk-Informed Evaluation of Extensions to AC Electrical Power System Completion Times. (MUHP-3010) | Ultimate heat sink Mission time Probabilistic Risk Assessment Large early release frequency |
ML023360136 | 2 December 2002 | Inspection Date for Temporary Instruction 2515/148, Inspection of Nuclear Reactor Safeguards Interim Compensatory Measures - Callaway Plant | |
ML023380536 | 27 November 2002 | Transmittal of RAI Responses for WCAP-15622, Risk-Informed Evaluation of Extensions to AC Electrical Power System Completion Times (MUHP-3010) | Ultimate heat sink Mission time Probabilistic Risk Assessment Large early release frequency |
ML023400185 | 3 December 2002 | NRC Plans to Administer Generic Fundamentals Section of Written Operator Licensing Examination on 02/05/2003 | Generic Fundamentals Examination |
ML023440140 | 10 December 2002 | Clarifying Information for Radiological Emergency Response Plan Change Submitted May 6, 2002 for Callaway Plant | |
ML023460033 | 12 December 2002 | Summary of Meeting with Strategic Teaming & Resource Sharing-Integrated Regulatory Affairs Group for Callaway, Comanche Peak, Diablo Canyon, South Texas, Wolf Creek & Palo Verde | |
ML023540252 | 12 December 2002 | November 2002 Monthly Operating Report for Callaway Unit 1 | |
ML023580189 | 23 December 2002 | Notice of Enforcement Discretion for Union Electric Regarding Callaway Plant (NOED 02-4-004) | Enforcement Discretion |
PNO-IV-02-077, A - Union Electric Co., Update - Automatic Reactor Trip While Reducing Power Due to Condensate Pump Failure | 19 December 2002 | PNO-IV-02-077A - Union Electric Co., Update - Automatic Reactor Trip While Reducing Power Due to Condensate Pump Failure | Enforcement Discretion Power change |
Press Release-IV-02-044, Michael Peck Named NRC Senior Resident Inspector at Callaway | 18 October 2002 | Press Release-IV-02-044: Michael Peck Named NRC Senior Resident Inspector at Callaway | |
TAC:MB6478 | 11 October 2002 | ||
TAC:MB6534 | 30 October 2002 | ||
ULNRC-04742, Revision to Technical Specification 3.1.8, Physics Tests Exceptions - Mode 2. | 3 October 2002 | Revision to Technical Specification 3.1.8, Physics Tests Exceptions - Mode 2. | Shutdown Margin Anticipated operational occurrence Probabilistic Risk Assessment |
ULNRC-04743, Revision to SG Water Level Low Low LCO Applicability & Allowable Values in TS 3.3.1 & 3.3.2 | 3 October 2002 | Revision to SG Water Level Low Low LCO Applicability & Allowable Values in TS 3.3.1 & 3.3.2 | Safe Shutdown Anticipated operational occurrence Probabilistic Risk Assessment |
ULNRC-04745, Application for Amendment to License NPF-30, to Revise Technical Specification 5.5.9 | 3 October 2002 | Application for Amendment to License NPF-30, to Revise Technical Specification 5.5.9 | Shutdown Margin High Radiation Area Offsite Dose Calculation Manual Anticipated operational occurrence Post Accident Monitoring Hydrostatic Operating Basis Earthquake Pressure and Temperature Limits Report Annual Radiological Environmental Operating Report Process Control Program Deep Dose Equivalent |
ULNRC-04751, 10CFR50.46 Annual Report ECCS Evaluation Model Revisions | 14 October 2002 | 10CFR50.46 Annual Report ECCS Evaluation Model Revisions | |
ULNRC-04754, September 2002 Monthly Operating Report for Callaway Plant Unit 1 | 11 October 2002 | September 2002 Monthly Operating Report for Callaway Plant Unit 1 | |
ULNRC-04760, Request for Relief from ASME Section III Requirements Regarding Non-Destructive Examination of Welds Performed Under Site Repair/Replacement Program | 17 October 2002 | Request for Relief from ASME Section III Requirements Regarding Non-Destructive Examination of Welds Performed Under Site Repair/Replacement Program | Nondestructive Examination |
ULNRC-04765, Operating License Appendix B Report Unanticipated Cooling Tower Basin Ph Excursion | 25 October 2002 | Operating License Appendix B Report Unanticipated Cooling Tower Basin Ph Excursion | Ultimate heat sink Grab sample |
ULNRC-04768, Amerenue - Revision to Request for Relief from ASME Section III Requirements Regarding Non-Destructive Examination of Welds Performed Under Site Repair/Replacement Program for Callaway, Unit 1 | 30 October 2002 | Amerenue - Revision to Request for Relief from ASME Section III Requirements Regarding Non-Destructive Examination of Welds Performed Under Site Repair/Replacement Program for Callaway, Unit 1 | Non-Destructive Examination |
ULNRC-04776, C-3 Classified Inservice Inspection Results for Steam Generator Tube Inspections | 19 November 2002 | C-3 Classified Inservice Inspection Results for Steam Generator Tube Inspections | |
ULNRC-04778, Special Report 2002-04 Inservice Inspection Results for Steam Generator Tube Inspections - Number of Tubes Plugged or Repaired | 21 November 2002 | Special Report 2002-04 Inservice Inspection Results for Steam Generator Tube Inspections - Number of Tubes Plugged or Repaired | |
ULNRC-04783, Response to Information Requested 30 Days After the Next Refueling Outage by NRC Bulletins 2001-01, 2002,01, & 2002-02 | 20 December 2002 | Response to Information Requested 30 Days After the Next Refueling Outage by NRC Bulletins 2001-01, 2002,01, & 2002-02 | Boric Acid Foreign Material Exclusion Pressure Boundary Leakage |
ULNRC-04787, Core Operating Limits Report | 20 December 2002 | Core Operating Limits Report |