Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
IA-86-162, Partially Withheld Rept of Inquiry Q-1-83-012 Re Alleged Deficiencies in Emergency Diesel Generator,Radiation Containment Sys & Qualifications of Contractor Personnel. Region I Will Inspect Generator Design & Operating Details | 3 May 1983 | Partially Withheld Rept of Inquiry Q-1-83-012 Re Alleged Deficiencies in Emergency Diesel Generator,Radiation Containment Sys & Qualifications of Contractor Personnel. Region I Will Inspect Generator Design & Operating Details | |
IA-86-596, Rept of Inquiry Q2-85-021 on 860919 Re Alleged Falsification of Preservice Piping Insp Records by Contractor.W/Nuclear Energy Svcs,Inc Calibr Data Sheets | 19 September 1986 | Rept of Inquiry Q2-85-021 on 860919 Re Alleged Falsification of Preservice Piping Insp Records by Contractor.W/Nuclear Energy Svcs,Inc Calibr Data Sheets | Nondestructive Examination Liquid penetrant |
IA-87-399, Partially Withheld Rept of Investigation:Investigation of Alleged NRC Inspector Misconduct | 10 July 1987 | Partially Withheld Rept of Investigation:Investigation of Alleged NRC Inspector Misconduct | |
IR 05000018/1987001 | 23 September 1987 | Insp Repts 50-018/87-01,50-070/87-01,50-073/87-01 & 50-183/87-01 on 870901-03.Violations Noted.Major Areas Inspected:Evesr,Getr,Nuclear Test Reactor & Vbwr Facility Operation Programs & Emergency Preparedness Program | |
IR 05000083/1982001 | 19 July 1984 | IE Safeguards Insp Repts 50-083/82-01 & 70-1068/82-01 on 820729-31.No Nocompliance Noted.Major Areas Inspected: Security Plan,Organization,Access Controls,Records & Repts, Testing & Maint,Locks & Keys.Portions Deleted | |
IR 05000124/1983001 | 20 December 1983 | IE Safeguards Insp Rept 50-124/83-01 on 831128-29.No Violations or Deviations Identified.Major Areas Inspected: Security Plan,Protection of Snm,Security Organization, Surveillance,Access Control & Alarm Sys.Portions Deleted | |
IR 05000124/1984001 | 15 June 1981 | IE Safeguards Insp Rept 50-124/84-01 on 810504.No Noncompliance Noted.Major Areas Inspected:Security Plan, Organization,Physical Barriers,Access Control,Alarm Stations,Communications & Testing.Portions Deleted | |
IR 05000157/1989001 | 11 May 1989 | Insp Rept 50-97/89-01 & 50-157/89-01 on 890425-26.No Violations Noted.Major Areas Inspected:Operation & Records of Triga & Zpr Reactors | |
IR 05000171/1998001 | 7 August 1998 | Insp Rept 50-171/98-01 on 980612.No Violations Noted. Major Areas Inspected:Review of Facility Mgt & Control, Decommissioning Support Activities,Radiological Safety & Independent Measurements by Inspector | Fire Protection Program |
IR 05000213/1982013 | 1 July 1982 | IE Insp Repts 50-213/82-13,50-245/82-14,50-336/82-15 & 50-423/82-07 on 820607 & 08.No Noncompliance Noted.Major Areas Inspected:Prompt Public Notification Sys | |
IR 05000213/1985099 | 13 August 1985 | Revised SALP Rept 50-213/85-99 for Sept 1983 - Feb 1985, Modifying Discussion Re Deviations from Normal QA Requirements & after-the-fact Determinations of Quality | |
IR 05000213/1988021 | 15 November 1988 | Physical Security Insp Repts 50-213/88-21,50-245/88-22, 50-336/88-25 & 50-423/88-21 on 881017-21.No Noncompliance Noted.Major Areas Inspected:Safeguards Info Program - Corporate Ofcs | |
IR 05000237/1982008 | 15 June 1982 | IE Insp Repts 50-237/82-08,50-249/82-09,50-254/82-09 & 50-265/82-10 on 820503-06 & 17-18.Noncompliance Noted: Inadequate Design Analysis for Effects of Component Cooling Svc Water Check Valve Slamming | |
IR 05000245/1985099 | 6 May 1985 | SALP Repts 50-245/85-99 & 50-336/85-99 for Sept 1983 - Feb 1985 | High Radiation Area Non-Destructive Examination Fire Barrier Weld Overlay Hydrostatic Reserve Station Service Transformer Systematic Assessment of Licensee Performance Safeguards Contingency Plan Exemption Request Control of Heavy Loads Fuel cladding Inattentive |
IR 05000247/1986026 | 22 September 1986 | Insp Rept 50-247/86-26 on 860826-28.Major Areas Inspected: Requalification & Initial Licensing Training Programs for Licensed Operators.No Tracking Sys for Assuring Compliance w/10CFR55.31(e) Requirements | |
IR 05000250/1986027 | 1 December 1986 | SALP Repts 50-250/86-27 & 50-251/86-27 for Nov 1984 - Apr 1986 | Fitness for Duty High Radiation Area Fire Barrier Temporary Modification Locked High Radiation Area Missed surveillance Systematic Assessment of Licensee Performance Operability Determination Exemption Request Control of Heavy Loads Fire Protection Program Overexposure |
IR 05000254/1972009 | 20 October 1972 | Insp Repts 50-254/72-09 & 50-265/72-09 on 720825-27,0907 & 28.No Noncompliance Noted.Major Areas Inspected:Events, Investigation & Corrective Measures Re Unit 2 Jet Pump Failure on 720820 | |
IR 05000254/1985013 | 11 May 1985 | Insp Repts 50-254/85-13,50-265/85-14,50-295/85-19, 50-304/85-20,50-373/85-15,50-374/85-15,50-454/85-20 & 50-455/85-14 on 850425 & 0503.No Violations or Deviations Identified.Areas Inspected:Radiological Environ Program | Offsite Dose Calculation Manual |
IR 05000254/1986003 | 13 February 1986 | Insp Repts 50-454/86-07,50-455/86-06,50-373/86-05, 50-374/86-06,50-254/86-03,50-265/86-03,50-295/86-03 & 50-304/86-03.No Violations or Deviations Noted.Major Areas Inspected:Radiological Environ Monitoring Program | Offsite Dose Calculation Manual |
IR 05000259/1986037 | 15 December 1986 | Partially Withheld Insp Repts 50-259/86-37,50-260/86-37, 50-296/86-37,50-327/86-58 & 50-328/86-58 on 860721-1031 (Ref 10CFR2.790 & 73.21).Unresolved Item Opened.Major Areas inspected:pre-employment Screening of Certain Individuals | |
IR 05000261/1985016 | 24 May 1985 | Insp Repts 50-261/85-16,50-324/85-13,50-325/85-13 & 50-400/85-17 on 850506-09.No Violations or Deviations Noted. Major Areas Inspected:Preoperational Radiological Environ Monitoring Program at Shearon Harris & QA at Harris Lab | |
IR 05000263/1987008 | 8 June 1987 | Mgt Meeting Repts 50-263/87-08,50-282/87-10 & 50-306/87-10 on 870526.Areas Discussed:Operator Licensing Program Implementation & Methods to Improve Performance in Operator Licensing | |
IR 05000264/1973001 | 24 October 1973 | Insp Rept 50-264/73-01 on 730920 & 21.Violations Noted: Reactor Operated W/Greater than 1.5% Delta K/K Excess Reactivity on 730125 Change to Operating Procedure Inserted in Operating Log,W/O Formal Approval | Shutdown Margin Power change |
IR 05000264/1975001 | 15 October 1975 | Insp Rept 50-264/75-01 on 750922-24.No Noncompliance Noted. Major Areas Inspected:Reactor Operations,Maint, Implementation of Modified Operator Requalification Program & Corrective Action on Noncompliance Item 73-01 | |
IR 05000264/1977002 | 17 August 1977 | Insp Rept 50-264/77-02 on 770719-22,26 & 27.No Noncompliance Noted.Major Areas Inspected:Reactor Startup & Routine Operation | |
IR 05000269/1982020 | 11 June 1982 | IE Enforcement Meeting Repts 50-269/82-20,50-270/82-20, 50-287/82-21 & 50-369/82-19 on 820521.No Noncompliance Noted.Major Areas Discussed:Corrective Actions Re Breach of Reactor Bldg Integrity Due to Uncapped Calibr Line | |
IR 05000269/1982025 | 28 June 1982 | IE Insp Repts 50-269/82-25,50-270/82-25,50-287/82-25 & 50-369/82-22 on 820607-09.No Noncompliance Noted.Major Areas Inspected:Validation of Retran Computer Code | |
IR 05000269/1984031 | 31 December 1984 | SALP Repts 50-269/84-31,50-270/84-31 & 50-287/84-35 for May 1983 - Aug 1984 | Safe Shutdown Probabilistic Risk Assessment Emergency Lighting Systematic Assessment of Licensee Performance Exemption Request |
IR 05000269/1985013 | 11 June 1985 | Insp Repts 50-269/85-13,50-270/85-13,50-287/85-13, 50-369/85-18 & 50-370/85-19 on 850528-31.No Violation or Deviation Noted.Major Areas Inspected:Seismic Analysis for as-built safety-related Piping Sys | |
IR 05000269/1985014 | 13 June 1985 | Insp Repts 50-269/85-14,50-270/85-14,50-287/85-14, 50-369/85-19,50-370/85-20,50-413/85-21 & 50-414/85-20 on 850528-31.No Violation or Deviation Noted.Major Areas Inspected:Radiological Environ & Meteorological Programs | Annual Radiological Environmental Operating Report |
IR 05000269/1985022 | 11 August 1985 | Insp Repts 50-269/85-22,50-270/85-22,50-287/85-22, 50-369/85-25,50-370/85-30,50-413/85-32 & 50-414/85-30 on 850723.No Violation or Deviation Noted.Major Areas Inspected:Emergency Preparedness & Response Facilities | |
IR 05000269/1986032 | 10 December 1986 | Insp Repts 50-413/86-44,50-414/86-47,50-369/86-32, 50-370/86-32,50-269/86-32,50-270/86-32 & 50-287/86-32 on 861103-12.Violations Noted:Failure to Follow Procedures for Radiological Sample Analyses & Inadequate Surveys | Annual Radiological Environmental Operating Report |
IR 05000272/1986099 | 5 February 1988 | SALP Repts 50-272/86-99 & 50-311/86-99 for Oct 1986 - Dec 1987 | Safe Shutdown High Radiation Area Fire Barrier Weld Overlay Locked High Radiation Area Missed surveillance Systematic Assessment of Licensee Performance Safeguards Contingency Plan Fire Protection Program Fire Watch Siren |
IR 05000272/1988006 | 18 March 1988 | Partially Withheld Physical Security Insp Repts 50-272/88-06,50-311/88-06 & 50-354/88-04 on 880201-05 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected: Procedures,Security Organization & Mgt Effectiveness | Inattentive |
IR 05000277/1978021 | 14 September 1978 | Insp Repts 50-277/78-21 & 50-278/78-26 on 780914-16. Noncompliance Noted:Quantity of Radioactive Decay of Pu-241 During Periods Ending 770331,770930 & 780331 Not Reported on Form 742 | |
IR 05000277/1978026 | 2 October 1978 | IE Inspec Rept 50-277/78-26 on 780919-22 During Which 2 Items of Noncompliance Were Noted:Failure to Complete Procedure Prerequisites Prior to Performing Procedure & Failure to Observe Fuel Bundle During Movement | |
IR 05000277/1982005 | 30 March 1982 | IE Insp Repts 50-277/82-05 & 50-278/82-05 on 820218. Noncompliance Noted:Dose Rate in Rear of Sleeper of Vehicle Exceeded 2 M/H | Exclusive Use |
IR 05000277/1982007 | 26 May 1982 | IE Insp Repts 50-277/82-07 & 50-278/82-07 on 820420-21 & 26-30.No Noncompliance Noted.Major Areas Inspected:Qa/Qc Organization & Administrations & Design Change Mods | |
IR 05000277/1982012 | 19 July 1982 | IE Insp Repts 50-277/82-12 & 50-278/82-12 on 820616.No Noncompliance Noted.Major Areas Inspected:Emergency Preparedness Exercise | High Radiation Area Overexposure |
IR 05000277/1985003 | 30 May 1985 | Insp Repts 50-277/85-03 & 50-278/85-03 on 850107-11. Violation Noted:Failure to Update Telephone List for Emergency Use & Member of Emergency Response Organization Had Not Received Training for CY85 | |
IR 05000277/1985007 | 8 July 1985 | Enforcement Conference Repts 50-277/85-07 & 50-278/85-07 on 850208.Topics Discussed:Simultaneous Inoperability of One Diesel Generator & One Loop of Containment Cooling & Potential for Complete Loss of Containment Cooling | |
IR 05000277/1985012 | 21 June 1985 | Insp Repts 50-277/85-12 & 50-278/85-12 on 850316-0510. Violations Noted:Improper Shift Relief Procedures, Unrestrained Seismic Backup Nitrogen Bottle & Inadequate Control of Security Badges | Half scram Non-Destructive Examination Fire Barrier Test box Liquid penetrant Downpower |
IR 05000277/1985015 | 4 June 1985 | Insp Rept 50-277/85-15 on 850410-19.No Violation or Deviation Noted.Major Areas Inspected:Work Performed During Extended Recirculation Piping Replacement Outage | Stroke time Hydrostatic Grace period |
IR 05000277/1985017 | 30 May 1985 | Insp Rept 50-277/85-17 on 850424-26.No Violation or Deviation Noted.Major Areas Inspected:Containment Leakage Program,Including Procedure Review of Integrated Leak Rate Test & Local Leak Rate Test,Results Review & Facility Tour | |
IR 05000277/1985019 | 13 June 1985 | Insp Repts 50-277/85-19 & 50-278/85-15 as Followup Review to Insp on 840820-23.No Violation Noted.Major Areas Inspected: Results of Licensee Dosimetry Performance Tests | |
IR 05000277/1985021 | 3 July 1985 | Insp Repts 50-277/85-21 & 50-278/85-17 on 850511-0614.No Violation or Deviation Noted.Major Areas Inspected: Operational Safety Radiation Protection,Physical Security & Licensee Events | Packing leak Half scram Fire Barrier Hydrostatic Squib Excess Flow Check Valve Inattentive |
IR 05000277/1985022 | 21 August 1985 | Exam Repts 50-277/85-22 & 50-278/85-19 on 850625-27.Exam Results:All Candidates Passed Both Written & Oral Exams | |
IR 05000277/1985024 | 29 August 1985 | Insp Repts 50-277/85-24 & 50-278/85-20 on 850611-14.No Violations Noted.Major Areas Inspected:Emergency Preparedness,Licensee Audits,Knowledge & Performance of Duties & Discussion Re 850524 Radiological Release | Offsite Dose Calculation Manual Siren |
IR 05000277/1985025 | 26 August 1985 | Insp Repts 50-277/85-25 & 50-278/85-21 on 850615-0726.No Unacceptable Conditions Identified.Major Areas Inspected: Operational Safety,Radiation Protection,Physical Security, Control Room Activities,Licensee Events & Maint | Shutdown Margin Half scram Fire Barrier Hydrostatic |
IR 05000277/1985026 | 9 August 1985 | Insp Rept 50-277/85-26 on 850708-12 & 14-17.No Violation Noted.Major Areas Inspected:Mod Acceptance Tests, post-refueling Acceptance Tests,Routine Surveillance Tests & Test Performance Witnessing | Shutdown Margin Hydrostatic |