ML17187A80316 May 1969Cavitation Test Rept 12x14x14-1/2 Cvds Pump.
ML17194B5579 May 19832 Main Steam Monitoring Procedure 7-Day Data Evaluation.
ML19209A79325 September 1979Startup Test 1:Core Loading Verification.
ML19209A79625 September 1979Startup Test 2:Control Rod Operability & Subcritical Check.
ML19209A80225 September 1979Startup Test 3:Transient In-Core Probe Sys Symmetry, Reproducibility & Total Uncertainty.
ML19209A80425 September 1979Startup Test 4:Initial Criticality Comparison.
ML19225A5525 July 1979Reactor Containment Bldg Integrated Leak Rate Test, 790219-22
ML19257D15731 December 1979Quad-Cities Nuclear Power Station Units 1 & 2 Secondary Containment Leak Rate Test Summary, Per Tech Specs Section 6.6.C.3
ML19263D2106 March 1979Secondary Containment Leak Test Rept.Concludes Standby Gas Treatment Sys Maintains 1/4 Inch of Water Vacuum in Secondary Containment Bldg Under Calm Conditions W/Flow Rate No Higher than 4,000 Cfm
ML19318B66519 June 1980Cycle 5 Startup Test Results.Shutdown Margin
ML19321B17112 March 1980Reactor Containment Bldg Integrated Leak Rate Test.
ML19341D6713 April 1981Quad-Cities Nuclear Power Station,Unit 1,Cycle 6 Startup Test Results.Shutdown Margin
ML20011E7166 February 1990Reactor Containment Bldg Integrated Leak Rate Test,Quad Cities Nuclear Power Station Unit 1,891114-15.
ML20011F51426 February 1990Quad-Cities Nuclear Power Station Unit 1 Cycle 11 Startup Test Results. W/900226 LtrShutdown Margin
ML20023D26611 May 1983Preliminary Test Rept on Dynamic Testing of Dresden 2 Mechanical Pipe Snubbers.
ML20028F11520 January 1983Reactor Containment Bldg Integrated Leak Rate Test, Quad-Cities Nuclear Power Station,Unit One,821216-17.Packing leak
ML20042A64115 March 1982Quad-Cities Nuclear Power Station Unit 2,Cycle 6 Startup Test Results.Shutdown Margin
ML20044C0639 March 1993Cycle 13 Startup Test Rept Summary. W/930309 LtrShutdown Margin
ML20045H56419 September 1989Equipment Qualification Rept for Moore,Isolator,Moore Signal Transmitter & Marathon Fuse Block,CWE-3840,890919. W/930713 Ltr
ML20046B57819 May 1993Reactor Containment Bldg Integrated Leak Rate Test Quad- Cities Nuclear Power Station.Packing leak
ML20055C85931 October 1989Special Neutron Attenuation Test for High Density Spent Fuel Racks (Wet), Final ReptFire Protection Program
ML20056F06219 August 1993Quad-Cities Nuclear Power Station,Unit 1 Cycle 12 Startup Test ResultsShutdown Margin
ML20056F06319 August 1993Quad-Cities Nuclear Power Station,Unit 2 Cycle 12 Startup Test ResultsShutdown Margin
ML20056F71624 August 1993Quad-Cities Nuclear Power Station,Unit 2 Cycle 13 Startup Test Results ReptShutdown Margin
ML20059G00329 October 1993Revised Quad-Cities Nuclear Power Station Unit 2 Cycle 13 Startup Test Results
ML20069P27115 November 1983Environmental Qualification of SC-1300 & ET-1200 Families of Signal Transmitters & Electronic Trips & EI-4400 Analog Isolator SysWeak link
ML20071A83717 February 1983Quad-Cities Nuclear Power Station,Unit 1,Cycle 7 Startup Test ResultsShutdown Margin
ML20077G7942 March 1991Reactor Containment Bldg Integrated Leak Rate Test. W/
ML20078B92220 October 1994Reactor Containment Bldg Integrated Leak Rate Test,Quad- Cities Nuclear Power Station,Unit 1,940723-24
ML20078M90423 November 1994Quad-Cities Nuclear Power Station Unit One Cycle Fourteen Startup Test Results SummaryShutdown Margin
ML20082V23813 December 1983As-Found Type B & C Local Leak Rate Test Results for Unit 1 During Last Three Refueling Outages
ML20084F70910 February 1984Reactor Containment Bldg Integrated Leak Rate Test
ML20084N0348 May 1984Cycle 7 Startup Test ResultsShutdown Margin
ML20085A95519 July 1991Quad-Cities Nuclear Power Station Unit 1 Cycle 12 Startup Test ResultsShutdown Margin
ML20085C22320 December 1968Sys Leak Tests for Dresden Units 2 & 3 AdditionHydrostatic
ML20093K77212 October 1995Quad-Cities Nuclear Power Station Unit 2 Cycle 14 Startup Test Results SummaryShutdown Margin
ML20099H0526 April 1992Reactor Containment Bldg Integrated Leak Rate Test, Quad-Cities Nuclear Power Station Unit II for Period 920401-06
ML20100C04424 January 1996Secondary Containment Leak Test Summary
ML20100N10931 August 1984Reactor Vessel Irradiation Surveillance Program Analysis of Capsule 8, Final Rept
ML20100N11531 March 1984Reactor Vessel Irradiation Surveillance Program Analysis of Capsule 18, Final Rept
ML20102A69323 July 1992Quad-Cities Nuclear Power Station,Unit 2,Cycle 12 Startup Test ResultsShutdown Margin
ML20107F09924 July 1984Reactor Containment Bldg Integrated Leak Rate Test, Quad-Cities Nuclear Power Station,Unit One,840724-27
ML20108A4928 November 1984Cycle 8 Startup Test Results
ML20126B11024 December 1968Seismic Analysis of Reactor InternalsDesign basis earthquake
Earthquake
ML20129K33218 October 1996Cycle 15 Startup Test ResultsShutdown Margin
ML20134N78728 August 1985Quad-Cities Nuclear Power Station Unit 2,Cycle 8,Startup Test ResultsShutdown Margin
ML20135F12128 May 1985Reactor Containment Bldg Integrated Leak Rate Test, for 850526-28Exemption Request
ML20150C1546 December 1987Reactor Containment Bldg Integrated Leak Rate Test
ML20153G04213 June 1988Reactor Containment Bldg Integrated Leak Rate Test
ML20153G34825 November 1987Rev 1 to Irradiation Study of Boraflex Neutron Absorber Interim Test Data, Interim Technical Rept