ML19209A793

From kanterella
Jump to navigation Jump to search
Startup Test 1:Core Loading Verification
ML19209A793
Person / Time
Site: Dresden 
Issue date: 09/25/1979
From:
COMMONWEALTH EDISON CO.
To:
Shared Package
ML17174A048 List:
References
NUDOCS 7910050401
Download: ML19209A793 (1)


Text

.

DRESDEN UNIT 2 STARTUP TEST NO. 1 CORE LOADING VERIFICATION PURPOSE The purpose of this test is to visually verify that the core is loaded as intended.

CRITERIA The as-loaded core must conform with the referenced core upon which the licensing analysis was perforced. At least one independent person must either participate in performing the verification or review a videotape of the verification prior to a scartup. Any discrepancies discovered in the loading will be promptly corrected and the affected areas re-verified to be properly loaded prior to startup.

Conformance to the reference loading will br demonstrated by a permanent core serial number map and documented by the signatures of the verifiers.

RESULTS AND DISCUSSION The Cycle 7 core verification ecnsisted of a core heighe check per-formed by the fuel handlers and two videotaped passes over the core by nuclear engineering personnel during which assembly orientation and location were verified. Two independent CECO. auditors participated in the verification of the reactor core. No dincrepancies were discovered.

1126 313 7 01003o 4$l