Issue date | Title | Topic | |
---|---|---|---|
IR 05000272/2009004 | 4 November 2009 | IR 05000272-09-004, 05000311-09-004 on 07-01-09 - 09-30-09 for Salem, Units 1 and 2 - Integrated Inspection | Offsite Dose Calculation Manual Fire Barrier Temporary Modification Significance Determination Process Job Performance Measure Operability Determination Maintenance Rule Program |
IR 05000272/2013202 | 20 December 2013 | IR 05000272-13-202, 05000311-13-202 & 05000354-13-201, September 9-13, 2013, Salem Nuclear Generating Station and Hope Creek Generating Station - Cover Letter | Affidavit |
LR-N10-0115, Salem, Units 1 & 2 and Hope Creek, 2010 Annual Report - Guarantees of Payment of Deferred Premiums | 1 April 2010 | Salem, Units 1 & 2 and Hope Creek, 2010 Annual Report - Guarantees of Payment of Deferred Premiums | |
LR-N11-0087, 2011 Annual Report - Guarantees of Payment of Deferred Premiums | 31 March 2011 | 2011 Annual Report - Guarantees of Payment of Deferred Premiums | |
ML011220288 | 2 May 2001 | Facsimile Transmission, Issues to Be Discussed in an Upcoming Conference Call | |
ML021140484 | 1 May 2002 | Documentation of Conference Call Reactor Vessel Head Inspection Activities | Boric Acid |
ML021580052 | 10 June 2002 | Facsimile Transmission and Information Discussed in a Recent Conference Call | Hydrostatic |
ML021580061 | 10 June 2002 | Facsimile Transmission, Issues to Be Discussed in an Upcoming Conference Call | Fire Barrier Exemption Request |
ML022250296 | 14 August 2002 | Facsimile Transmission, Issues to Be Discussed in an Upcoming Conference Call (Tac Nos. MB5488 and MB5489) | |
ML022380271 | 26 August 2002 | Results of the Hope Creek Generating Station SDP Phase 2 Notebook Benchmarking Visit | Significance Determination Process |
ML022470402 | 15 October 2002 | Salem Nuclear Generating Station, Units 1 & 2, Hope Creek Generating Station, Oyster Creek Nuclear Generating Station - Staff Response to Comments on Proposed Director'S Decision DD-02-XX | |
ML022660420 | 24 September 2002 | Closure of Tac Nos. MB3046 & 3047 - Technical Specification 3/4.9.1 Boron Concentration | |
ML022660512 | 24 September 2002 | Closure of Tac No. MB3214 - Third Interval Inservice Inspection Program | |
ML030980023 | 8 April 2003 | Meeting with PSEG Nuclear, Llc. to Discuss Items of General Nature Relating to Hope Creek Nuclear Generating Station & Salem Nuclear Generating Station | |
ML031260059 | 5 May 2003 | Plant Systems Branch Safety Evaluation of Salem Unit 1 and 2 Request for Deviation from Appendix R to 10 CFR Part 50 | Safe Shutdown Exemption Request Fire Protection Program |
ML032050003 | 24 July 2003 | Facsimile Transmission, Issues to Be Discussed in an Upcoming Conference Call | |
ML032170153 | 1 August 2003 | Transmittal of Final ASP Analyses | Safe Shutdown Fire Barrier Significance Determination Process |
ML032400592 | 24 May 2003 | May 10-11, 2000, Summary of NRC Senior Management Meeting to Review Performance of Operating Nuclear Power Plants and Materials Facilities Licensed by Nrc. Partially Withheld | Systematic Assessment of Licensee Performance |
ML033580657 | 24 December 2003 | Frank Cassidy, PSEG Power Drop-In Visit Memorandum Dated 12/24/2003 | |
ML041590024 | 3 June 2004 | Request for Additional Information to Be Discussed in an Upcoming Conference Call, TAC No. MC2533 | |
ML041700415 | 24 June 2004 | Facsimile Transmission, Draft Request for Additional Information (RAI) to Be Discussed in an Upcoming Conference Call | |
ML041810465 | 29 June 2004 | Facsimile Transmission, Draft Request for Additional Information (RAI) to Be Discussed in an Upcoming Conference Call | |
ML041820224 | 30 June 2004 | Facsimile Transmission, Draft Request for Additional Information (RAI) to Be Discussed in an Upcoming Conference Call | |
ML041950101 | 13 July 2004 | Facsimile Transmission, Draft Request for Additional Information to Be Discussed in an Upcoming Conference Call | Probabilistic Risk Assessment Large early release frequency |
ML041980018 | 16 July 2004 | RAI, Draft Request to Be Discussed in an Upcoming Conference Call | Minimum Critical Power Ratio |
ML042290139 | 20 August 2004 | Deviation to Matrix to Provide Heightened NRC Oversight of the Salem and Hope Creek Units | |
ML042320628 | 25 August 2004 | Forthcoming Meeting with PSEG Nuclear, LLC | |
ML042440640 | 31 August 2004 | Memo, E-mail from PSEG Nuclear, LLC Regarding Hope Creek Generating Station Proposed Removal of Selected Reactor Protection System Surveillance Requirements | |
ML042450230 | 1 September 2004 | Teleconference with PSEG Nuclear, LLC Regarding Hope Creek Generating Station Proposed Implementation of a Risk-Informed Inservice Inspection Plan TAC No. MC2221) | |
ML043080264 | 3 November 2004 | Draft Request for Additional Information to Be Discussed in an Upcoming Conference Call | |
ML043100263 | 5 November 2004 | Receipt of Draft Responses | Offsite Circuit |
ML043100277 | 5 November 2004 | Facsimile Transmission, Draft Request for Additional Information to Be Discussed in an Upcoming Conference Call | |
ML043230163 | 18 November 2004 | Expected Task Interface Agreement to Review 'B' Recirculation Pump High Vibration Report | |
ML043240015 | 9 December 2004 | Notice of Meeting with PSEG Nuclear LLC, Regarding Amendment Request to Install a Non-Safety Related Cooling Loop to Containment Coolers, Salem Generating Station, Unit No. 1 | |
ML043360337 | 29 December 2004 | Change to Commitment Inservice Leak and Hydrostatic Testing | Hydrostatic |
ML043480164 | 13 December 2004 | Questions Regarding 'B' Recirculation Pump High Vibrations and High Pressure Coolant Injection System Exhaust Damage | |
ML043480242 | 29 December 2004 | November Monthly Report on the Status of Open TIAs Assigned to NRR | Boric Acid |
ML043490551 | 14 December 2004 | Facsimile Transmission, Draft RAI to Be Discussed in an Upcoming Conference Call (TAC No. Mc 5173) | Weld Overlay Hydrostatic Dissimilar Metal Weld |
ML043500645 | 16 December 2004 | Pseg'S Preliminary Responses to NRC Staff Questions Regarding 'B' Recirculation Pump Vibration | |
ML043650296 | 30 December 2004 | Public Availability and Docketing of Documents | |
ML050120255 | 12 January 2005 | Response to Task Interface Agreement - TIA 2004-006, Request for Evaluation of Sargent and Lundy Report on Hope Creek 'B' Reactor Recirculation Pump and PSEG Nuclear LLC Evaluation of High Pressure Coolant Injection System Exhaust Snubbers | Hydrostatic Nondestructive Examination |
ML050120261 | 12 January 2005 | December Monthly Report on the Status of Open TIAs Assigned to NRR | Boric Acid |
ML050120303 | 12 January 2005 | Flowserve Response to NRC Questions Station 'B' Recirculation Pump | |
ML050490153 | 8 March 2005 | Facsimile Transmission, Draft Request for Additional Information to Be Discussed in an Upcoming Conference Call | Anticipated operational occurrence MELLLA |
ML050630070 | 2 March 2005 | January Monthly Report on the Status of Open TIAs Assigned to NRR | |
ML050680155 | 9 March 2005 | 3/15/05 Forthcoming Meeting with PSEG Nuclear LLC, Regarding Future Application for Extended Power Uprate of Hope Creek Generating Station | Flow Induced Vibration |
ML051020343 | 15 April 2005 | Y020050058 - Hope Creek NRR Staff Review of PSEG Causal Determination and Corrective Actions for Failure of a Weld | Non-Destructive Examination Downpower |
ML051120311 | 11 May 2005 | Transmittal of Summaries of Final ASP Analyses | Significance Determination Process |
ML051750004 | 24 June 2005 | NRC Response to Bently Ltr Dated 5/18/05, Hope Creek Nuclear Generating Station B Reactor Recirculation Pump | Non-Destructive Examination Hydrostatic |
ML052130264 | 29 July 2005 | Request for Renewal of Deviation to the Action Matrix to Provide Heightened NRC Oversight of the Salem and Hope Creek Generating Stations | Power change |