MONTHYEARML18269A2522018-10-12012 October 2018 F&O Closure Observation Hope Creek Fire PRA ML17023A1452017-01-23023 January 2017 Summary of Teleconference with PSEG Regarding Hope Creek HPCI ML16259A2042016-09-20020 September 2016 Hope Creek Generating Station - Safety Evaluation - Request to revise technical specifications - safety limit minimum critical power ratio.(TAC NO. MF7793) ML15015A6772015-01-16016 January 2015 Forthcoming Closed Meeting with PSEG Nuclear, LLC, Regarding a Planned Digital Instrumentation and Controls License Amendment Request Associated with Hope Creek Generating Station, Unit 1 IR 05000272/20132022013-12-20020 December 2013 IR 05000272-13-202, 05000311-13-202 & 05000354-13-201, September 9-13, 2013, Salem Nuclear Generating Station and Hope Creek Generating Station - Cover Letter ML13309A0802013-12-11011 December 2013 Memorandum to File: Transcript for 10 CFR 2.206 Petition from Beyond Nuclear (Et Al) Regarding General Electric Mark I and Mark II Boiling-Water Reactors ML13233A1132013-08-22022 August 2013 Notice of Forthcoming Meeting with PSEG Nuclear, LLC Regarding a Planned Digital Instrumentation and Controls License Amendment Request Associated with Hope Creek Generating Station, Unit 1 ML13154A4952013-06-0404 June 2013 Rai'S Following Ifib Analysis of Pseg'S 2013 Decommissioning Funding Status Report for Hope Creek Generating Station ML13196A2202012-06-0606 June 2012 Memo from B. Balsam, NRR and D. Logan, NRR to J. Susco, NRR on Summary of Section 7 Consultation Activities Related to the National Marine Fisheries Service'S Final Rule to List the Atlantic Sturgeon ML1209002372012-03-29029 March 2012 and Salem Nuclear Generating Station, Unit Nos. 1 and 2, Draft Request for Additional Information ML1129901422011-10-25025 October 2011 Draft Request for Additional Information ML1129700652011-10-21021 October 2011 Summary of PSEG Drop-in Visit, 9-28-2011 and Slides ML11250A1712011-09-14014 September 2011 Notice of Forthcoming Meeting with Petitioner Requesting Action Under 10 CFR 2.206 Regarding Immediate Suspension of the Operating Licenses of General Electric (GE) Mark 1 Boiling Water Reactors (Bwrs) ML1118605722011-07-0505 July 2011 Draft Request for Additional Information ML11181A1772011-06-30030 June 2011 June 29, 2011 Summary of Public Meeting to Discuss Observations and Lessons Learned During the Hope Creek Nuclear Generating Station Application of the Nuclear Energy Institute'S Nuclear Safety Culture Assessment Process ML11137A0762011-06-0202 June 2011 Summary of Telephone Conference Call Held on May 11, 2011, Between the U.S. Nuclear Regulatory Commission and PSEG Nuclear, LLC, Concerning the Hope Creek License Condition for the Drywell ML11126A0962011-05-12012 May 2011 Notice of Meeting with Petitioner Requesting Action Under 10CFR2.206 Regarding Immediate Suspension of Operating Licenses of General Electric Mark 1 Boiling Water Reactors ML11105A0372011-05-0404 May 2011 Summary of Telephone Conference Call Held on March 25, 2011, Between the U.S. Nuclear Regulatory Commission and PSEG Nuclear, LLC, Concerning Findings on the Hope Creek Generating Station Gas Turbine ML1111108862011-04-20020 April 2011 and Salem Nuclear Generating Station, Unit Nos. 1 and 2, Draft Request for Additional Information LR-N11-0087, 2011 Annual Report - Guarantees of Payment of Deferred Premiums2011-03-31031 March 2011 2011 Annual Report - Guarantees of Payment of Deferred Premiums ML1106801152011-03-0808 March 2011 Draft Request for Additional Information ML1106005572011-03-0101 March 2011 Minutes of the Meeting of the Subcommittee on Plant License Renewal Regarding Hope Creek Generating Plant on November 3, 2010, in Rockville, Maryland ML1034909292011-02-0909 February 2011 Summary of Telephone Conference Call Held on November 18, 2010, Between the U.S. Nuclear Regulatory Commission and PSEG Nuclear, LLC, Concerning Findings on the Hope Creek Generating Station Recent Outage ML1101901352011-01-18018 January 2011 Draft Request for Additional Information ML1029500062010-10-28028 October 2010 11/17/10 Forthcoming Meeting to Discuss the Draft Supplemental Environmental Impact Statement for the License Renewal of Hope Creek Generating Station and Salem Nuclear Generating Station Units 1 and 2 ML1027100672010-09-30030 September 2010 Advisory Committee on Reactor Safeguards Review of the Hope Creek Generating Station License Renewal Application - Safety Evaluation Report with Open Items ML1027207232010-09-29029 September 2010 Federal Register Notice Regarding the ACRS Subcommittee Meeting on Plant License Renewal (Hope Creek), November 3, 2010 ML1024407062010-09-20020 September 2010 Summary of Telephone Conference Call Held on August 18,2010 Between Us NRC and PSEG Nuclear, LLC Concerning Questions Pertaining to the Hope Creek Generating Station License Renewal Application ML11263A0282010-09-16016 September 2010 E-mail with Attachment from T. Ghosh, NRR, to C. Eccleston, NRR Et Al, on Reaction Hope Creek SAMA Transmittal Memo ML11263A0272010-09-14014 September 2010 E-mail with Attachment from T. Ghosh, RES, to L. Perkins, NRR Et Al, on Fyi Salem SAMA Transmittal ML1023201782010-09-0303 September 2010 Summary of Telephone Conference Call Held on 8/16/10, Between Us NRC and PSEG Nuclear,Llc,Concerning Draft Request for Additional Information Pertaining to the Hope Creek Generating Station, License Renewal Application ML1023201792010-09-0202 September 2010 Summary of Telephone Conference Call Held on 6/21/10 Between the USNRC and PSEG Nuclear LLC Concerning Responses to Requests for Additional Information Pertaining to the Hope Creek Generating Station License Renewal Application ML1022204762010-08-18018 August 2010 Summary of Telephone Conference Call Held on 8/4/10,Between Us NRC and PSEG Nuclear, LLC, Concerning Draft RAI Pertaining to the Hope Creek Generating Station, License Renewal Application ML1022200122010-08-13013 August 2010 Summary of Telephone Conf Call Held on 7/29/10, Between the USNRC and PSEG Nuclear LLC, Concerning Follow-Up Questions Pertaining to the Salem Nuclear Generating Station, Units 1 & 2, and Hope Creek Generating Station License Renewal Enviro ML1020105012010-07-20020 July 2010 Draft Request for Additional Information ML1018303472010-07-0202 July 2010 Draft Request for Additional Information ML1017600102010-06-24024 June 2010 Draft Request for Additional Information ML1011004322010-04-19019 April 2010 PSEG Slides for Salem and Hope Creek Annual Assessment Meeting, April 6, 2010 ML1009904032010-04-0808 April 2010 Draft Request for Additional Information LR-N10-0115, Salem, Units 1 & 2 and Hope Creek, 2010 Annual Report - Guarantees of Payment of Deferred Premiums2010-04-0101 April 2010 Salem, Units 1 & 2 and Hope Creek, 2010 Annual Report - Guarantees of Payment of Deferred Premiums ML11259A2702010-03-0101 March 2010 E-mail with Attachment from D. Logan, NRR, to S. Duda, Aecom Et Al, on Mitigation Memo ML1002907322010-01-28028 January 2010 Draft Request for Additional Information ML0934405582009-12-10010 December 2009 Notice of Closed Meeting with PSEG Nuclear LLC (PSEG) to Discuss Exemption from Schedular Requirements of 10 CFR 73.55 for Hope Creek Generating Station and Salem Nuclear Generating Station, Unit Nos. 1 and 2 ML0928706352009-10-23023 October 2009 11/05/2009 Notice of Meeting to Discuss License Renewal Process and Environmental Scoping for Salem Nuclear Generating Station, Units 1 and 2, and Hope Creek Generating Station, License Renewal Application Review ML0923606212009-08-27027 August 2009 Logistics Trip Report to Delaware Emergency Management Agency Regarding Salem-Hope Creek License Renewal ML0920103212009-07-30030 July 2009 Logistics Trip Report to Salem and Hope Creek Nuclear Stations and Salem, New Jersey ML0919504062009-07-14014 July 2009 Draft Request for Additional Information ML0917302782009-06-22022 June 2009 PSEG Drop-in Visit (Salem and Hope Creek) on 6-18-2009 ML0913502412009-05-14014 May 2009 Draft Request for Additional Information ML0911701652009-04-27027 April 2009 Draft Request for Additional Information 2018-10-12
[Table view] |
Text
May 2, 2001 MEMORANDUM TO: James W. Clifford, Chief, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation FROM: Richard B. Ennis, Project Manager, Section 2 /RA/
Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation
SUBJECT:
HOPE CREEK GENERATING STATION, FACSIMILE TRANSMISSION, ISSUES TO BE DISCUSSED IN AN UPCOMING CONFERENCE CALL (TAC NO. MB0644)
The attached information was transmitted by facsimile on May 1, 2001, to Mr. Brian Thomas of PSEG Nuclear LLC (the licensee). This information was transmitted to facilitate a upcoming conference call in order to clarify the licensees submittal dated December 1, 2000. In the submittal, the licensee requested a revision to the Hope Creek Generating Station (HCGS) Facility Operating License and Technical Specifications to increase the HCGS licensed power level by approximately 1.4%. This memorandum and the attachment do not convey or represent an NRC staff position regarding the HCGS power uprate request.
Docket No. 50-354
Attachment:
Issues for Discussion in Upcoming Telephone Conference
May 2, 2001 MEMORANDUM TO: James W. Clifford, Chief, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation FROM: Richard B. Ennis, Project Manager, Section 2 /RA/
Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation
SUBJECT:
HOPE CREEK GENERATING STATION, FACSIMILE TRANSMISSION, ISSUES TO BE DISCUSSED IN AN UPCOMING CONFERENCE CALL (TAC NO. MB0644)
The attached information was transmitted by facsimile on May 1, 2001, to Mr. Brian Thomas of PSEG Nuclear LLC (the licensee). This information was transmitted to facilitate a upcoming conference call in order to clarify the licensees submittal dated December 1, 2000. In the submittal, the licensee requested a revision to the Hope Creek Generating Station (HCGS) Facility Operating License and Technical Specifications to increase the HCGS licensed power level by approximately 1.4%. This memorandum and the attachment do not convey or represent an NRC staff position regarding the HCGS power uprate request.
Docket No. 50-354
Attachment:
Issues for Discussion in Upcoming Telephone Conference DISTRIBUTION PUBLIC ZAbdullahi JClifford JBongarra REnnis PDI-2 Reading DOCUMENT NAME: C:\FileNet\ML011220288.wpd Accession No. ML0112202 OFFICE PDI-2/PM NAME REnnis DATE 5/1/07 OFFICIAL RECORD COPY
Issues for Discussion in Upcoming Telephone Conference Related to PSEG License Change Request H00-05, dated December 1, 2000 Hope Creek Generating Station 1.4% Power Uprate
- 1) Attachment 1, Section 13.5 of the submittal states that the changes due to the proposed power uprate will have minimal effect on the plant simulator. Are the changes to the simulator being made in accordance with ANSI/ANS 3.5, Nuclear Power Plant Simulators for Use in Operator Training? If so, what revision of the standard is being applied? If ANSI/ANS 3.5 is not being used, please provide an explanation.
- 2) Attachment 1, Section 5.2 of the submittal discusses reactor overpressure protection analysis and states that the peak vessel bottom pressure is 1331 psig which is below the 1375 psig ASME limit. This section also states that the ASME limit of 1375 psig is 110% of the design value. Attachment 1, Section 15.2 of the submittal discusses fuel related overpressure protection analysis and states that there is more than 100 psi margin to the ASME 110% peak pressure design criteria (i.e., 1375 psig). Please clarify the apparent discrepancy between these two sections and verify that the peak pressure is 1331 psig.