ML043240015
| ML043240015 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 12/09/2004 |
| From: | Geoffrey Miller NRC/NRR/DLPM/LPD1 |
| To: | Darrell Roberts NRC/NRR/DLPM/LPD1 |
| Miller G, NRR/DLPM, 415-2481 | |
| References | |
| Download: ML043240015 (5) | |
Text
1Commission's Policy Statement on Enhancing Public Participation in NRC Meetings" (67 FR 36920), May 28, 2002.
December 9, 2004 MEMORANDUM TO: Darrell J. Roberts, Chief, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation FROM:
G. Edward Miller, Project Engineer, Section 2 /RA by RFretz for//
Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation
SUBJECT:
FORTHCOMING MEETING WITH PSEG NUCLEAR LLC, REGARDING AMENDMENT REQUEST TO INSTALL A NON-SAFETY RELATED COOLING LOOP TO CONTAINMENT COOLERS, SALEM GENERATING STATION, UNIT NO. 1 DATE & TIME:
Thursday, December 16, 2004 9:00 a.m. - 12:00 p.m.
LOCATION:
U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike, Room 09B4 Rockville, Maryland PURPOSE:
To discuss PSEG Nuclear, LLCs, requested amendment to allow installation of a non-safety related chilled water system to provide cooling to the Containment Fan Cooling Units.
CATEGORY1:
This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the Nuclear Regulatory Commission (NRC) after the business portion, but before the meeting is adjourned.
The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript or other information from the meeting in another format (e.g.,
braille, large print), please notify the NRCs meeting coordinator.
Determinations on requests for reasonable accommodation will be made on a case-by-case basis.
PARTICIPANTS:
Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR).
NRC/NRR PSEG R. Fretz J. Arias G. Miller A. Moudgil E. Throm H. Trenka J. Tatum T. DelGaizo S. Mannon G. Schwartz J. Sullivan Docket No. 50-272
Attachment:
Agenda cc w/att: See next page MEETING CONTACTS: Robert J. Fretz, NRR G. Edward Miller, NRR 301-415-1324 301-415-2481 rxf@nrc.gov gxm@nrc.gov Determinations on requests for reasonable accommodation will be made on a case-by-case basis.
PARTICIPANTS:
Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR).
NRC/NRR PSEG R. Fretz J. Arias G. Miller A. Moudgil E. Throm H. Trenka J. Tatum T. DelGaizo S. Mannon G. Schwartz J. Sullivan Docket No. 50-272
Attachment:
Agenda cc w/att: See next page MEETING CONTACTS: Robert J. Fretz, NRR G. Edward Miller, NRR 301-415-1324 301-415-2481 rxf@nrc.gov gxm@nrc.gov DISTRIBUTION:
PUBLIC PD1-2 Reading BSheron LMarsh/JLyons CHolden DRoberts GMiller EThrom JTatum RDennig KGrimes CRaynor OPA GMatakas, RI JJolicoeur, EDO RI DScrenci, RI ORA PMNS TMensah OGC ACRS Receptionist (OWFN and TWFN)
ADAMS Accession Number: ML043240015 OFFICE PDI-2/PE PDI-2/LA PDI-2/SC NAME RFretz for GMiller CRaynor DRoberts DATE 11/30/04 11/30/04 12/7/04 OFFICIAL RECORD COPY
Salem Nuclear Generating Station, Unit Nos. 1 and 2 cc:
Mr. Michael H. Brothers Vice President - Site Operations PSEG Nuclear - X15 P.O. Box 236 Hancocks Bridge, NJ 08038 Mr. John T. Carlin Vice President - Nuclear Assessments PSEG Nuclear - N10 P.O. Box 236 Hancocks Bridge, NJ 08038 Mr. Patrick S. Walsh Vice President - Eng/Tech Support PSEG Nuclear - N28 P.O. Box 236 Hancocks Bridge, NJ 08038 Ms. Christina L. Perino Director - Licensing & Nuclear Safety PSEG Nuclear - N21 P.O. Box 236 Hancocks Bridge, NJ 08038 Jeffrie J. Keenan, Esquire PSEG Nuclear - N21 P.O. Box 236 Hancocks Bridge, NJ 08038 Ms. R. A. Kankus Joint Owner Affairs PECO Energy Company Nuclear Group Headquarters KSA1-E 200 Exelon Way Kennett Square, PA 19348 Lower Alloways Creek Township c/o Mary O. Henderson, Clerk Municipal Building, P.O. Box 157 Hancocks Bridge, NJ 08038 Dr. Jill Lipoti, Asst. Director Radiation Protection Programs NJ Department of Environmental Protection and Energy CN 415 Trenton, NJ 08625-0415 Brian Beam Board of Public Utilities 2 Gateway Center, Tenth Floor Newark, NJ 07102 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Senior Resident Inspector Salem Nuclear Generating Station U.S. Nuclear Regulatory Commission Drawer 0509 Hancocks Bridge, NJ 08038 Mr. Carl J. Fricker Plant Manager PSEG Nuclear - N21 P.O. Box 236 Hancocks Bridge, NJ 08038
Attachment AGENDA MEETING BETWEEN THE NUCLEAR REGULATORY COMMISSION AND PSEG NUCLEAR LLC, REGARDING AN AMENDMENT REQUEST TO INSTALL A NON-SAFETY RELATED COOLING LOOP TO CONTAINMENT COOLERS SALEM GENERATING STATION, UNIT NO. 1 December 16, 2004 I.
Opening Remarks II.
Introduction III.
Project Summary IV.
Design Details V.
Containment Analysis VI.
Licensing Submittal VII.
Operations Viewpoint VIII.
Questions and Answers IX.
Summary