Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
DD-85-09, Forwards Director'S Decision DD-85-09 Issued on 850604. Decision Addresses Palmetto Alliance & Gap Request for Enforcement Action Under 10CFR2.206 Against Util Re Allegations of Harassment & Intimidation of Employees | 6 June 1985 | Forwards Director'S Decision DD-85-09 Issued on 850604. Decision Addresses Palmetto Alliance & Gap Request for Enforcement Action Under 10CFR2.206 Against Util Re Allegations of Harassment & Intimidation of Employees | |
IA-84-722, Provides Addl Info Re 831025 Interview.B Garde,B Jones & B Guild Attended Interview.Signed Sworn Statement Not Taken Due to Late Hour of Termination of Interview.Info Partially Withheld | 31 October 1983 | Provides Addl Info Re 831025 Interview.B Garde,B Jones & B Guild Attended Interview.Signed Sworn Statement Not Taken Due to Late Hour of Termination of Interview.Info Partially Withheld | |
IA-84-927, Forwards Request for Addl Info & Proposed License Conditions Re Hydrogen Control Measures.Target Date for Upgraded Analyses Should Be Extended to 841201 | 21 September 1984 | Forwards Request for Addl Info & Proposed License Conditions Re Hydrogen Control Measures.Target Date for Upgraded Analyses Should Be Extended to 841201 | |
IA-85-584, Submits Description of Actions Taken Re ASLB 840622 Partial Initial Decision Concerning Procedures for Control of Welding Filler Metal,Welding Concerns D-18 & E-2 & Procedures for Walkdown Insp | 27 November 1984 | Submits Description of Actions Taken Re ASLB 840622 Partial Initial Decision Concerning Procedures for Control of Welding Filler Metal,Welding Concerns D-18 & E-2 & Procedures for Walkdown Insp | |
IA-87-778, Board Notification 84-024:forwards SECY-84-34 Re Emergency Diesel Generators Mfg by Transamerica Delaval,Inc.Staff Continuing Overall Assessment of Reliability of Diesel Engines | 15 February 1984 | Board Notification 84-024:forwards SECY-84-34 Re Emergency Diesel Generators Mfg by Transamerica Delaval,Inc.Staff Continuing Overall Assessment of Reliability of Diesel Engines | |
ML20046C176 | 21 July 1993 | Forwards Revs to Catawba Station Selected Licensee Commitments Manual,List of Effective Pages 1 & 5 & Chapter 16.11,page 16.11-33,Table 16.11-6 Re Radioactive Gaseous Effluent Monitoring Instrumentation SRs | |
ML20054F577 | 15 June 1982 | Advises That NRC Review of Liquid & Gaseous Emissions (Source Term) Resulting from Normal Plant Operation,Re Charlotte-Mecklenburg Environ Coalition Contentions 1 & 2, Will Be Included in SER | |
ML20054H416 | 9 June 1982 | Notification of 820628 & 29-30 Meetings W/Util & Westinghouse in York County,Sc to Discuss Reactor Sys Branch Review Questions of Facility FSAR | |
ML20054M826 | 7 July 1982 | Notification of 820720-21 Meetings W/Util to Visit Site & Discuss Auxiliary Sys Branch Open Items Transmitted on 820427 | |
ML20055D979 | 5 July 1990 | Notification of 900719 Meeting W/Util in Rockville,Md to Discuss Cause,Morphology & Future Plans Re Cracking Tubes at Expansion Transition Zone & at Tube Support Locations in Steam Generators.Agenda Encl | |
ML20056H002 | 20 August 1993 | Submits Daily Highlight Re 930824 Meeting W/Util in Rockville,Md to Discuss Main Steamline Break Analysis Assumptions | |
ML20058C963 | 19 November 1993 | Notification of 931201 Meeting W/Util in Rockville,Md to Update NRC on Mcguire,Units 1 & 2 & Catawba,Unit 1 Steam Generator Replacement Project | |
ML20058J506 | 29 November 1993 | Notification of Significant Licensee Meeting W/Util on 931203 to Discuss Licensee Intended EAL Changes for All Three Plants Relative to NUMARC Issues & Implementation of EPA-400 | |
ML20058J819 | 12 November 1993 | Notification of Significant Licensee Meeting W/Util on 931129 to Discuss Performance of Facility During SALP Cycle 11 | |
ML20058Q301 | 15 October 1993 | Notification of Significant Licensee Meeting W/Util on 931019 in Atlanta,Ga to Discuss SALP Performance of Plant During Period of 920503-931002 | |
ML20069N468 | 2 June 1994 | Forwards 940525 Approval Ltr from DHEC Authorizing Use of Sodium Bromide in Cooling Towers.Internal DHEC Memo from Vernon Beaty Giving Rept on Review of Toxicity Data Supplied State on Sodium Bromide Also Encl | |
ML20069N513 | 15 June 1994 | Forwards Approved Const Permit to Install Drinking Water Line to Serve Blast & Coat Facility at Catawba | |
ML20081J788 | 17 March 1995 | Forwards Sc Dept of Health & Environ Control Approving Continued Use of Sodium Bromide in Cooling Towers Until 950901.Approval Will Become Permanent When State Updates NPDES Permit Later This Year | |
ML20081K629 | 16 March 1995 | Forwards Ltr from Sc Dept of Health & Environ Control in Response to Util 950215 Request to Use Addl Treatment Chemicals | |
ML20085B248 | 8 June 1995 | Forwards Revised Approval Ltr Which Replaces 950315 Approval Ltr from Sc Dept of Health & Environ Control,Approving Use of Stated Chemicals Provided Discharge Level for Each Parameter Less than No Observed Effect Concentration Level | |
ML20095C308 | 6 December 1995 | Forwards Ltr from Sc Dept of Health & Environ Control Approving 950920 Request to Begin Using Dimethylamine | |
ML20107B705 | 10 April 1996 | Forwards Approval Ltrs from Army Corp of Engineers & Sc Dept of Health & Environ Control for 960125 Application to Raise Standby Nuclear Service Water Pond Elevation by Two Ft | |
ML20127B055 | 21 November 1983 | Requests Addl Info Re Ice Condenser Containment Bldg Capabilities to Withstand Reverse Pressure Differentials Developing After Combustion of Large Quantities of Hydrogen | Overspeed trip |
ML20127B428 | 19 March 1984 | Recommends That Facility OL Include Listed License Conditions,Based on Continuing Review.Rationale for Proposed License Condition Re Hydrogen Control Measures Encl | Overspeed trip |
ML20127B664 | 16 May 1984 | Forwards Sser,Salp Input & Addl License Conditions Re Hydrogen Control Measures for Degraded Core Accidents. Completion Date for Revised List of Proposed License Condition Is 841201 Rather than Full Power Licensing Date | Fuel cladding Overspeed trip |
ML20127C048 | 16 September 1991 | Forwards Insp Guidance for Outage Team Insp Based on PWR Generic PRA Insights Study & Available Shutdown Risk Study Results,Per Request | |
ML20127C131 | 21 September 1984 | Forwards Request for Addl Info & Proposed License Conditions Re Hydrogen Control Measures.Target Date for Upgraded Analyses Should Be Extended to 841201 | |
ML20127D701 | 29 April 1985 | Forwards Position Paper Re Main Steam Line Break in Superpipe Concurrent W/Single Active Failure.Revised Westinghouse Scenario Has Caused Staff to Rereview Guidelines Used in Evaluating Such Breaks | |
ML20127E938 | 20 June 1985 | Advises That NRC 850628 Oral Argument Will Be Presented by GE Johnson,Per Aslab 850613 Order.Related Correspondence | |
ML20127F306 | 18 June 1985 | Forwards Tabular Summary of Key Results from Regional Survey of plant-specific Info Re Potential for Uncontrolled Radiation Exposures in PWR Cavities,Per Jg Partlow 850315 Request.No Further Generic Action Needed | High Radiation Area |
ML20128K104 | 7 October 1996 | Forwards e-mail to Copp & M Kitlan of Duke Power Co. Purpose of Message to Prepare Licensee Personnel for Conference Call | |
ML20128Q243 | 1 August 1996 | Discusses Concerns Raised During 960722 AEOD Program Review Re Reportability of Reactor Trip Breaker Problems at Plants | Time of Discovery |
ML20129A311 | 20 January 1984 | Forwards FOIA Request from B Garde for Documents Re Region II &/Or Ofc of Investigations Insp/Investigation of Issues Raised by Langley & Witnesses Testifying in Licensing Proceeding.Response Requested by 840130 | |
ML20129A370 | 30 March 1984 | Discusses 840321 Interview W/Welding Inspector Employed by Util Re Final Resolution/Disposition of Two Separate R2A Const Deficiency Repts.Resident Inspector Should Address Issues | |
ML20129A412 | 24 April 1984 | Discusses Info Provided by GE Ross,Supervisory Technician/ Welding Insp,Re Lack of Mgt Support Suppression of Nci & Harassment & Intimidation at Facilities | |
ML20129A438 | 24 May 1984 | Notifies That Ofc of Investigations Has Contacted Individuals Mentioned in 840424 Memo.No Addl Investigative Effort Warranted | |
ML20129A471 | 12 July 1984 | Forwards IE Investigation Rept 2-83-038 on 831128-840413. No Noncompliance Noted | |
ML20129H740 | 29 August 1996 | Ack Receipt of 960801 Memo Re Reactor Trip Breaker Problems at Plants.Recommended That AEOD or Appropriate Group within NRR Advise OE Whether Technical Staff Considers That Violations Occurred,Per 10CFR50.73 or 10CFR21 | |
ML20129H775 | 18 July 1985 | Forwards Matls License Package Containing Documents Supporting Issuance of License SNM-1949 to Util for Receipt, Possession,Insp & Storage of Snm.Related Correspondence | Fuel cladding Fire Protection Program |
ML20129K218 | 7 November 1996 | Informs That Task Interface Agreement (TIA 95-10) Technical Assistance Request,Service Water Pond Model Adequacy Which Serves as Ultimate Heat Sink at Catawba Has Been re-evaluated & Assistance from NMSS Requested | Ultimate heat sink |
ML20132B537 | 29 March 1983 | Forwards ACRS Seismology Consultant Comments on NRR Charleston Plan & Plan Impact on Facility.License Procedure Change Postponement for 3 Yrs Inappropriate.Hazard Curves for Facilities to Be Examined & Need for Actions Indicated | Earthquake |
ML20132B646 | 12 October 1983 | Forwards Chronology of Documented Events Re Util Organization for Qc.Organization for QC Acceptable from 2 Yrs Before CP Issued to Present.Related Documentation Encl | |
ML20132B651 | 6 October 1983 | Forwards Chronology of Util Documented Events in Response to Govt Accountability Project Ltr to Refute Allegation Re Util QA Organization | |
ML20132F527 | 23 December 1996 | Forwards Facsimile from DPC Signifying Implementation of Operating License Amends 156 & 148 on 961219 | Grace period |
ML20133E502 | 11 July 1985 | Notification of 850723-25 Meetings W/Util in York County, Sc to Discuss NRC 850705 Comments on First Draft Tech Specs | |
ML20133J606 | 2 October 1985 | Forwards List of Remaining Const Testing & Insp Items That Require Resolution Prior to Fuel Loading,Per Insp Procedure 94300B.Earliest Fuel Loading Date Projected for 860101 | Safe Shutdown Emergency Lighting Safeguards Contingency Plan |
ML20133K659 | 21 October 1983 | Provides Status of Review of NRC Handling of Gap 830421 Allegations.Gap Compiling Affidavits from Plant Employees Which Identify Numerous Technical/Hardware Problems at Site. Related Info Encl | Scaffolding Affidavit |
ML20133P828 | 12 August 1985 | Advises That,Due to Issuance of License SNM-1949,annual Indemnity Fee Should Be Changed as Listed,Effective 850710 | |
ML20134A714 | 5 November 1985 | Forwards List of Current AEOD Studies of Operational Events Re Reactor & Nonreactor Activities.Each Study Will Be Documented as Technical Review,Engineering Evaluation or Case Study Rept When Completed | |
ML20134D342 | 17 October 1996 | Forwards Facsimile Re Implementation of Operating License Amends 152 & 144 for Unit 2 | Grace period |