Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
DD-85-09, Forwards Director'S Decision DD-85-09 Issued on 850604. Decision Addresses Palmetto Alliance & Gap Request for Enforcement Action Under 10CFR2.206 Against Util Re Allegations of Harassment & Intimidation of Employees6 June 1985Forwards Director'S Decision DD-85-09 Issued on 850604. Decision Addresses Palmetto Alliance & Gap Request for Enforcement Action Under 10CFR2.206 Against Util Re Allegations of Harassment & Intimidation of Employees
IA-84-722, Provides Addl Info Re 831025 Interview.B Garde,B Jones & B Guild Attended Interview.Signed Sworn Statement Not Taken Due to Late Hour of Termination of Interview.Info Partially Withheld31 October 1983Provides Addl Info Re 831025 Interview.B Garde,B Jones & B Guild Attended Interview.Signed Sworn Statement Not Taken Due to Late Hour of Termination of Interview.Info Partially Withheld
IA-84-927, Forwards Request for Addl Info & Proposed License Conditions Re Hydrogen Control Measures.Target Date for Upgraded Analyses Should Be Extended to 84120121 September 1984Forwards Request for Addl Info & Proposed License Conditions Re Hydrogen Control Measures.Target Date for Upgraded Analyses Should Be Extended to 841201
IA-85-584, Submits Description of Actions Taken Re ASLB 840622 Partial Initial Decision Concerning Procedures for Control of Welding Filler Metal,Welding Concerns D-18 & E-2 & Procedures for Walkdown Insp27 November 1984Submits Description of Actions Taken Re ASLB 840622 Partial Initial Decision Concerning Procedures for Control of Welding Filler Metal,Welding Concerns D-18 & E-2 & Procedures for Walkdown Insp
IA-87-778, Board Notification 84-024:forwards SECY-84-34 Re Emergency Diesel Generators Mfg by Transamerica Delaval,Inc.Staff Continuing Overall Assessment of Reliability of Diesel Engines15 February 1984Board Notification 84-024:forwards SECY-84-34 Re Emergency Diesel Generators Mfg by Transamerica Delaval,Inc.Staff Continuing Overall Assessment of Reliability of Diesel Engines
ML20046C17621 July 1993Forwards Revs to Catawba Station Selected Licensee Commitments Manual,List of Effective Pages 1 & 5 & Chapter 16.11,page 16.11-33,Table 16.11-6 Re Radioactive Gaseous Effluent Monitoring Instrumentation SRs
ML20054F57715 June 1982Advises That NRC Review of Liquid & Gaseous Emissions (Source Term) Resulting from Normal Plant Operation,Re Charlotte-Mecklenburg Environ Coalition Contentions 1 & 2, Will Be Included in SER
ML20054H4169 June 1982Notification of 820628 & 29-30 Meetings W/Util & Westinghouse in York County,Sc to Discuss Reactor Sys Branch Review Questions of Facility FSAR
ML20054M8267 July 1982Notification of 820720-21 Meetings W/Util to Visit Site & Discuss Auxiliary Sys Branch Open Items Transmitted on 820427
ML20055D9795 July 1990Notification of 900719 Meeting W/Util in Rockville,Md to Discuss Cause,Morphology & Future Plans Re Cracking Tubes at Expansion Transition Zone & at Tube Support Locations in Steam Generators.Agenda Encl
ML20056H00220 August 1993Submits Daily Highlight Re 930824 Meeting W/Util in Rockville,Md to Discuss Main Steamline Break Analysis Assumptions
ML20058C96319 November 1993Notification of 931201 Meeting W/Util in Rockville,Md to Update NRC on Mcguire,Units 1 & 2 & Catawba,Unit 1 Steam Generator Replacement Project
ML20058J50629 November 1993Notification of Significant Licensee Meeting W/Util on 931203 to Discuss Licensee Intended EAL Changes for All Three Plants Relative to NUMARC Issues & Implementation of EPA-400
ML20058J81912 November 1993Notification of Significant Licensee Meeting W/Util on 931129 to Discuss Performance of Facility During SALP Cycle 11
ML20058Q30115 October 1993Notification of Significant Licensee Meeting W/Util on 931019 in Atlanta,Ga to Discuss SALP Performance of Plant During Period of 920503-931002
ML20069N4682 June 1994Forwards 940525 Approval Ltr from DHEC Authorizing Use of Sodium Bromide in Cooling Towers.Internal DHEC Memo from Vernon Beaty Giving Rept on Review of Toxicity Data Supplied State on Sodium Bromide Also Encl
ML20069N51315 June 1994Forwards Approved Const Permit to Install Drinking Water Line to Serve Blast & Coat Facility at Catawba
ML20081J78817 March 1995Forwards Sc Dept of Health & Environ Control Approving Continued Use of Sodium Bromide in Cooling Towers Until 950901.Approval Will Become Permanent When State Updates NPDES Permit Later This Year
ML20081K62916 March 1995Forwards Ltr from Sc Dept of Health & Environ Control in Response to Util 950215 Request to Use Addl Treatment Chemicals
ML20085B2488 June 1995Forwards Revised Approval Ltr Which Replaces 950315 Approval Ltr from Sc Dept of Health & Environ Control,Approving Use of Stated Chemicals Provided Discharge Level for Each Parameter Less than No Observed Effect Concentration Level
ML20095C3086 December 1995Forwards Ltr from Sc Dept of Health & Environ Control Approving 950920 Request to Begin Using Dimethylamine
ML20107B70510 April 1996Forwards Approval Ltrs from Army Corp of Engineers & Sc Dept of Health & Environ Control for 960125 Application to Raise Standby Nuclear Service Water Pond Elevation by Two Ft
ML20127B05521 November 1983Requests Addl Info Re Ice Condenser Containment Bldg Capabilities to Withstand Reverse Pressure Differentials Developing After Combustion of Large Quantities of HydrogenOverspeed trip
ML20127B42819 March 1984Recommends That Facility OL Include Listed License Conditions,Based on Continuing Review.Rationale for Proposed License Condition Re Hydrogen Control Measures EnclOverspeed trip
ML20127B66416 May 1984Forwards Sser,Salp Input & Addl License Conditions Re Hydrogen Control Measures for Degraded Core Accidents. Completion Date for Revised List of Proposed License Condition Is 841201 Rather than Full Power Licensing DateFuel cladding
Overspeed trip
ML20127C04816 September 1991Forwards Insp Guidance for Outage Team Insp Based on PWR Generic PRA Insights Study & Available Shutdown Risk Study Results,Per Request
ML20127C13121 September 1984Forwards Request for Addl Info & Proposed License Conditions Re Hydrogen Control Measures.Target Date for Upgraded Analyses Should Be Extended to 841201
ML20127D70129 April 1985Forwards Position Paper Re Main Steam Line Break in Superpipe Concurrent W/Single Active Failure.Revised Westinghouse Scenario Has Caused Staff to Rereview Guidelines Used in Evaluating Such Breaks
ML20127E93820 June 1985Advises That NRC 850628 Oral Argument Will Be Presented by GE Johnson,Per Aslab 850613 Order.Related Correspondence
ML20127F30618 June 1985Forwards Tabular Summary of Key Results from Regional Survey of plant-specific Info Re Potential for Uncontrolled Radiation Exposures in PWR Cavities,Per Jg Partlow 850315 Request.No Further Generic Action NeededHigh Radiation Area
ML20128K1047 October 1996Forwards e-mail to Copp & M Kitlan of Duke Power Co. Purpose of Message to Prepare Licensee Personnel for Conference Call
ML20128Q2431 August 1996Discusses Concerns Raised During 960722 AEOD Program Review Re Reportability of Reactor Trip Breaker Problems at PlantsTime of Discovery
ML20129A31120 January 1984Forwards FOIA Request from B Garde for Documents Re Region II &/Or Ofc of Investigations Insp/Investigation of Issues Raised by Langley & Witnesses Testifying in Licensing Proceeding.Response Requested by 840130
ML20129A37030 March 1984Discusses 840321 Interview W/Welding Inspector Employed by Util Re Final Resolution/Disposition of Two Separate R2A Const Deficiency Repts.Resident Inspector Should Address Issues
ML20129A41224 April 1984Discusses Info Provided by GE Ross,Supervisory Technician/ Welding Insp,Re Lack of Mgt Support Suppression of Nci & Harassment & Intimidation at Facilities
ML20129A43824 May 1984Notifies That Ofc of Investigations Has Contacted Individuals Mentioned in 840424 Memo.No Addl Investigative Effort Warranted
ML20129A47112 July 1984Forwards IE Investigation Rept 2-83-038 on 831128-840413. No Noncompliance Noted
ML20129H74029 August 1996Ack Receipt of 960801 Memo Re Reactor Trip Breaker Problems at Plants.Recommended That AEOD or Appropriate Group within NRR Advise OE Whether Technical Staff Considers That Violations Occurred,Per 10CFR50.73 or 10CFR21
ML20129H77518 July 1985Forwards Matls License Package Containing Documents Supporting Issuance of License SNM-1949 to Util for Receipt, Possession,Insp & Storage of Snm.Related CorrespondenceFuel cladding
Fire Protection Program
ML20129K2187 November 1996Informs That Task Interface Agreement (TIA 95-10) Technical Assistance Request,Service Water Pond Model Adequacy Which Serves as Ultimate Heat Sink at Catawba Has Been re-evaluated & Assistance from NMSS RequestedUltimate heat sink
ML20132B53729 March 1983Forwards ACRS Seismology Consultant Comments on NRR Charleston Plan & Plan Impact on Facility.License Procedure Change Postponement for 3 Yrs Inappropriate.Hazard Curves for Facilities to Be Examined & Need for Actions IndicatedEarthquake
ML20132B64612 October 1983Forwards Chronology of Documented Events Re Util Organization for Qc.Organization for QC Acceptable from 2 Yrs Before CP Issued to Present.Related Documentation Encl
ML20132B6516 October 1983Forwards Chronology of Util Documented Events in Response to Govt Accountability Project Ltr to Refute Allegation Re Util QA Organization
ML20132F52723 December 1996Forwards Facsimile from DPC Signifying Implementation of Operating License Amends 156 & 148 on 961219Grace period
ML20133E50211 July 1985Notification of 850723-25 Meetings W/Util in York County, Sc to Discuss NRC 850705 Comments on First Draft Tech Specs
ML20133J6062 October 1985Forwards List of Remaining Const Testing & Insp Items That Require Resolution Prior to Fuel Loading,Per Insp Procedure 94300B.Earliest Fuel Loading Date Projected for 860101Safe Shutdown
Emergency Lighting
Safeguards Contingency Plan
ML20133K65921 October 1983Provides Status of Review of NRC Handling of Gap 830421 Allegations.Gap Compiling Affidavits from Plant Employees Which Identify Numerous Technical/Hardware Problems at Site. Related Info EnclScaffolding
Affidavit
ML20133P82812 August 1985Advises That,Due to Issuance of License SNM-1949,annual Indemnity Fee Should Be Changed as Listed,Effective 850710
ML20134A7145 November 1985Forwards List of Current AEOD Studies of Operational Events Re Reactor & Nonreactor Activities.Each Study Will Be Documented as Technical Review,Engineering Evaluation or Case Study Rept When Completed
ML20134D34217 October 1996Forwards Facsimile Re Implementation of Operating License Amends 152 & 144 for Unit 2Grace period