ML20132F527
| ML20132F527 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 12/23/1996 |
| From: | Tam P NRC (Affiliation Not Assigned) |
| To: | NRC (Affiliation Not Assigned) |
| References | |
| TAC-M95838, TAC-M95839, NUDOCS 9612260001 | |
| Download: ML20132F527 (2) | |
Text
$* "R I
p 41 UNITED STATES.
g j
NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20616 4001 December 23, 1996 MEMORANDUM FOR: Docket 1 File.,
FROM:
Peter S. Tam, Senior Project Manager Project Directorate II-2 i
y Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation-
SUBJECT:
CATAWBA UNITS 1 AND 2 - IMPLEMENTATION OF AMENDMENTS 156 AND
~
148 TO OPERATING LICENSES (TAC M95838 AND M95839)
The attached page, transmitted by fax from Duke Power Company, signifies-the implementation of operating license Amendments 156 (for Unit 1) and 148 (for Unit 2) on December 19, 1996.
Docket Numbers 50-413 and 50-414 Distribution Docket file PUBLIC H. Berkow NRC FILE CENTER COPY f
\\
\\
240062 fd NOk
$$$13 p
(--.
.~
j CounpEamee Fumettamal Area Masusal.
f 3.3 701/13 Rev.1 i
Enclooms'5 i
Page 1 of 2 i
g FACILITY OPERATING IJCENSE/ TECHNICAL SPECIP1 CATION CHANGE i
IMPLEMENTATION StiEET i
9 j
El CNS Q MNS O ONS UNrrNO. 515 2 Q 3 4
i
'ISNO. 1.9.G fMWIPuLAh DATE RECEIVED illio/%
Egowe
/
AMENDMENT. NO. M/o /142 SITE PLANNO(S).
I 1.
IMPIEMENTATION DATES i
j A.
NRC EFFECITYE DATE (From NMC letter): _ MoV Rf, l9%
l
)'
B.
STATION IMPLSEENTATION(Grace Period - 2 WEEKS): 2>sc 9; 194 (a 2.
PLANT NOTIHCATION Pi9 f 6 -332 i NmMh M
3AVS enecsonas cWAbes a os inirsah der ye 4 p4oNE bk'fb? MS
- * '88N i
A. E/g Via E-Mail Distribution; Include Site Contacts 1
B.
/
Pre-implementation Items 3.
RGC TECHNICAL CONTENT REVIEW CRITERIA O
A.
All Dig.A,,.ficies Have Been Resolved Via NRC Interface.
j O
B.
No Inadvertent Changes Were Made To TS Sheets Involved.
j D
C.
TS Chang as Issued As Requested By DPC.
TscHMCA1.REVEWER: 1LMYAL8k_
A D#LM (List Disorspancies On Anached Page)/
~
Dam CHECKED BY:
$l
_ Ib ld /.
(List Diocespancies On AW Page)l T s
' Dem 4.
k ALL CORRECTIVE ACTIONS FROM ASSIGNED PIP COMPIETED IM i171VDfD6)4M hCTIDO AM<FA_Aj 7 7 bbd T[,%
YERIFIED BY:
n.u ar D~
s 5.
FINALIMPLEMENTATION VAL 4
. m. -
b
. (('$
L O $G I
" Manager.keely Assurance Date i
E00%
D