ML20134D342
| ML20134D342 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 10/17/1996 |
| From: | Tam P NRC (Affiliation Not Assigned) |
| To: | NRC (Affiliation Not Assigned) |
| References | |
| TAC-M94192, TAC-M94193, NUDOCS 9610220003 | |
| Download: ML20134D342 (2) | |
Text
1sk* "%
p*
-t UNITE 3 STATES NUCLEAR REGULATORY COMMISSION If WASHINGTON, D.C. 20666 0001 g ****+,o October 17, 1996 i
MEMORANDUM FOR: @sfit(FileY4 FROM:
Peter S. Tam, Senior Project Manager Project Directorate II-2 i
Division of Reactor Projects - I/II
'M I
Office of Nuclear Reactor Regulation
SUBJECT:
CATAWBA UNITS 1 AND 2 - IMPLEMENTATION OF AMENDMENTS 152 AND 144 TO OPERATING LICENSES (TAC M94192 AND M94193)
The attached page, transmitted by fax from Duke Power Company, signifies the implementation of operating license Amendments 152 (for Unit 1) and 144 (for Unit 2) on October 3, 1996.
l I
Docket Numbers 50-413 and 50-414 I
Distribution Docket file TDTOI ',
kow NRC fitE CEEIER CON 210089 l
9610220003 961017
{
PDR ADOCK 05000413 P
PDH i
i
'o s,.
i l
CompHance Functional Area Manual 3.3 FOIJTS Rev.1 Page 1 of 2 FACILITY OPERATING LICENSE / TECHNICAL SPECIFICATION CHANGE IMPLEMENTATION SHEET
%CNS O MNS O ONS UNITNO k1 k2 03 TS NO. 3/#, 7. J' DATE RECEIVED
%40-96 4
AMENDMENT. NO. /d //tV SITE PLAN NO(S).
.,v/,#-
I.
IMPLEMENTATION DATES A.
NRC EFFECTIVE DATE (From NRC letter):
9 -d0-%
i B.
STATION IMPLEMENTATION (Grace Period - 2 WEEKS):
/o -Me6 j
2.
PLANT NOTIFICATION iniskxLs date i
A. &/h-/-% Via E-Mail Distribution; Include Site Technical Contacts B..:m. / /a+% Pre implementation Items 3.
RGC TECHNICAL CONTENT REVIEW CRITERIA E
A.
All Discrepancies Have Been Resolved Via NRC Interface.
E B.
No Inadvertent Changes Were Made To TS Sheets Involved.
E C.
TS Change Was Issued Requested By DPC.
TECHNICAL REVIEWER:
I
/4 -/-12.
4__ -
(List Di cies On At@ Page)
Date CHECKED BY:
M l6 '~ 2S b (List Disc'repancies On Attiched Pige)
Date h
ALL CO 4.
'E A - ONS FROM ASSIGNED PIP COMPLETED VERIFIED BY:
. h/
/d -J ~70
/
egulaIory Co ance Date 5.
FINALIMPLEMENTATION APPROVAL NY lb]3]%
Manager. Regulatory Compt
' date Rm[f,
/b/3/94 Manager. Safety Assurance
' D(te 200 @
3XVIldNO3 A80.L71.133H 101CICSC09 IVd Ot:91 G34 90/00,'0!