ML20129A471
| ML20129A471 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 07/12/1984 |
| From: | Hayes B NRC OFFICE OF INVESTIGATIONS (OI) |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML20127B003 | List: |
| References | |
| FOIA-84-722 NUDOCS 8507270229 | |
| Download: ML20129A471 (1) | |
Text
-.
,.[3 3g,,
UNITED STATES NUCLEAR REGULATORY COMMISSION y,(
g w-ca.o c. mss sg,
j U.S. MC July 12,1984 tm Jti 16 PN 2 07 h
Of f(( O' N.U G.IN 4',0 J fG. I %4 E i
MEMORANDUM FOR:
James P. O'Reilly, Regional Administrator Region II l
Ben B. Hayes, Director d.i.Q W FROM:
3 Office of Investigations
SUBJECT:
CATAWBA NUCLEAR STATION:
ALLEGED CHEATING ON QC WELDING INSPECTION EXAMINATIONS (2-83-039) l Enclosed is a Report of Investigation pertaining to an investigation at Duke Power Company's Catawba Nuclear Station, Clover, SC concerning the above subject.
Interviews were conducted with those welding inspectors who attended the class where the cheating allegedly occurred.
Additionally, current and former welding inspectors who attended subsequent classes were interviewed.
All of those interviewed, totalling 20 individuals, stated unequivocally I
that they were not aware of any improprieties in any welding inspector training.
The instructors who conducted the training class were also interviewed and provided sworn testimony wherein they denied providing any assistance as alleged.
Based on the fact no one was able to co.rroborate any of the information set forth by the alleger, the allegation appears to be without merit.
Neither this memorandur or report may be released outside the NRC without the permission of the Director, 01.
Internal NRC access and dissemination may be on a need to know basis.
Enclosure:
As Stated cc w/ encl:
y.-J. Dircks. EDO P J. 1. Vorse 01:RII l
L 8507270229 850506 Mi PDR FOIA BELL 84-722 PDR
- 'IL 5 f-l E 3. 2_
E 2
_.m