Issue date | Title | Topic | |
---|---|---|---|
05000335/LER-2016-001 | 29 July 2016 | Inadequate Legacy Evaluation for Containment High Range Radiation Monitor Nonconformance with Design Accuracy Requirements Resulted in Latent Inoperability and Operation Prohibited by Technical Specifications LER 16-001-00 for St. Lucie Units 1 and 2 Regarding Inadequate Legacy Evaluation for Containment High Range Radiation Monitor Nonconformance with Design Accuracy Requirements Resulted in Latent Inoperability and Operation Prohibited by Technical.... | Reactor Vessel Water Level |
05000335/LER-2016-003 | 15 August 2017 | Generator Lockout Relay Actuation During Power Ascension Results in Reactor Trip LER 16-003-01 for St. Lucie, Unit 1, Regarding Generator Lockout Relay Actuation During Power Ascension Results in Reactor Trip | |
05000389/LER-2017-001 | 27 April 2017 | Delay in Initiating Immediate Technical Specification Required Action During Fuel Movements LER 17-001-00 for St. Lucie, Unit 2 Regarding Delay in Initiating Immediate Technical Specification Required Action During Fuel Movements | |
CY-11-015, Response to Second Request for Additional Information for Application for NRC Consent to Indirect License Transfer/Threshold Determination - Merger of Northeast Utilities and Nstar | 16 May 2011 | Response to Second Request for Additional Information for Application for NRC Consent to Indirect License Transfer/Threshold Determination - Merger of Northeast Utilities and Nstar | Enforcement Discretion Exemption Request |
CY-11-024, Response to Request for Supplemental Information Related to the Request for Exemption from 10 C.F.R.50.38 and the Indirect License Transfer Related to Merger of Northeast Utilities and Nstar | 16 August 2011 | Response to Request for Supplemental Information Related to the Request for Exemption from 10 C.F.R.50.38 and the Indirect License Transfer Related to Merger of Northeast Utilities and Nstar | |
CY-11-025, Connecticut Yankee and Yankee Atomic, Response to Third Request for Additional Information for Application for NRC Consent to Indirect License Transfer/Threshold Determination - Merger of Northeast Utilities and Nstar | 24 August 2011 | Connecticut Yankee and Yankee Atomic, Response to Third Request for Additional Information for Application for NRC Consent to Indirect License Transfer/Threshold Determination - Merger of Northeast Utilities and Nstar | |
CY-11-035, Follow-Up to Meeting on September 20, 2011, Regarding Foreign Ownership and Decommissioning Funding Issues | 5 October 2011 | Follow-Up to Meeting on September 20, 2011, Regarding Foreign Ownership and Decommissioning Funding Issues | Exemption Request |
CY-11-041, Foreign Ownership Negation Action Plan and Decommissioning Funding Assurance | 21 December 2011 | Foreign Ownership Negation Action Plan and Decommissioning Funding Assurance | Decommissioning Funding Assurance Status Report |
CY-92-223, G20110523/LTR-11-0411/EDATS: SECY-2011-0411 - Ltr. from Rep. E.J. Markey to Chairman Jaczko NRC Safety Requirements for Reactors Granted Construction Permits Prior to 1971 | 14 July 2011 | G20110523/LTR-11-0411/EDATS: SECY-2011-0411 - Ltr. from Rep. E.J. Markey to Chairman Jaczko NRC Safety Requirements for Reactors Granted Construction Permits Prior to 1971 | Fukushima Dai-Ichi Significance Determination Process Earthquake Backfit |
IR 05000033/2006003 | 27 July 2006 | IR 0500033-06-003, 05000389-06-003, on 04/01/2006 - 06/30/2006, St. Lucie, Units 1 & 2 | Boric Acid High winds Ultimate heat sink Internal Flooding Enforcement Discretion Nondestructive Examination Foreign Material Exclusion Operability Determination Through-Wall Leak |
IR 05000039/2018003 | 8 November 2018 | Nuclear Regulatory Commission Integrated Inspection Report 05000335/2018003 and 0500039/2018003 | Boric Acid Non-Destructive Examination Internal Flooding Coatings Nondestructive Examination Functionality Assessment Aging Management Significance Determination Process Operability Determination License Renewal Maintenance Rule Program Liquid penetrant Fire Protection Program |
IR 05000309/2004001 | 18 August 2004 | IR 05000309-04-001, on January 12, 2004 - July 29, 2004, Maine Yankee Atomic Power Company | |
IR 05000309/2004002 | 1 February 2005 | IR 05000309-04-002, on 05/24/2004 - 12/31/2004, Maine Yankee Atomic Power Company, Integrated Inspection | |
IR 05000309/2005001 | 5 October 2005 | IR 05000309-05-001 on 02/05/2005 - 07/29/2005 for Maine Yankee Atomic Power Company, Wiscasset, Maine | |
IR 05000309/2005002 | 30 September 2005 | IR 05000309-05-002 on 06/10/2005 - 09-09/2005, Maine Yankee, Licensee Safety Reviews, Design Changes, and Modifications; Final Status Surveys (Fss); and Radioactive Waste Management Programs | |
IR 05000309/2008001 | 28 January 2008 | IR 05000309-08-001, on 06/04/2007 - 07/02/2007 and 11/15/2007 - 12/31/2007, Maine Yankee, Wiscasset, Maine | Fire Protection Program |
IR 05000309/2016001 | 18 May 2016 | IR 07200030-16-001 and 05000309-16-001 on 4/19/16, Maine Yankee Atomic Power Company, Wiscasset, Me Site | Aging Management Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Fire Protection Program |
IR 05000309/2018001 | 30 May 2018 | NRC Independent Spent Fuel Storage Installation Report Nos. 07200030/2018001 and 05000309/2018001, Maine Yankee Atomic Power Company, Wiscasset, Maine Site | Offsite Dose Calculation Manual Fire Protection Program |
IR 05000309/2021001 | 28 October 2021 | Company - NRC Independent Spent Fuel Storage Installation Inspection Report Nos. 07200030/2021001 and 05000309/2021001 | Annual Radioactive Effluent Release Report Fire Protection Program |
IR 05000335/2001003 | 30 July 2001 | NRC Integrated Inspection Report 05000335/2001003 and 05000389/2001003 | Safe Shutdown Fitness for Duty Non-Destructive Examination Offsite Dose Calculation Manual Fire Barrier Contraband Coatings Temporary Modification Emergency Lighting Locked High Radiation Area Condition Adverse to Quality Significance Determination Process Annual Radioactive Effluent Release Report Process Control Program Liquid penetrant Fire Protection Program |
IR 05000335/2001005 | 28 January 2002 | IR 05000335/2001-005 & IR 05000389/2001-005, St. Lucie, Units 1 & 2, Inspection on 09/30 - 12/29/2001 Related to Administrative & Engineering Controls. Non-cited Violation Noted | Boric Acid High Radiation Area Post Accident Monitoring Temporary Modification VT-2 Significance Determination Process Foreign Material Exclusion Pressure Boundary Leakage Downpower |
IR 05000335/2001006 | 26 April 2002 | IR 05000335/2001-006 & IR 05000389/2001-006, St. Lucie, Units 1 and 2, Inspection on 03/30/2002 Related to Safety and Compliance with NRC Rules and Regulations. No Violations Noted | Loop seal Commercial Grade Dedication Past operability Temporary Modification Significance Determination Process Operability Determination |
IR 05000335/2002002 | 29 July 2002 | IR 05000335-02-002, IR 05000389-02-002, on 06/29/02 for Florida Power & Light Company, St. Lucie Plant, Units 1 & 2. Resident Integrated Inspection Report | Boric Acid Time of Discovery High winds Ultimate heat sink Internal Flooding Temporary Modification Operability Determination Maintenance Rule Program |
IR 05000335/2002003 | 28 October 2002 | IR 05000335-02-003 & IR 05000389-02-003, on 06/30/2002 - 09/28/2002, St. Lucie Nuclear Plant, Units 1 & 2. One Finding in Area of Access Control | Fitness for Duty Contraband Temporary Modification Significance Determination Process Operability Determination Safeguards Contingency Plan |
IR 05000335/2002004 | 29 January 2003 | IR 05000335-02-004 & IR 05000389-02-004 on 09/29/2002 - 01/4/2003; Florida Power & Light; St. Lucie, Units 1 and 2; Refueling and Outage Activities, Event Followup | Safe Shutdown Boric Acid Reactor Vessel Water Level Fire Barrier Nondestructive Examination Temporary Modification VT-2 Significance Determination Process Foreign Material Exclusion Operability Determination Power change |
IR 05000335/2002005 | 21 May 2002 | IR 05000335/2002-005 & 05000389/2002-005, St. Lucie Nuclear Plant, Inspection on 04/15/2002-04/25/2002 Related to Identification & Resolution of Problems. No Findings of Significance Identified | Probabilistic Risk Assessment Coatings Significance Determination Process Maintenance Rule Program |
IR 05000335/2002006 | 11 July 2002 | IR 05000335-02-006, Final Significance Determination - No Violation of NRC Requirements & No Inspection Finding | |
IR 05000335/2003001 | 3 March 2003 | Annual Assessment Letter - St Lucie Nuclear Plant IRs 05000335-03-001 & 05000389-03-001 | |
IR 05000335/2003004 | 29 April 2003 | IR 05000335-03-004, IR 05000389-03-004, on 01/05 - 04/05/2003, Florida Power & Light Company | Significance Determination Process Operability Determination Siren |
IR 05000335/2003005 | 24 July 2003 | IR 05000335-03-005, IR 05000389-03-005, on 04/06 - 06/28/2003, Florida Power & Light Co, St. Lucie Nuclear Plant, Units 1 & 2; Refueling and Outage Activities, Radiological Access Controls | Boric Acid High winds High Radiation Area Ultimate heat sink Contraband Internal Flooding Nondestructive Examination Temporary Modification Locked High Radiation Area Significance Determination Process Annual Radioactive Effluent Release Report Foreign Material Exclusion Process Control Program Operability Determination Safeguards Contingency Plan Liquid penetrant Operability Assessment |
IR 05000335/2003006 | 27 October 2003 | IR 05000335-03-006, IR 05000389-03-006, on 06/29/2003 - 09/27/2003; St. Lucie Nuclear Plant, Units 1 & 2; Personnel Performance During Non-Routine Plant Evolutions | Temporary Modification Significance Determination Process Job Performance Measure Downpower |
IR 05000335/2003007 | 26 January 2004 | IR 05000335-03-007 and IR 05000389-03-007, on 12/27/03, for St. Lucie, Units 1 and 2, Problem Identification and Resolution | Boric Acid Ultimate heat sink Internal Flooding Past operability Enforcement Discretion Significance Determination Process Pressure Boundary Leakage Downpower |
IR 05000335/2003008 | 12 March 2003 | IR 05000335-03-008 & IR 05000389-03-008, on January 27-30, 2003, St. Lucie Plant. Verification of Compliance with Interim Compensatory Measures Order | B.5.b |
IR 05000335/2003009 | 13 January 2004 | IR 05000335-03-009, 05000389-03-009, on 12/01-05/2003 and 12/15-19/2003; St. Lucie Nuclear Plant, Units 1 and 2; Plant Design - Pilot, Enclosures 1, 2, and 3 | High winds Offsite Dose Calculation Manual Stroke time Probabilistic Risk Assessment Job Performance Measure Battery sizing |
IR 05000335/2003010 | 13 February 2003 | IR 05000335-03-010 and IR 05000389-03-010 on 12/02/2002 - 02/10/2003; Florida Power and Light Company; St. Lucie, Units 1 & 2; Access to Radiologically Significant Areas, Radiation Monitoring Instrumentation and Protective Equipment.. | High Radiation Area Grab sample Offsite Dose Calculation Manual Met Tower Locked High Radiation Area Significance Determination Process Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Operability Determination |
IR 05000335/2003013 | 7 November 2003 | IR 05000335-03-013, IR 05000389-03-013, on 07/14/2003 - 11/06/2003, for St. Lucie Nuclear Plant, Units 1 and 2; Significance Determination of Fire Protection Inspection Findings | Hot Short Safe Shutdown Fire Barrier Significance Determination Process Fire Protection Program |
IR 05000335/2004003 | 15 April 2004 | IR 05000335-04-003, IR 05000389-04-003 on 03/27/04, Florida Power & Light, St. Lucie Nuclear Plant, Units 1 and 2. Findings of Very Low Safety Significance Were Identified | Boric Acid Coatings Significance Determination Process |
IR 05000335/2004004 | 26 July 2004 | IR 05000335-04-004, 05000389-04-004, on 03/28/2004 - 06/26/2004, St. Lucie Nuclear Plant, Units 1 & 2; Licensed Operator Requalification, Maintenance Effectiveness, & Personnel Performance During Nonroutine Plant Evolutions & Events | Boric Acid High winds Packing leak Nondestructive Examination Temporary Modification Significance Determination Process Foreign Material Exclusion Operability Determination License Renewal Maintenance Rule Program Minimum staff |
IR 05000335/2004005 | 25 October 2004 | NRC Integrated Inspection Report 05000335-04-005 and 05000389-04-005 | Boric Acid High winds High Radiation Area Ultimate heat sink Offsite Dose Calculation Manual Internal Flooding Past operability Met Tower Temporary Modification Locked High Radiation Area Significance Determination Process Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Operability Determination Scaffolding |
IR 05000335/2004006 | 26 January 2005 | IR 05000335-04-006, 05000389-04-006, on 09/26/2004 - 12/31/2004; Florida Power & Light; St. Lucie Nuclear Plant, Units 1 & 2; Operator Performance During Nonroutine Plant Evolutions and Events | Boric Acid Internal Flooding Coatings Temporary Modification Significance Determination Process Operability Determination Downpower |
IR 05000335/2004007 | 26 March 2004 | IR 05000335-04-007 & 05000389-04-007, on 02/09/2004 - 02/27/2004, St. Lucie Nuclear Plant Units 1 & 2; Problem Identification & Resolution | |
IR 05000335/2004011 | 4 February 2005 | IR 05000335-04-011 and 05000389-04-011 on 12/16/2004 - 1/7/2005 for St. Lucie, Units 1 and 2; Florida Power & Light; Special Inspection | Commercial Grade Dedication Significance Determination Process Operability Determination |
IR 05000335/2004302 | 6 January 2005 | Senior Reactor Operator Retake Examination St. Lucie Nuclear Plant - 05000335/2004302 and 05000389/2004302 | |
IR 05000335/2005002 | 27 April 2005 | IR 05000335-05-002, 05000389-05-002, on 01/01/2005 - 03/31/2005; St. Lucie Nuclear Plant, Units 1 & 2; Routine Integrated Report | Safe Shutdown Boric Acid Non-Destructive Examination Fire Barrier Internal Flooding Nondestructive Examination Temporary Modification VT-2 Tornado Generated Missile Significance Determination Process Foreign Material Exclusion Operability Determination Liquid penetrant Through Wall Leak Power change Siren |
IR 05000335/2005003 | 25 July 2005 | IR 05000335-05-003, and IR 05000389-05-003, on 04/01-06/30/2005 for Florida Power & Light Company; Temporary Plant Modifications | Hot Short Safe Shutdown High winds Enforcement Discretion Coatings Temporary Modification Significance Determination Process Operability Determination Fire Protection Program Fire Watch Scaffolding |
IR 05000335/2005004 | 13 October 2005 | IR 05000335-05-004 & IR 05000389-05-004, on 07/01/2005 - 09/30/2005, St. Lucie Nuclear Plant, Units 1 & 2; Equipment Alignment and Temporary Plant Modifications | Boric Acid High winds Temporary Modification Condition Adverse to Quality Significance Determination Process Job Performance Measure Operability Determination |
IR 05000335/2005005 | 30 January 2006 | IR 05000335-05-005, IR 05000389-05-005 on 10/01/2005 - 12/31/2005 for St. Lucie Nuclear Plant, Units 1 & 2; Refueling and Other Outage Activities, Inservice Inspection Activities, Radiation Safety, and PI&R Annual Sample Review | Boric Acid High winds Packing leak High Radiation Area Stroke time Commercial Grade Dedication Internal Flooding Hydrostatic Coatings Nondestructive Examination VT-2 Locked High Radiation Area Significance Determination Process Foreign Material Exclusion Process Control Program Operability Determination Control of Heavy Loads Liquid penetrant Pressure boundary leak Fire Protection Program Fire Watch Scaffolding Substantial potential for overexposure Overexposure |
IR 05000335/2005007 | 22 July 2005 | IR 05000335-05-007 and IR 05000389-05-007, on 06/13-17/2005 & 06/20-24/2005 for St. Lucie Nuclear Plant - NRC Safety System Design and Performance Capability | Internal Flooding Job Performance Measure |
IR 05000335/2006002 | 27 April 2006 | IR 05000335-06-002 and 05000389-06-002 for St. Lucie Nuclear Plant, Notice of Enforcement Discretion 06-02-01 | Internal Flooding Enforcement Discretion Significance Determination Process Operability Determination Downpower |
IR 05000335/2006004 | 26 October 2006 | IR 05000335-06-004, 05000389-06-004 on 07/01/2006 - 09/30/2006 for St. Lucie Nuclear Plant, Units 1 & 2; Permanent Plant Modifications, Event Followup | Boric Acid Significance Determination Process Operability Determination Scaffolding Operability Assessment |