Category:Inspection Report
MONTHYEARIR 05000335/20230102024-01-26026 January 2024 NRC Quadrennial Focused Engineering Inspection (FEI) Commercial Grade Dedication Report 05000335/2023010 and 05000389/2023010 IR 05000335/20230042024-01-24024 January 2024 Integrated Inspection Report 05000335/2023004 and 05000389/2023004 IR 05000335/20230032023-11-0606 November 2023 Integrated Inspection Report 05000335/2023003 and 05000389/2023003 IR 05000335/20233012023-09-20020 September 2023 NRC Operator License Examination Report 05000335/2023301 and 05000389/2023301 IR 05000335/20230022023-08-0707 August 2023 Integrated Inspection Report 05000335/2023002 and 05000389/2023002 IR 05000335/20234032023-06-29029 June 2023 Security Inspection Report 05000335/2023403 and 05000389/2023403 IR 05000335/20234022023-06-20020 June 2023 Security Baseline Inspection Report 05000335/2023402 and 05000389/2023402 IR 05000335/20234012023-05-16016 May 2023 Cyber Security Inspection Report 05000335/2023401 and 05000389/2023401 (Cover Letter) IR 05000335/20230012023-05-0909 May 2023 Integrated Inspection Report 05000335/2023001 and 05000389/2023001 IR 05000335/20234202023-03-21021 March 2023 Security Baseline Inspection Report 05000335/2023420 and 05000389/2023420 IR 05000335/20220062023-03-0101 March 2023 Annual Assessment Letter for St. Lucie Units 1 & 2 (Report 05000335/2022006 and 05000389/2022006) IR 05000335/20220042023-02-10010 February 2023 Integrated Inspection Report 05000335/2022004 and 05000389/2022004 IR 05000335/20220112022-12-27027 December 2022 Triennial Fire Protection Inspection Report 05000335/2022011 and 05000389/2022011 IR 05000335/20220032022-11-0404 November 2022 Integrated Inspection Report 05000335/2022003 and 05000389/2022003 ML22208A1762022-08-0404 August 2022 Review of the Fall 2021 Steam Generator Tube Inspection Report IR 05000335/20220022022-08-0101 August 2022 Integrated Inspection Report 05000335/2022002 and 05000389/2022002 ML22210A0782022-07-22022 July 2022 Stl 2022003 Document Request IR 05000335/20220122022-06-29029 June 2022 Biennial Problem Identification and Resolution Inspection Report 05000335 2022012 and 05000389 2022012 IR 05000335/20224012022-05-20020 May 2022 Security Baseline Inspection Report 05000335/2022401 and 05000389/2022401 IR 05000335/20220012022-05-12012 May 2022 Integrated Inspection Report 05000335/2022001 and 05000389/2022001 IR 05000335/20220102022-04-27027 April 2022 Design Basis Assurance Inspection (Programs) Inspection Report 05000335/2022010 and 05000389/2022010 IR 05000335/20214022022-04-0404 April 2022 Material Control and Accounting Program Inspection Report 05000335/2021402 and 05000389/2021402 - Public IR 05000335/20210062022-03-0202 March 2022 Annual Assessment Letter for St. Lucie, Units 1 & 2 (Report No. 05000335/2021006 and 05000389/2021006) IR 05000335/20210042022-02-14014 February 2022 Integrated Inspection Report 05000335/2021004 and 05000389/2021004 IR 05000335/20214032021-12-14014 December 2021 Security Baseline Inspection Report 05000335/2021403 and 05000389/2021403 IR 05000335/20210102021-12-0707 December 2021 Design Basis Assurance Inspection (Teams) Inspection Report 05000335/2021010 and 05000389/2021010 IR 05000335/20210032021-11-0303 November 2021 Integrated Inspection Report 05000335/2021003 and 05000389/2021003 IR 05000335/20210052021-08-25025 August 2021 Updated Inspection Plan for St. Lucie Plant Units 1 & 2 (Report 05000335/2021005 and 05000389/2021005) IR 05000335/20210022021-08-10010 August 2021 Integrated Inspection Report 05000335/2021002 and 05000389/2021002 IR 05000335/20214012021-06-23023 June 2021 Security Baseline Inspection Report 05000335/2021401 and 05000389/2021401 IR 05000335/20213012021-06-21021 June 2021 NRC Examination Report 05000335/2021301 and 05000389/2021301 IR 05000335/20210012021-05-12012 May 2021 Integrated Inspection Report 05000335/2021001 and 05000389/2021001 IR 05000335/20200062021-03-0303 March 2021 Annual Assessment Letter for St. Lucie Nuclear Plant, Unit 1 and Unit 2 Report 05000335/2020006 and 05000389/2020006 IR 05000335/20203012021-02-16016 February 2021 NRC Operator License Examination Report 05000335/2020301 and 05000389/2020301 IR 05000335/20200042021-02-0808 February 2021 Integrated Inspection Report 05000335/2020004 and 05000389/2020004 and Independent Spent Fuel Storage Installation (ISFSI) Inspection 07200061/2020002 IR 05000335/20204012021-01-0505 January 2021 Security Baseline Inspection Report 05000335/2020401 and 05000389/2020401 IR 05000335/20200112020-12-16016 December 2020 Triennial Inspection of Evaluation of Changes, Tests and Experiments Baseline Inspection Report 05000335/2020011 and 05000389/2020011 IR 05000335/20200032020-10-30030 October 2020 Integrated Inspection Report 05000335/2020003 and 05000389/2020003 ML20296A3732020-10-22022 October 2020 Security Inspection Report IR 05000335/20200052020-08-24024 August 2020 Updated Inspection Plan for St. Lucie Plant, Unit 1 and 2 (Report 05000335/2020005 and 05000389/2020005) IR 05000335/20200022020-07-29029 July 2020 St.Lucie Units 1 & 2 Integrated Inspection Report 05000335/2020002, 05000389/2020002, and Independent Spent Fuel Storage Installation Inspection (Lsfsi) 07200061/2020001 IR 05000335/20200102020-07-16016 July 2020 Biennial Problem Identification and Resolution Inspection Report 05000335/2020010 and 05000389/2020010 IR 05000335/20200012020-05-0505 May 2020 Integrated Inspection Report 05000335/2020001 and 05000389/2020001 and Exercise of Enforcement Discretion IR 05000335/20190062020-03-0303 March 2020 Annual Assessment Letter for St. Lucie Nuclear Plant, Units 1 and 2 NRC Report 05000335/2019006 and 05000389/2019006 IR 05000335/20190032019-11-14014 November 2019 Integrated Inspection Report 05000335/2019003 and 05000389/2019003 IR 05000335/20193022019-10-18018 October 2019 NRC Examination Report 05000335/2019302 and 05000389/2019302 IR 05000335/20194112019-10-0707 October 2019 NRC Security Inspection Report 05000335/2019411 and 05000389/2019411 IR 05000335/20194012019-09-0909 September 2019 Cyber Security Inspection Report 05000335/2019401 and 05000389/2019401 (Public) IR 05000335/20190052019-08-27027 August 2019 Updated Inspection Plan for St. Lucie Plant, Unit 1 and Unit 2 - (Report 05000335/2019005 and 05000389/2019005) IR 05000335/20190112019-08-20020 August 2019 Triennial Fire Protection Inspection Report 05000335/2019011 and 05000389/2019011 2024-01-26
[Table view] Category:Inspection Report Correspondence
MONTHYEARML23216A1412023-06-30030 June 2023 August 2023 RP Inspection Document Request ML22251A3682022-09-0909 September 2022 Notification of an NRC Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000335 2022011, 05000389 2022011) and Request for Information (RFI) ML22077A3732022-03-22022 March 2022 Review of the Spring 2021 Steam Generator Tube Inspection Report IR 05000335/20170112017-04-18018 April 2017 Final Significance Determination of a White Finding; NRC Inspection Report 05000335/2017011 IR 05000335/20080072008-04-18018 April 2008 IR 05000335-08-007, IR 05000389-08-007, and IR 07200061-08-001, on 02/25/2008 - 03/14/2008, for St. Lucie, Units 1 and 2, and ISFSI, Inspector Notes IR 05000335/20074022007-07-26026 July 2007 Transmittal Letter for St. Lucie Nuclear Plant - NRC Security Inspection Report 05000335/2007402 and 05000389/2007402 - SGI Removed ML0708501102007-03-22022 March 2007 NRC Inspection Report No. 05000335,389/2007401 IR 05000335/20070012007-03-0101 March 2007 Annual Assessment Letter - St. Lucie Nuclear Plant (NRC Inspection Report 05000335, 389/2007001) IR 05000335/20064012007-01-18018 January 2007 NRC Inspection Report 05000335-06-401 and 05000389-06-401 IR 05000335/20060072006-11-24024 November 2006 IR 05000335-06-007, 05000389-06-007, Safeguards Information Removed IR 05000033/20060032006-07-27027 July 2006 IR 0500033-06-003, 05000389-06-003, on 04/01/2006 - 06/30/2006, St. Lucie, Units 1 & 2 ML0401608942003-12-22022 December 2003 Undated Input for St. Lucie Fire Protection Baseline Inspection on 03/10-14 and 24-28/2003 ML0401201012003-12-22022 December 2003 Undated Input for St. Lucie Fire Protection Baseline Inspection on 03/10-14 and 24-28/2003 ML0401200992003-12-22022 December 2003 Undated Input for St. Lucie Fire Protection Baseline Inspection on 03/10-14 and 24-28/2003 ML0400902832003-12-22022 December 2003 Undated Inspection Post-Inspection Debrief to Region II DRS Managers Regarding St. Lucie Triennial Fire Protection Inspection ML0401201042003-04-0404 April 2003 Input for St Lucie Inspection Report 03-02 IR 05000335/20020052002-05-21021 May 2002 IR 05000335/2002-005 & 05000389/2002-005, St. Lucie Nuclear Plant, Inspection on 04/15/2002-04/25/2002 Related to Identification & Resolution of Problems. No Findings of Significance Identified ML0209508842002-04-0505 April 2002 IR 05000335/2002-006, St. Lucie Nuclear Power Plant, Inspection on 03/14/2002-04/03/2002 Related to Fire Protection Unresolved Item 50-335, 389/98-201-09 IR 05000335/20010072002-03-0707 March 2002 IR 05000335/2001-007 & IR 05000389/2001-007 for Inspection on 02/01/2002 Related to Safety System Design & Performance Capability. No Violations Noted IR 05000335/20010052002-01-28028 January 2002 IR 05000335/2001-005 & IR 05000389/2001-005, St. Lucie, Units 1 & 2, Inspection on 09/30 - 12/29/2001 Related to Administrative & Engineering Controls. Non-cited Violation Noted 2023-06-30
[Table view] Category:Letter
MONTHYEARIR 05000335/20230102024-01-26026 January 2024 NRC Quadrennial Focused Engineering Inspection (FEI) Commercial Grade Dedication Report 05000335/2023010 and 05000389/2023010 L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) IR 05000335/20230042024-01-24024 January 2024 Integrated Inspection Report 05000335/2023004 and 05000389/2023004 L-2024-004, Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years2024-01-18018 January 2024 Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years L-2024-002, Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2024-01-0808 January 2024 Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-179, Unusual or Important Environmental Event - Turtle Mortality2023-12-14014 December 2023 Unusual or Important Environmental Event - Turtle Mortality L-2023-168, License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 52023-12-12012 December 2023 License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 5 L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, ML23332A1772023-11-28028 November 2023 Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-162, Response to 50.69 2nd Round of Rals2023-11-21021 November 2023 Response to 50.69 2nd Round of Rals IR 05000335/20230032023-11-0606 November 2023 Integrated Inspection Report 05000335/2023003 and 05000389/2023003 ML23270B8882023-10-23023 October 2023 Regulatory Audit Summary Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structure, Systems, and Components for Nuclear Power Reactors EPID L-2022-LLA-0182 ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23275A1102023-10-0202 October 2023 License Amendment Request Revision 2 for the Technical Specifications Conversion to NUREG-1432, Revision 5 L-2023-131, Subsequent License Renewal Application - Second Annual Update2023-09-28028 September 2023 Subsequent License Renewal Application - Second Annual Update L-2023-136, Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-26026 September 2023 Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-122, Corrections to the 2022 Annual Radiological Environmental Operating Report2023-09-20020 September 2023 Corrections to the 2022 Annual Radiological Environmental Operating Report IR 05000335/20233012023-09-20020 September 2023 NRC Operator License Examination Report 05000335/2023301 and 05000389/2023301 L-2023-127, Correction to the 2022 Annual Radioactive Effluent Release Report2023-09-18018 September 2023 Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-113, Correction to the 2020 Annual Radiological Environmental Operating Report2023-09-14014 September 2023 Correction to the 2020 Annual Radiological Environmental Operating Report L-2023-108, Report of 10 CFR 50.59 Plant Changes2023-09-11011 September 2023 Report of 10 CFR 50.59 Plant Changes L-2023-118, Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-11011 September 2023 Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-112, Corrections to the 2021 Annual Radioactive Effluent Release Report2023-09-0606 September 2023 Corrections to the 2021 Annual Radioactive Effluent Release Report L-2023-107, Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.42023-09-0606 September 2023 Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 ML23219A0042023-09-0101 September 2023 Transmittal Letter - Safety Evaluation Related to the SLRA of St. Lucie Plant, Units 1and 2, Revision 1 L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 IR 05000335/20230022023-08-0707 August 2023 Integrated Inspection Report 05000335/2023002 and 05000389/2023002 L-2023-105, Preparation and Scheduling of Operator Licensing Examinations2023-08-0303 August 2023 Preparation and Scheduling of Operator Licensing Examinations ML23201A0872023-08-0303 August 2023 Audit Plan in Support of Review of License Amendment ML23212B2652023-07-27027 July 2023 Operator Licensing Written Examination Approval 05000335/2023301 and 05000389/2023301 L-2023-099, Pump Relief Request 10 (PR-10), One-Time Request for an Alternative to the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2023-07-26026 July 2023 Pump Relief Request 10 (PR-10), One-Time Request for an Alternative to the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-102, Relief Request PSL2-15-RR-01, Proposed Alternative to ASME Section XI Code Examination Requirements for Reactor Vessel Bottom Area and Piping in Covered Trenches2023-07-26026 July 2023 Relief Request PSL2-15-RR-01, Proposed Alternative to ASME Section XI Code Examination Requirements for Reactor Vessel Bottom Area and Piping in Covered Trenches ML23200A1232023-07-21021 July 2023 Transmittal Letter for the St. Lucie SLRA Review L-2023-097, Subsequent License Renewal Application Revision 1 - Supplement 62023-07-13013 July 2023 Subsequent License Renewal Application Revision 1 - Supplement 6 L-2023-076, In-Service Inspection Program Owner'S Activity Report (OAR-1)2023-07-11011 July 2023 In-Service Inspection Program Owner'S Activity Report (OAR-1) ML23184A0352023-06-30030 June 2023 Notification of St. Lucie Units 1 & 2 Focused Engineering Inspection (FEI) 05000335/2023010 and 05000389/2023010 and Initial Information Request L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) IR 05000335/20234032023-06-29029 June 2023 Security Inspection Report 05000335/2023403 and 05000389/2023403 IR 05000335/20234022023-06-20020 June 2023 Security Baseline Inspection Report 05000335/2023402 and 05000389/2023402 L-2023-082, Subsequent License Renewal Application Revision 1, Supplement 52023-06-14014 June 2023 Subsequent License Renewal Application Revision 1, Supplement 5 L-2023-074, Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update2023-06-0202 June 2023 Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal2023-05-22022 May 2023 NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal IR 05000335/20234012023-05-16016 May 2023 Cyber Security Inspection Report 05000335/2023401 and 05000389/2023401 (Cover Letter) IR 05000335/20230012023-05-0909 May 2023 Integrated Inspection Report 05000335/2023001 and 05000389/2023001 ML23109A1132023-04-30030 April 2023 SLRA Change Schedule Letter L-2023-059, Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response2023-04-21021 April 2023 Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response ML23097A1642023-04-17017 April 2023 Summary of March 23, 2023, Meeting with Florida Power and Light on St. Lucie and Turkey Point Improved Technical Specifications Conversion License Amendment Requests L-2023-055, 2022 Annual Environmental Operating Report2023-04-12012 April 2023 2022 Annual Environmental Operating Report 2024-01-08
[Table view] |
Text
SUBJECT:
ST. LUCIE NUCLEAR PLANT - NRC INSPECTION REPORT 50-335/02-05 AND 50-389/02-05
Dear Mr. Stall:
On April 25, 2002, the NRC completed an inspection at your St. Lucie Nuclear Units 1 and 2.
The enclosed report documents the inspection findings, which were discussed on April 25, 2002, with Mr. D. Jernigan and other members of your staff.
This inspection was an examination of activities conducted under your license as they relate to the identification and resolution of problems, and compliance with the Commissions rules and regulations and the conditions of your operating license. Within these areas, the inspection involved selected examination of procedures and representative records, observations of plant equipment and activities, and interviews with personnel.
On the basis of the sample selected for review, there were no findings of significance identified during this inspection. The team concluded that problems were properly identified, evaluated, and resolved within the problem identification and resolution programs.
In accordance with 10 CFR 2.790 of the NRCs "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Randall A. Musser, Acting Chief Reactor Projects Branch 3 Division of Reactor Projects Docket Nos. 50-335, 50-389 License Nos. DPR-67, NPF-16
Enclosure:
Inspection Report 50-335/02-05, 50-389/02-05 w/attachment
REGION II==
Docket Nos: 50-335, 50-389 License Nos: DPR-67, NPF-16 Report No: 50-335/02-05, 50-389/02-05 Licensee: Florida Power & Light Company (FPL)
Facility: St. Lucie Nuclear Plant, Units 1 & 2 Location: 6351 South Ocean Drive Jensen Beach, FL 34957 Dates: April 15 - 25, 2002 Inspectors: J. Stewart, Senior Resident Inspector, Crystal River 3 (Lead Inspector)
D. Lanyi, Resident Inspector, St. Lucie Nuclear Power Plant K. Green-Bates, Project Engineer Accompanied: J. Herrera, Inspector Trainee, NRC Region I Approved by: Randall A. Musser, Acting Chief Reactor Projects Branch 3 Division of Reactor Projects Enclosure
SUMMARY OF FINDINGS IR 05000335-02-05, IR 05000389-02-05 on 04/15-04/25/2002, Florida Power & Light Company, St. Lucie Plant, Units 1 & 2. Biennial baseline inspection of the identification and resolution of problems.
The inspection was conducted by two resident inspectors and one region-based inspector. No findings of significance were identified. The significance of most findings is indicated by their color (Green, White, Yellow, Red) using the significance determination process (SDP) found in Inspection Manual Chapter 0609. Findings to which the SDP does not apply are indicated by No Color or by the severity level of the applicable violation. The NRCs program for overseeing the safe operation of commercial nuclear power reactors is described at its Reactor Oversight Process website.
Identification and Resolution of Problems Based on the results of the inspection, no findings of significance were identified. The implementation of the corrective action program was acceptable. There was an isolated maintenance effectiveness issue involving repairs to a failed emergency diesel generator cooling system radiator. Overall, the licensee properly classified discrepant conditions and corrective actions were completed in a timely manner with respect to plant risk. The licensees quality audits were effective in identifying deficiencies in the licensee programs. The inspectors did not observe a reluctance to report safety concerns.
Report Details 4. OTHER ACTIVITIES (OA)
4OA2 Problem Identification and Resolution a. Effectiveness of Problem Identification (1) Inspection Scope The inspectors reviewed items selected across the seven cornerstones of safety to determine if problems were being properly identified, characterized, and entered into the licensee corrective action program. The review included a selection of condition reports entered into the corrective action program (CAP) since February of 2001. The inspectors conducted walkdowns of plant systems important to safety, accompanied plant operators on their log-taking tours, interviewed station personnel, and evaluated corrective action documentation to determine the licensees threshold for identifying problems and entering them into the CAP. Also, the licensees efforts in establishing the scope of problems were evaluated by reviewing pertinent work orders, engineering requests, station assessment results, and program plans. The inspectors reviewed a sample of licensee audits and assessments, trending reports, system health reports, maintenance rule implementation documents, and various other documents related to problem identification and resolution. Documents requested to support the inspection and documents reviewed are listed in the Attachment. The team compared the audit and assessment results, with self-revealing and NRC issues such as those in licensee event reports, to assess the effectiveness of the problem identification and resolution program.
The team reviewed the licensees evaluation of selected industry experience information including event reports and NRC generic communications, to assess if issues applicable to the St. Lucie Nuclear Plant were appropriately addressed.
(2) Findings The inspectors determined that the licensee was effective at identifying problems and placing them into the CAP. In general, the threshold for documenting problems was at an appropriate level, commensurate with the issues risk significance and ease of discovery. The inspectors found an isolated instance where a problem with a safety related battery charger was delayed being placed in a corrective action program for two days. The licensee placed this in there CAP as CR 02-0806. The inspectors concluded that external industry operating experience and NRC generic communications had been evaluated for plant applicability, and had been incorporated into the CAP. Quality Assurance audits performed by the licensee were effective in identifying deficiencies and these deficiencies were entered into the CAP.
b. Prioritization and Evaluation of Issues (1) Inspection Scope The inspectors reviewed corrective action documents (CRs/PMAIs/MAIs) to determine if the licensee appropriately characterized problems for evaluation and resolution. The documents reviewed are listed in the Attachment. The inspectors review was to determine if the licensee identified root and contributing causes for significant conditions adverse to quality, and when appropriate, identified common cause and generic concerns. The corrective action documents selected for review were those having general application to regulatory programs, and those associated with plant systems that have risk significance determined by the plant-specific probabilistic risk assessment. These systems included the auxiliary feedwater (AFW), component cooling water (CCW), emergency diesel generator (EDG), intake cooling water (ICW),
reactor protection (RPS), and high pressure safety injection (HPSI) systems. The inspectors also reviewed corrective action documents to check if the issues were being classified using the licensees definition of significance level with proper consideration of risk, operability, and reportability. For issues classified at the highest significance level, the inspectors checked if proper consideration was given to root cause evaluation, extent of condition, and generic implications. One issue involving the failure of a safety related electrical breaker identified by the licensee during the inspection was not checked because the licensees assessment continued at the end of the inspection (CR 02-0704).
The inspectors also reviewed the condition reports initiated by the licensee in response to NRC Non-Cited Violations (NCVs) and licensee event reports to verify that the licensee had appropriately addressed the associated issues.
The inspectors observed daily meetings where corrective action issues were discussed to ensure that risk insights were being used in prioritization and evaluation of issues.
The inspectors also reviewed the plants weekly plan of activities and risk profiles to assess that risk information was employed in work planning and scheduling.
(2) Findings The inspectors determined that when conditions adverse to quality were identified, the licensee entered those conditions into the CAP and identified the appropriate causes.
The inspectors determined that the licensee properly classified discrepant conditions.
NRC identified issues and violations of regulatory requirements were appropriately addressed.
c. Effectiveness of Corrective Actions (1) Inspection Scope The inspectors checked the corrective actions associated with condition reports to verify that the licensee had identified and implemented corrective actions commensurate with the safety-significance of the issue, and where appropriate, evaluated the effectiveness of the actions taken. The inspectors also checked if common causes and generic
concerns were addressed when appropriate. The inspectors reviewed selected station internal performance indicators and reports such as maintenance rule documents, walked down plant systems important to safety, and discussed safety system status with plant personnel to verify that deficiencies had been corrected. Maintenance effectiveness issues, such as those identified in licensee event reports for systems important to safety were checked for timely corrective actions as well as for appropriate inclusion in licensee maintenance rule programs.
(2) Findings Corrective actions developed and implemented for plant equipment problems were generally effective in correcting the equipment deficiencies. The inspectors found that the scope and depth of corrective actions assigned by the licensee were appropriate for the severity and risk significance of the problem identified. An isolated maintenance effectiveness issue was found where a failure of an emergency diesel generator cooling system radiator was not initially corrected to prevent recurrence. When the system failed a second time, the radiator was replaced and long term preventive actions were specified to prevent recurrence (CR 01-1491). The inspectors also observed that licensee reviews of the effectiveness of corrective actions for significant conditions adverse to quality were at times, less than formal and actions had been started to formalize and document these assessments. Maintenance rule monitoring of systems important to safety was done and performance goals for the selected systems designated a(1) were appropriate.
d. Assessment of Safety-Conscious Work Environment (1) Inspection Scope The inspectors interviewed licensee operations, maintenance, security, health physics, engineering, and supervisory personnel to develop a general view of the safety-conscious work environment at St. Lucie and to determine whether any conditions existed that would cause workers to be reluctant to raise safety concerns. The inspectors questioned licensee staff to determine whether any conditions existed that were not placed in the CAP. The inspectors also checked the licensees employee concerns (Speakout) program designated by the licensee as an alternate means for workers to identify deficiencies and to raise safety concerns while remaining anonymous. The inspectors checked Speakout concern resolution with the program coordinator to check if concerns were being adequately assessed and concerns were being resolved.
(2) Findings The inspectors found that licensee management emphasized the need for all employees to identify and report nonconforming conditions using the methods established within their administrative programs. The inspectors did not identify a reluctance of licensee staff to report safety concerns.
4OA6 Exit Meeting The team discussed these findings with Mr. D. Jernigan and other members of the licensees staff on April 25, 2002. Licensee management did not identify any materials examined during the inspection as proprietary.
KEY POINTS OF CONTACT Licensee G. Bird, Protection Services Manager D. Calabrese, Emergency Preparedness Supervisor R. De La Espriella, Site Quality Manager B. Dunn, Site Engineering Manager W. Guldemond, Operations Manager, Acting Plant General Manager D. Jernigan, Site Vice President J. Martin, Operations Supervisor D. Mohre, Engineering Supervisor G. Varns, Security Manager J. Voorhees, Licensing Manager C. Wood, Maintenance Manager ITEMS OPENED AND CLOSED None
ATTACHMENT DOCUMENTS REQUESTED FOR INSPECTION 1. Copies of procedures associated with the corrective action process 2. A list of all condition reports initiated since February 2, 2001 (Note: This is the starting date for all other lists unless otherwise stated) including a brief description of the problem and the classification 3. A list of top cutsets from the plant probabilistic risk assessment 4. A copy of all condition report documents associated with NRC findings and licensee event reports 5. A list of industry operating experience documents 6. Corrective action program statistics such as the number initiated by department 7. A list of systems which are classified as (a)(1) in accordance with the Maintenance Rule, 10 CFR 50.65, including related goals and action plans 8. A list of Maintenance Preventable Functional Failures 9. System Health Reports 10. Summary of actions taken to upgrade EOPs to latest revision 11. Results of recent quality assurance audits 12. Department self-assessments 13. The employee concerns program (Speakout) will be checked LIST OF DOCUMENTS REVIEWED Condition Reports CR 98-0259, CR 98-0260, CR 98-0303, CR 98-0304, CR 98-0305, CR 98-0307, CR 98-0405, CR 98-0429, CR 00-2076, CR 01-0049, CR 01-0125, CR 01-0184, CR 01-0237, CR 01-0244, CR 01-0403, CR 01-0464, CR 01-0714, CR 01-0728, CR 01-0741, CR 01-0822, CR 01-1069, CR 01-1108, CR 01-1159, CR 01-1195, CR 01-1202, CR 01-1237, CR 01-1305, CR 01-1355, CR 01-1372, CR 01-1441, CR 01-1491, CR 01-1551, CR 01-1662, CR 01-1992, CR 01-1993, CR 01-2056, CR 01-2181, CR 01-2255, CR 01-2290, CR 01-2397, CR 01-2476, CR 01-2515, CR 01-2521, CR 01-2554 CR 01-2555, CR 01-2597, CR 01-2602, CR 01-2604, CR 01-2645, CR 01-2698, CR 01-2710, CR 01-2720, CR 01-2752, CR 01-2754, CR 01-2757, CR 01-2759, CR 01-2789, CR 01-2817, CR 01-2828, CR 01-3055, CR 01-3090, CR 01-3117, CR 01-3181, CR 01-3184, CR 01-3248, CR 01-3259, CR 01-3270, CR 01-3281, CR 02-0011, CR 02-0028, CR 02-0030, CR 02-0041, CR 02-0059, CR 02-0082,
CR 02-0194, CR 02-0219, CR 02-0234, CR 02-0242, CR 02-0263, CR 02-0272, CR 02-0277, CR 02-0278, CR 02-0280, CR 02-0282, CR 02-0294, CR 02-0299, CR 02-0312, CR 02-0330, CR 02-0340, CR 02-0347, CR 02-0349, CR 02-0381, CR 02-0382, CR 02-0396, CR 02-0398, CR 02-0411, CR 02-0451, CR 02-0473, CR 02-0502, CR 02-0525, CR 02-0613, CR 02-0685 Condition Reports Generated From Inspection CR 02-0793, CR 02-0806, CR 02-0825, CR 02-0826, CR 02-0828 Corrective Actions (Plant Management Action Items)
PMAI 98-03-138, PMAI 98-03-204, PMAI 98-03-230, PMAI 98-04-129, PMAI 01-03-005, PMAI 01-03-006, PMAI 01-09-014, PMAI 01-05-022, PMAI 01-05-024, PMAI 01-05-025, PMAI 01-07-027, PMAI 01-05-060, PMAI 01-03-129, PMAI 01-03-162, PMAI 01-03-167, PMAI 01-05-175, PMAI 01-10-180, PMAI 01-05-181, PMAI 01-05-188, PMAI 01-05-186, PMAI 01-07-186, PMAI 01-05-187, PMAI 01-07-187, PMAI 01-05-188, PMAI 01-07-188, PMAI 01-05-189, PMAI 01-07-189, PMAI 01-05-190, PMAI 01-05-191, PMAI 01-07-214, PMAI 02-02-016, PMAI 02-02-017, PMAI 02-02-018, PMAI 02-03-060, PMAI 02-02-092, Procedures and Drawings Quality Instruction QI-16-PSL-3, Corrective Action Administrative Procedure ADM-08.04, Root Cause Evaluations Administrative Procedure ADM-07.01, PMAI Corrective Action Tracking Program Administrative Procedure ADM-07-02, Condition Reports 1-ARP-01-MOO; Annunciator Response Procedure, Panel M Operations Instruction 0-OI-99-02, Appendix A, General Inspection Guidelines Operations Instruction 0-OI-99-02, Appendix D, Generic Rounds Operating Procedure 1-0640020, Intake Cooling Water System Operation 1-NOP-03.05, Shutdown Cooling Normal Operating Procedure 1-GOP-504, Operating Procedure Reactor Plant Heatup 0-NOP-100.01, Equipment Out of Service Log ADM 27.10, Administrative Procedure, Controls for Application of Coatings ADM-17.08, Administrative Procedure, Implementation of 10 CFR 50.65 The Maintenance Rule ADM-18.05, Implementation of The Systematic Approach to Training 1-EOP-01: Emergency Procedure, Standard Post Trip Actions, Revision 18 1-EOP-03: Loss of Coolant Accident Flow Diagram 2998-6-078, Sheet 130A, 131, Safety Injection System Flow Diagram 8770G-080, Sheet 4, Feedwater and Condensate System Flow Diagram 8770-6-079, Sheet 1, Main Steam System Flow Diagram 8770-G-083, Sheet 1A, Component Cooling System Flow Diagram 8770-G-082, Sheet 2, Circulating and Intake Cooling Water System Attachment
Engineering Documents Maintenance Rule Program, 4th Quarter Report, January 15, 2002 System Health Reports, Fourth Quarter 2001 Quality Assurance Documents ENG-SPSL-02-0037; Engineering Self-Assessment 10 CFR 50.59, April 9, 2002 2001 St. Lucie Self-Assessment Plan, Revision 2 Chemistry Human Performance Assessment, 2001-003, 3rd Quarter 2001 Information Systems Self-Assessment, Qualification of Facility Review Group Members, December 2001 Nuclear Assurance Quality Report, Technical Specification Surveillances, April 18, 2002 Other Documents Work order 98015698-01,02 Inspect Fire Suppression Sprinkler Heads Work order 31023133-01, 02 Battery Charger 2A/2A Trouble; Annunciator Locked In Work order 3103516, 02 Battery Charger 2A/2A Trouble; Low Voltage Alarm Work order 31012015, 02 Battery Charger 2A/2A Trouble; Low Voltage Alarm Work order 32000026-01, 02 Battery Charger 2A/2A Trouble; Low Voltage Alarm Operations Policy-109 Tagout Controls Work order 31009500-3A Replace Containment Spray Actuation System Relay Operator Workaround Summary Log, April 15, 2002 Operations Plan of the Day, Workweek 3B, April 15, 2002 Maintenance Schedule, Workweek 13B, April 15, 2002 Chief Nuclear Officers Indicator Report, November 12, 2001 Site Engineering Audit Report, QSL-ENG-01-05, July 19, 2001 Office Correspondence, Closure of Significant Level 1 Condition Reports, February 22, 2002 Inter-Office Correspondence, Use of Condition Reports, March 7, 2002 Memorandum, Raising Nuclear Safety or Quality Concerns, February 20, 2002 Unit 2 Performance Indicator, 125VDC Panels, Batteries and Chargers, 1st Quarter Emergency Preparedness Evaluated Exercise Critique; February 20, 2002 St. Lucie Plant Health Report, 4th Quarter 2001 Temporary Change 02-008 Alignment of 2AB Busses and Components, March 20, 2002 Attachment