IR 05000335-03-008 & IR 05000389-03-008, on January 27-30, 2003, St. Lucie Plant. Verification of Compliance with Interim Compensatory Measures Order
ML030730337
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 03/12/2003
From: Boland A
Division of Reactor Safety II
To: Stall J
Florida Power & Light Co
References
IR-03-008
Download: ML030730337 (6)


Text

rch 12, 2003

SUBJECT:

NRC INSPECTION REPORT NO. 50-335/2003-08 AND 50-389/2003-08

Dear Mr. Stall:

On January 30, 2003, the U. S. Nuclear Regulatory Commission (NRC) completed an inspection at your St. Lucie Nuclear Plant. The enclosed inspection report documents the inspection findings, which were discussed on January 30, 2003, with Mr. D. Jernigan and other members of your staff.

The inspection examined activities conducted under your license as they relate to safety and compliance with an Order issued on February 25, 2002, which required your site to implement specific measures related to security of your facility. The inspection used Temporary Instruction 2515/148, Inspection of Nuclear Reactor Safeguards Interim Compensatory Measures, to verify implementation of the Order as clarified in your responses dated March 14, 2002; May 17, 2002; and August 28, 2002. Within these areas, the inspection consisted of selected examination of procedures and records, observation of activities, and interviews with personnel.

In accordance with 10 CFR 2.790 of the NRCs "Rules of Practice," a copy of this letter, without the enclosed Safeguards Information, will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS)

component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

DOCUMENT CONTAINS ENCLOSURE(S) CONTAIN(S) UPON SEPARATION THIS PAGE IS DECONTROLLED

FP&L 2 DOCUMENT CONTAINS Should you have any questions concerning this letter, please contact us.

Sincerely,

/RA/

Anne T. Boland, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 50-335, 50-389 License Nos. DPR-67, NPF-16

Enclosure:

NRC Inspection Report 50-335/2003-08 and 50-389/2003-08

REGION II==

Docket Nos: 50-335, 50-389 License Nos: DPR-67, NPF-16 Report No.: 50-335, 389/2003-08 Licensee: Florida Power and Light Company Facility: St. Lucie Nuclear Plant Location: Jensen Beach, FL Dates: January 27 - 30, 2003 Inspectors: Jerry D. Ennis, Senior Physical Security Inspector Donald B. Forbes, Physical Security Inspector William M. Sartor, Senior Emergency Preparedness Inspector Thierry M. Ross, Senior Resident Inspector Approved By: Anne T. Boland, Chief Plant Support Branch Division of Reactor Safety DOCUMENT CONTAINS ENCLOSURE(S) CONTAIN(S) UPON SEPARATION THIS PAGE IS DECONTROLLED SUMMARY OF FINDINGS IR 05000335/2003-008, 05000389/2003-008; Florida Power and Light Company; 1/27/2003 -

01/30/2003; St. Lucie Nuclear Plant, Units 1 and 2; TI 2515/148, Verification of Compliance with Interim Compensatory Measures Order.

The report covered an announced inspection by two regional physical security inspectors, an emergency preparedness inspector, and the senior resident inspector. Two unresolved items remain open pending further NRC review. The NRCs program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, Reactor Oversight Process, Revision 3, dated July 2000.

A. Inspector-Identified and Self-Revealing Findings Cornerstone: Physical Security

  • The inspectors identified an unresolved item concerning the licensees implementation of Interim Compensatory Measures (ICM) Section B.4.f of the Order (Section V.F).
  • The inspectors identified an unresolved item concerning the licensees implementation of ICM Section B.5.b of the Order (Section VI.B).

B. Licensee-Identified Violations None DOCUMENT CONTAINS ENCLOSURE(S) CONTAIN(S) UPON SEPARATION THIS PAGE IS DECONTROLLED