Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
CNRO-2007-00038, Entergy Operations, Inc. - Proof of Financial Protection (10 CFR 140.15)24 September 2007Entergy Operations, Inc. - Proof of Financial Protection (10 CFR 140.15)
CNRO-2016-00024, Entergy - Form 10-K for Fiscal Year Ended December 31, 201520 December 2016Entergy - Form 10-K for Fiscal Year Ended December 31, 2015High winds
Enforcement Discretion
Incorporated by reference
Aging Management
Earthquake
Environmental Justice
LIC-05-0057, Revised Relaxation Request for First Revised Order (EA-03-009) Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors14 May 2005Revised Relaxation Request for First Revised Order (EA-03-009) Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water ReactorsPacking leak
Nondestructive Examination
Finite Element Analysis
LIC-13-0140, Attachment 3 - Strategy to Protect Fort Calhoun Station from Beyond Design Basis Flood - Redacted26 October 2013Attachment 3 - Strategy to Protect Fort Calhoun Station from Beyond Design Basis Flood - Redacted
ML02114004026 March 2002Attachment 7, Faxed on March 26, 2002, (Docket Nos. 50-313 and 50-368). Moderate Susceptibility PlantsBoric Acid
ML02305010618 July 2002Attachment 3, River Bend, Human Performance Questions, 1.7% Power UprateSafe Shutdown
ML02305010719 July 2002Attachment 4, River Bend, Executive Summary
ML02305016916 September 2002Attachment 12, ANO-1, Units 1 and 2, Table B-1, Minimum Staffing Requirements
ML03042019122 April 2002Review of Part 50 Application for Reactor License, Amendment, Exemptions, Reliefs, Performance Reviews, Assessments and Other Approvals
ML03119070716 April 2003Listing of Operators, Region 4, Arkansas
ML03252142920 August 2003Westinghouse - Nuclear Safety Advisory Letter NSAL-03-6, High Net Heat Input, Dated 08/20/2003
ML0329400657 October 2003Fire Protection Issue at River BendSafe Shutdown
Fire Barrier
Fire Protection Program
ML0329400677 October 2003Fire Protection Issue at River BendSafe Shutdown
Fire Barrier
Fire Protection Program
ML03294008317 January 2002Backfit Panel Minutes FormBackfit
ML03294009827 March 2003Riv Backfit StatusBackfit
ML0329401047 October 2003Riv Backfit StatusBackfit
ML03302014810 October 2003Undated Phase 2 SDP AnalysisSafe Shutdown
ML03338105824 November 2003Overview of IssueSafe Shutdown
Significance Determination Process
ML0334404927 November 2003Appendix R to Part 50 - Fire Protection Program for Nuclear Power Facilities Operating Prior to January 1, 1979Hot Short
Safe Shutdown
Fire Barrier
Emergency Lighting
Fire Protection Program
Scaffolding
ML0334404957 November 2003Influential Assumptions. Partially WithheldSafe Shutdown
ML0334404977 November 2003ANO SDP Results. Partially WithheldSafe Shutdown
ML03358039421 November 2003ANO Fire Protection Finding Summary
ML03358040821 November 2003Licensee Point & Our View - Points Made by ANO During Public Meeting with NRC in October
ML03358041921 November 2003Sensitivity AnalysisSafe Shutdown
ML03358045630 April 2002SERP Worksheet for SDP-Related FindingsHot Short
Safe Shutdown
Fire Barrier
ML03358046223 January 2003SERP Worksheet for SDP-Related FindingsSafe Shutdown
ML04005011212 December 2003Phase 3 SDP Analysis with Handwritten NotesSafe Shutdown
ML04005011712 December 2003Phase 3 SDP Analysis: Arkansas Nuclear One Unit 1Safe Shutdown
Fire Barrier
ML0402801992 January 2003Draft, SERP Worksheet for SDP-Related FindingsHot Short
Safe Shutdown
Fire Barrier
ML04028020123 January 2003SERP Worksheet for SDP-Related FindingsHot Short
Safe Shutdown
Fire Barrier
ML04028020324 January 2003SERP Worksheet for SDP-Related FindingsHot Short
Safe Shutdown
Fire Barrier
ML0403605499 December 2002Draft SERP Worksheet for SDP-Related Findings
ML04036055110 December 2002SERP Worksheet for SDP-Related FindingsHot Short
Safe Shutdown
Fire Barrier
ML04041049220 February 2004Order EA-03-009 Service List
ML04041065718 February 2004Meeting Summary of January 21, 2004 with STPNOC- Enclosure 4 - Stpnoc'S Response to NRC Staff'S Comments
ML04058061330 April 2002Detailed SID Log Entry - Ft. Calhoun
ML04064074420 February 2004Ignition Source FrequencyHot Short
Fire Watch
ML04064074820 February 2004Ignition Source FrequencyHot Short
Safe Shutdown
Fire Watch
ML04064075220 February 20043.1.5 Fire Zones, Appendix R Questions & AnswersSafe Shutdown
Fire Barrier
ML04068054420 February 200410 CFR 50 Appendix R Fire Protection ReviewSafe Shutdown
Boric Acid
Fire Barrier
ML04077058913 April 2004Draft Information Request Response to RAI - Attachment 7Finite Element Analysis
ML04077059323 December 2003Draft Information Request PRA Analysis Assessment PRA-03-024, Rev. 0 - Attachment 6
ML0411703759 April 2004Fire Area PT-1 Summary Table E. F & G TunnelsHot Short
Safe Shutdown
Reactor Vessel Water Level
Ultimate heat sink
Fire Barrier
Emergency Lighting
Exemption Request
Fire Protection Program
ML0419805943 December 2003ANO 1 - Initial Exam - 01/2004 - Public Forms
ML04261007213 September 2004Plant Engineering Branch Closed Items Interim Safety Basis
ML04299054423 September 2004RB-09-2004 - Final - Written Exam - ROLoop seal
Half scram
Scram Discharge Volume
Earthquake
ML0432806261 February 2002LTR-ME-02-15, Rev 00, MNSA2 Belleville Washer Data.
ML0503400227 February 2005OPGP03-ZA-0091Offsite Dose Calculation Manual
Probabilistic Risk Assessment
Maintenance Rule Program
Scaffolding
ML0503400257 February 20050POP01-ZO-0006, Rev. 13, Extended Allowed Outage TimeOffsite Dose Calculation Manual
Grace period
ML0505404649 February 2004Dynamic Web Page Printout Dated 02/09/2004 Regarding Applied Violations for Nuclear Power Plants