Letter Sequence Request |
|---|
|
|
MONTHYEARML0426100722004-09-13013 September 2004 Plant Engineering Branch Closed Items Interim Safety Basis Project stage: Request 0CAN030501, Units 1 and 2, 90-Day Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors2005-03-0303 March 2005 Units 1 and 2, 90-Day Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Request ML0515202862005-06-0202 June 2005 Request for Additional Information (RAI) Related to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-water Reactors Project stage: RAI ML0603805752006-02-0909 February 2006 RAI Re Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized-Water Reactors Project stage: RAI ML0603806242006-02-0909 February 2006 Request for Additional Information, Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized-Water Reactors Project stage: RAI ML0726904102007-11-0808 November 2007 Staff Observations of Arkansas Nuclear One, Unit 2, Strainer Testing for Generic Safety Issue 191 During August 13-14, 2007, Trip to Fauske and Associates Project stage: Other CNRO-2007-00044, Unit 1 and Arkansas Nuclear One, Units 1 & 2 - Inservice Testing Plan2007-11-30030 November 2007 Unit 1 and Arkansas Nuclear One, Units 1 & 2 - Inservice Testing Plan Project stage: Request 0CAN020803, Notification of Submission of Final Supplemental Response within 90 Days of Completion of Generic Letter 2004-02 Actions2008-02-28028 February 2008 Notification of Submission of Final Supplemental Response within 90 Days of Completion of Generic Letter 2004-02 Actions Project stage: Request ML0817202552008-06-17017 June 2008 /17/2008 E-Mail from N. Mosher, Entergy Operations, Inc. to A. Wang, NRR/DORL/LPL4 Enclosing Draft Request for Extension of Completion Date for Resolution of GL 2004-02 (GSI-191) Project stage: Draft Request ML0817202952008-06-17017 June 2008 Draft Request for Extension of Completion Date for Resolution of GL 2004-02 (GSI-191) Project stage: Draft Request 0CAN090801, GL 2004-02 Final Supplemental Response2008-09-15015 September 2008 GL 2004-02 Final Supplemental Response Project stage: Request 0CAN020901, Unit 2, Annual Radioactive Effluent Release Report, January 1 Through December 31, 20082009-02-26026 February 2009 Unit 2, Annual Radioactive Effluent Release Report, January 1 Through December 31, 2008 Project stage: Request ML0911903222009-05-21021 May 2009 Request for Additional Information, Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: RAI 2CAN050905, Response to Request for Additional Information for Alternative - PRR-ANO2-2009-12009-05-21021 May 2009 Response to Request for Additional Information for Alternative - PRR-ANO2-2009-1 Project stage: Response to RAI ML0917508322009-06-26026 June 2009 Notice of Conference Call with Entergy Operations, Inc. to Discuss Draft Request for Additional Information for GL-2004-02 Sent to Arkansas Nuclear One, Units 1 and 2 on June 22, 2009 Project stage: Draft RAI ML0923706572009-09-0303 September 2009 Summary of Conference Call with Entergy Operations, Inc. on Draft Response to the RAI for GL 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Project stage: Draft RAI 0CAN090901, Arkansas, Units 1 and 2, Generic Letter 2004-02 Final Supplemental Response to Request for Additional Information2009-09-24024 September 2009 Arkansas, Units 1 and 2, Generic Letter 2004-02 Final Supplemental Response to Request for Additional Information Project stage: Supplement ML0932004602009-11-23023 November 2009 Request for Withholding Information from Public Disclosure - 8/3/2009 Affidavit Executed by J. Gresham, Westinghouse Project stage: Withholding Request Acceptance ML1001903202010-01-26026 January 2010 Generic Letter 2004-02 Supplemental Response Project stage: Other 2008-06-17
[Table View] |
Text
iSaceyt Munro X*X items Page 1l Plant Engineering Branch Open Items Interim Safety Basis SITE ACTIO PEB Item Issue Planned Closure Disposition/Status/URI for Significance N
LEAD Num Quarter ORG ber Interim Safety Basis ANO PEB RLN URI Adequacy of manual actions CY 2004 Quarter 1 Regional Pre-SERP completed. SERP to be 2001 used in lieu of providing rescheduled next week.
006-0 protection for cables In FAs Comp measures 2
B8J and 99M established Final SERP letter In concurrence 3/20/4 CGS PEB RPM URI Failure to provide appropriate CY 2004 Quarter 1 SRAs determined that this issue Is Green. RPM will 2003 corrective measures to provide feeder for close out of this Item In current RI 002-0 address CAQ affecting low Ucensee corrected inspection report 4
pressure coolant. A known the problem during leaking RHR check valve last outage Draft Closure In review for Inclusion in IR 2004-002 could adversely affect ASD during a control room fire.
CGS PEB RPM URI Procedure provided CY 2004 Quarter 1 SRAs determined that this Issue is Green. RPM will 2003 Inadequate post fire direction Ucensee revised provide feeder for close out this Item In current RI 002-0 for control room evacuation procedure Inspection report.
3 with two examples.
Draft Closure In review for inclusion In IR 2004-002 1
i
-.1 _. --
.1... I.,......
" -0jo tem table RI Fire Protectionmp4 nroe -
4
- 11. -. Pegg ?,
PV PEB RPM URI Manual actions taken In lieu CY 2004 Quarter 1 Ray completed the review of the license basis 2003 of providing physical Manual actions met IP and found the license basis Included approval of 007-0 protection. (licensee says It's Interim criteria for safety the as-found condition.
1 In the LB)
Draft Closure In review for Inclusion In I R
___________________2004.002 submitted to DRIP on 3/23 STP FEB NFO URI The licensee relied on CY 2004 Quarter 2 Nell O'Keefe reinspection In progress (weeks of STP 2002 diagnosing and taking Initial info provided Mar 22 &29).
003-0 manual actions In response Indicated that adequate 2
to equipment malfunctions Instrumentation was Unresolved for compliance In IR 2003-003 dated due to fire damage. The available. Ucensee July 23, 2002.
availability of diagnostic documented the available Instrumentation to help Instrumentation In the new mitigate the effects of a fire fire response procedure.
w as not docum ented.__
7