ML030420191

From kanterella
Jump to navigation Jump to search
Review of Part 50 Application for Reactor License, Amendment, Exemptions, Reliefs, Performance Reviews, Assessments and Other Approvals
ML030420191
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 04/22/2002
From:
NRC/OCFO
To: Ridenoure R
Omaha Public Power District
References
Download: ML030420191 (4)


Text

U.

S.

NUCLEAR REGULATORY COMMISSION Part 170 License Fee Invoice 10 CFR 170.21 if paid by Fedwire see attached Terms and Conditions.

If paid by check, make check payable to the KRC (reference Invoice no.) and mail tot U.S. Nuclear Regulatory Commission License Fee & Accounts Receivable Branch P.O. Box 954514 St. Louis, MO 63195-4514 TO:

OMAHA PUBLIC POWER DISTRICT ATTN: MR.

R.

T.

RIDENOURE PO BOX 550 FORT CALHOUN, NE 68023-0000 Invoice No.: RL0416-02 Invoice Date: 04/22/02

Contact:

ELLEN POTEAT Phone:

301/415-6392 Docket: 050-00285 Period: 12/30/01 - 03/23/02 FORT CALHOUN Review of Part 50 Application for Reactor License, Amendments, Exemptions, Reliefs, Performance Reviews, Assessments and Other Approvals 636.6 HRS @ $150.00 Contract Costs:

Project Manager:

95,490.00 15,751.00 51,735.00 AMOUNT DUE 162,976.00 TERMS.

Interest will accrue from the invoice date at the annual rate of 3.000 %. Payment is due irn-ediately.

However, interest will he waived if payment is received within 30 days from the invoice date.

Penalty and administrative charges will be assessed on a delinquent Invoice.

Additional terms and conditions are attached, if applicable.

NOTES.

if there are any questions about the existence or amount of the debt, contact the Individual named above.

For NRC debt collection procedures, including interest and penalty provisions, see 31 U.S.C. 3717, 4 CFR 101-105, and 10 CYR.5.

Page Number, 1

01/23/03 08t05028 Detail Line For Invoice RL0416-02 For the Period 12/30/01 -

03/23/02 Docket Reg XonReg Contractual Number TAC/BARt Hours Hours Rate Hourly Costs PH Costs Costs m.......

a.................

ee*.........

050-00285 050-00285 050-00285 050-00285 050-00285 050-00285 050-00285 050-00285 050-00285 050-00285 050-00285 050-00285 050-00285 050-00285 050-00285 050-00285 050-00285 050-00285 050-00285 050-00285 050-00285 050-00285 050-00285 M12063 1473400 M13401 M1B3402 MB3422 "14n3443 1n3449 M'B3581 m173606 M83651 xD3652 143653 M13654 MB4130 M74457 101100AA 101100AS 101100AC 101104 102130 MD3402 M83402 KM3402 4.0 0.7 104.5 61.2 40.0 46.5 47.0 77.0 20.4 46.5 66.3 30.0 74.0 1.0 2.0 22.0 14.5 6.0 32.5 238.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.5 1.0 0.0 3.0 3.0 4.0 1.0 1.0 1.0 1.0 0.0 1.0 0.5 0.0 4.6 25.8 0.0 0.0 0.0 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 0.00 0.00 0.00 600.00 105.00 15,675.00 9,180.00 6,075.00 7,125.00 7.050.00 12,000.00 3.510.00 7,575.00 10,095.00 4,650.00 11,250.00 300.00 300.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,450.00 2,250.00 900.00 5,565.00 39,570.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,298.00 13.400.00 1,053.00 Cost Applient Date Date Names/Remarks ft 0.....

I I

/

/

/

/

/

/

/

/

/

/

/

/

/

I

/

I

/

20021/02 2002102 2002/02 05/15/01 01/09/02 01/09/02 01/09/02 11/oe/01 11/21/01 11/21/01 12/11/01 12/14/01 12/14/01 12/14/01 12/14/01 12/14/01 02/25/02 02/27/02

/ /

//I FORT CALHOUN I - (L 9S-06 iS Changes FORT CALHOUN (LR) nviwiromental PH Administration FORT CALHOUN (LR)

- License Renewal Application Safety R.vle FORT CALHOUN (LK)

- License Renewal Application Environmenta FORT CALHOUN 1 - Reactor Vessel Surveillance Capsule Removal FORT CALHOUN 1 - Alternate shutdown panel TS FORT CALHOUN I COLR Analytical methods TS Change FORT CALHOUN I - Mechanical Nozzle Seal Assembly Relief Requ FORT CALHOUN I - Exemption from Appendix 0 - Code Case 0-640 FORT CALHOUN 1 - Allow Open Containment During Refueling TS FORT CALHOUN 1 - Emergency Power Periodic Teats TS Change FORT CALHOUN I - Minimum Flow RCS TS Change FORT CALHOUN I

- P-T Limit Curve TS Change FORT CALHOUN -

Order for Interim Safeguards and Security Cow FORT CALHOUN -

Clarification of Exemption in Fire Area 32 PH -

PH LICENSER INTERFACES PH - PH REGIONAL INT RFACES PH

  • PH HEA.DQUARTERS INTERFACES PH - OTHER LICENSING TASIS -

(H) (R) REACTORS PH - RENEWAL APPLICATION REVIEWS (HR (R)

FORT CALHOUN (LR)

- License Renewal Application Environmenta FORT CALHOUN (LR)

- License Renewal Application Enviro menta FORT CALHOUN (MR)

- License Renewal Application Rnvironmenta 6.00W....s...............W................

934.1 47.4 95,490.00 51,735.00 15,751.00 Total Invoice Cost, 162,976.00 Job Contr Code ID J2442 PmL J2801

LLHI, 02837 ANL

.. &so....

n.

niiO

.l........

U.

S.

NUCLEAR REGULATORY COMMISSION Part 170 License Fee Invoice 10 CFR 170.21 it paid by Fedwire see attached Terms and Conditions.

If paid by check, make check payable to the NRC (reference Invoice no.)

and mail tos U.S. Nuclear Regulatory Commission License Fee & Accounts Receivable Branch P.O. Box 954514 St. Louis, MO 63195-4514 TO:

OMAHA PUBLIC POWER DISTRICT ATTN: MR.

R.

T.

RIDENOURE PO BOX 550 FORT CALHOUN, NE 68023-0000 Invoice No.: RL0416-02 Invoice Date: 04/22/02

Contact:

ELLEN POTEAT Phone:

301/415-6392 Docket: 050-00285 Period: 12/30/01 -

03/23/02 FORT CALHOUN Review of Part 50 Application for Reactor License, Amendments, Exemptions, Reliefs, Performance Reviews, Assessments and Other Approvals 990.4 HRS @ $150.00 Contract Costs:

Project Manager:

148,560.00 15,751.00 99,135.00 Gnf ir!ltlo that thiS bill has bsen

\\Jý AMOUNT DUE 263,446.00 TzEMS.

interest will accrue from the invoice date at the annual rate of 3.000 %. Payment is due immediately.

However, interest will he waived if payment is received within 30 days from the Invoice date.

Penalty and administrative charges will be assessed on a delinquent invoice.

Additional terms and conditions are attached, if applicable.

NOTES.

If there are any questions about the existence or amount of the debt, contact the individual named above.

For NRC debt collection procedures, including interest and penalty provisions, see 31 U.S.C. 3117, 4 CFR 101-105, and 10 CrR 15.

12/31/02 11,20,29 Detail Line For invoice RL0416-02 For the Period 12/30/01 - 03/23/02 Job Contr Docket Reg NouReg Contractual Code ID Number TAC/A&R Hours Hours Rate Hourly Costs PH Costs Costs m

m e*mtt

.t.tt

............. att lt

,fB2063 4.0 xB3400 a

0.7 xB3401?4 5s1a-150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 150.00 0.00 0.00 0.00 600.00 0.00 105.00 1,'* 0.00

.98;745:00 "

V) 0.00 9,180.00 0.00 6,075.00 0.00 7,125.00 0.00 7,050.00 0.00 12,000.00

.0.00 3,510.00 0.00 7,575.00 0.00 10,095.00 0.00 4,650.00 0.00 11,250.00 0.00 300.00 0.00 300.00 0.00 0.00 3,450.00 0.00 2,250.00 0.00 900.00 0.00 5,565.00 _.

0.00 u91 0,iioo 0.0 1,0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,298.00 13,400.00 1,053.00 Cost Applicnt Date Date

/ /

/

/

/

I

/

I

/

/

/

/

/

/

2 002/02 2 002/02 2002/02 05/15/01 01/09/02 01/09/02 01/09/02 11/08/01 11/21/01 11/21/01 12111/01 12/14/01 12/14/01 12/14/01 12/14/01 12/14/01 02/25/02 02/27/02 1/

/ /

I I

/ I

/ /

1//

Names/Remarks a....

e N00..........

FORT CALHOUN 1 -

OL 95-06 TO Changes FORT CALHOUN (LR) - Environmental P16 Administration FORT CALHOUN (LM) - License Renewal Application Safety Revie FORT CALHOUN (LR)

- License Renewal Application Environmenta FORT CALHOUN 1 - Reactor Vessel Surveillance Capsule Removal FORT CALHOUN 1 - Alternate shutdown panel TO FORT CALHOUN I -

COLR Analytical methods TO Change FORT CALHOUN I - Nechanical Notsle geal Assembly Relief Requ FORT CALHOUN I - Exemption from Appendix 0 - Code Case N-640 FORT CALHOUN 1 - Allow Open Containment During Refueling TO PORT CALHOUN 1 - Emergency Power Periodic Tests TO Change FORT CALHOUN I - Minimum Flow RCS TO Change FORT CALHOU 1 - P-T Limit Curve TO Change FORT CALHOUN - Order for Interim Safeguards and Security Con FORT CALHOUN - Clarification of Rxemption in Fire Area 32 PM -

PH LICENSEE INTERFACES PM -

PM REGIONAL XINTRFACES PH -

PM HEADQUARTERS INTERFACES PM -

OTHER LICENSING TASKS -

(H)

(R)

REACTORS PH -

RENEWAL APPLICATION REVIEWS (H)

(R)

FORT CALHOUN (LX)

- License Renewal Application nvir*o enta FORT CALHOUN (LE)

- License Renewal Application Environmenta FORT CALHOUN (MR) - License Renewal Application Environmenta owe..

Total Invoice Costs 3'C

**,

r t.a....names..

m 0.0......

1603.9 47.4 148,560.00 99,135.00 15,751.00 263,446.00 A-

? )o

-(,.s,

-/Y

-4 g

E

$,',1

,.2-3 o

,rh~ 65

-S 10-10 D

-74 jr qJLqjq 0 0 733. 0

+

367

.q -, 0

/

050-00285 050-00285 050-00285 050-00285 050-00285 050-00285 050-00285 050-00285 050-00285 050-00285 050-00285 050-00285 050-00285 050-00285 050-00285 050-00285 050-00285 050-00285 050-00285 050-00285 050-00285 050-00285 050-00285 M'3402 M1B3422 mB3448 M'B3449 MB(3581 mB3606 MD43651 MB3652 1(B3653 MB3654 MB4130 MB4457 101100AA 101100A 101100AC 101104 102130 MB3402 MB3402

!,133402 0.0 0.0 0.0 0.0 0.5 1.0 0.0 3.0 3.0 4.0 1.0 1.0 1.0 1.0 0.0 1.0 0.5 0.0 4.6 25.8 0.0 0.0 0.0 61.2 40.0 46.5 47.0 77.0 20.4 46.5 66.3 30.0 74.0 1.0 2.0 22.0 14.5 6.0 32.5 0.0 0.0 j2442 J2801 j2837 LLNL Page lHumbert a.......

memi............

tftemom.0

~

I I

-3i -,-70

÷ q6,q,7o 0