MONTHYEARML24227A5212024-08-12012 August 2024 Inservice Inspection Request for Information ML22034A3952022-02-16016 February 2022 Enclosure 3 - IP 96001 CY2021 - IR 8 Baseline Inspection Completion ML22034A3972022-02-16016 February 2022 Enclosure 2 - IP 92707 CY2021 - IR 8 Baseline Inspection Completion ML22034A3992022-02-16016 February 2022 Enclosure 1 - IP 71130.03 Cy 2021 - IR 8 Baseline Inspection Completion ML21354A7632021-12-20020 December 2021 Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 18 of 18 ML21354A7592021-12-20020 December 2021 Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 14 of 18 ML21354A7602021-12-20020 December 2021 Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 15 of 18 ML21354A7612021-12-20020 December 2021 Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 16 of 18 ML21354A7462021-12-20020 December 2021 Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 1 of 18 ML21354A7572021-12-20020 December 2021 Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 12 of 18 ML21354A7492021-12-20020 December 2021 Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 4 of 18 ML21354A7562021-12-20020 December 2021 Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 11 of 18 ML21026A2602021-02-0808 February 2021 Authorization and Safety Evaluation for Alternative Request No. ANO1-ISI-034 ML20329A1452020-11-20020 November 2020 Terrapower'S QAPD Preliminary Questions ML20135G7202020-05-14014 May 2020 Final ASP Analysis - ANO 1 (LER 313-93-003) ML19009A3222019-01-0808 January 2019 NRC-2017-000688 - Resp 4 - Interim, Agency Records Subject to the Request Are Enclosed (Arkansas Nuclear One, Units 1 and 2, FHRR - Released Set) ML18228A5012018-08-15015 August 2018 NEI 99-02 FAQ 18-04 ANO Uswc Rev 1 W/Proposed NRC Response ML18232A2332018-06-20020 June 2018 FAQ 18-04 ANO-1 Uswc Rev 1 Wapproved Final NRC Response, August 20, 2018 ML18002A2362018-01-0303 January 2018 Public Notice of Application for Exigent Amendment, Request for Allowance to Exclude Exercise of Control Element Assembly 4 Related to Surveillance Requirement 4.1.3.1.2 for Remainder of Cycle 26 ML18008A2972018-01-0303 January 2018 ANO Timeline for Remaining Key Milestones CNRO-2016-00024, Entergy - Form 10-K for Fiscal Year Ended December 31, 20152016-12-20020 December 2016 Entergy - Form 10-K for Fiscal Year Ended December 31, 2015 ML16327A5302016-12-0202 December 2016 Enclosure 1 - Mitigating Strategies Flood Hazard Information Tables for Interim Staff Response (Redacted Version) ML16285A3312016-10-12012 October 2016 ROP PI Frequently Asked Questions (Faqs): 14-09 ML16285A3262016-10-12012 October 2016 ROP PI Frequently Asked Questions (Faqs): 14-03 ML16225A5402016-08-12012 August 2016 U.S. Nuclear Regulatory Commission Staff Review of Resolutions of Arkansas Nuclear One Internal Events and Fire PRA Facts and Observations (F&Os) ML14314A5122014-11-13013 November 2014 Enclosure 2 - Frequently Asked Questions (Faqs) Discussed During the October 22 2014 Reactor Oversight Process Public Meeting ML14329A4112014-08-15015 August 2014 U.S. Nuclear Regulatory Commission, Record of Review, Arkansas Nuclear One Unit 2 (ANO-2), LAR Attachment V- Table V-1 Internal Events PRA Facts and Observations (F&Os) ML14219A4302014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial, Group B (Records Being Released in Their Entirety). Part 11 of 27 ML14220A1662014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial. Group B (Records Being Released in Their Entirety). Part 27 of 27 ML14220A1642014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial. Group B (Records Being Released in Their Entirety). Part 26 of 27 ML14220A1632014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial. Group B (Records Being Released in Their Entirety). Part 23 of 27 ML14220A1622014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial. Group B (Records Being Released in Their Entirety). Part 25 of 27 ML14220A1612014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial. Group B (Records Being Released in Their Entirety). Part 24 of 27 ML14220A0952014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial. Group B (Records Being Released in Their Entirety). Part 22 of 27 ML14220A0942014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial. Group B (Records Being Released in Their Entirety). Part 21 of 27 ML14220A0932014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial. Group B (Records Being Released in Their Entirety). Part 20 of 27 ML14220A0922014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial. Group B (Records Being Released in Their Entirety). Part 19 of 27 ML14219A4352014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial, Group B (Records Being Released in Their Entirety). Part 18 of 27 ML14219A4342014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial, Group B (Records Being Released in Their Entirety). Part 17 of 27 ML14219A4332014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial, Group B (Records Being Released in Their Entirety). Part 13 of 27 ML14219A4312014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial, Group B (Records Being Released in Their Entirety). Part 12 of 27 ML14219A4232014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial, Group B (Records Being Released in Their Entirety). Part 14 of 27 ML14219A4282014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial, Group B (Records Being Released in Their Entirety). Part 10 of 27 ML14219A4272014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial, Group B, (Records Being Released in Their Entirety), Part 9 of 27 ML14219A4262014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial. Group B (Records Being Released in Their Entirety). Part 8 of 27 ML14219A4252014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial, Group B (Records Being Released in Their Entirety). Part 16 of 27 ML14219A4242014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial, Group B (Records Being Released in Their Entirety). Part 15 of 27 ML14218A4882014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial. Group B (Records Being Released in Their Entirety) ML14218A4972014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial. Group C (Records Being Released in Part) ML14218A6052014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial. Group B (Records Being Released in Their Entirety). Part 4 of 27 2024-08-12
[Table view] |
Text
3.1.5 Fire Zones QUESTION Appendix R,Section III.G.3 states "alternative or dedicated shutdown capability and its associated circuits, independent of cables, systems or components in the area room or zone under consideration...." What is the implied utilization of a room or zone concept under Section III.G of Appendix R? The use of the ,
phraseology "area, room or zone under consideration" is used again at the end of the Section III.G.3. Does the requirement for detection and fixed suppres-sion indicate that the requirement can be limited to a fire zone rather than throughout a fire area? Under what conditions and with what caveats can the fire zone concept be utilized in demonstrating conformance to Appendix R?
RESPONSE
Section III.G was written after NRC's multi-discipline review teams had visited all operating power plants.' From these audits, the NRC recognized that it is not practical and may be impossible to subdivide some portions of an operating plant into fire areas. In addition, the NRC recognized that in some cases where fire areas are designated, it may not be possible to provide alternate shutdown capability independent of the fire area and, therefore, would have to be evaluated on the basis of fire zones within the fire area. The NRC also recognized that because some licensees had not yet performed a safe shutdown analysis, these analyses may identify new unique configurations.
To cover the large variation of possible configurations, the reqL rements of Section III.G were presented in three parts:
o Section III.G.1 requires one train of hot shutdown systems be free of fire damage and damage to cold shutdown systems be limited.
o Section III.G.2 provides certain separation, suppression and detection requirements within fire areas; where such requirements are met, analysis is not necessary.
o Section III.G.3 requires alternative dedicated shutdown capability for configurations that do not satisfy the requirements of III.G.2 or where fire suppressants released as a result of fire fighting, rupture of the system or inadvertent operation of the system may damage redundant equip-ment; If alternate shutdown is provided on the basis of rooms or zones,
'the provision of fire detection and fixed suppression is only required in the room or zone under consideration.
Section 11I.G recognizes that the need for alternate or dedicated shutdown capability may have to be considered on the basis of a fire area,.a room or a fire zone. The alternative or dedicated capability should be independent of the fire area where it is possible to do so (See Supplementary Information for the final rule Section Ii1.G). When fire areas are not designated or where it is not possible to have the alternative or dedicated capability independent of the fire area, careful consideration must be given to the selection and location of the alternative or dedicated shutdown capability to assure that the performance requirement set forth in Section III.G.1 is met. Where alternate or dedicated shutdown is provided for a room or zone, the capability must be physically and 'da APPENDIX R QUESTIONS & ANSWERS 6 'il?
v l electrically independent of that room or zone. The vulnerability of the equip-(Pit ment and personnel required at the location of the alternative or dedicated shutdown capability to the environments produced at that location as a result of the fire or fire suppressant's must be evaluated. These environments may be due to the hot layer, smoke, drifting suppressants, common ventilation systems, common drain systems-or flooding. In addition, other interactions between the locations may be possible in unique configurations.
If alternate shutdown is provided on the basis of rooms or zones, the provision of fire detection and fixed suppression is only required in the room or zone under consideration. Compliance with Section III.G.2 cannot be based on rooms or. zones.
See also Sections #5 and #6 of the "Interpretations of Appendix R."
3.1.6 Documentation QUESTION In Generic Letter 83-33 at pg. 2, the NRC Staff referred to the guidance in Appendix A to BTP 9.5-1 to establish the rating of the barrier. What level of documentation must be provided to verify that the fire area meets the require-ments of Appendix R?
-RESPONSE The documentation required to verify the rating of a fire barrier should in-clude the design description of the barrier and the test reports that verify
- its fire rating. Reference can be made to UL listed designs.
3.2 Fire Barrier Qualification 3.2.1 Acceptance Criteria QUESTION Recently the Staff has applied a 3250 F cold side temperature criterion to its evaluation of the acceptability of one-hour and three-hour fire barrier cable tray wraps. This criterion is not in Branch Technical Position (BTP) APCSB 9.5-1, Appendix A as an acceptance criterion for fire barrier cable tray wraps and is not contained in Appendix R. It appears to represent post-Appendix R guidance.
What is the origin of this criterion and why is it applicable to electrical cables where insulation degradation does not begin until jacket temperatures reach 450'F to 650'F?
RESPONSE
Fire barriers relied upon to protect shutdown related systems to meet the re-quirements of III.G.2 need to have a fire rating of either one or three hours.
§ 50.48 references BTP APCSB 9.5-1, where the fire protection definitions are found. Fire rating is defined:
t "Fire Rating - the endurance period of a fire barrier or structure; it defines the period of resistance to a standard fire exposure before the first critical point in behavior is observed (see NFPA 251)."
APPENDIX R QUESTIONS & ANSWERS 7