|
---|
Category:Letter
MONTHYEARPLA-8145, Biennial 10 CFR 50.59 and 72.48 Summary Report and Changes to Regulatory Commitments - PLA-81452024-10-21021 October 2024 Biennial 10 CFR 50.59 and 72.48 Summary Report and Changes to Regulatory Commitments - PLA-8145 ML24291A1562024-10-16016 October 2024 Missed Annual Inventory Required by 40 CFR 266, Subpart in PLE 0026645 PLA-8148, Registration for the Use of Spent Fuel Storage Casks 311, 308, and 3102024-10-15015 October 2024 Registration for the Use of Spent Fuel Storage Casks 311, 308, and 310 PLA-8141, Response to Request for Additional Information Regarding Relief Request 1RR06, PLA-81412024-09-18018 September 2024 Response to Request for Additional Information Regarding Relief Request 1RR06, PLA-8141 PLA-8142, Registration for the Use of Spent Fuel Storage Casks 306, 309, and 307 - PLA-81422024-09-18018 September 2024 Registration for the Use of Spent Fuel Storage Casks 306, 309, and 307 - PLA-8142 ML24260A2312024-09-17017 September 2024 Senior Reactor and Reactor Operator Initial License Examinations 05000387/LER-2024-002, B Diesel Generator Inoperable Due to Failed Excitation System Linear Reactor2024-09-16016 September 2024 B Diesel Generator Inoperable Due to Failed Excitation System Linear Reactor ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 ML24233A2192024-09-0303 September 2024 – Authorized Alternative to Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code IR 05000387/20240052024-08-29029 August 2024 Updated Inspection Plan for Susquehanna Steam Electric Station, Units 1 and 2 (Report 05000387/2024005 and 05000388/2024005) 05000387/LER-2023-004-01, Manual Reactor Scram Due to Degraded Main Condenser Vacuum2024-08-26026 August 2024 Manual Reactor Scram Due to Degraded Main Condenser Vacuum 05000387/LER-2024-001-01, Main Steam Isolation Valve Leakage Due to Valve Body Seat Wear2024-08-21021 August 2024 Main Steam Isolation Valve Leakage Due to Valve Body Seat Wear IR 05000387/20240022024-08-12012 August 2024 Integrated Inspection Report 05000387/2024002 and 05000388/2024002 ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification PLA-8117, 23rd Refueling Outage Owners Activity Report (PLA-8117)2024-07-23023 July 2024 23rd Refueling Outage Owners Activity Report (PLA-8117) ML24197A0982024-07-15015 July 2024 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000387/2024010 and 05000388/2024010 ML24127A2262024-05-29029 May 2024 Issuance of Amendment Nos. 288 and 272 Adoption of TSTF-563 PLA-8126, Response to Request for Confirmation of Information Regarding Relief Request 1RR062024-05-29029 May 2024 Response to Request for Confirmation of Information Regarding Relief Request 1RR06 PLA-8122, Annual Radiological Environmental Operating Report (PLA-8122)2024-05-28028 May 2024 Annual Radiological Environmental Operating Report (PLA-8122) PLA-8123, Main Steam Isolation Valve Leakage2024-05-23023 May 2024 Main Steam Isolation Valve Leakage PLA-8115, Relief Request IRR06 One Time Extension to the Fourth 10-Year Inservice Testing Program Interval (PLA-8115)2024-05-23023 May 2024 Relief Request IRR06 One Time Extension to the Fourth 10-Year Inservice Testing Program Interval (PLA-8115) IR 05000387/20240012024-05-13013 May 2024 Integrated Inspection Report 05000387/2024001 and 05000388/2024001 IR 05000387/20244042024-05-0707 May 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000387/2024404 and 05000388/2024404 ML24082A1372024-04-22022 April 2024 Issuance of Amendment Nos. 287 and 271 Adoption of TSTF-568, Revision 2 and Associated Technical Specification Changes PLA-8094, Radioactive Effluent Release Report and Offsite Dose Calculation Manual PLA-80942024-04-22022 April 2024 Radioactive Effluent Release Report and Offsite Dose Calculation Manual PLA-8094 PLA-8095, 2023 Annual Radiological Environmental Operating Report (PLA-8095)2024-04-22022 April 2024 2023 Annual Radiological Environmental Operating Report (PLA-8095) PLA-8101, Re 2023 Annual Report of Radiation Exposure2024-04-22022 April 2024 Re 2023 Annual Report of Radiation Exposure PLA-8102, Annual Environmental Operating Report (Nonradiological) PLA-81022024-04-11011 April 2024 Annual Environmental Operating Report (Nonradiological) PLA-8102 PLA-8113, Response to Request for Additional Information Regarding Relief Request 4RR-11 (PLA-8113)2024-04-11011 April 2024 Response to Request for Additional Information Regarding Relief Request 4RR-11 (PLA-8113) PLA-8112, Relief Request 4RR-11 Relief from End of Interval Boundary Leakage Test PLA-81122024-04-0909 April 2024 Relief Request 4RR-11 Relief from End of Interval Boundary Leakage Test PLA-8112 PLA-8110, Submittal of Unit 1 Cycle 24 Core Operating License Report (Pla 8110)2024-04-0404 April 2024 Submittal of Unit 1 Cycle 24 Core Operating License Report (Pla 8110) PLA-8100, Property Insurance Program (PLA-8100)2024-04-0101 April 2024 Property Insurance Program (PLA-8100) ML24092A4022024-04-0101 April 2024 Annual Financial Report (PLA-8098) PLA-8109, Supplement to Request for Exemption from Certain Requirements of 10 CR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance (PLA-8109)2024-03-21021 March 2024 Supplement to Request for Exemption from Certain Requirements of 10 CR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance (PLA-8109) ML24067A2512024-03-19019 March 2024 Authorized Alternative to Requirements of the ASME Code PLA-8107, Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance2024-03-19019 March 2024 Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance ML24044A2532024-03-14014 March 2024 Associated Independent Spent Fuel Storage Installation – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0077 (Security Notifications, Reports, and Recordkeeping & Suspicious Activity Reporting)) IR 05000387/20240112024-02-29029 February 2024 Commercial Grade Dedication Inspection Report 05000387/2024011 and 05000388/2024011 IR 05000387/20230062024-02-28028 February 2024 Annual Assessment Letter for Susquehanna Steam Electric Station, Units 1 and 2 (Reports 05000387/2023006 and 05000388/2023006) ML24039A1882024-02-27027 February 2024 Issuance of Amendment Nos. 286 and 270 Changes to Technical Specifications for Control Rods ML24037A3072024-02-22022 February 2024 Summary of Regulatory Audit in Support of Relief Request 5RR-02 PLA-8099, Proof of Financial Protection and Guarantee of Payment of Deferred Premiums (PLA-8099)2024-02-13013 February 2024 Proof of Financial Protection and Guarantee of Payment of Deferred Premiums (PLA-8099) IR 05000387/20230042024-02-0707 February 2024 Integrated Inspection Report 05000387/2023004 and 05000388/2023004 PLA-8096, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval2024-01-0404 January 2024 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval PLA-8077, Emergency Plan Revision 67 (PLA-8077)2023-12-27027 December 2023 Emergency Plan Revision 67 (PLA-8077) IR 05000387/20230102023-12-11011 December 2023 Fire Protection Team Inspection Report 05000387/2023010 and 05000388/2023010 PLA-8088, Request for Exemption from Enhanced Weapons, Firearms Background Checks and Security Event Notifications Implementation (PLA-8088)2023-12-0505 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks and Security Event Notifications Implementation (PLA-8088) PLA-8089, Submittal of Revision to Inservice Testing Program Plan2023-12-0505 December 2023 Submittal of Revision to Inservice Testing Program Plan PLA-8084, Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.22023-11-29029 November 2023 Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 2024-09-06
[Table view] Category:License-Operator
MONTHYEARML21245A2192021-09-0202 September 2021 Requalification Program Inspection ML21200A1392021-07-19019 July 2021 Operator Licensing Examination Approval ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20105A1882020-04-14014 April 2020 March 4, 2020, NRC Generic Fundamentals Examination Results for Susquehanna Steam Electric Station, Units 1 and 2 (Cover Letter Publicly Available, Enclosures Withheld from Public) PLA-7852, Response to NRC Regulatory Issue Summary 2020-1 Preparation and Scheduling of Operator Licensing Examinations (PLA-7852)2020-03-19019 March 2020 Response to NRC Regulatory Issue Summary 2020-1 Preparation and Scheduling of Operator Licensing Examinations (PLA-7852) ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19235A0642019-08-22022 August 2019 Operator Licensing Examination Approval PLA-7801, Response to Request for Information Pertaining to a Licensed Operator2019-07-31031 July 2019 Response to Request for Information Pertaining to a Licensed Operator ML19189A3522019-07-0808 July 2019 LLC Licensed Operator Positive Fitness-For-Duty Test ML18296A4472018-10-23023 October 2018 Senior Reactor and Reactor Operator Initial License Examinations PLA-7701, Response to NRC Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examination.2018-04-11011 April 2018 Response to NRC Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examination. ML18060A2842018-03-0101 March 2018 Operator Licensing Examination Approval ML18109A3292018-02-21021 February 2018 Final Qa/Related Forms (Folder 1) ML18086B0252018-02-16016 February 2018 Facility Cover Letter - Ri - March 2018 - GFE ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 PLA-7598, Response to NRC Regulatory Issue Summary 2017-03 'Preparation and Scheduling of Operator Licensing Examinations PLA-75982017-05-0505 May 2017 Response to NRC Regulatory Issue Summary 2017-03 'Preparation and Scheduling of Operator Licensing Examinations PLA-7598 ML17018A2822017-01-17017 January 2017 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2017 IR 05000387/20163012017-01-17017 January 2017 NRC Initial Operator Licensing Examination Report 05000387/2016301 and 05000388/2016301 ML17013A4622016-11-14014 November 2016 Draft Operating Exam (Section a, Section B, Section C) (Folder 2) ML17013A4582016-11-14014 November 2016 NRC Comments on Draft Written Exam (Folder 2) ML17013A4602016-11-14014 November 2016 Draft - Outlines (Folder 2) ML17013A4612016-11-14014 November 2016 Draft Written Exam ((Folder 2) ML17102A8382016-11-14014 November 2016 Final Q/A Related Forms (Folder 1) ML16315A2442016-11-10010 November 2016 and Electric Station Units 1 and 2 - Initial Operator Licensing Operating Test and Writen Examination Approval - ML17102A8392016-11-10010 November 2016 Final Qa/Related Forms - Form ES-401-6 (Folder 1) ML17013A4552016-11-10010 November 2016 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML17013A4572016-11-10010 November 2016 Final Operating Test Sections a, B, and C) (Folder 3) ML17013A4542016-11-10010 November 2016 Final Outlines (Folder 3) ML17013A4592016-11-0404 November 2016 Facility Comments on Draft NRC-Developed Operating Test (Folder 2) ML16155A0692016-06-0202 June 2016 Senior Reactor and Reactor Operator Initial Examinations - Susquehanna Units 1 and 2 IR 05000387/20153022015-10-0707 October 2015 Examination Report 05000387/2015302 and 05000388/2015302; August 17-21, 2015 and August 27, 2015-Susquehanna Steam Electric Station, Units 1 and 2 ML15266A2352015-09-22022 September 2015 Requalification Program Inspection Susquehanna Steam Electric Station, Units 1 and 2 ML15275A3622015-08-27027 August 2015 Handouts to Applicants (Folder 3) Summary of References ML15275A3632015-08-11011 August 2015 Final Outlines (Folder 3) ML15275A3642015-08-11011 August 2015 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML15275A3652015-08-11011 August 2015 Final Operating Exam (Sections a, B, and C) (Folder 3) ML15223A0332015-08-10010 August 2015 Initial Operator Licensing Operating Test and Written Examination Approval ML15244A3162015-07-30030 July 2015 Draft Written Exam (Folder 2) ML15244A3202015-07-30030 July 2015 Draft Operating Exam (Sections a, B, and C) (Folder 2) ML15244A3142015-07-30030 July 2015 Draft - Outlines (Folder 2) PLA-7366, Response to NRC Regulatory Issue Summary 2015-05, Preparation and Scheduling of Operator Licensing Examinations.2015-07-30030 July 2015 Response to NRC Regulatory Issue Summary 2015-05, Preparation and Scheduling of Operator Licensing Examinations. ML15244A3122015-07-27027 July 2015 NRC Comments on Draft FAC-Developed Written Exam (Folder 2) ML15244A3112015-07-27027 July 2015 NRC Comments on Draft FAC-Developed Operating Exam (Folder 2) ML15072A0182015-03-12012 March 2015 Senior Reactor and Reactor Operator Initial Examinations, Susquehanna, Units 1 and 2 IR 05000387/20153012015-02-25025 February 2015 Er 05000387/2015301; 05000388/2015301; January 19-20, 2015; Susquehanna Steam Electric Station, Units 1 and 2; Retake Operator Licensing Examination Report ML15128A4702015-01-21021 January 2015 Final Qa/Related Forms (Folder 1) ML15126A2662015-01-19019 January 2015 Final Outlines (Folder 3) ML15049A3502015-01-19019 January 2015 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML15049A3492015-01-19019 January 2015 Final Operating Exam (Sections a, B, and C) (Folder 3) ML15014A3062015-01-13013 January 2015 Operator Licensing Retake Examination Approval - Susquehanna Steam Electric Station, Units 1 and 2 2021-09-02
[Table view] Category:Part 55 Historical Related Material
MONTHYEARML18060A2842018-03-0101 March 2018 Operator Licensing Examination Approval 2018-03-01
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PA 19406-2713 March 1, 2018 Mr. Timothy S. Rausch Senior Vice President and Chief Nuclear Officer Susquehanna Nuclear, LLC 769 Salem Blvd. - NUCSB3 Berwick, PA 18603-0467
SUBJECT:
SUSQUEHANNA STEAM ELECTRIC STATION - UNITS 1 AND 2 OPERATOR LICENSING EXAMINATION APPROVAL
Dear Mr. Rausch:
The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at Susquehanna Steam Electric Station, Units 1 and 2. The NRC has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to Mr. John Goodbred, Jr., Training Manager. Note that any examination waivers, excusals, and application denials have been addressed in separate correspondence. The U.S. Nuclear Regulatory Commission (NRC) has approved the subject examinations, and you may administer the written examination in accordance with Revision 11 to NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," on March 14, 2018. The NRC staff will administer the operating tests during the week of March 5, 2018. The examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensed operators at your facility, do not administer the examination and contact me at 610-337-5306.
T. Rausch 2 Please contact your Chief Examiner, Mr. Peter Presby, at 610-337-5392, if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of examination (partial or complete written examination or operating test) specified for each applicant. Sincerely, /RA/ Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-387 and 50-388 License Nos. NPF-14 and NPF-22 cc: Distribution via ListServ T. Rausch 3
SUBJECT:
SUSQUEHANNA STEAM ELECTRIC STATION - UNITS 1 AND 2 OPERATOR LICENSING EXAMINATION APPROVAL DATED MARCH 1, 2018 DISTRIBUTION w/encl: (via e-mail) DCollins, RA (R1ORAMAIL) DLew, DRA (R1ORAMAIL) MGray, DRP (R1DRPMAIL) DPelton, DRP (R1DRPMAIL) JYerokun, DRS (R1DRSMAIL) BWelling, DRS (R1DRSMAIL) JKrafty, Acting BC SBarber, DRP DJackson, DRS PPresby, DRS CBixler, DRS LMicewski, SRI TDaun, DRP, RI AGould, DRP, AA JBowen, RI, OEDO RidsNrrPMSusquehanna Resource RidsNrrDorlLpl1 Resource ROPreports Resource DOCUMENT NAME: G:\DRS\Operations Branch\PRESBY\Exam FY18-Susq Mar 2018\ExamApproval-W-O-Ltr-Rev11.docx ADAMS PKG: ML17138A109 ADAMS ACCESSION NO.: ML18060A284 SUNSI Review Non-Sensitive Publicly Available OFFICE RI/DRS/OB RI/DRS/OB NAME PPresby DEJackson DATE 02/26/18 03/01/18 OFFICIAL RECORD COPY