MONTHYEARPY-CEI-NRR-2427, Application for Amend to License NPF-58,deleting License Condition 2.C.10 Re Controls Over Containment Air Locks During Plant Outages & Clarifying License Condition 2.F Re Reporting Requirements of TS & EPP Violations1999-09-14014 September 1999 Application for Amend to License NPF-58,deleting License Condition 2.C.10 Re Controls Over Containment Air Locks During Plant Outages & Clarifying License Condition 2.F Re Reporting Requirements of TS & EPP Violations PY-CEI-NRR-2406, Application for Amend to License NPF-58,eliminating Requirement in EPP to Sample Lake Erie Sediment in Perry & Eastlake Plant Area for Corbicula.Summary & Description of Change Is Encl1999-09-0909 September 1999 Application for Amend to License NPF-58,eliminating Requirement in EPP to Sample Lake Erie Sediment in Perry & Eastlake Plant Area for Corbicula.Summary & Description of Change Is Encl PY-CEI-NRR-2430, Application for Amend to License NPF-58,revising Allowables Values for CST Low Water Level Limits from Greater than or Equal to 59,700 Gallons to Greater than or Equal to 90,300 Gallons1999-09-0909 September 1999 Application for Amend to License NPF-58,revising Allowables Values for CST Low Water Level Limits from Greater than or Equal to 59,700 Gallons to Greater than or Equal to 90,300 Gallons PY-CEI-NRR-2420, Application for Amend to License NPF-58,increasing Present 100% Authorized Rated Thermal Power Level of 3579 Megawatts Thermal to 3758 Megawatts Thermal.Proprietary SAR Encl. Proprietary SAR Withheld,Per 10CFR2.790(a)(4)1999-09-0909 September 1999 Application for Amend to License NPF-58,increasing Present 100% Authorized Rated Thermal Power Level of 3579 Megawatts Thermal to 3758 Megawatts Thermal.Proprietary SAR Encl. Proprietary SAR Withheld,Per 10CFR2.790(a)(4) PY-CEI-NRR-2418, Application for Amend to License NPF-58,incorporating Addl Option Into TS 3.9.1 Required Actions When Refueling Interlocks Are Inoperable1999-08-0404 August 1999 Application for Amend to License NPF-58,incorporating Addl Option Into TS 3.9.1 Required Actions When Refueling Interlocks Are Inoperable PY-CEI-NRR-2398, Application for Amend to License NPF-58,changing SRs as Identified to Support Implementation of 24-month Operating Cycle at Pnpp1999-06-17017 June 1999 Application for Amend to License NPF-58,changing SRs as Identified to Support Implementation of 24-month Operating Cycle at Pnpp ML20206F5971999-05-0505 May 1999 Application for Amend to License NPF-58,authorizing CEI to Possess Dl 13.74% Undivided Ownership Interest in Pnpp PY-CEI-NRR-2362, Application for Amend to License NPF-58,proposing Change in Plant USAR by Incorporating leak-off Line in RHR Sys, Which Will Significantly Reduce Collective Dose to Plant Operations Personnel.Annotated USAR Pages,Encl1999-03-17017 March 1999 Application for Amend to License NPF-58,proposing Change in Plant USAR by Incorporating leak-off Line in RHR Sys, Which Will Significantly Reduce Collective Dose to Plant Operations Personnel.Annotated USAR Pages,Encl PY-CEI-NRR-2373, Application for Amend to License NPF-58,correcting Typos Found in TS Table 3.3.6.1-11999-03-15015 March 1999 Application for Amend to License NPF-58,correcting Typos Found in TS Table 3.3.6.1-1 PY-CEI-NRR-2359, Suppl Application for Amend to License NPF-58,involving Rev of Main Steam Line Leakage Requirements & Elimination of Main Steam Isolation Valve Leakage Control Sys.Proprietary Calculations Encl.Proprietary Encls Withheld1999-01-18018 January 1999 Suppl Application for Amend to License NPF-58,involving Rev of Main Steam Line Leakage Requirements & Elimination of Main Steam Isolation Valve Leakage Control Sys.Proprietary Calculations Encl.Proprietary Encls Withheld PY-CEI-NRR-2352, Suppl to 980909 LAR to License NPF-58,improving Licensing & Design Basis for Isolation of Feedwater Penetrations, Including Sensitivity Study Performed to Examine Radiological Significance of Leakage Through FW Sys Cvs1999-01-0606 January 1999 Suppl to 980909 LAR to License NPF-58,improving Licensing & Design Basis for Isolation of Feedwater Penetrations, Including Sensitivity Study Performed to Examine Radiological Significance of Leakage Through FW Sys Cvs PY-CEI-NRR-2325, Application for Amend to License NPF-58,applying Addl Conservatism by Modifying MCPR Safety Limit Values,As Calculated by Ge.Proprietary Addl Info Re 1.09 Cycle Specific Slmcpr,Encl.Proprietary Info Withheld1998-10-27027 October 1998 Application for Amend to License NPF-58,applying Addl Conservatism by Modifying MCPR Safety Limit Values,As Calculated by Ge.Proprietary Addl Info Re 1.09 Cycle Specific Slmcpr,Encl.Proprietary Info Withheld PY-CEI-NRR-2322, Application for Amend to License NPF-58,stipulating That Water Leakage from Feedwater motor-operated CIVs Will Be Added Into Primary Coolant Sources Outside of Containment Program & Valves Need Not Be Included in Test Program1998-09-0909 September 1998 Application for Amend to License NPF-58,stipulating That Water Leakage from Feedwater motor-operated CIVs Will Be Added Into Primary Coolant Sources Outside of Containment Program & Valves Need Not Be Included in Test Program PY-CEI-NRR-2319, Application for Amend to License NPF-58,permitting EDG TS Action Completion Time of Up to 14 Days for Div 1 or 2 EDG & Allow Performance of EDG 24-hour TS SR Test in Modes 1 & 21998-09-0303 September 1998 Application for Amend to License NPF-58,permitting EDG TS Action Completion Time of Up to 14 Days for Div 1 or 2 EDG & Allow Performance of EDG 24-hour TS SR Test in Modes 1 & 2 PY-CEI-NRR-2298, Application for Amend to License NPF-58,increasing Present Div 3 DG Fuel Oil Level Requirements to Account for Rounding Error in Calculation & Unusable Vol Due to Vortex Formation at Eductor Suction Nozzles Located in Fuel Oil Storag1998-09-0303 September 1998 Application for Amend to License NPF-58,increasing Present Div 3 DG Fuel Oil Level Requirements to Account for Rounding Error in Calculation & Unusable Vol Due to Vortex Formation at Eductor Suction Nozzles Located in Fuel Oil Storage Tank PY-CEI-NRR-2300, Application for Amend to License NPF-58,allowing Blind Flange in Inclined Fuel Transfer Sys (Ifts) Containment Penetration to Be Removed While Primary Containment Is Required to Be Operable1998-08-31031 August 1998 Application for Amend to License NPF-58,allowing Blind Flange in Inclined Fuel Transfer Sys (Ifts) Containment Penetration to Be Removed While Primary Containment Is Required to Be Operable PY-CEI-NRR-2299, Supplemental Application for Amend to License NPF-58, Revising MSL Leakage Requirements & Eliminating Msli Valve Leakage Control Sys.Proprietary & non-proprietary Rev 1 to Calculation Psat 08401T.03,encl.Proprietary Info Withheld1998-07-22022 July 1998 Supplemental Application for Amend to License NPF-58, Revising MSL Leakage Requirements & Eliminating Msli Valve Leakage Control Sys.Proprietary & non-proprietary Rev 1 to Calculation Psat 08401T.03,encl.Proprietary Info Withheld ML20151P1891998-07-13013 July 1998 Application for Amend to License NPF-58,revising Safety Setpoint Requirements for Srv.Proprietary Info & Affidavit Are Contained in Attachment 5.Proprietary Info Withheld PY-CEI-NRR-2295, Application for Amend to License NPF-58,revising TS 3.1.7, Standby Liquid Control Sys to Increase Boron Concentration in Standby Liquid Control Sys for Cycle 8 Fuel Design & to Provide Margin for Future Cycles as Required1998-06-30030 June 1998 Application for Amend to License NPF-58,revising TS 3.1.7, Standby Liquid Control Sys to Increase Boron Concentration in Standby Liquid Control Sys for Cycle 8 Fuel Design & to Provide Margin for Future Cycles as Required ML20236H6931998-06-30030 June 1998 Application for Amend to License NPF-58,transferring Operating Authority for Pnpp from Ceic & Centerior Svc Co to New Operating Company Named Firstenergy Nuclear Operating Co.Marked Up License,Safety & Environ Assessments,Included PY-CEI-NRR-2245, Application for Amend to License NPF-58,revising TS 3.8.1, AC Sources - Operating, to Be Consistent W/Recommendations in GL 94-01, Removal of Accelerated Testing & Special Reporting Requirements for Edgs1997-12-23023 December 1997 Application for Amend to License NPF-58,revising TS 3.8.1, AC Sources - Operating, to Be Consistent W/Recommendations in GL 94-01, Removal of Accelerated Testing & Special Reporting Requirements for Edgs PY-CEI-NRR-2230, Application for Amend to License NPF-58,incorporating Temp Control Valves & Associated Bypass Lines Around Emergency Closed Cooling Sys Heat Exchangers1997-10-22022 October 1997 Application for Amend to License NPF-58,incorporating Temp Control Valves & Associated Bypass Lines Around Emergency Closed Cooling Sys Heat Exchangers PY-CEI-NRR-2207, Application for Amend to License NPF-58,revising TS 5.2.2.e, Organization-Unit Staff, by Removing Ref to NRC Policy Statement on Working Hours1997-09-0808 September 1997 Application for Amend to License NPF-58,revising TS 5.2.2.e, Organization-Unit Staff, by Removing Ref to NRC Policy Statement on Working Hours PY-CEI-NRR-2206, Application for Amend to License NPF-58,revising Pressure- Temp Limits,Per Reactor Vessel Matl Surveillance Program Requirements Contained in App H of 10CFR50.901997-08-28028 August 1997 Application for Amend to License NPF-58,revising Pressure- Temp Limits,Per Reactor Vessel Matl Surveillance Program Requirements Contained in App H of 10CFR50.90 ML20217F5751997-07-28028 July 1997 Application for Amends to Licenses DPR-66,NPF-73 & NPF-58, Authorizing Holders to Possess Beaver Valley Power Station, Unit 1 & Authorizes Duquesne Light to Use & Operate Beaver Valley Unit 1 in Accordance W/Procedures PY-CEI-NRR-2164, Application for Amend to License NPF-58,revising Existing Exception to LCO 3.0.4 as Applies to LCO 3.6.1.9 for MSIV Leakage Control Sys1997-05-0202 May 1997 Application for Amend to License NPF-58,revising Existing Exception to LCO 3.0.4 as Applies to LCO 3.6.1.9 for MSIV Leakage Control Sys PY-CEI-NRR-2165, Application for Amend to License NPF-58,revising Tech Specs Surveillance Requirement for MSIV Leakage Rate Acceptance Criteria1997-05-0202 May 1997 Application for Amend to License NPF-58,revising Tech Specs Surveillance Requirement for MSIV Leakage Rate Acceptance Criteria PY-CEI-NRR-2155, Application for Amend to License NPF-58,revising TS Surveillance Requirements 3.9.1.1 & 3.9.2.2,extending SR Frequency on Refueling Equipment & one-rod-out Interlocks1997-04-0909 April 1997 Application for Amend to License NPF-58,revising TS Surveillance Requirements 3.9.1.1 & 3.9.2.2,extending SR Frequency on Refueling Equipment & one-rod-out Interlocks PY-CEI-NRR-2133, Application for Amend to License NPF-58,requesting Implementation of App J,Option B,Performance-based Primary Containment Leakage Rate Testing Program for Type A,B & C Leak Rate Tests1997-01-31031 January 1997 Application for Amend to License NPF-58,requesting Implementation of App J,Option B,Performance-based Primary Containment Leakage Rate Testing Program for Type A,B & C Leak Rate Tests ML20132C7601996-12-13013 December 1996 Application for Amend to License NPF-58,authorizing Transfers of Control PY-CEI-NRR-2104, Application for Amend to License NPF-58,modifying MCPR Reactor Core Safety Limit Contained in TS 2.1.1.21996-10-24024 October 1996 Application for Amend to License NPF-58,modifying MCPR Reactor Core Safety Limit Contained in TS 2.1.1.2 ML20117E7821996-08-27027 August 1996 Application for Amend to License NPF-58,revising MSL Leakage Requirements & Eliminating MSIV Leakage Control Sys. Attachment 7 Provides Proprietary Dose Calculations. Attachment 7 Withheld PY-CEI-NRR-1999, Application for Amend to License NPF-58,revising Improved Tech Specs.Changes Either Administrative in Nature or Reflect Minor Technical Errors Discovered During Implementation Process1996-04-26026 April 1996 Application for Amend to License NPF-58,revising Improved Tech Specs.Changes Either Administrative in Nature or Reflect Minor Technical Errors Discovered During Implementation Process PY-CEI-NRR-2030, Application for Amend to License NPF-58 Re Drywell Personnel Air Lock Shield Door Analyses1996-02-27027 February 1996 Application for Amend to License NPF-58 Re Drywell Personnel Air Lock Shield Door Analyses PY-CEI-NRR-2027, Application for Amend to License NPF-58,changing TS to Reflect Mod of Leakage Rate Requirements for Main Steam Lines Until End of Operating Cycle 61996-02-17017 February 1996 Application for Amend to License NPF-58,changing TS to Reflect Mod of Leakage Rate Requirements for Main Steam Lines Until End of Operating Cycle 6 PY-CEI-NRR-2007, Application for Amend to License NPF-58,revising TS Requirements for Drywell Leak Rate Testing1996-01-16016 January 1996 Application for Amend to License NPF-58,revising TS Requirements for Drywell Leak Rate Testing PY-CEI-NRR-2013, Application for Amend to License NPF-58,requesting one-time Surveillance Interval Extension to Support Current Schedule for Refueling Outage 5,scheduled to Begin 9601271996-01-10010 January 1996 Application for Amend to License NPF-58,requesting one-time Surveillance Interval Extension to Support Current Schedule for Refueling Outage 5,scheduled to Begin 960127 ML20095L2181995-12-28028 December 1995 Suppl Application for License Transfer of 12.58% Ownership Interest in Addition to 17.42% Approved on 951220 PY-CEI-NRR-2004, Application for Amend to License NPF-58,revising License to Reflect License Transfer for Part of Oh Edison Co Ownership Interest in Pnpp Unit 1 to Wholly Owned Subsidiary,Oes Nuclear,Inc1995-11-22022 November 1995 Application for Amend to License NPF-58,revising License to Reflect License Transfer for Part of Oh Edison Co Ownership Interest in Pnpp Unit 1 to Wholly Owned Subsidiary,Oes Nuclear,Inc PY-CEI-NRR-1978, Application for Amend to License NPF-58,requesting Rev to TS for Onsite Power Distribution Sys:Ts 3/4.8.3.1, Distribution - Operating1995-11-0202 November 1995 Application for Amend to License NPF-58,requesting Rev to TS for Onsite Power Distribution Sys:Ts 3/4.8.3.1, Distribution - Operating PY-CEI-NRR-1995, Application for Amend to License NPF-58,revising TS Requirements for Handling Irradiated Fuel in Containment or Fuel Handling Bldg & Certain Specs Related to Performing Core Alterations1995-11-0202 November 1995 Application for Amend to License NPF-58,revising TS Requirements for Handling Irradiated Fuel in Containment or Fuel Handling Bldg & Certain Specs Related to Performing Core Alterations PY-CEI-NRR-1997, Application for Amend to License NPF-58,providing Suppl Info That Revises License to Reflect Proposed Merger of Operating Companies1995-11-0101 November 1995 Application for Amend to License NPF-58,providing Suppl Info That Revises License to Reflect Proposed Merger of Operating Companies PY-CEI-NRR-1969, Application for Amend to License NPF-58,revising Tech Specs Allowable Values & Trip Setpoints for Selected Plant Process Instrumentation Using Instrument Setpoint Methodology Discussed in Util (PY-CEI/NRR-1706L)1995-08-29029 August 1995 Application for Amend to License NPF-58,revising Tech Specs Allowable Values & Trip Setpoints for Selected Plant Process Instrumentation Using Instrument Setpoint Methodology Discussed in Util (PY-CEI/NRR-1706L) PY-CEI-NRR-1961, Application for Amends to Licenses NPF-58,reflecting One Time Extension of Performance Intervals for Certain TS Surveillance Requirements1995-06-30030 June 1995 Application for Amends to Licenses NPF-58,reflecting One Time Extension of Performance Intervals for Certain TS Surveillance Requirements PY-CEI-NRR-1954, Application for Amend to License NPF-58.Amend Would Allow one-time Extension of Performance Intervals for Certain Srs. Application Supplements Original Request1995-06-0909 June 1995 Application for Amend to License NPF-58.Amend Would Allow one-time Extension of Performance Intervals for Certain Srs. Application Supplements Original Request PY-CEI-NRR-1956, Application for Amend to License NPF-58,proposing Early Implementation of Control Rod Drive Scram Time Testing Consistent W/Requirements in Pnpp Improved TS LAR1995-06-0101 June 1995 Application for Amend to License NPF-58,proposing Early Implementation of Control Rod Drive Scram Time Testing Consistent W/Requirements in Pnpp Improved TS LAR PY-CEI-NRR-1944, Suppl Application for Amend to License NPF-58,App a Tss. Suppl Addresses Minor Discrepancies & Items Needing Clarification1995-05-0505 May 1995 Suppl Application for Amend to License NPF-58,App a Tss. Suppl Addresses Minor Discrepancies & Items Needing Clarification PY-CEI-NRR-1932, Application for Amend to License NPF-58.Amend Would Incorporate Results of Work Performed by BWROG Re Elimination of Selected Response Time Testing Requirements1995-05-0101 May 1995 Application for Amend to License NPF-58.Amend Would Incorporate Results of Work Performed by BWROG Re Elimination of Selected Response Time Testing Requirements PY-CEI-NRR-1934, Application for Amend to License NPF-58,proposing Extension for One Operating Cycle of Exception to LCO 3.0.4 as Applies to TS for MSIV LCS1995-04-28028 April 1995 Application for Amend to License NPF-58,proposing Extension for One Operating Cycle of Exception to LCO 3.0.4 as Applies to TS for MSIV LCS PY-CEI-NRR-1927, Application for Amend to License NPF-58 Re Removal of License Conditions for Tdi EDGs Specified by Paragraph 2.c & Defined in Attachment 2 to Operating License1995-04-28028 April 1995 Application for Amend to License NPF-58 Re Removal of License Conditions for Tdi EDGs Specified by Paragraph 2.c & Defined in Attachment 2 to Operating License 1999-09-09
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARPY-CEI-NRR-2427, Application for Amend to License NPF-58,deleting License Condition 2.C.10 Re Controls Over Containment Air Locks During Plant Outages & Clarifying License Condition 2.F Re Reporting Requirements of TS & EPP Violations1999-09-14014 September 1999 Application for Amend to License NPF-58,deleting License Condition 2.C.10 Re Controls Over Containment Air Locks During Plant Outages & Clarifying License Condition 2.F Re Reporting Requirements of TS & EPP Violations PY-CEI-NRR-2430, Application for Amend to License NPF-58,revising Allowables Values for CST Low Water Level Limits from Greater than or Equal to 59,700 Gallons to Greater than or Equal to 90,300 Gallons1999-09-0909 September 1999 Application for Amend to License NPF-58,revising Allowables Values for CST Low Water Level Limits from Greater than or Equal to 59,700 Gallons to Greater than or Equal to 90,300 Gallons PY-CEI-NRR-2406, Application for Amend to License NPF-58,eliminating Requirement in EPP to Sample Lake Erie Sediment in Perry & Eastlake Plant Area for Corbicula.Summary & Description of Change Is Encl1999-09-0909 September 1999 Application for Amend to License NPF-58,eliminating Requirement in EPP to Sample Lake Erie Sediment in Perry & Eastlake Plant Area for Corbicula.Summary & Description of Change Is Encl PY-CEI-NRR-2420, Application for Amend to License NPF-58,increasing Present 100% Authorized Rated Thermal Power Level of 3579 Megawatts Thermal to 3758 Megawatts Thermal.Proprietary SAR Encl. Proprietary SAR Withheld,Per 10CFR2.790(a)(4)1999-09-0909 September 1999 Application for Amend to License NPF-58,increasing Present 100% Authorized Rated Thermal Power Level of 3579 Megawatts Thermal to 3758 Megawatts Thermal.Proprietary SAR Encl. Proprietary SAR Withheld,Per 10CFR2.790(a)(4) PY-CEI-NRR-2418, Application for Amend to License NPF-58,incorporating Addl Option Into TS 3.9.1 Required Actions When Refueling Interlocks Are Inoperable1999-08-0404 August 1999 Application for Amend to License NPF-58,incorporating Addl Option Into TS 3.9.1 Required Actions When Refueling Interlocks Are Inoperable PY-CEI-NRR-2398, Application for Amend to License NPF-58,changing SRs as Identified to Support Implementation of 24-month Operating Cycle at Pnpp1999-06-17017 June 1999 Application for Amend to License NPF-58,changing SRs as Identified to Support Implementation of 24-month Operating Cycle at Pnpp ML20206F5971999-05-0505 May 1999 Application for Amend to License NPF-58,authorizing CEI to Possess Dl 13.74% Undivided Ownership Interest in Pnpp PY-CEI-NRR-2362, Application for Amend to License NPF-58,proposing Change in Plant USAR by Incorporating leak-off Line in RHR Sys, Which Will Significantly Reduce Collective Dose to Plant Operations Personnel.Annotated USAR Pages,Encl1999-03-17017 March 1999 Application for Amend to License NPF-58,proposing Change in Plant USAR by Incorporating leak-off Line in RHR Sys, Which Will Significantly Reduce Collective Dose to Plant Operations Personnel.Annotated USAR Pages,Encl PY-CEI-NRR-2373, Application for Amend to License NPF-58,correcting Typos Found in TS Table 3.3.6.1-11999-03-15015 March 1999 Application for Amend to License NPF-58,correcting Typos Found in TS Table 3.3.6.1-1 PY-CEI-NRR-2359, Suppl Application for Amend to License NPF-58,involving Rev of Main Steam Line Leakage Requirements & Elimination of Main Steam Isolation Valve Leakage Control Sys.Proprietary Calculations Encl.Proprietary Encls Withheld1999-01-18018 January 1999 Suppl Application for Amend to License NPF-58,involving Rev of Main Steam Line Leakage Requirements & Elimination of Main Steam Isolation Valve Leakage Control Sys.Proprietary Calculations Encl.Proprietary Encls Withheld PY-CEI-NRR-2352, Suppl to 980909 LAR to License NPF-58,improving Licensing & Design Basis for Isolation of Feedwater Penetrations, Including Sensitivity Study Performed to Examine Radiological Significance of Leakage Through FW Sys Cvs1999-01-0606 January 1999 Suppl to 980909 LAR to License NPF-58,improving Licensing & Design Basis for Isolation of Feedwater Penetrations, Including Sensitivity Study Performed to Examine Radiological Significance of Leakage Through FW Sys Cvs PY-CEI-NRR-2325, Application for Amend to License NPF-58,applying Addl Conservatism by Modifying MCPR Safety Limit Values,As Calculated by Ge.Proprietary Addl Info Re 1.09 Cycle Specific Slmcpr,Encl.Proprietary Info Withheld1998-10-27027 October 1998 Application for Amend to License NPF-58,applying Addl Conservatism by Modifying MCPR Safety Limit Values,As Calculated by Ge.Proprietary Addl Info Re 1.09 Cycle Specific Slmcpr,Encl.Proprietary Info Withheld PY-CEI-NRR-2322, Application for Amend to License NPF-58,stipulating That Water Leakage from Feedwater motor-operated CIVs Will Be Added Into Primary Coolant Sources Outside of Containment Program & Valves Need Not Be Included in Test Program1998-09-0909 September 1998 Application for Amend to License NPF-58,stipulating That Water Leakage from Feedwater motor-operated CIVs Will Be Added Into Primary Coolant Sources Outside of Containment Program & Valves Need Not Be Included in Test Program PY-CEI-NRR-2298, Application for Amend to License NPF-58,increasing Present Div 3 DG Fuel Oil Level Requirements to Account for Rounding Error in Calculation & Unusable Vol Due to Vortex Formation at Eductor Suction Nozzles Located in Fuel Oil Storag1998-09-0303 September 1998 Application for Amend to License NPF-58,increasing Present Div 3 DG Fuel Oil Level Requirements to Account for Rounding Error in Calculation & Unusable Vol Due to Vortex Formation at Eductor Suction Nozzles Located in Fuel Oil Storage Tank PY-CEI-NRR-2319, Application for Amend to License NPF-58,permitting EDG TS Action Completion Time of Up to 14 Days for Div 1 or 2 EDG & Allow Performance of EDG 24-hour TS SR Test in Modes 1 & 21998-09-0303 September 1998 Application for Amend to License NPF-58,permitting EDG TS Action Completion Time of Up to 14 Days for Div 1 or 2 EDG & Allow Performance of EDG 24-hour TS SR Test in Modes 1 & 2 PY-CEI-NRR-2300, Application for Amend to License NPF-58,allowing Blind Flange in Inclined Fuel Transfer Sys (Ifts) Containment Penetration to Be Removed While Primary Containment Is Required to Be Operable1998-08-31031 August 1998 Application for Amend to License NPF-58,allowing Blind Flange in Inclined Fuel Transfer Sys (Ifts) Containment Penetration to Be Removed While Primary Containment Is Required to Be Operable PY-CEI-NRR-2299, Supplemental Application for Amend to License NPF-58, Revising MSL Leakage Requirements & Eliminating Msli Valve Leakage Control Sys.Proprietary & non-proprietary Rev 1 to Calculation Psat 08401T.03,encl.Proprietary Info Withheld1998-07-22022 July 1998 Supplemental Application for Amend to License NPF-58, Revising MSL Leakage Requirements & Eliminating Msli Valve Leakage Control Sys.Proprietary & non-proprietary Rev 1 to Calculation Psat 08401T.03,encl.Proprietary Info Withheld ML20151P1891998-07-13013 July 1998 Application for Amend to License NPF-58,revising Safety Setpoint Requirements for Srv.Proprietary Info & Affidavit Are Contained in Attachment 5.Proprietary Info Withheld PY-CEI-NRR-2295, Application for Amend to License NPF-58,revising TS 3.1.7, Standby Liquid Control Sys to Increase Boron Concentration in Standby Liquid Control Sys for Cycle 8 Fuel Design & to Provide Margin for Future Cycles as Required1998-06-30030 June 1998 Application for Amend to License NPF-58,revising TS 3.1.7, Standby Liquid Control Sys to Increase Boron Concentration in Standby Liquid Control Sys for Cycle 8 Fuel Design & to Provide Margin for Future Cycles as Required ML20236H6931998-06-30030 June 1998 Application for Amend to License NPF-58,transferring Operating Authority for Pnpp from Ceic & Centerior Svc Co to New Operating Company Named Firstenergy Nuclear Operating Co.Marked Up License,Safety & Environ Assessments,Included PY-CEI-NRR-2245, Application for Amend to License NPF-58,revising TS 3.8.1, AC Sources - Operating, to Be Consistent W/Recommendations in GL 94-01, Removal of Accelerated Testing & Special Reporting Requirements for Edgs1997-12-23023 December 1997 Application for Amend to License NPF-58,revising TS 3.8.1, AC Sources - Operating, to Be Consistent W/Recommendations in GL 94-01, Removal of Accelerated Testing & Special Reporting Requirements for Edgs PY-CEI-NRR-2230, Application for Amend to License NPF-58,incorporating Temp Control Valves & Associated Bypass Lines Around Emergency Closed Cooling Sys Heat Exchangers1997-10-22022 October 1997 Application for Amend to License NPF-58,incorporating Temp Control Valves & Associated Bypass Lines Around Emergency Closed Cooling Sys Heat Exchangers PY-CEI-NRR-2207, Application for Amend to License NPF-58,revising TS 5.2.2.e, Organization-Unit Staff, by Removing Ref to NRC Policy Statement on Working Hours1997-09-0808 September 1997 Application for Amend to License NPF-58,revising TS 5.2.2.e, Organization-Unit Staff, by Removing Ref to NRC Policy Statement on Working Hours PY-CEI-NRR-2206, Application for Amend to License NPF-58,revising Pressure- Temp Limits,Per Reactor Vessel Matl Surveillance Program Requirements Contained in App H of 10CFR50.901997-08-28028 August 1997 Application for Amend to License NPF-58,revising Pressure- Temp Limits,Per Reactor Vessel Matl Surveillance Program Requirements Contained in App H of 10CFR50.90 ML20217F5751997-07-28028 July 1997 Application for Amends to Licenses DPR-66,NPF-73 & NPF-58, Authorizing Holders to Possess Beaver Valley Power Station, Unit 1 & Authorizes Duquesne Light to Use & Operate Beaver Valley Unit 1 in Accordance W/Procedures PY-CEI-NRR-2164, Application for Amend to License NPF-58,revising Existing Exception to LCO 3.0.4 as Applies to LCO 3.6.1.9 for MSIV Leakage Control Sys1997-05-0202 May 1997 Application for Amend to License NPF-58,revising Existing Exception to LCO 3.0.4 as Applies to LCO 3.6.1.9 for MSIV Leakage Control Sys PY-CEI-NRR-2165, Application for Amend to License NPF-58,revising Tech Specs Surveillance Requirement for MSIV Leakage Rate Acceptance Criteria1997-05-0202 May 1997 Application for Amend to License NPF-58,revising Tech Specs Surveillance Requirement for MSIV Leakage Rate Acceptance Criteria PY-CEI-NRR-2155, Application for Amend to License NPF-58,revising TS Surveillance Requirements 3.9.1.1 & 3.9.2.2,extending SR Frequency on Refueling Equipment & one-rod-out Interlocks1997-04-0909 April 1997 Application for Amend to License NPF-58,revising TS Surveillance Requirements 3.9.1.1 & 3.9.2.2,extending SR Frequency on Refueling Equipment & one-rod-out Interlocks PY-CEI-NRR-2133, Application for Amend to License NPF-58,requesting Implementation of App J,Option B,Performance-based Primary Containment Leakage Rate Testing Program for Type A,B & C Leak Rate Tests1997-01-31031 January 1997 Application for Amend to License NPF-58,requesting Implementation of App J,Option B,Performance-based Primary Containment Leakage Rate Testing Program for Type A,B & C Leak Rate Tests ML20132C7601996-12-13013 December 1996 Application for Amend to License NPF-58,authorizing Transfers of Control PY-CEI-NRR-2104, Application for Amend to License NPF-58,modifying MCPR Reactor Core Safety Limit Contained in TS 2.1.1.21996-10-24024 October 1996 Application for Amend to License NPF-58,modifying MCPR Reactor Core Safety Limit Contained in TS 2.1.1.2 ML20117E7821996-08-27027 August 1996 Application for Amend to License NPF-58,revising MSL Leakage Requirements & Eliminating MSIV Leakage Control Sys. Attachment 7 Provides Proprietary Dose Calculations. Attachment 7 Withheld PY-CEI-NRR-1999, Application for Amend to License NPF-58,revising Improved Tech Specs.Changes Either Administrative in Nature or Reflect Minor Technical Errors Discovered During Implementation Process1996-04-26026 April 1996 Application for Amend to License NPF-58,revising Improved Tech Specs.Changes Either Administrative in Nature or Reflect Minor Technical Errors Discovered During Implementation Process PY-CEI-NRR-2030, Application for Amend to License NPF-58 Re Drywell Personnel Air Lock Shield Door Analyses1996-02-27027 February 1996 Application for Amend to License NPF-58 Re Drywell Personnel Air Lock Shield Door Analyses PY-CEI-NRR-2027, Application for Amend to License NPF-58,changing TS to Reflect Mod of Leakage Rate Requirements for Main Steam Lines Until End of Operating Cycle 61996-02-17017 February 1996 Application for Amend to License NPF-58,changing TS to Reflect Mod of Leakage Rate Requirements for Main Steam Lines Until End of Operating Cycle 6 PY-CEI-NRR-2007, Application for Amend to License NPF-58,revising TS Requirements for Drywell Leak Rate Testing1996-01-16016 January 1996 Application for Amend to License NPF-58,revising TS Requirements for Drywell Leak Rate Testing PY-CEI-NRR-2013, Application for Amend to License NPF-58,requesting one-time Surveillance Interval Extension to Support Current Schedule for Refueling Outage 5,scheduled to Begin 9601271996-01-10010 January 1996 Application for Amend to License NPF-58,requesting one-time Surveillance Interval Extension to Support Current Schedule for Refueling Outage 5,scheduled to Begin 960127 ML20095L2181995-12-28028 December 1995 Suppl Application for License Transfer of 12.58% Ownership Interest in Addition to 17.42% Approved on 951220 PY-CEI-NRR-2004, Application for Amend to License NPF-58,revising License to Reflect License Transfer for Part of Oh Edison Co Ownership Interest in Pnpp Unit 1 to Wholly Owned Subsidiary,Oes Nuclear,Inc1995-11-22022 November 1995 Application for Amend to License NPF-58,revising License to Reflect License Transfer for Part of Oh Edison Co Ownership Interest in Pnpp Unit 1 to Wholly Owned Subsidiary,Oes Nuclear,Inc PY-CEI-NRR-1978, Application for Amend to License NPF-58,requesting Rev to TS for Onsite Power Distribution Sys:Ts 3/4.8.3.1, Distribution - Operating1995-11-0202 November 1995 Application for Amend to License NPF-58,requesting Rev to TS for Onsite Power Distribution Sys:Ts 3/4.8.3.1, Distribution - Operating PY-CEI-NRR-1995, Application for Amend to License NPF-58,revising TS Requirements for Handling Irradiated Fuel in Containment or Fuel Handling Bldg & Certain Specs Related to Performing Core Alterations1995-11-0202 November 1995 Application for Amend to License NPF-58,revising TS Requirements for Handling Irradiated Fuel in Containment or Fuel Handling Bldg & Certain Specs Related to Performing Core Alterations PY-CEI-NRR-1997, Application for Amend to License NPF-58,providing Suppl Info That Revises License to Reflect Proposed Merger of Operating Companies1995-11-0101 November 1995 Application for Amend to License NPF-58,providing Suppl Info That Revises License to Reflect Proposed Merger of Operating Companies PY-CEI-NRR-1969, Application for Amend to License NPF-58,revising Tech Specs Allowable Values & Trip Setpoints for Selected Plant Process Instrumentation Using Instrument Setpoint Methodology Discussed in Util (PY-CEI/NRR-1706L)1995-08-29029 August 1995 Application for Amend to License NPF-58,revising Tech Specs Allowable Values & Trip Setpoints for Selected Plant Process Instrumentation Using Instrument Setpoint Methodology Discussed in Util (PY-CEI/NRR-1706L) PY-CEI-NRR-1961, Application for Amends to Licenses NPF-58,reflecting One Time Extension of Performance Intervals for Certain TS Surveillance Requirements1995-06-30030 June 1995 Application for Amends to Licenses NPF-58,reflecting One Time Extension of Performance Intervals for Certain TS Surveillance Requirements PY-CEI-NRR-1954, Application for Amend to License NPF-58.Amend Would Allow one-time Extension of Performance Intervals for Certain Srs. Application Supplements Original Request1995-06-0909 June 1995 Application for Amend to License NPF-58.Amend Would Allow one-time Extension of Performance Intervals for Certain Srs. Application Supplements Original Request PY-CEI-NRR-1956, Application for Amend to License NPF-58,proposing Early Implementation of Control Rod Drive Scram Time Testing Consistent W/Requirements in Pnpp Improved TS LAR1995-06-0101 June 1995 Application for Amend to License NPF-58,proposing Early Implementation of Control Rod Drive Scram Time Testing Consistent W/Requirements in Pnpp Improved TS LAR PY-CEI-NRR-1944, Suppl Application for Amend to License NPF-58,App a Tss. Suppl Addresses Minor Discrepancies & Items Needing Clarification1995-05-0505 May 1995 Suppl Application for Amend to License NPF-58,App a Tss. Suppl Addresses Minor Discrepancies & Items Needing Clarification PY-CEI-NRR-1932, Application for Amend to License NPF-58.Amend Would Incorporate Results of Work Performed by BWROG Re Elimination of Selected Response Time Testing Requirements1995-05-0101 May 1995 Application for Amend to License NPF-58.Amend Would Incorporate Results of Work Performed by BWROG Re Elimination of Selected Response Time Testing Requirements PY-CEI-NRR-1934, Application for Amend to License NPF-58,proposing Extension for One Operating Cycle of Exception to LCO 3.0.4 as Applies to TS for MSIV LCS1995-04-28028 April 1995 Application for Amend to License NPF-58,proposing Extension for One Operating Cycle of Exception to LCO 3.0.4 as Applies to TS for MSIV LCS PY-CEI-NRR-1927, Application for Amend to License NPF-58 Re Removal of License Conditions for Tdi EDGs Specified by Paragraph 2.c & Defined in Attachment 2 to Operating License1995-04-28028 April 1995 Application for Amend to License NPF-58 Re Removal of License Conditions for Tdi EDGs Specified by Paragraph 2.c & Defined in Attachment 2 to Operating License 1999-09-09
[Table view] |
Text
f%rry Nuclear F>er Plant to Center Rud
~-
Perry. Otno 44081 Lew W Myers 440-280-59 t5 VQC President Fax:44C-280 BC29 January 18,1999 PY-CEl/NRR-2359L United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Perry Nuclear Power Plant Docket No. 50-440 Supplement to a License Amendment Request: Revision of Main Steam Line Leakage Requirements and Elimination of the Main Steam Isolation Valve Leakage Control System (TAC No. M96931)
Ladies and Gentlemen:
A supplement to a license amendment request for the Perry Nuclear Power Plant (PNPP) is provided. The amendment involves revision of the Main Steam Line leakage rerfirements and elimination of the Main Steam isolation Valve Leakage Control System. This amendment was submitted to the Nuclear Regulatory Commission (NRC) by letters dated August 27,1996 (PY-CEl/NRR-2076L), and July 22,1998 (PY-CEl/NRR-2299L). Revised Accident Source -
Term (RAST) dose calculations provide a primary justification for this amendment.
A PNPP-specific meeting was held with the NRC staff on September 15,1998, and an industry meeting between the NRC and the Nuclear Energy Institute (NEI) was held on October 1,1998.
At these meetings and in subsequent telephone discussions, resolution of several staff issues has been achieved. Summaries of these items are provided in Attachment 1. Attachment 2 provides an update to two of the commitments provided in the letters dated August 27,1996, and July 22,1998, regarding the use of the containment spray system and a backup method for pH control of the suppression pool.
Attachment 3 provides the two calculations that have been revised as a result of issue resolutions with the NRC staff. These calculations are considered to be Proprietary. Non-Proprietary versions of these calculations can be provided at NRC request. Proprietary affidavits l from Polestar Applied Technology, Inc., were submitted for these calculations as part of the letters dated August 27,1996, and July 22,1998. Pursuant to 10 CFR 2.790(b)(1), it is requested that Attachment 3 be withheld from public disclosure.
, Other than the updated commitments described in Attachment 2, this letter does not contain
! regulatory commitments. If you have questions or require additional information, please contact l Mr. Henry L. Hegrat, Manager - Regulatory Affairs, at (440) 280-5606.
I i
Very truly yours,
)f l M
For ew W. Myers Attachments 29000'7 Attachment 3 contains 2.790(a)(4) cc: NRC Project Manager PROPRIETARY information. Upon NRC Resident inspector removal of Attachment 3, the NRC Region ill remainder of this letter and its State of Ohio Attachments may be disclosed.
9901220351 990118 ADOCK 05000440
@ cy; PDR P ,,PDR . . _ ,_% \ \ tMO ptp
l 1, Robert W. Schrauder, being duly sworn state that (1) I am Director, Perry Nuclear Engineering Department, of the FirstEnergy Nuclear Operating Company, (2) I am duly authorized to execute and file this certification as the duly authorized agent for The Cleveland Electric illuminating Company, Toledo Edison Company, Duquesne Light Company, Ohio Edison Company, and Pennsylvania Power Company, and (3) the j statements set forth herein are true and correct to the best of my knowledge, ;
information and belief. 1 l
C &/
Rpbfrt W. Schrauder l
./ l l
l Sworn to and subscribed before me, the /O'44 day of bm _ / 99 9 '
y u' 1
Untdo f-s-4*/
% e.cr 6 9 l
s
Attichm:nt 1 PY-CEl/NRR-2359L Pigs 1 of 5 Changes To The Revised Accident Source Term (RAST) Calculations The calculations included in Attachment 3 were revised to reflect resolution of several items with the NRC staff. Note that these issues are specific to the Perry Nuclear Power Plant (PNPP). !
Several of these items are expected to receive additional attention as part of the generic l regulatory guide development in support of the current rulemaking effort. It is possible that if ;
PNPP revises RAST calculations in support of future applications, the PNPP values may change in such future calculations as a result of the generic industry discussions. The primary changes are summarized below. Further details on these changes are described in the attached calculations.
The sweepout flow rate from drywell to containment during the fission product release phase ,
of the loss of coolant accident (LOCA) event (approximately the first two hours) is assumed !
to be 3000 cubic feet per minute (cfm) in the thermal-hydraulic calculation. This was reduced by more than half from the previous calculation, from =6200 cfm. Although there are a number of mechanisms that would produce sweepout flow rates greater than or equal to the 6200 cfm sweepout rate, this change was made in order to incisase the calculated dose from the Main Steam Lines during the first two hours of the event.
. After two hours, the drywell and the unsprayed region of the containment are assumed to be well-mixed. The ECCS injection function is assumed to be recovered at the two hour point, which is an integral assumption for application of the revised accident source term. The previous calculations assumed that when the Emergency Core Cooling Systems (ECCS) l began injecting, the resultant steam generation spike would sweep essentially all of the !
source term out of the drywell and into the unsprayed region of the wetwell (the containment). This change to a well mixed volume was made so that the mitigation techniques for the leakage from both the containment and the drywell would be more equally challenged in the time frame after the ECCS injection recovery at two hours.
. The Main Steam Line aerosol removal efficiency (the ability of the steam lines to retain aerosol fission products) was assumed to be slightly reduced as compared to the assumptions in the previous calculations. The aerosol removal efficiency in the new calculation is equivalent to an increase in aerosol penetration of 10 percent. This vias done to further increase the calculated dose from the Main Steam Line pathway.
. The dispersion values (also known as Chi /O or X/Q) used in the Control Room dose calculations were revised to utilize more conservative values. The current PNPP licensing basis Chi /Q's are based on a PNPP-specific study that was included as Attachment 5 of the August 27,1996 letter. Following discussions with the NRC, it was decided that for these revised accident source term calculations, the values used would be somewhat more conservative, especially for the first several hours following the event. Note that in the interim period until any license amendments based on the revised accident source term calculations are made effective, the current calculations based on the existing Chi /Q values are considered to remain valid.
Intearated Assessment During the meeting with the NRC staff on September 15,1998, it was requested that an examination be performed on a variety of subjects related to the potentialimpact of applying the revised accident source term at the Perry Nuclear Power Plant. This was described using the term " integrated assessment".
Attachment 1 PY-CEl/NRR-2359L Page 2 of 5 To determine the implications of the Perry revised accident source term on aspects of plant design other than the radiological design basis accident (DBA) LOCA, an integrated assessment has been performed. This assessment addressed environmental qualification (EO) of equipment, vital area access, post accident sampling system (PASS) access, and probabilistic risk assessment (PRA) impact. Scoping evaluations in eight areas were performed:
- 1. Annulus exhaust gas treatment system (AEGTS) filter train EQ dose
- 2. Control room emergency recirculation filter train EQ dose
- 3. EQ dose adjacent to main steam line between inboard and outboard main steam isolation valves (MSIVs)
- 4. Emergency core cooling system (ECCS) equipment EQ dose
- 5. Drywell atmosphere EQ dose
- 6. Vital area access dose
- 7. PASS dose
- 8. PRA impact of technical specifications changes associated with the revised accident source term The first five areas were selected to provide a representative sample of PNPP EQ equipment, and to address equipment where there could be differences in the doses from the revised accident source term vs. the TID-14844 source term (the revised accident source term demonstrated that there would be a different percentage of the various chemical forms of radionuclides). Vital area and PASS access doses were evaluated since they involve specific post-LOCA design basis operator actions outside the control room. Finally, PRA impact was addressed to provide a risk-informed perspective for this revised accident source term license amendment application at PNPP.
Specific results are as follows:
- The long term (180 day) AEGTS filter train plenum EQ dose from the revised accident source term was evaluated to be below that from TID, and well below the qualification envelope for radiation sensitive components in the vicinity of the plenum.
. The long term (180 day) control room emergency recirculation filter train EQ dose was evaluated to be well below the qualification envelope of radiation sensitive components in the vicinity of the filter train.
The long term (180 day) dose adjacent to the main steam lirse (from aerosol deposition in the steam line) was evaluated to be well below the qualification envelope of radiation sensitive components in the vicinity of the steam line.
- The long term (180 day) ECCS equipment EQ dose based on revised accident source terrn was evaluated to be below that from TID, and well below the qualification envelope for radiation sensitive ECCS components, due to the fact that the Perry TID-based ECCS equipment EQ used a 50% cesium source term.
. The long term (180 day) drywell atmosphere EQ integrated dose was evaluated to be a factor of 3 less than the qualification envelope of the minimally qualified radiation-sensitive component in the drywell.
ii r
___m..._.
Attichm:nt 1 PY-CEl/NRR-2359L Pig) 3 of 5
= The revised accident source term dose to personnel for vital area access was evaluated to be below that based on TID.
. The revised accident source term dose to personnel for PASS access was evaluated to be below that based on TID.
Based on the Perry ledvidual Plant Examination (IPE), there is essentially zero impact on Perry core damage faquency and large early release frequency from the technical specification changes associated with the application of the revised accident source term (revision of main steam line leakage requirements and elimination of the Main Steam Isolation Valve Leakage Control System).
Based on these results, the following conclusions may be drawn on the integrated assessment:
- 1. The existing TID-based environmental qualification envelopes provide adequate margin for the revised accident source term for EQ. Thus, the application of the revised accident source term does not necessitate changes to the existing EQ design basis for plant components.
- 2. The existing TID-based radiological design bases for vital area access and PASS access provide adequate margin, and changes to their design basis are not necessary.
- 3. The risk impact of Perry plant changes associated with application of the revised accident source term is negligible.
Consideration Of Events Other Than A Larae Break LOCA During the meeting with the NRC staff on September 15,1998, it was also requested that consideration be given to the potential impact of applying the revised accident source term to several events other than the large break LOCA at the Perry Nuclear Power Plant. This was described as a scoping level evaluation, and quantitative / detailed calculations were not necessary to meet the intent of these evaluations.
In determining the impact of the PNPP revised accident source term on such other events, consideration was given to several design basis accidents and transients. Also, a beyond-design-basis event was considered, although such severe accident considerations are considered to be outside the envelope of items formally under NRC review for this license amendment.
Design Basis Events The events considered to be design-basis accidents at PNPP are summarized in Updated Safety Analysis Report Table 15.0-3, which also identifies the amount of failed fuel that is assumed for each of the listed accidents. Most of these accidents do not result in failed fuel, and therefore are not discussed below, since application of the revised accident source term is clearly not applicable to those design-basis accidents. As noted in the Table, even the design-basis large and small break LOCAs discussed above are not postulated to result in failed fuel, since the normal plant operating limits such as the Average Planar Linear Heat Generation Rate (APLHGR) limits and the design of the plant are such that post-LOCA fuel temperatures will not exceed 2200 F. However, regulatory guidance directs that a source term from a severe
Att:chment 1 PY-CEt/NRR-2359L Piga 4 cf 5 accident (previously the TID-1484 i source term, currently the NUREG-1465 source term) be utilized as the design-basis LOC 4 3ource term, even though such a severe accident source term would not actually be rejet te d from a true design-basis event.
FuelHandling Accident The fuel handling accident (fha i be h inWe and outside of the containment was considered, and the conclusion was that appict m. vi the revised accident source term to the PNPP FHA's will result in dosas below the w tir. f MD-based docas for the FHA's. Thus, changes to the existing analyses are not cons!dena necessary at this time.
SmaII Break Loss of Coolant Accideri!
A small break LOCA was also examined in a qualitative comparison with the newly performed design-basis revised accident source term (RAST) calculations for the large break LOCA. The radiological DBA for Perry is a large LOCA with toe NUREG-1465 source term release fractions entering the drywell over a 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> period after ue initiating event. A small LOCA also has a pathway from the reactor coolant system (RCE) directly to the drywell, but would likely have slower core degradation than a large LOCA.
For small LOCA, core degradation would occur over e priod of several hours, the exact time depending upon the size of the break. m d#ay in core damage vs. the 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> release duration for large LOCA will reduce dosi due to radiological decay of the fission products. Also, delay in core damage will increase fissic~ c - fuct residern time in the RCS, thus increasing aerosol retention in the RCS and decreas.39 a!a9se to % drywell atmosphere compared to large LOCA. Steaming rate during fission product release for a small LOCA would likely not be any smaller than assumed in the Attachment 3 calculations for a large LOCA, since for small LOCA there would be more residual water in the reactor vessel at the beginning of core damage. Finally, small LOCA fission product release duration may be extended vs. large LOCA, which would decrease the maximum 2 h:,or dose for the E ame release fraction. For these reasons, integrated airborne fission product e ar. centration for small LOCA was evaluated to be bounded by that from large LOCA.
ControlRod Drop Accident The changes being proposed by this license amendment do nct iinpact this accident. The Control Rod Drop event has been previously reanalyzed ta not require c!osure of the Main Steam isolation Valves based on a high radiation signal. Therefore, tM anal) ses do not credit any specific leakage rate for the MSIVs. The Main Steam isolation Valve Leakage Control System has never been credited for any event other than the design-ba5l5 LOCA. Therefore, the analyses for the Control Rod Drop Accident were not revised es a result of applying the revised accident source term.
i I
Loss of Offsite Power, or Various Trar:sientr, ;
I Other events, such as a loss of offsite power (LOOP) or vario';s trans ents, are already analyzed using design basis guidelines and shown to not result in co'e dan.p. Regulatory guidance does not direct that the severe accident source term be costulated for events such as the LOOP or other transients. Therefore, their current analyses e.re not changed as a result of applying the revised accident source term to PNPP. j l
l
Attichment 1 PY-CEl/NRR-2359L Pag 3 5 of 5 l
Other Events Required To Be Analyzed By Regulation Regulatory guidance also does not direct that the severe accident source term be postulated for events that have been required to be analyzed per regulations imposed in addition to the normal design-basis events. These " licensing basis" events are the Anticipated Transients Without Scram (ATWS) and the Station Blackout (SBO) events. These we;e imposed by 10 CFR 50.62 and 50.63, respectively. These events have been previously analyzed for PNPP and shown to not result in significant core damage or offsite releases. The application of the revised accident source term to PNPP does not impact the analyses of the ATWS or SBO events in any way.
Beyond-design-basis events in the meeting with the NRC staff on September 15,1998, it was requested that an event be considered in which the release pathway for a revised accident source term from the reactor pressure vessel is through the Safety Relief Valves rather than through a piping break leading to the drywell. This would be an " isolated vessel" event that had multiple failures such that it led to a core damage event. This would be an event such as a loss of AC power event that progressed much further than the Station Bla:kout event required by the regulation discussed above. This is discussed here to provide cornpleteness, but is considered to be a severe accident rather than a DBA or a licensing basis event, and therefore is outside the envelope of items formally under NRC review for this license amendment.
For an isolated vessel event, the onset of core damage would be delayed in comparison to the large break LOCA event, for up to several hours. This would provide for additional decay of the radionuclides, and decrease the maximum 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> dose due to the slower release.
In such an event, the main fission product release path would be through the safety relief valves (SRVs) into the suppression pool. Thus the drywell would be bypassed (for a LOCA, drywell lambda from sedimentation and sweepout is about 1 per hour which is a decontamination factor (DF) of about 7 over a 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> period). However, pool scrubbing occurs for this SRV pathway. The pool scrubbing DF will vary, but is unlikely to be less than a factor of 10. Thus the source term is subjected to a higher DF for this pathway than via the drywell.
Further, any drywell atmosphere source term would be from flow back from containment, and would receive further dilution from the drywell atmosphere, so the drywell source for leakage is reduced compared to that for a LOCA.
There is also the RCS pathway via the intact vessel and steam lines to the MSIVs. For this pathway, however, it is considered that a number of factors would mitigate the release such that the integrated 63 for the beyond-DBA isolated vessel event would be bounded by the doses calculated for the DBA large break LOCA. These factors include: the increased time for decay noted above; the reduction in fission product concentration available for release through the MSIVs due to the fission product gas and vapor flow through the SRVs to the suppression pool; the stratification of cooler gas in the 26 foot vertical section of steam line between the RPV and the inboard MSIV which will further delay the transport of hot fission product gas and aerosol to the inboard valve; the longer residence time in the RCS which will increase aerosol retention; and retention of aerosolin the safety-related piping section between the outboard MSIV and the third isolation valve (Main Steam Shutoff Valves) as well as in the non-safety main steam piping downstream of the Main Steam Shutoff Valve (neither of which are credited in the DBA analysis).
1 Att:chment 2 PY-CEl/NRR-2359L Prg31 of 3 l
Commitment Update Containment Spray in the letters dated August 27,1996, and July 22,1998, the following commitment was included:
Based on a high radiation signalin the Control Room, the Containment Spray system would be operated post-LOCA for up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> (previous analyses assumed 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> of spray operation), in order to scrub released radionuclides from the containment atmosphere and into the suppression pool, and thus reduce the post-LOCA off-site and Control Room dose.
In the interim period since this commitment was made in 1996, work has progressed on additional plant operator guidance for events that might result in large releases of radioactivity from the nuclear fuel, such as are postulated in the Revised Accident Source Terms of Reference 1. This work has been done under the Severe Accident Management (SAM)
Mitigation effort. Use of containment sprays for post-accident dose mitigation is a part of this effort. The new guidelines direct that containment sprays be initiated based on readings from the NUREG-0737 containment high range radiation monitor rather than the Control Room radiation monitor. Tnis is considered to be a more appropriate radiation monitor to use.
Therefore, the commitment quoted above is being revised to reflect the change in the identified radiation monitor from the Control Room monitor to the Containment monitor. [ Note: The Alarm Response Instruction (ARI) for the Control Room radiation monitor will, however, continue to direct use of containment sprays should that monitor indicate high Control Room dose rates.]
The commitment also includes the phrase "for up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />". This phrase is intended to address two concepts.
First, the dose calculations assume the sprays are run for the first 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, then are suspended.
This is the most important time period for scrubbing of radiation down into the suppression pool.
However, in an actual event, spray use would not necessarily be suspended at 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, if appropriate conditions for their use still existed. Therefore, the phrase "up to" is not intendeo to be interpreted as a commitment to stop using sprays after 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
Second, the phrase "up to" is intended to mean that in an actual event, the sprays will be run when it is appropriate, and not necessarily the entire time during the first 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of a LOCA.
This does not invalidate the assumptions in the dose calculations, however. The accident guidance to operators is written to be symptom based, rather than event based. This was a lesson learned from the Three Mile Island accident. Most postulated LOCAs will not result in large radiation releases (in fact the PNPP design basis LOCA results in peak clad temperatures less than 2200*F). Therefore, it would not be appropriate to run containment sprays for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> following such an event. As noted above,it is more appropriate to base spray use on the containment radiation monitor reading, which would indicate the need for spray if the "two hours with no Emergency Core Cooling System (ECCS) cooling" event (as postulated in the RAST calculations) were to actually occur. Another critical factor in spray use is containment pressure.
Use of the sprays will work to reduce containment pressures, due to steam condensation and the containment heat removal function that they provide. If a high radiation signalis present from the containment radiation monitor and pressures are elevated in containment, the instructions direct that the sprays be run. However, if containment pressure reduces to near zero and use of the sprays is terminated by the operators, this does not have an adverse impact on offsite doses (or the dose calculations) since the driving pressure for containment and MSIV leakage has been eliminated. The dose calculations assume that the maximum allowable leakage (La) corresponding to the peak post-accident pressure (P.) remains during the entire 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period, 1
I
Attichment 2 PY-CEl/NRR-2359L Pigs 2 of 3 so if containment pressure actually reduces to substantially less than P., a reduction in leakage l and the resultant offsite doses will follow, if containment pressure increases again, and the high !
radiation signal is still present, the instructions would again direct use of the sprays. ;
1 These SAM guidelines became effective in December 1998. l Based on the above discussion, the commitment on use of containment sprays is being revised by PNPP to read:
e Based on a high radiation signal in 6 Conta!nment, the Containment Spray system
~ould N operated post-LOCA for up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> (previous analyses assumed 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> oi apey operation), in order to scrub released radionuclides from the containment atmosphere into the suppression pool, and inus reduce the post-LOCA off-site and ,
Control Room dose. I Backup Method ofpH Control ;
in the letters dated August 27,1996, and July 22,1998, the following commitment was included: !
. A backup method for pH control will be developed for use if post-accident suppression pool sampling identifies that the primary pH control method is not being effective.
The following provides further information on the primary and backup methods of pH control.
As noted in the previous letters, the pH level of the suppression pool will be raised to 7 or above post-LOCA, and then maintained at 7 or above. The method for pH control will use the existing Standby Liquid Control (SLC) system. This is a redundant, safety-related, Technical Specification controlled system, which can inject a boron solution into the reactor vessel. This buffers the acids that are postulated to eventually migrate into the suppression pool due to radiolytic decomposition of compounds such as the insulation on cables in containment due to high postulated radiation levels. In the event of a large break LOCA, during the vessel reflood period, the boron solution would spill from the break, fill the drywell, and retum over the drywell weir wall back into the suppression pool. This sets up a recirculation path back to the ECCS pumps, and provides for equal distribution of the buffer solution around the circumference of the suppression pool.
The commitment listed above provides for development of a backup method of providing buffer solution to the suppression pool if the prhary pH control method (injection of SLCS into the reactor vessel) was not proving effective. This commitment was made to address the case that might occur if a LOCA has occurred very high up on the reactor vessel. In such an event, operators could recover water level over the core without necessarily spilling it out of the break, l and therefore the buffer solution would not get to the suppression pool (if the break is more than 215 inches above the top of +.he active fuel). In this case, the vessel water is highly buffered, but the suppressicn pool could eventually drop below a pH of 7.
Therefore, a backup method of getting the buffer solution to the suppression pool will be through direction to operators to establish a flow path directly to the suppression pool from the reactor vessel, through the Safety Relief Valves (SRVs). This is similar to the already proceduralized, safety related, " Alternate Shutdown Cooling" method, which involves opening Safety Relief
- Valves (SRVs) and flooding up the reactor to spill the buffered water down to the suppression pool through the SRV spargers. This can be accomplished from the Control Room. The abi!ity of the SRVs to perform in such a mode was the subject of a testing program which e ~ .iewed
Attichment 2 PY-CEl/NRR-2359L Pigs 3 of 3 l
and approved in Supplement 7 to the NRC Safety Evaluation Report for PNPP (Confirmatory Issue 7, resolved in Section 3.9.3.2.1). There are SRV spargers distributed around the entire suppression pool. There are multiple emergency instruction steps which would have already directed depressurization of the reactor pressure vessel in an event with low water levels and fuel damage on the order of magnitude being considered here. Depressurization instructions require opening of at least eight of the 19 SRVs if available (preferably the Automatic Depressurization System (ADS) SRVs). The SRVs can be opened and maintained open from control switches in the Control Room, and the ADS valves are powered from DC supplies.
Additional guidance is proposed to be added to the SAM guidelines to raise water level to permit it to flow out the open SRVs to enhance suppression pool buffering if sampling of the pool shows that the normal ph control method is not proving effective. The use of multiple SRVs for this flow would provide for good mixing of the buffered water with the suppression pool.
i l