Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
PY-CEI-NRR-2427, Application for Amend to License NPF-58,deleting License Condition 2.C.10 Re Controls Over Containment Air Locks During Plant Outages & Clarifying License Condition 2.F Re Reporting Requirements of TS & EPP Violations14 September 1999Application for Amend to License NPF-58,deleting License Condition 2.C.10 Re Controls Over Containment Air Locks During Plant Outages & Clarifying License Condition 2.F Re Reporting Requirements of TS & EPP ViolationsSafe Shutdown
Recently irradiated fuel
Fire Protection Program
PY-CEI-NRR-2406, Application for Amend to License NPF-58,eliminating Requirement in EPP to Sample Lake Erie Sediment in Perry & Eastlake Plant Area for Corbicula.Summary & Description of Change Is Encl9 September 1999Application for Amend to License NPF-58,eliminating Requirement in EPP to Sample Lake Erie Sediment in Perry & Eastlake Plant Area for Corbicula.Summary & Description of Change Is EnclZebra Mussel
PY-CEI-NRR-2430, Application for Amend to License NPF-58,revising Allowables Values for CST Low Water Level Limits from Greater than or Equal to 59,700 Gallons to Greater than or Equal to 90,300 Gallons9 September 1999Application for Amend to License NPF-58,revising Allowables Values for CST Low Water Level Limits from Greater than or Equal to 59,700 Gallons to Greater than or Equal to 90,300 GallonsHigh Radiation Area
Recently irradiated fuel
PY-CEI-NRR-2420, Application for Amend to License NPF-58,increasing Present 100% Authorized Rated Thermal Power Level of 3579 Megawatts Thermal to 3758 Megawatts Thermal.Proprietary SAR Encl. Proprietary SAR Withheld,Per 10CFR2.790(a)(4)9 September 1999Application for Amend to License NPF-58,increasing Present 100% Authorized Rated Thermal Power Level of 3579 Megawatts Thermal to 3758 Megawatts Thermal.Proprietary SAR Encl. Proprietary SAR Withheld,Per 10CFR2.790(a)(4)Temporary Modification
PY-CEI-NRR-2418, Application for Amend to License NPF-58,incorporating Addl Option Into TS 3.9.1 Required Actions When Refueling Interlocks Are Inoperable4 August 1999Application for Amend to License NPF-58,incorporating Addl Option Into TS 3.9.1 Required Actions When Refueling Interlocks Are Inoperable
PY-CEI-NRR-2398, Application for Amend to License NPF-58,changing SRs as Identified to Support Implementation of 24-month Operating Cycle at Pnpp17 June 1999Application for Amend to License NPF-58,changing SRs as Identified to Support Implementation of 24-month Operating Cycle at PnppSafe Shutdown
Reactor Vessel Water Level
Stroke time
Anticipated operational occurrence
Post Accident Monitoring
Scram Discharge Volume
Maintenance Rule Program
Fuel cladding
Pressure Boundary Leakage
Recently irradiated fuel
Offsite Circuit
Grace period
Power change
ML20206F5975 May 1999Application for Amend to License NPF-58,authorizing CEI to Possess Dl 13.74% Undivided Ownership Interest in Pnpp
PY-CEI-NRR-2362, Application for Amend to License NPF-58,proposing Change in Plant USAR by Incorporating leak-off Line in RHR Sys, Which Will Significantly Reduce Collective Dose to Plant Operations Personnel.Annotated USAR Pages,Encl17 March 1999Application for Amend to License NPF-58,proposing Change in Plant USAR by Incorporating leak-off Line in RHR Sys, Which Will Significantly Reduce Collective Dose to Plant Operations Personnel.Annotated USAR Pages,Encl
PY-CEI-NRR-2373, Application for Amend to License NPF-58,correcting Typos Found in TS Table 3.3.6.1-115 March 1999Application for Amend to License NPF-58,correcting Typos Found in TS Table 3.3.6.1-1
PY-CEI-NRR-2359, Suppl Application for Amend to License NPF-58,involving Rev of Main Steam Line Leakage Requirements & Elimination of Main Steam Isolation Valve Leakage Control Sys.Proprietary Calculations Encl.Proprietary Encls Withheld18 January 1999Suppl Application for Amend to License NPF-58,involving Rev of Main Steam Line Leakage Requirements & Elimination of Main Steam Isolation Valve Leakage Control Sys.Proprietary Calculations Encl.Proprietary Encls WithheldProbabilistic Risk Assessment
Large early release frequency
Rod Drop Event
Affidavit
PY-CEI-NRR-2352, Suppl to 980909 LAR to License NPF-58,improving Licensing & Design Basis for Isolation of Feedwater Penetrations, Including Sensitivity Study Performed to Examine Radiological Significance of Leakage Through FW Sys Cvs6 January 1999Suppl to 980909 LAR to License NPF-58,improving Licensing & Design Basis for Isolation of Feedwater Penetrations, Including Sensitivity Study Performed to Examine Radiological Significance of Leakage Through FW Sys CvsStroke time
Hydrostatic
Operator Manual Action
Earthquake
Power-Operated Valves
Backfit
PY-CEI-NRR-2325, Application for Amend to License NPF-58,applying Addl Conservatism by Modifying MCPR Safety Limit Values,As Calculated by Ge.Proprietary Addl Info Re 1.09 Cycle Specific Slmcpr,Encl.Proprietary Info Withheld27 October 1998Application for Amend to License NPF-58,applying Addl Conservatism by Modifying MCPR Safety Limit Values,As Calculated by Ge.Proprietary Addl Info Re 1.09 Cycle Specific Slmcpr,Encl.Proprietary Info WithheldShutdown Margin
Safety Limit Minimum Critical Power Ratio
Fuel cladding
PY-CEI-NRR-2322, Application for Amend to License NPF-58,stipulating That Water Leakage from Feedwater motor-operated CIVs Will Be Added Into Primary Coolant Sources Outside of Containment Program & Valves Need Not Be Included in Test Program9 September 1998Application for Amend to License NPF-58,stipulating That Water Leakage from Feedwater motor-operated CIVs Will Be Added Into Primary Coolant Sources Outside of Containment Program & Valves Need Not Be Included in Test ProgramHydrostatic
Operator Manual Action
Earthquake
Power-Operated Valves
Backfit
PY-CEI-NRR-2319, Application for Amend to License NPF-58,permitting EDG TS Action Completion Time of Up to 14 Days for Div 1 or 2 EDG & Allow Performance of EDG 24-hour TS SR Test in Modes 1 & 23 September 1998Application for Amend to License NPF-58,permitting EDG TS Action Completion Time of Up to 14 Days for Div 1 or 2 EDG & Allow Performance of EDG 24-hour TS SR Test in Modes 1 & 2Anticipated operational occurrence
Enforcement Discretion
Probabilistic Risk Assessment
Large early release frequency
Maintenance Rule Program
Offsite Circuit
PY-CEI-NRR-2298, Application for Amend to License NPF-58,increasing Present Div 3 DG Fuel Oil Level Requirements to Account for Rounding Error in Calculation & Unusable Vol Due to Vortex Formation at Eductor Suction Nozzles Located in Fuel Oil Storag3 September 1998Application for Amend to License NPF-58,increasing Present Div 3 DG Fuel Oil Level Requirements to Account for Rounding Error in Calculation & Unusable Vol Due to Vortex Formation at Eductor Suction Nozzles Located in Fuel Oil Storage TankSafe Shutdown
PY-CEI-NRR-2300, Application for Amend to License NPF-58,allowing Blind Flange in Inclined Fuel Transfer Sys (Ifts) Containment Penetration to Be Removed While Primary Containment Is Required to Be Operable31 August 1998Application for Amend to License NPF-58,allowing Blind Flange in Inclined Fuel Transfer Sys (Ifts) Containment Penetration to Be Removed While Primary Containment Is Required to Be OperableHigh Radiation Area
Safe Shutdown Earthquake
Emergency Lighting
PY-CEI-NRR-2299, Supplemental Application for Amend to License NPF-58, Revising MSL Leakage Requirements & Eliminating Msli Valve Leakage Control Sys.Proprietary & non-proprietary Rev 1 to Calculation Psat 08401T.03,encl.Proprietary Info Withheld22 July 1998Supplemental Application for Amend to License NPF-58, Revising MSL Leakage Requirements & Eliminating Msli Valve Leakage Control Sys.Proprietary & non-proprietary Rev 1 to Calculation Psat 08401T.03,encl.Proprietary Info WithheldCold shutdown justification
ML20151P18913 July 1998Application for Amend to License NPF-58,revising Safety Setpoint Requirements for Srv.Proprietary Info & Affidavit Are Contained in Attachment 5.Proprietary Info WithheldFeedwater Controller Failure
PY-CEI-NRR-2295, Application for Amend to License NPF-58,revising TS 3.1.7, Standby Liquid Control Sys to Increase Boron Concentration in Standby Liquid Control Sys for Cycle 8 Fuel Design & to Provide Margin for Future Cycles as Required30 June 1998Application for Amend to License NPF-58,revising TS 3.1.7, Standby Liquid Control Sys to Increase Boron Concentration in Standby Liquid Control Sys for Cycle 8 Fuel Design & to Provide Margin for Future Cycles as RequiredBoric Acid
Shutdown Margin
ML20236H69330 June 1998Application for Amend to License NPF-58,transferring Operating Authority for Pnpp from Ceic & Centerior Svc Co to New Operating Company Named Firstenergy Nuclear Operating Co.Marked Up License,Safety & Environ Assessments,IncludedSafe Shutdown
PY-CEI-NRR-2245, Application for Amend to License NPF-58,revising TS 3.8.1, AC Sources - Operating, to Be Consistent W/Recommendations in GL 94-01, Removal of Accelerated Testing & Special Reporting Requirements for Edgs23 December 1997Application for Amend to License NPF-58,revising TS 3.8.1, AC Sources - Operating, to Be Consistent W/Recommendations in GL 94-01, Removal of Accelerated Testing & Special Reporting Requirements for EdgsSafe Shutdown
Maintenance Rule Program
PY-CEI-NRR-2230, Application for Amend to License NPF-58,incorporating Temp Control Valves & Associated Bypass Lines Around Emergency Closed Cooling Sys Heat Exchangers22 October 1997Application for Amend to License NPF-58,incorporating Temp Control Valves & Associated Bypass Lines Around Emergency Closed Cooling Sys Heat ExchangersSafe Shutdown
Ultimate heat sink
Power Operated Valves
PY-CEI-NRR-2207, Application for Amend to License NPF-58,revising TS 5.2.2.e, Organization-Unit Staff, by Removing Ref to NRC Policy Statement on Working Hours8 September 1997Application for Amend to License NPF-58,revising TS 5.2.2.e, Organization-Unit Staff, by Removing Ref to NRC Policy Statement on Working HoursHigh Radiation Area
PY-CEI-NRR-2206, Application for Amend to License NPF-58,revising Pressure- Temp Limits,Per Reactor Vessel Matl Surveillance Program Requirements Contained in App H of 10CFR50.9028 August 1997Application for Amend to License NPF-58,revising Pressure- Temp Limits,Per Reactor Vessel Matl Surveillance Program Requirements Contained in App H of 10CFR50.90Anticipated operational occurrence
Hydrostatic
ML20217F57528 July 1997Application for Amends to Licenses DPR-66,NPF-73 & NPF-58, Authorizing Holders to Possess Beaver Valley Power Station, Unit 1 & Authorizes Duquesne Light to Use & Operate Beaver Valley Unit 1 in Accordance W/ProceduresIncorporated by reference
Stolen
PY-CEI-NRR-2164, Application for Amend to License NPF-58,revising Existing Exception to LCO 3.0.4 as Applies to LCO 3.6.1.9 for MSIV Leakage Control Sys2 May 1997Application for Amend to License NPF-58,revising Existing Exception to LCO 3.0.4 as Applies to LCO 3.6.1.9 for MSIV Leakage Control Sys
PY-CEI-NRR-2165, Application for Amend to License NPF-58,revising Tech Specs Surveillance Requirement for MSIV Leakage Rate Acceptance Criteria2 May 1997Application for Amend to License NPF-58,revising Tech Specs Surveillance Requirement for MSIV Leakage Rate Acceptance Criteria
PY-CEI-NRR-2155, Application for Amend to License NPF-58,revising TS Surveillance Requirements 3.9.1.1 & 3.9.2.2,extending SR Frequency on Refueling Equipment & one-rod-out Interlocks9 April 1997Application for Amend to License NPF-58,revising TS Surveillance Requirements 3.9.1.1 & 3.9.2.2,extending SR Frequency on Refueling Equipment & one-rod-out InterlocksShutdown Margin
PY-CEI-NRR-2133, Application for Amend to License NPF-58,requesting Implementation of App J,Option B,Performance-based Primary Containment Leakage Rate Testing Program for Type A,B & C Leak Rate Tests31 January 1997Application for Amend to License NPF-58,requesting Implementation of App J,Option B,Performance-based Primary Containment Leakage Rate Testing Program for Type A,B & C Leak Rate Tests
ML20132C76013 December 1996Application for Amend to License NPF-58,authorizing Transfers of Control
PY-CEI-NRR-2104, Application for Amend to License NPF-58,modifying MCPR Reactor Core Safety Limit Contained in TS 2.1.1.224 October 1996Application for Amend to License NPF-58,modifying MCPR Reactor Core Safety Limit Contained in TS 2.1.1.2Shutdown Margin
Fuel cladding
ML20117E78227 August 1996Application for Amend to License NPF-58,revising MSL Leakage Requirements & Eliminating MSIV Leakage Control Sys. Attachment 7 Provides Proprietary Dose Calculations. Attachment 7 WithheldFuel cladding
PY-CEI-NRR-1999, Application for Amend to License NPF-58,revising Improved Tech Specs.Changes Either Administrative in Nature or Reflect Minor Technical Errors Discovered During Implementation Process26 April 1996Application for Amend to License NPF-58,revising Improved Tech Specs.Changes Either Administrative in Nature or Reflect Minor Technical Errors Discovered During Implementation ProcessReactor Vessel Water Level
High Radiation Area
Post Accident Monitoring
PY-CEI-NRR-2030, Application for Amend to License NPF-58 Re Drywell Personnel Air Lock Shield Door Analyses27 February 1996Application for Amend to License NPF-58 Re Drywell Personnel Air Lock Shield Door AnalysesHigh Radiation Area
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Operating Basis Earthquake
Earthquake
PY-CEI-NRR-2027, Application for Amend to License NPF-58,changing TS to Reflect Mod of Leakage Rate Requirements for Main Steam Lines Until End of Operating Cycle 617 February 1996Application for Amend to License NPF-58,changing TS to Reflect Mod of Leakage Rate Requirements for Main Steam Lines Until End of Operating Cycle 6
PY-CEI-NRR-2007, Application for Amend to License NPF-58,revising TS Requirements for Drywell Leak Rate Testing16 January 1996Application for Amend to License NPF-58,revising TS Requirements for Drywell Leak Rate Testing
PY-CEI-NRR-2013, Application for Amend to License NPF-58,requesting one-time Surveillance Interval Extension to Support Current Schedule for Refueling Outage 5,scheduled to Begin 96012710 January 1996Application for Amend to License NPF-58,requesting one-time Surveillance Interval Extension to Support Current Schedule for Refueling Outage 5,scheduled to Begin 960127Scram Discharge Volume
ML20095L21828 December 1995Suppl Application for License Transfer of 12.58% Ownership Interest in Addition to 17.42% Approved on 951220
PY-CEI-NRR-2004, Application for Amend to License NPF-58,revising License to Reflect License Transfer for Part of Oh Edison Co Ownership Interest in Pnpp Unit 1 to Wholly Owned Subsidiary,Oes Nuclear,Inc22 November 1995Application for Amend to License NPF-58,revising License to Reflect License Transfer for Part of Oh Edison Co Ownership Interest in Pnpp Unit 1 to Wholly Owned Subsidiary,Oes Nuclear,IncSafe Shutdown
Fire Protection Program
PY-CEI-NRR-1978, Application for Amend to License NPF-58,requesting Rev to TS for Onsite Power Distribution Sys:Ts 3/4.8.3.1, Distribution - Operating2 November 1995Application for Amend to License NPF-58,requesting Rev to TS for Onsite Power Distribution Sys:Ts 3/4.8.3.1, Distribution - Operating
PY-CEI-NRR-1995, Application for Amend to License NPF-58,revising TS Requirements for Handling Irradiated Fuel in Containment or Fuel Handling Bldg & Certain Specs Related to Performing Core Alterations2 November 1995Application for Amend to License NPF-58,revising TS Requirements for Handling Irradiated Fuel in Containment or Fuel Handling Bldg & Certain Specs Related to Performing Core AlterationsShutdown Margin
Fuel cladding
Recently irradiated fuel
PY-CEI-NRR-1997, Application for Amend to License NPF-58,providing Suppl Info That Revises License to Reflect Proposed Merger of Operating Companies1 November 1995Application for Amend to License NPF-58,providing Suppl Info That Revises License to Reflect Proposed Merger of Operating Companies
PY-CEI-NRR-1969, Application for Amend to License NPF-58,revising Tech Specs Allowable Values & Trip Setpoints for Selected Plant Process Instrumentation Using Instrument Setpoint Methodology Discussed in Util (PY-CEI/NRR-1706L)29 August 1995Application for Amend to License NPF-58,revising Tech Specs Allowable Values & Trip Setpoints for Selected Plant Process Instrumentation Using Instrument Setpoint Methodology Discussed in Util (PY-CEI/NRR-1706L)
PY-CEI-NRR-1961, Application for Amends to Licenses NPF-58,reflecting One Time Extension of Performance Intervals for Certain TS Surveillance Requirements30 June 1995Application for Amends to Licenses NPF-58,reflecting One Time Extension of Performance Intervals for Certain TS Surveillance Requirements
PY-CEI-NRR-1954, Application for Amend to License NPF-58.Amend Would Allow one-time Extension of Performance Intervals for Certain Srs. Application Supplements Original Request9 June 1995Application for Amend to License NPF-58.Amend Would Allow one-time Extension of Performance Intervals for Certain Srs. Application Supplements Original Request
PY-CEI-NRR-1956, Application for Amend to License NPF-58,proposing Early Implementation of Control Rod Drive Scram Time Testing Consistent W/Requirements in Pnpp Improved TS LAR1 June 1995Application for Amend to License NPF-58,proposing Early Implementation of Control Rod Drive Scram Time Testing Consistent W/Requirements in Pnpp Improved TS LAR
PY-CEI-NRR-1944, Suppl Application for Amend to License NPF-58,App a Tss. Suppl Addresses Minor Discrepancies & Items Needing Clarification5 May 1995Suppl Application for Amend to License NPF-58,App a Tss. Suppl Addresses Minor Discrepancies & Items Needing Clarification
PY-CEI-NRR-1927, Application for Amend to License NPF-58 Re Removal of License Conditions for Tdi EDGs Specified by Paragraph 2.c & Defined in Attachment 2 to Operating License28 April 1995Application for Amend to License NPF-58 Re Removal of License Conditions for Tdi EDGs Specified by Paragraph 2.c & Defined in Attachment 2 to Operating License
PY-CEI-NRR-1655, Application for Amend to License NPF-58,adding New Programmatic Requirements Governing Radiological Effluents Into Administrative Controls Section of TS & Relocating Procedural Details of RETS to ODCM or Pcp,Per GL 89-013 April 1995Application for Amend to License NPF-58,adding New Programmatic Requirements Governing Radiological Effluents Into Administrative Controls Section of TS & Relocating Procedural Details of RETS to ODCM or Pcp,Per GL 89-01Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Process Control Program
PY-CEI-NRR-1890, Application for Amend to License NPF-58 Re one-time Extension of Performance Intervals for Certain TS Surveillance Requirements24 March 1995Application for Amend to License NPF-58 Re one-time Extension of Performance Intervals for Certain TS Surveillance Requirements