PY-CEI-NRR-1944, Suppl Application for Amend to License NPF-58,App a Tss. Suppl Addresses Minor Discrepancies & Items Needing Clarification

From kanterella
Jump to navigation Jump to search
Suppl Application for Amend to License NPF-58,App a Tss. Suppl Addresses Minor Discrepancies & Items Needing Clarification
ML20083A673
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 05/05/1995
From: Shelton D
CENTERIOR ENERGY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20083A676 List:
References
PY-CEI-NRR-1944, NUDOCS 9505110097
Download: ML20083A673 (3)


Text

-

I GNTEntOR \

ENERGY i l

PERRY NUCLEAR POWER PLANT Mail Address: DOR 3ld C. ShGitOR 4 C CENTER ROAD SENIOR VICE PRESIDENT I RY, O 10 44081 PERRY, OHIO 44081 NUCLEAR (216) 259-3737 May 5, 1995 PY-CEI/NRR-1944L United States Nuclear Regulatory Commission Document Control Desk Vashington, D.C. 20555 Perry Nuclear Power Plant Docket No. 50-440 Supplemental Submittal for Conversion of Current Technical Specifications i to Technical Specifications Based on NUREG-1434, " Improved BVR-6 Technical Specifications," Revision 0 Gentlemen Enclosed is a supplemental application for amendment of the Facility Operating License (NFP-58) Appendix A Technical Specifications for the Perry Nuclear Power Plant (PNPP). This supplements the application made December 16, 1993 by letter PY-CEI/NRR-1732L, as revised by letter PY-CEI/NRR-1880L dated November 7, 1994.

This change request addresses minor discrepancies and items needing clarification, found during various reviews and discussions with the NRC staff. Attachment 1 provides a brief explanation of the reason for each change. Attachment 2 provides a mark up of the proposed changes to the Technical Specification pages. In addition, Attachment 3 provides proposed changes to the Bases for the Improved Technical Specifications, ,

to account for plant specific nomenclature, methods and plant I descriptions. The justifications, Significant Hazards Considerations,  !

and Environmental Considerations provided in the December 16, 1993 and l November 7, 1994 applications remain valid.

If you have questions or require additional information, please contact Mr. James D. Kloosterman, Manager - Regulatory Affairs at (216) 280-5833. l i

Very u y yours,

}

C wGR:sc

)

Enclosure j l

At tachmer.ts cc: NRC Iroject Manager ,

NRC 'Aesident Inspector Office l 4

090170 NRC Region n1 Str.te of Ohio e e mineng 9505110097 950505 I l w eoota> son PDR ADOCK 05000440 l P PDR I .

fjg::  %

l l

s i

i p..

i

')

I i

I, Donald C. Shelton, being duly sworn state that (1) I am Senior Vice President,

l

' Nuclear of the Centerior Service Company, (2) I an duly authorized to execute and  ;

file this' certification on behalf of The Cleveland Electric Illuminating Company e and Toledo Edison Company, and as the duly authorized agent for Duquesne Light l Company, Ohio Edison Company,_and Pennsylvania Power Company, and (3) the  !

statetents set forth herein are true and correct to the best of my knowledge,  !

information and belief.  !

  • Donald C. Shelton j i

t i .Swor to and subscribed before me, the day of 42-t. , i Eb .

Q nn '

V () '

I f

GARY L. GARRETT l Notary Public. State of Die  ;

Cassuosion Empires 06-11-2000 t (Recorded in Lake County) j

}

i

}

CODED /8838/SC l

I t

I l

t

w -. - . . - -. - . . . - - . - . - - . . -. - .. . -~_ . -

f I

t l

l

> s i

PY-CEI/NRR-1944L. )

Attachment l' l

.Page 1 of 1  !

.l l

The following are changes that have been found during the review process  :

that need to be incorporated into the Improved Technical Specifications:

Change 1. The Allowable Value for the Flow Biased Simulated Thermal Power .

- High function when in single loop [ footnote (b) on page l 3.3-6] has been corrected - to the proper value as approved by-  :

the NRC in Amendment 61 to the Perry Nuclear Power Plant  !

Operating License.. l Change 2. Change the refereAce in the Notes in SR 3.3.3.1.1, 3.3.3.1.2 snd 3.3.3.1.3 to Function 10 rather than Function 11. These .

changes are necessary due to previously deleting other l Functions from. Table 3.3.3.1-1.

Change 3. Delete the requirement to perform SR.3.3.8.1.2 from Table l 3.3.8.1-1 Functions 1.d and 1.e for timer testing. . These l bracketed tests were inadvertently included in the original j submittal. The deletion of the tests will maintain the current  ;

testing. requirements for these instruments. l Change 4. Add clarification "when corrected to nominal input voltage" to 5.5.7.e to address issue of adjusting test. results for voltage j variations. This clarification indicates how the requirement  ;

is allowed to be met. .j

.i Change 5. Change 5.5.11.d to read "b.1 or b.2" for clarification. This  !

clarification vill avoid further questions on'whether all of i "b" is applicable, or only a portion of "b".

i 1

l l

l i

r l l