ML20202G106

From kanterella
Revision as of 18:10, 1 January 2021 by StriderTol (talk | contribs) (StriderTol Bot change)
Jump to navigation Jump to search
Forwards Response to Request for Addl Info Re Relocation of RCS pressure-temp Limits from TS to Pressure Temp Limits Rept,Per GL 96-03
ML20202G106
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 02/12/1998
From: Dennis Morey
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20202G112 List:
References
GL-96-03, GL-96-3, NUDOCS 9802200061
Download: ML20202G106 (6)


Text

_ _ --- ___-- - _ - _ _ - _

e Dave Mor:y Southern Nucle:r Vice Presioent Operatino CompaIy a Farley Project RO. Box 1295 Birmingham. Alabama 35201 l

Tel 205.992.5131 February 12, 1998 SOUTHERN COMFANY Energy to Serve hur u~orld

Docket Nos.: 50-348 10 CFR 50.90 50-364 U. S. Nuclear Regulatory Commission ATTN: Document Contr01 Desk Washington, DC 20555 Joseph M. Farley Nuclear Plant Technical Specifications Change Request Pressure Temperature Limits Reoort Ladies and Gentlemen:

By letter dated July 23,1997, Southern Nuclear Operating Company (SNC) submitted a Technical Specifications (TS) change request associated with the relocation of the reactor coolant system (RCS) pressure-temperature (P-T) limits from the TS to the Pressure Temperature Limits Report (PTLR) in accordance with the guidance provided in Generic Letter (GL) 96-03,

" Relocation of the Pressure Temperature Limit Curves and Low Temperature Overpressure Protection System Limits." By letter dated November 14,1997, the NRC issued a Request for Information (RAI) requesting clarification of the methodology used associated with the Farley Nuclear Plant (FNP) TS amendment request. SNC responded to the NRC RAI by letter dated December 18,1997.

Recently, additional questions have been asked by the NRC Staffin several conference calls.

Enclosure I provides the NRC StafTquestions and SNC responses. Enclosure 2 provides the revised technical specification pages. These changes must be incorporated with the technical specification pages forwarded by the December 18,1997 submittal. In accordance with the requirements of 10 CFR 50.92, Enclosure 3 provides a significant hazards evaluation for the technical specification changes. Enclosure 4 provides a revision to the PTLR methodology submitted in the December 18,1997 letter. This revision incorporates the latest NRC Staff requirements. The revised PTLRs for FNP Unit I and Unit 2 will be provided to the NRC Staff following approval of the PTLR Tec hnical Specifications change.

SNC has determined that the proposed changes will not significantly increase the amount of any efIluent which may be released ofTsite and that there is no significant increase in individual or cumulative occupational radiation exposure. A copy of these proposed changes is being sent to the Alabama State Designee in accordance with 10 CFR 50.91 (b)(1).

\p_a 9802200061 980212 '

, PDR ADOCK 05000348 P PDR. ll........

ll lf lllllll fll (

lL U. S. Nuclear Regulatory Commission Page 2

. If you have any questions, please advise.

Respectfully submitted, SOUTHERN NUCLEAR OPERATING COMPANY h Mh2*[

Dave Morey 4

Sworn to wut:.ubscribed bef re me this A2 - dayof N W 1998 Yd '

b_ W Y Notary Public V My Commission Expires: th '- e /,80/'

L TWS/ REM /maf:LTOPTS. DOC

Enclosures:

1. Res >onse to NRC Request for Additional Information Concerning the PTLR Tecinical Specification Amendment
2. Revised Technical Specification Pages
3. Significant Hazards Evaluation
4. Revised PTLR Methodology ,

cc:- Mr. L. A. Reyes, Region II Administrator Mr. J. I. Zimmerman, NRR Project Manager Mr. T. M. Ross, Plant Sr. Resident inspector Dr. D. E. Williamson, State Department of Public Health

Enclosure 1 Response to NRC Rec; nest for Additional Information Concerning the PTLR Technical Specification Amendment s

f

Response to NRC Request for AdditionalInformation Concerning the PTLR Technical Specification Amendment

1. The analysis assumes that the residual heat removal suction relief valves (RHRRV) open at the Technical Specification (TS) setpoint plus 10% for valve accumulation (450 psi + 45 psi

= 495 psi). The submittalindicates that the surveillance procedures use 445 psii 5 psi, which is lower than the TS required value. Please describe why it is acceptable to add the assumed setpoint drift to the surveillance procedure value rather than the TS value.

Additionally, if the AShE code allows i3% tolerance, why is 15 psi used?

SNC Response: TS 3.4.10.3 states, "At least one of the following overpressure protection syctems shall be OPERABLE:

a. Two RHR relief valves with:
1. A lift setting ofless than or equal to 450 psig, and
2. The associated RHR relief valve isolation valves open; or
b. The Reactor Coolant System (RCS) depressurized with an RCS vent of greater than or equal to 2.85 square inches."

Accordingly, an RHRRV setpoint greater than 450 psig is unacceptable. An RHRRV setpoint less than 450 psig is consistent with the TS and provides greater protection of the RCS in the unlikely event of a low temperature overpressure transient.

Following SNC's original PTLR submittal dated August 20,1997, the calibration procedure for the RHRRVs was revised to reflect a setpoint of 436 psig with a tolerance ofi 13 psi (

3 %), consistent with the AShE Code for Class II valves. Addition of the setpoint tolerance ofi 13 psi to the 436 psig value assures that the setpoint for the RHRRVs remains less than or equal to 450 psig as required by TS 3.4.10.3.

2. The P/T limit curves include an adjustment to include the static and dynamic head associated with the operation of the reactor coolant pumps (RCPs). Only one RCP is assumed to be operating below 110 F and three RCPs are assumed above 110*F. Do the TSs prohibit operating with more than one RCP below 110 F? If not, why? Additionally, please verify that the values chosen for the static and dynamic head include the effects of the running RHR pumps.

SNC Response: The technical specification pages are being revised to limit the operation of more than one reactor coolant pump below 110 F. The revised technical specification pages are included in Enclosure 2. Additionally, the corrections to the P/T limits associated

Enclosure 1 Page 2 Response to NRC RAI Concerning the PTLR Technical Specification Amendment with the operation of the reactor coolant pumps include the static and dynamic efTects of the two operating RHR pumps.

3. Is there any possibility that pressurizati on could occur below 70 F, where the P/T limits and setpoi.as are calculated, if the temperature instrumentation drift or uncertainty is considered? The submittal indicates that no additional margin for instrumentation uncenainty is needed for the enable temperature because there is 8 F margin. Please state the temperature instmment uncertainty, the technique used to derive the instrument uncertainty, and verify that it is less than 8 F.

SNC Response: Based on use of wide range cold leg temperature, the indicated temperature uncertainty is i21'F while cooling down. At cold conditions less than 100'F, prior to RCP startup, the best indicator of RCS vessel temperature is the RHR heat exchanger discharge temperature. This indicated temperature uncertainty is 110'F or less.

These uncertainties were developed using the Westinghouse cetpoint uncertainty methodology for Protection Systems which is consistent with IS A 67.04, employs a square root sum of the squares (SRSS) approach, and reflects Farley specific equipment and calibration practices. This methodology has been previously employed for other projects for the Farley Nuclear Plants, such as RTD Bypass Elimination, Sterm Generator Level Tap Relocation, and VANTAGE 5 Fuel Upgrade, which have been approved by the NRC Staff.

Incorporation of the 21'F temperature uncertainty into the temperature at which the RHR relief valves must be operable results in a change in the applicability statement of Technical Specification 3.4.10.3 to require the RHR relief valves to be operable when one cf the RCS cold leg temperatures is less than 325 F. The revised technical specification pages are included in Enclosure 2. The revised Significant Hazards Evaluation is provided in Enclosure 3.

Incorporation of the 10 F temperature uncertainty into the minimum boltup temperature results in a proposed minimum boltup temperature of 75 F (the original minimum boltup temperature included a 5 F margin).

4. The methodology submitted indicates that,"if the projected RCS pressure exceeds the Appendix G allowable pressure for the corresponding temperature, changes to the RHRRV characteristics, e.g., may be required" and that these changes may require NRC approval (emphasis added). Although there are a number of ways that could be used to resolve the issue, the methodology must clearly state that if the projected RCS pressure exceeds the l

Enclosure 1 Page 3 Response to NRC RAI Concerning the PTLR Technical Specification Amendment Appendix G allowable pressure using the methodology presented and referenced in the TS that the issue must or shall be resolved with NRC review and approval.

SNC Response: The methodology has been revised to incorporate the requested change.

The methodology, with the changes marked, is provided in Enclosure 4.

5. Generic Letter 96-03 includes an LCO that requires the accumulatorn to be isolated when the accumulator pressure is greater than or equal to the maximum RCS pressure for existing cold leg temperature allowed in the PTLR. The proposed changes to the technical specifications do not include this LCO.

SNC Response: During conversations with the NRC staff, a questiot. was raised regarding failure of SNC to include a TS that requires the accumulator = to be isolated from the RCS during low temperature operation to preclude inadvertent injection of an accumulator into a water-solid RCS By NRC Safety Evaluation Report dated July 31,1979, the NRC found FNP's commitment to isolate the accumulators with power removed from the isolation -

valves whenever the plant is on RHR cooling to be an acceptable means for precluding the inadvertent injection. The model Technical Specifications included in GL 96-03 were based on the Improved Standard Technical Specifications which have not been implemented for FNP. The requirement to isolate the accumulators when the accumulator pressure is greater than or equal to the maximum RCS pressure for the cold leg temperature allowed in the PTLR will be incorporated in the FNP Technical Specifications upon implementation of the Improved Standard Technical Specifications.

. _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ . _ _ _ _ _ _ .