MONTHYEARML20211A4361999-08-18018 August 1999 Notification of Significant Licensee Meeting 99-47 with Entergy Nuclear,Inc on 990831 to Discuss Results of NRC Plant Performance Review of Pilgrim Nuclear Power Station Issued on 990409 ML20212H7621999-06-22022 June 1999 Notification of 990701 Meeting with NEI & Entergy in Rockville,Md to Discuss Price-Anderson Issues Re Transfer of Pilgrim License from Beco to Entergy ML20205L0301999-04-0909 April 1999 Notification of 990413 Meeting with Boston Edison Co & Entergy Nuclear Generation Co in Rockville,Md to Discuss Sale & Transfer of Pilgrim Station from Boston Edison Co to Entergy Nuclear Generation Co ML20196J5801998-12-0707 December 1998 Notification of 981209 Meeting with Representatives of Beco & Entergy in Rockville,Md to Discuss Sale of Pilgrim Plant ML20196F3461998-12-0202 December 1998 Forwards Info Re Operator Licensing Exam Administered on 981016-23 at Pilgrim Station,For Distribution Under Rids Code IE42 ML20196F5611998-12-0202 December 1998 Forwards Info Re OL Exam Administered on 981016-23 at Pilgrim Station,For Distribution Under Rids A070 ML20154D5091998-10-0202 October 1998 Notification of Meeting W/Beco on 981008 in Rockville,Md to Discuss Core Spray Piping Integrity ML20154G5141998-10-0202 October 1998 Notification of 981008 Meeting W/Beco in Rockville,Md to Discuss Core Spray Piping Integrity.Meeting Has Been Rescheduled to 981015 ML20247G2441998-04-15015 April 1998 Notification of Significant Licensee Meeting 98-34 W/Util on 980427 to Discuss Weaknesses in Licensee Alarm Assessment Program (EA 98-191) ML20203E2781998-02-19019 February 1998 Notification of Significant Licensee Meeting 98-18 W/Util in King of Prussia,Pa on 980310 Re Plant Design Basis Project Discussion ML20199C7581997-10-31031 October 1997 Notification of Significant Licensee Meeting 97-112 W/Util on 971113 to Discuss NRC SALP ML20212D6201997-10-28028 October 1997 Notification of Licensee Meeting on 971121 W/Util in King of Prussia,Pa to Discuss Apparent Violations Identified During NRC Insp 50-293/97-05 ML20140F6151997-06-11011 June 1997 Notification of 970612 Meeting W/Util in Rockville,Md to Discuss Net Positive Suction Head for ECCS Pumps ML20137Q9761997-03-31031 March 1997 Informs That as-found LOCA & Life Testing & Analysis Does Not Provide Acceptable Approach for Demonstrating Qualification at Accident Temp Higher than 340F,per 970110 TAR ML20137B4781997-03-14014 March 1997 Undated Memo Discussing Beco Reorganization ML20141A7361997-03-12012 March 1997 Rcommends That Key RES Staff Attend Subcommittee Meetings to Address Any Questions,Arise in Discussions Among Members & to Answer Any Key Questions Posed in Advance by Subcommittee Chairmen ML20149M3291996-11-12012 November 1996 Forwards Input Re TIA on Plant Licensing Basis & Subsequent Mod Under 10CFR50.59 for Two Safety Significant Problems ML20129K2561996-11-0505 November 1996 Notification of Significant Licensee Meeting 96-109 W/Listed Attendees on 961202-03 in Philadelphia,Pa to Provide Training,Resolve Interagency Exercise Scheduling Conflicts & Discuss Current Issues in Emergency Preparedness ML20129D8331996-09-19019 September 1996 Notification of 961003 Predecisional Enforcement Conference 96-98 W/Util to Discuss Containment Penetration Protection. Meeting Closed to Public ML20134J7301996-07-26026 July 1996 Forwards Resolution of Spent Fuel Storage Pool Action Plan Issues Re Response to Two Postulated Event Sequences Involving SFP NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl IR 05000293/19930291993-11-23023 November 1993 Notification of Significant Licensee Meeting 93-156 W/Util on 931202 Re Three Recently Reported Design Issues in Insp Rept 50-293/93-29 ML20058C9711993-11-22022 November 1993 Notification of Significant Licensee Meeting 93-150 W/Util on 931217 Re Hpci/Rcic Reliability & Switchyard Betterment Status ML20059L9721993-11-12012 November 1993 Licensing Board Memorandum & Order Terminating Proceeding .* Informs That Time Provided by NRC Regulation to Review Decision of ASLB Terminating Proceeding in Docket Has Expired.W/Certificate of Svc.Served on 931112 ML20056C4721993-06-17017 June 1993 Discusses Util Assessment of Low Pressure Turbine Analysis. Licensee Retained Structural Integrity Assocs,Inc (SIA) to Evaluate Flaw Indications in 7GA Disk.Sia Anaylsis Reduce Some Obvious Conservatisms Used in GE Analysis ML20128F3911993-02-0303 February 1993 Requests Listed Instructions to Ensure That P Blanch of Northeast Utils & E Hadley of We the People Kept Promptly Informed of NRC Activities on BWR Water Level Indicators & Rosemount Transmitters ML20128E2181993-01-26026 January 1993 Notice of Significant Licensee Meeting 93-11 W/Licensee on 930225 in King of Prussia,Pa to Discuss Util Reorganization ML20059C1171992-11-20020 November 1992 Submits Status Rept on Reactor Water Level Spiking That Occurred on 921024.Related Info Encl ML20125D1161992-10-0707 October 1992 Notification of Significant Licensee Meeting 92-177 W/Util on 921217 to Discuss tie-in of New Security Computer ML20082B1581991-02-20020 February 1991 Summarizes Telcon W/R Murphy Re Mobilization Time for State of Ma Natl Guard Personnel Assigned to Respond to Wellesley, Ma Reception Ctr & State of Ma Civil Defense Agency Area II Headquarters in Event of Emergency at Facility ML20062H5361990-11-23023 November 1990 Forwards Info from Pilgrim Citizens Radiological Monitoring Network,Covering Rept Periods 900910-1017 ML20059P0861990-10-0101 October 1990 Notification of Significant Licensee Meeting 90-118 W/Util on 901016 to Discuss SALP ML20059L1541990-09-0707 September 1990 Notification of Significant Licensee Meeting 90-114 on 900912 at Region I Ofc to Discuss Corrective Actions & Restart Planning Re 900902 Manual Reactor Scram ML20059G4681990-08-0606 August 1990 Forwards Citizens Radiological Monitoring Network Weather Data Rept for Apr-Jul 1990 for Processing Through Nudocs Sys ML20127B4901990-08-0303 August 1990 Responds to 900726 Request for Recommendations for Appropriate Actions in Response to Inspector General Rept 90N-02 ML20127B4961990-08-0101 August 1990 Advises That Staff Did Not Conduct Thorough Review of Offsite Emergency Preparedness Which Resulted in Inaccurate Info Being Provided to Commission ML20058B4501990-06-28028 June 1990 Provides Status Rept Re Progress of off-site Emergency Preparedness Activities at Facility ML20055C2661990-02-0505 February 1990 Forwards Draft Ltr to Util Re Completion of Plant Power Ascension Program.Ltr Will Be Issued on 900209 Which Will Accept Util Completion of Power Ascension Program & Close Out Confirmatory Action Ltr CAL-86-10 ML20248C5841989-09-26026 September 1989 Notification of Significant Licensee Meeting 89-154 W/Util on 891006 in Plymouth,Ma to Discuss SALP Mgt ML20247N0121989-09-12012 September 1989 Forwards Plant Status Rept for 890826-0908.On 890830,reactor Automatically Scrammed Due to Fault on Main Generator Voltage Regulation Circuitry.On 890905,inadvertent Actuation LPCI Loop Select Logic Experienced ML20246N5751989-08-30030 August 1989 Forwards Plant Biweekly Status Rept for 890812-25 ML20245F6401989-08-0101 August 1989 Forwards Facility Biweekly Status Rept for 890715-28.NRC Restart Staff in Place & Onsite Monitoring Licensee Activities on Extended day-shift Basis During Reporting Period ML20247C0631989-07-19019 July 1989 Forwards Biweekly Status Rept for 890701-14.NRC Restart Staff in Place & Onsite & Monitoring Licensee Activities on around-the-clock Basis During Plant Startup & Power Ascension.Part 21 Related ML20247C1611989-07-14014 July 1989 Notification of Significant Licensee Meeting 89-112 W/Util on 890816 in King of Prussia,Pa to Discuss SALP ML20247E4531989-07-10010 July 1989 Forwards Plant Status Rept for 890617-30 Period.Rept Intended to Provide NRC Mgt & Public W/Overview of Plant Activities & NRC Restart Insp Activities ML20246K1141989-07-0303 July 1989 Notification of Significant Licensee Meeting 89-105/suppl Enforcement Conference Re Augmented Insp Team Findings Concerning 890412 Reactor Core Isolation Cooling Sys Overpressurization ML20245E6561989-06-22022 June 1989 Forwards Plant Biweekly Status Rept for 890603-16.On 890616, Reactor Operating at Approx 25% Power w/turbine-generator Synchronized to Grid.On 890612,util Commenced Controlled Reactor Shutdown to Perform Minor Mods,Maint & Testing ML20245F9581989-06-16016 June 1989 Notification of Significant Licensee Meeting 89-096 W/Util on 890619 in King of Prussia,Pa Re 890412 RCIC Sys ML20245A3311989-06-0909 June 1989 Notification of Significant Licensee Meeting 89-90 on 890627 W/Util in King of Prussia,Pa for Mgt Meeting to Discuss Status of Licensee Radiation Control Program ML20244E5081989-06-0707 June 1989 Forwards Biweekly Status Rept for 890520-0602.Rept Provides Overview of Plant Activities & NRC Restart Insp Activities. Part 21 Related 1999-08-18
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20211A4361999-08-18018 August 1999 Notification of Significant Licensee Meeting 99-47 with Entergy Nuclear,Inc on 990831 to Discuss Results of NRC Plant Performance Review of Pilgrim Nuclear Power Station Issued on 990409 ML20212H7621999-06-22022 June 1999 Notification of 990701 Meeting with NEI & Entergy in Rockville,Md to Discuss Price-Anderson Issues Re Transfer of Pilgrim License from Beco to Entergy ML20205L0301999-04-0909 April 1999 Notification of 990413 Meeting with Boston Edison Co & Entergy Nuclear Generation Co in Rockville,Md to Discuss Sale & Transfer of Pilgrim Station from Boston Edison Co to Entergy Nuclear Generation Co ML20196J5801998-12-0707 December 1998 Notification of 981209 Meeting with Representatives of Beco & Entergy in Rockville,Md to Discuss Sale of Pilgrim Plant ML20196F3461998-12-0202 December 1998 Forwards Info Re Operator Licensing Exam Administered on 981016-23 at Pilgrim Station,For Distribution Under Rids Code IE42 ML20196F5611998-12-0202 December 1998 Forwards Info Re OL Exam Administered on 981016-23 at Pilgrim Station,For Distribution Under Rids A070 ML20154G5141998-10-0202 October 1998 Notification of 981008 Meeting W/Beco in Rockville,Md to Discuss Core Spray Piping Integrity.Meeting Has Been Rescheduled to 981015 ML20154D5091998-10-0202 October 1998 Notification of Meeting W/Beco on 981008 in Rockville,Md to Discuss Core Spray Piping Integrity ML20247G2441998-04-15015 April 1998 Notification of Significant Licensee Meeting 98-34 W/Util on 980427 to Discuss Weaknesses in Licensee Alarm Assessment Program (EA 98-191) ML20203E2781998-02-19019 February 1998 Notification of Significant Licensee Meeting 98-18 W/Util in King of Prussia,Pa on 980310 Re Plant Design Basis Project Discussion ML20199C7581997-10-31031 October 1997 Notification of Significant Licensee Meeting 97-112 W/Util on 971113 to Discuss NRC SALP ML20212D6201997-10-28028 October 1997 Notification of Licensee Meeting on 971121 W/Util in King of Prussia,Pa to Discuss Apparent Violations Identified During NRC Insp 50-293/97-05 ML20140F6151997-06-11011 June 1997 Notification of 970612 Meeting W/Util in Rockville,Md to Discuss Net Positive Suction Head for ECCS Pumps ML20137Q9761997-03-31031 March 1997 Informs That as-found LOCA & Life Testing & Analysis Does Not Provide Acceptable Approach for Demonstrating Qualification at Accident Temp Higher than 340F,per 970110 TAR ML20137B4781997-03-14014 March 1997 Undated Memo Discussing Beco Reorganization ML20141A7361997-03-12012 March 1997 Rcommends That Key RES Staff Attend Subcommittee Meetings to Address Any Questions,Arise in Discussions Among Members & to Answer Any Key Questions Posed in Advance by Subcommittee Chairmen ML20149M3291996-11-12012 November 1996 Forwards Input Re TIA on Plant Licensing Basis & Subsequent Mod Under 10CFR50.59 for Two Safety Significant Problems ML20129K2561996-11-0505 November 1996 Notification of Significant Licensee Meeting 96-109 W/Listed Attendees on 961202-03 in Philadelphia,Pa to Provide Training,Resolve Interagency Exercise Scheduling Conflicts & Discuss Current Issues in Emergency Preparedness ML20129D8331996-09-19019 September 1996 Notification of 961003 Predecisional Enforcement Conference 96-98 W/Util to Discuss Containment Penetration Protection. Meeting Closed to Public ML20134J7301996-07-26026 July 1996 Forwards Resolution of Spent Fuel Storage Pool Action Plan Issues Re Response to Two Postulated Event Sequences Involving SFP NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl IR 05000293/19930291993-11-23023 November 1993 Notification of Significant Licensee Meeting 93-156 W/Util on 931202 Re Three Recently Reported Design Issues in Insp Rept 50-293/93-29 ML20058C9711993-11-22022 November 1993 Notification of Significant Licensee Meeting 93-150 W/Util on 931217 Re Hpci/Rcic Reliability & Switchyard Betterment Status ML20059L9721993-11-12012 November 1993 Licensing Board Memorandum & Order Terminating Proceeding .* Informs That Time Provided by NRC Regulation to Review Decision of ASLB Terminating Proceeding in Docket Has Expired.W/Certificate of Svc.Served on 931112 ML20056C4721993-06-17017 June 1993 Discusses Util Assessment of Low Pressure Turbine Analysis. Licensee Retained Structural Integrity Assocs,Inc (SIA) to Evaluate Flaw Indications in 7GA Disk.Sia Anaylsis Reduce Some Obvious Conservatisms Used in GE Analysis ML20128F3911993-02-0303 February 1993 Requests Listed Instructions to Ensure That P Blanch of Northeast Utils & E Hadley of We the People Kept Promptly Informed of NRC Activities on BWR Water Level Indicators & Rosemount Transmitters ML20128E2181993-01-26026 January 1993 Notice of Significant Licensee Meeting 93-11 W/Licensee on 930225 in King of Prussia,Pa to Discuss Util Reorganization ML20059C1171992-11-20020 November 1992 Submits Status Rept on Reactor Water Level Spiking That Occurred on 921024.Related Info Encl ML20125D1161992-10-0707 October 1992 Notification of Significant Licensee Meeting 92-177 W/Util on 921217 to Discuss tie-in of New Security Computer ML20082B1581991-02-20020 February 1991 Summarizes Telcon W/R Murphy Re Mobilization Time for State of Ma Natl Guard Personnel Assigned to Respond to Wellesley, Ma Reception Ctr & State of Ma Civil Defense Agency Area II Headquarters in Event of Emergency at Facility ML20062H5361990-11-23023 November 1990 Forwards Info from Pilgrim Citizens Radiological Monitoring Network,Covering Rept Periods 900910-1017 ML20059P0861990-10-0101 October 1990 Notification of Significant Licensee Meeting 90-118 W/Util on 901016 to Discuss SALP ML20059L1541990-09-0707 September 1990 Notification of Significant Licensee Meeting 90-114 on 900912 at Region I Ofc to Discuss Corrective Actions & Restart Planning Re 900902 Manual Reactor Scram ML20059G4681990-08-0606 August 1990 Forwards Citizens Radiological Monitoring Network Weather Data Rept for Apr-Jul 1990 for Processing Through Nudocs Sys ML20127B4901990-08-0303 August 1990 Responds to 900726 Request for Recommendations for Appropriate Actions in Response to Inspector General Rept 90N-02 ML20127B4961990-08-0101 August 1990 Advises That Staff Did Not Conduct Thorough Review of Offsite Emergency Preparedness Which Resulted in Inaccurate Info Being Provided to Commission ML20058B4501990-06-28028 June 1990 Provides Status Rept Re Progress of off-site Emergency Preparedness Activities at Facility ML20055C2661990-02-0505 February 1990 Forwards Draft Ltr to Util Re Completion of Plant Power Ascension Program.Ltr Will Be Issued on 900209 Which Will Accept Util Completion of Power Ascension Program & Close Out Confirmatory Action Ltr CAL-86-10 ML20248C5841989-09-26026 September 1989 Notification of Significant Licensee Meeting 89-154 W/Util on 891006 in Plymouth,Ma to Discuss SALP Mgt ML20247N0121989-09-12012 September 1989 Forwards Plant Status Rept for 890826-0908.On 890830,reactor Automatically Scrammed Due to Fault on Main Generator Voltage Regulation Circuitry.On 890905,inadvertent Actuation LPCI Loop Select Logic Experienced ML20246N5751989-08-30030 August 1989 Forwards Plant Biweekly Status Rept for 890812-25 ML20245F6401989-08-0101 August 1989 Forwards Facility Biweekly Status Rept for 890715-28.NRC Restart Staff in Place & Onsite Monitoring Licensee Activities on Extended day-shift Basis During Reporting Period ML20247C0631989-07-19019 July 1989 Forwards Biweekly Status Rept for 890701-14.NRC Restart Staff in Place & Onsite & Monitoring Licensee Activities on around-the-clock Basis During Plant Startup & Power Ascension.Part 21 Related ML20247C1611989-07-14014 July 1989 Notification of Significant Licensee Meeting 89-112 W/Util on 890816 in King of Prussia,Pa to Discuss SALP ML20247E4531989-07-10010 July 1989 Forwards Plant Status Rept for 890617-30 Period.Rept Intended to Provide NRC Mgt & Public W/Overview of Plant Activities & NRC Restart Insp Activities ML20246K1141989-07-0303 July 1989 Notification of Significant Licensee Meeting 89-105/suppl Enforcement Conference Re Augmented Insp Team Findings Concerning 890412 Reactor Core Isolation Cooling Sys Overpressurization ML20245E6561989-06-22022 June 1989 Forwards Plant Biweekly Status Rept for 890603-16.On 890616, Reactor Operating at Approx 25% Power w/turbine-generator Synchronized to Grid.On 890612,util Commenced Controlled Reactor Shutdown to Perform Minor Mods,Maint & Testing ML20245F9581989-06-16016 June 1989 Notification of Significant Licensee Meeting 89-096 W/Util on 890619 in King of Prussia,Pa Re 890412 RCIC Sys ML20245A3311989-06-0909 June 1989 Notification of Significant Licensee Meeting 89-90 on 890627 W/Util in King of Prussia,Pa for Mgt Meeting to Discuss Status of Licensee Radiation Control Program ML20244E5081989-06-0707 June 1989 Forwards Biweekly Status Rept for 890520-0602.Rept Provides Overview of Plant Activities & NRC Restart Insp Activities. Part 21 Related 1999-08-18
[Table view] |
Text
c
() f
,, U d
JAN og gg Docket No. 50-293 MEMORANDUM FOR: James T. Wiggins, Chief Reactor Projects Branch No. 3 Division of Reactor Projects i
FROM: A. Randy Blough, Chief Reactor Projects Section No. 3B Division of Reactor Projects
SUBJECT:
PILGRIM STATUS REPORT FOR THE PERIOD DECEMBER 17-30, 1988 1
Enclosed is the Pilgrim bi-weekly status report from the NRC Resident Of fice i at Pilgrim. Three resident inspectors and six additional inspectors were on-site to monitor licensee preparations for startup at the plant during the ;
report period. I i
On December 21, 1988, the NRC Commissioner o voted to allow the restart of the Pilgrim plant. On December 29, 1988, the NRC Restart Assessment Panel met and recommended to the Regional Administrator that the Pilgrim plant be released from the first holdpoint. At 10:00 a.m., on December 30, 1988, Mr. William T. Russell, Regional Administrator, approved the NRC Restart i Assessment Panel's recciamendation to release the licensee from the first j holdpoint. j k
The Pilgrim bi-weekly status report is intended to provide NRC management and the public with an overview of plant activities and NRC inspection activities.
Subsequent inspection reports will address many of these topics in more detail.
Om M At per 9 py A. Randy Blough, Chief Reactor Projects Section No. 38
Enclosure:
As stated V~
ppt D 8901170368 89o1o9 EM m@ m mm WM MWM - M.0.0 / f5$
DR 01/08/89 ip ADOCK 05000293 PDC p
.' .. O O
. Mem*orandum for James T. Wiggins 2 N 091989 cc w/ enc 1:
R. Bird, Senior Vice President - Nuclear, BECo L. Gustin, Vice President - Corporate Relations, BECo K. Highfill, Station Director, BECo J. Keyes, Licensing Division Manager, BECo E. Robinson, Nuclear Information Manager, BECo R. Swanson, Nuclear Engineering Department Manager, BECo Chairman, Board of Selectmen, Plymouth Chairman, Board of Selectmen, Carver Chairman, Board of Selectmen, Duxbury Chairman, Board of Selectmen, Marshfield Chairman, Board of Selectmen, Kingston Chairman, Board of Selectmen, Bridgewater Mayor, City of Taunton The Honorable Edward M. Kennedy The Honorable Edward P. Kirby The Honorable Peter V. Forman The Honorable Edward J. Markey P. Agnes, Assistant Secretary of Public Safety, Commonwealth of Massachusetts M. Ernst, Committee on Energy, Commonwealth of Massachusetts S. Pollard, Energy Secretary, Commonwealth of Massachusetts B. McIntyre, Chairman, Department of Public Utilities N. Jof 1 son, Chairman, Duxbury Nuclear Committee R. Sh,mshak, MASSPIRG Plymouth Civil Defense Director R. Boulay M. Conyngham M. Jeka K. Anderson Public Document Room (PDR)
Local Public Document Room (LPOR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector Commonwealth of Massachusetts (2) 0FFICIAL RECORD COPY PILGRIM STATUS 12/17-30/88 - 0002.0.0 01/09/89
h..,,,
z o n l.
'V' V'
. Medorandum for James T. Wiggins 3 JAivug,ggg bec w/ encl:
Region I Dockat Room (with concurrences)
T. Murley, NRR F. Miraglia, NRR S. Varga, NRR B. Boger, NRR D. Crutchfield, NRR J. Partlow, NRR C. Rossi, NRR F. Congel, NRR L. Shao, NRR R. Wessman, NRR D. Mcdonald, NRR J. Roe, NRR F. Akstulewicz, NRR L. Whitney, NRR P. Boehnert, ACRS W. Russell, RI !
W. Kane, RI T. Martin, RI S. Ebneter, RI S. Collins, RI E. Butcher, RI R. Bellamy, RI
-J. Durr, RI R. Gallo, RI R. Blough, RI L. Doerflein, RI J. Lyash, RI M. Kohl, RI M. J. DiDonato, RI (2)
K. Abraham, RI (2)
M. Miller, RI M. Johnson, ED0 O
k RI:DRP RI:DRP RI:DRP CWarren/mjd RBlough JWiggins 1/9/89 1/d/89 1/ /89 0FFICIAL RECORD COPY PILGRIM STATUS 12/17-30/88 - 0003.0.0 01/08/89
pa
. ' ,, I
- .c Gq
(
, t a
i I
ENCLOSURE /
I Pilgrim Status Report for the Period December 17-30, 1988 1.0 Plant Status I
As of 10:00 a.m. on December 30, 1988, the reactor was.in..the cold s' hut-
.down mode with moderator temperature about 180 degrees Fahrenheit.
2.0 Facility Operations Summary The plant has been shutdown for maintenance and to make program improve-ments since April 12, 1936.
The licensee completed a formal management self-assessment of their readi-ness for restart and submitted this to the NRC for review on May 26, 1988, in the Pilgrim Nuclear Power Station Self-Assessment of Readiness for Restart Report and Volume 2, Revision 2 of the Restart Plan. The NRC conducted an Integrated Assessment Team Inspection (IATI) during the weeks of August 8-24, 1988, and the IATI Inspection Report 50-293/88-21 was issued on September 7, 1988. The IATI team identified a relatively small number of additional items for which actions or evaluations appeared appropriate and those items identified as being required for restart have been completed by the licensee and reviewed by the NRC. On September 29, 1988, the NRC conducted a public meeting in Plymouth, Massachusetts, to discuss the proposed restart of the Pilgrim plant and on October 14, 1988, the NRC Commissioners met in Rockville, Maryland, to discuss the possible restart. A vote on the restart was postponed at that time. l The licensee formally requested permission of the NRC for restart of the Pilgrim plant by letter dated November 19, 1988, to the NRC. The licensee reported the completion of restart open items and declared Pilgrim Station ready for restart.
On December 21, 1988, the NRC Commissioners voted to endorse the staff's recommendation to allow the restart of the Pilgrim plant. On December 30, 1988, the NRC Region I Regional Administrator, Mr. William T. Russell released the licensee from the criticality holdpoint.
3.0 Items of Special Interest NRC Commission Meeting On December 21, 1988, the NRC Commissioners voted unanimously to allow ,
restart of the Pilgrim Station in Plymouth, Massachusetts. The Commission i had previously met on October 14 and on December 9, 1988, to discuss proposed restart.
OFFICIAL RECORD COPY PILGRIM STATUS 12/17-30/88 - 0004.0.0 01/08/89
' ' ': . O O l
. Enciosure 2 !
On December 21, 1988, the Attorney General of Massachusetts filed a petition with the U.S. Court of Appeals for the First Circuit on behalf of the Commonwealth of Massachusetts requesting the court to set aside the Commission's clecision. The stated grounds of the petition are the incom-plete status of offsite emerger.cy plans and relief is requested before the operation of Pilgrim progresses to the po: .t where accumulated decay heat could cause a threat to the environment in the evant of an accident at Pilgrim.
Licensee Management Realignment Effective December 26, 1988, Mr. Leon Olivier assumed the por,i tion of Chief Operating Engineer. Mr. Olivier, who was the Simulator Training Group Leader, had previously served four years as a Watch Engineer at Pilgrim and has held a Senior Reactor Operator license for approximately nine years.
Restart Preparations On December 27, 1988, five additional inspectors arrived on site to aid the resident inspectors in monitoring the licensee's preparations for startup activities. This included two regional-based inspectors, one resident inspector from another site, and one headquarters-based inspector and an NRC contractor. Startup inspections by the NRC inspectors included review of the licensee's valve lineups, surveillance, staf fing, Quality N Assurance Reports and other areas.
NRC Assessment Panel Meeting An NRC Assessment Panel meeting for Pilgrim was held on December 29, 1988, in the NRC resident office in Plymouth, Massachusetts. NRC management from Region I, NRR and the NRC resident staff participated. After thorough discussion and review of licensee activities and plant status, the NRC Assessment Panel recommended to 'the Regional Administrator that the Pilgrim plant be released from the first holdpoint, which is reactor criticality.
The NRC Assessment Panel meets periodically to coordinate planning and execution of NRC inspection and licensing activities related to Pilgrim.
The Assessment Panel will continue to meet throughout the Power Ascension ;
Program. The Panel is chaired by Mr. Samuel J. Collins, Deputy Director, i Division of Reactor Projects, NRC Region I.
l l
l l
l OFFICIAL RECORD COPY PILGRIM STATUS 12/17-30/88 - 0005.0.0 l 01/08/89 i
y L .
o o
~; .__,
i
, Enc 50sure 3 I
l l
l L
Release From the First Holdpoint_(Initial Criticality) .
I On December 30, 1988, at 10:00 a.m. , Mr. William T. Russell, the Regional Administrator for Region I, approved the NRC Restart Assessment Panel's recommendation to reiease the licensee from the first holdpoint (initial criticality to 5'; rated power) in Boston Edison's power ascension test program. ,Mr. Russell was briefed by both the NRC Assessment Panel and the licensee management on startup readiness.
A press conference held by Mr. Russell was scheduled for 12:00 p.m. on December 30, 1988.
4.0 Emergency Notification System (ENS) Reports On December 22, 1938, the licensee performed a secondary containment leak rate test with a revised procedure and determined that the test results failed to meet the technical specification required acceptance criteria.
The procedure was revised as a result of the licensee's followup to an NRC Generic Letter. The NRC was notified via ENS on December 22, 1988.
The proposed corrective actions included installing flexible rubber flaps around the truck lock door in addition to the existing seal as a permanent fixture. The rubber flaps were installed and the secondary containment leak rate test successfully re performed on December 29, 1988 5.0 NRC Staff Status During the Period The inspection staff at Pilgrim during the report period consisted of the following:
Clay Warren --- Senior Resident Inspector Tae Kim --- Resident Inspector Cynthia Carpenter --- Resident Inspector During the week of December 19, 1988, one regional-based inspector was .
onsite to assist the resident inspectors. During the week of l December 26, 1988, two regional-based and one headquarters-based inspectors, the resident inspector from Vermont Yankee, as well as an NRC contractor were onsite to monitor licensee preparations for restart. On December 22, 1988, and December 28-30, 1988, the Chief, Reactor Projects Section No. 3B, responsible for Pilgrim was onsite. On December 29 and 30, 1988, Mr. William Russell, Regional Administrator was onsite to tour the facility. Also onsite December 29 and 30, 1988, were Mr. Sam Collins, Deputy Director, Division of Reactor Projects; Mr. Jay Gutierrez, Regional Attorney, and Mr. Ronald Bellamy, Chief, Facilities Radiological Safety I and Safeguards Branch.
OFFICIAL RECORD COPY PILGRIM STATUS 12/17-30/88 - 0006.0.0 01/08/89