Connecticut Yankee Atomic Power Company - Independent Spent Fuel Storage Installation Security Inspection Report 07200039/2020401, Without Enclosure (Public - Cover Letter Only)
ML20323A433
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 11/20/2020
From: Fred Bower
Plant Support Branch 1
To: Lenois J
Connecticut Yankee Atomic Power Co
Bower F
References
EA-2020-121 IR 2020401
Download: ML20323A433 (4)


Text

UNITED STATES ber 20, 2020

SUBJECT:

CONNECTICUT YANKEE ATOMIC POWER COMPANY - INDEPENDENT SPENT FUEL STORAGE INSTALLATION SECURITY INSPECTION REPORT 07200039/2020401

Dear Mr. Lenois:

On October 26, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an Independent Spent Fuel Storage Installation (ISFSI) security inspection at the Connecticut Yankee Atomic Power Company in East Hampton, Connecticut. The inspection covered the licensees physical security plan and the October 16, 2002, Interim Compensatory Measures for Dry Independent Spent Fuel Storage Installations Order and was conducted using NRC Inspection Procedure 81311, Physical Security Requirements for Independent Spent Fuel Storage Installations.

The enclosed inspection report documents the inspection results, which were discussed with you and other members of your staff, on October 26, 2020.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

Based on the results of this inspection, the inspectors documented one violation of very low security significance (SLIV) involving a violation of NRC requirements in this report. The NRC is treating this violation as a Non-Cited Violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy. If you contest the violation or significance of the NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555 0001; with copies to the Regional Administrator, Region I, and the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this cover letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

However, the enclosed report contains Security Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRCs ADAMS. If you choose to provide a response and Security Related Information is necessary to provide an acceptable response, please mark your entire response Security Related Information - Withhold From Public Disclosure Under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely, X /RA/

Signed by: Fred L. Bower Fred L. Bower, III, Chief Plant Support Branch Division of Reactor Safety Enclosure:

Inspection Report No. 07200039/2020401 cc w/o encl: (w/o OUO-SRI)

W. Norton, President and Chief Executive Officer C. Pizzella, Treasurer R. Capstick, Communications Manager J. Bourassa, ISFSI QA Manager J. Fay, General Counsel R. Snook, Connecticut Attorney General Office L. Milardo, Town of Haddam State of Connecticut SLO ML20323A433 (Cover letter w/o enclosure) (Publicly Available)

ADAMS ACCESSION NUMBER: ML20323A438 (Cover letter w/SRI enclosure) (Non-Publicly Available)

Cover Letter Only Non-Sensitive Publicly Available Sensitive Non-Publicly Available X SUNSI Review Cover Letter w/OUO- Non-Sensitive Publicly Available SRI Enclosure Sensitive Non-Publicly Available X SUNSI Review OFFICE RI/DRS RI/DRS RI/DNMS RI/DRS RI/EAGLT HQ/OE NAME JRey KHussar ADimitriadis FBower RMckinley DFurst DATE 11/17/2020 11/16/2020 11/18/2020 11/20/2020 11/16/2020 11/17/2020