January 2005 Monthly Operating Report for Beaver Valley, Units 1 and 2
ML050470120
Person / Time
Site: Beaver Valley
Issue date: 02/08/2005
From: Pearce L
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, L-05-024
Download: ML050470120 (3)


Text

FENO C ._~

Beaver Valley Power Station

- P. O.Box4 Shippingport, PA 15077 L-05-024 February 8, 2005 Beaver Valley Power Station Unit I - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. NPF-73 Monthly Operating Rep ort U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

In accordance with NRC Generic Letter 97-02, "Revised Contents of the Monthly Operating Report', .and Unit I and 2 Technical, Specification 6.9.4, the "Monthly Operating Report'" is submitted for Unit 1 and Unit 2 for the month of January, 2005. This information has also been inputted into the INPO Consolidated Data Entry (CDE) System. No regulatory commitments are contained in this submittal.

Respectfully, W. Pearce Vice-President BVPS DTJ/slp Encli Dsures  ; > . t * .;.

.-~~ ~~~~. I' .:

'*1**'.

  • I cc:; NRC.Regional Office , -. ,
  • King of Prussia, PA-l;o.  ; . . . .

, .. ~ .. 1, :' .  :

frjvf/

OPERATING DATA REPORT DOCKET NO. 50-334 UNIT NAME Beaver Valley 1

.DATE Febr-uary 01,2005 .

COMPLETED BY David T. Jones ;

TELEPHONE 724-682-4962 REPORTING PERIO January 2005

1. Design Electrical Rating 835.00
2. Maximum Denendable Canacitv IMWe-Netl R81 .00

- - This Month Yr-to-Date Cumulative

3. Number of Hours the Reactor was Critical  ; 744.00 744.00 176,907.14
4. Number of Hours Generator On-line 744.00 744.00 174,361.14
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net ectrcal Energy Generated (MWHrs) _ 627,660.00 627,660.00 131,947,579.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments NONE.

1 2 Reason: Method:

A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)

SUMMARY

The Unit began the report period operating at a nominal value of 100% output. On 1/24/05 at 0047 hours5.439815e-4 days <br />0.0131 hours <br />7.771164e-5 weeks <br />1.78835e-5 months <br />, the Unit began to reduce thermal power to less than 2652 MWt due to an inoperable Leading Edge Flow Meter (LEFM). A corresponding reduction in electrical output of approximately 8 MWe was achieved at 0130 hours0.0015 days <br />0.0361 hours <br />2.149471e-4 weeks <br />4.9465e-5 months <br /> on 1/24/05. Upon repair and return of the LEFM to operable status, the Unit commenced to return to full electrical and thermal power at 0024 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> on 1/28/05. Full power was achieved at 0120 hours0.00139 days <br />0.0333 hours <br />1.984127e-4 weeks <br />4.566e-5 months <br /> on 1/28/05. The Unit continued to operate at a nominal value of 100% output for the remainder of the report period.

Page 1 of 1

I OPERATING DATA REPORT DOCKET NO. 50-412 UNIT NAME Beaver Valle&y2 DATE FebruaryT01,2 5 COMPLETED BY David T. Jones TELEPHONE 724-682-4962 REPORTING PERIO January 2005

1. Design Electrical Rating 836.00
2. Maximum Dependable Capacity (MWe-Net) 831.00

- This Month Yr-to-Date Cumulative

3. Number of Hours the Reactor was Critical 744.00 744.00 127,136.48
4. Number of Hours Generator On-line 744.00 744.00 126,392.38
5. Reserve Shutdown Hours 0.00 0.00 0.00

_

_

6. Net Electrical Energy Generated (MWHrs) _

627,916.00 627,916.00 99,762,146.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No. Date S Scheduled (Hours) Reason 1 Down 2 Comments NONE.

1 2 Reason: Method:

A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)

SUMMARY

The Unit operated at a nominal value of 100% output for the entire report period.

Page 1 of 1

Text

FENO C ._~

Beaver Valley Power Station

- P. O.Box4 Shippingport, PA 15077 L-05-024 February 8, 2005 Beaver Valley Power Station Unit I - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. NPF-73 Monthly Operating Rep ort U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

In accordance with NRC Generic Letter 97-02, "Revised Contents of the Monthly Operating Report', .and Unit I and 2 Technical, Specification 6.9.4, the "Monthly Operating Report'" is submitted for Unit 1 and Unit 2 for the month of January, 2005. This information has also been inputted into the INPO Consolidated Data Entry (CDE) System. No regulatory commitments are contained in this submittal.

Respectfully, W. Pearce Vice-President BVPS DTJ/slp Encli Dsures  ; > . t * .;.

.-~~ ~~~~. I' .:

'*1**'.

  • I cc:; NRC.Regional Office , -. ,
  • King of Prussia, PA-l;o.  ; . . . .

, .. ~ .. 1, :' .  :

frjvf/

OPERATING DATA REPORT DOCKET NO. 50-334 UNIT NAME Beaver Valley 1

.DATE Febr-uary 01,2005 .

COMPLETED BY David T. Jones ;

TELEPHONE 724-682-4962 REPORTING PERIO January 2005

1. Design Electrical Rating 835.00
2. Maximum Denendable Canacitv IMWe-Netl R81 .00

- - This Month Yr-to-Date Cumulative

3. Number of Hours the Reactor was Critical  ; 744.00 744.00 176,907.14
4. Number of Hours Generator On-line 744.00 744.00 174,361.14
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net ectrcal Energy Generated (MWHrs) _ 627,660.00 627,660.00 131,947,579.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments NONE.

1 2 Reason: Method:

A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)

SUMMARY

The Unit began the report period operating at a nominal value of 100% output. On 1/24/05 at 0047 hours5.439815e-4 days <br />0.0131 hours <br />7.771164e-5 weeks <br />1.78835e-5 months <br />, the Unit began to reduce thermal power to less than 2652 MWt due to an inoperable Leading Edge Flow Meter (LEFM). A corresponding reduction in electrical output of approximately 8 MWe was achieved at 0130 hours0.0015 days <br />0.0361 hours <br />2.149471e-4 weeks <br />4.9465e-5 months <br /> on 1/24/05. Upon repair and return of the LEFM to operable status, the Unit commenced to return to full electrical and thermal power at 0024 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> on 1/28/05. Full power was achieved at 0120 hours0.00139 days <br />0.0333 hours <br />1.984127e-4 weeks <br />4.566e-5 months <br /> on 1/28/05. The Unit continued to operate at a nominal value of 100% output for the remainder of the report period.

Page 1 of 1

I OPERATING DATA REPORT DOCKET NO. 50-412 UNIT NAME Beaver Valle&y2 DATE FebruaryT01,2 5 COMPLETED BY David T. Jones TELEPHONE 724-682-4962 REPORTING PERIO January 2005

1. Design Electrical Rating 836.00
2. Maximum Dependable Capacity (MWe-Net) 831.00

- This Month Yr-to-Date Cumulative

3. Number of Hours the Reactor was Critical 744.00 744.00 127,136.48
4. Number of Hours Generator On-line 744.00 744.00 126,392.38
5. Reserve Shutdown Hours 0.00 0.00 0.00

_

_

6. Net Electrical Energy Generated (MWHrs) _

627,916.00 627,916.00 99,762,146.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No. Date S Scheduled (Hours) Reason 1 Down 2 Comments NONE.

1 2 Reason: Method:

A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)

SUMMARY

The Unit operated at a nominal value of 100% output for the entire report period.

Page 1 of 1