|
---|
Category:Letter type:L
MONTHYEARL-23-267, Submittal of Discharge Monitoring Report (Npdes), Permit No. PA00256152023-12-18018 December 2023 Submittal of Discharge Monitoring Report (Npdes), Permit No. PA0025615 L-23-229, Request for Additional Information Regarding the Spring 2023 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F-Star Reports2023-11-29029 November 2023 Request for Additional Information Regarding the Spring 2023 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F-Star Reports L-23-247, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-11-17017 November 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-23-227, Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Third Quarter 20232023-10-20020 October 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Third Quarter 2023 L-23-208, Submittal of Discharge Monitoring Report Cnpdes), Permit No. PA00256152023-09-14014 September 2023 Submittal of Discharge Monitoring Report Cnpdes), Permit No. PA0025615 L-23-167, Twenty-Third Refueling Outage Inservice Inspection Summary Report2023-09-13013 September 2023 Twenty-Third Refueling Outage Inservice Inspection Summary Report L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-179, Submittal of Discharge Monitoring Report, (NPDES) Permit No. PA00256152023-07-18018 July 2023 Submittal of Discharge Monitoring Report, (NPDES) Permit No. PA0025615 L-23-165, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-06-26026 June 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-23-139, Response to Request for Additional Information Regarding Fall 2022 180-Day Steam Generator Tube Inspection Report2023-06-13013 June 2023 Response to Request for Additional Information Regarding Fall 2022 180-Day Steam Generator Tube Inspection Report L-23-055, Submittal of the Updated Final Safety Analysis Report, Revision 342023-05-23023 May 2023 Submittal of the Updated Final Safety Analysis Report, Revision 34 L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report L-23-137, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-05-18018 May 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-23-125, Cycle 24 Core Operating Limits Report2023-05-17017 May 2023 Cycle 24 Core Operating Limits Report L-23-132, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-10010 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations L-23-129, Response to Request for Additional Information for 10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations2023-05-0505 May 2023 Response to Request for Additional Information for 10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations L-23-115, Submittal of 2022 Annual Radioactive Effluent Release Report, 2022 Annual Radiological Environmental Operating Report, and 2022 Annual Environmental Operating Report (Non-Radiological2023-04-27027 April 2023 Submittal of 2022 Annual Radioactive Effluent Release Report, 2022 Annual Radiological Environmental Operating Report, and 2022 Annual Environmental Operating Report (Non-Radiological L-23-126, Discharge Monitoring Report (Npdes), Permit No. PA00256152023-04-22022 April 2023 Discharge Monitoring Report (Npdes), Permit No. PA0025615 L-23-053, 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2023-04-14014 April 2023 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-23-061, Submittal of the Decommissioning Funding Status Reports2023-03-31031 March 2023 Submittal of the Decommissioning Funding Status Reports L-23-058, 180-Day Steam Generator Tube Inspection Report2023-03-27027 March 2023 180-Day Steam Generator Tube Inspection Report L-23-066, Annual Notification of Property Insurance Coverage2023-03-21021 March 2023 Annual Notification of Property Insurance Coverage L-23-036, Report of Facility Changes, Tests and Experiments2023-03-13013 March 2023 Report of Facility Changes, Tests and Experiments L-23-086, Response to Request for Additional Information for Emergency License Amendment Request for Technical Specification 3.5.2 Regarding One-Time Action for Valve Leak Repair2023-03-0404 March 2023 Response to Request for Additional Information for Emergency License Amendment Request for Technical Specification 3.5.2 Regarding One-Time Action for Valve Leak Repair L-23-087, Supplement to Emergency License Amendment Request for Technical Specification 3.5.2 Regarding One-Time Action for Valve Leak Repair (L-2023-LLA-0027)2023-03-0404 March 2023 Supplement to Emergency License Amendment Request for Technical Specification 3.5.2 Regarding One-Time Action for Valve Leak Repair (L-2023-LLA-0027) L-23-073, Emergency License Amendment Request for Technical Specification 3.5.2 Regarding One-Time Action for Valve Leak Repair2023-03-0101 March 2023 Emergency License Amendment Request for Technical Specification 3.5.2 Regarding One-Time Action for Valve Leak Repair L-23-016, Twenty-Eighth Refueling Outage Inservice Inspection Summary Report2023-02-21021 February 2023 Twenty-Eighth Refueling Outage Inservice Inspection Summary Report L-23-064, Discharge Monitoring Report, (NPDES) Permit No. PA00256152023-02-21021 February 2023 Discharge Monitoring Report, (NPDES) Permit No. PA0025615 L-23-057, Energy Harbor Nuclear Corp Retrospective Premium Guarantee2023-02-20020 February 2023 Energy Harbor Nuclear Corp Retrospective Premium Guarantee L-22-193, Request for Exemption from Specific Provisions in 10 CFR 50 Appendix H2023-02-14014 February 2023 Request for Exemption from Specific Provisions in 10 CFR 50 Appendix H L-22-286, Supplement to Request for an Amendment to Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time2023-02-14014 February 2023 Supplement to Request for an Amendment to Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time L-23-032, Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Second Half of 20222023-01-23023 January 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Second Half of 2022 L-22-281, Discharge Monitoring Report (NPDES) Permit No. PA00256152022-12-16016 December 2022 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-22-246, Response to Request for Additional Information Regarding a Request to Consolidate Fuel Decay Time Technical Specifications to New LCO2022-12-0707 December 2022 Response to Request for Additional Information Regarding a Request to Consolidate Fuel Decay Time Technical Specifications to New LCO L-22-217, Submittal of Discharge Monitoring Report (NPDES) Permit No. PA00256152022-11-21021 November 2022 Submittal of Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-22-226, Emergency Preparedness Plan2022-11-0404 November 2022 Emergency Preparedness Plan L-22-222, Cycle 29-1 Core Operating Limits Report2022-10-31031 October 2022 Cycle 29-1 Core Operating Limits Report L-22-228, Independent Spent Fuel Storage Installation Changes, Tests, and Experiments2022-10-26026 October 2022 Independent Spent Fuel Storage Installation Changes, Tests, and Experiments L-22-200, Response to Request for Additional Information Regarding a 180-Day Steam Generator Tube Inspection Report Fall 2021 Refueling Outage2022-10-21021 October 2022 Response to Request for Additional Information Regarding a 180-Day Steam Generator Tube Inspection Report Fall 2021 Refueling Outage L-22-232, Withdrawal of a License Amendment Request Associated with Fire Protection Program Changes2022-10-21021 October 2022 Withdrawal of a License Amendment Request Associated with Fire Protection Program Changes L-22-238, Submittal of Discharge Monitoring Report (NPDES) Permit No. PA00256152022-10-20020 October 2022 Submittal of Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-22-227, Revised August 2022 Outfall 003 & 004 NPDES Discharge Monitoring Report (Dmr), Revised Daily Effluent Monitoring Report Forms for Outfalls 003 & 004 and Corrective Action Letter from Eurofins2022-10-0303 October 2022 Revised August 2022 Outfall 003 & 004 NPDES Discharge Monitoring Report (Dmr), Revised Daily Effluent Monitoring Report Forms for Outfalls 003 & 004 and Corrective Action Letter from Eurofins L-22-219, Submittal of Discharge Monitoring Report (NPDES) Permit No. PA00256152022-09-26026 September 2022 Submittal of Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-22-204, Submittal of Evacuation Time Estimates2022-09-0707 September 2022 Submittal of Evacuation Time Estimates L-22-137, Request for Fire Protection Program Changes2022-09-0606 September 2022 Request for Fire Protection Program Changes L-21-238, License Amendment Request for Addition of Analytical Methodology to the Core Operating Limits Report for a Full Spectrum Loss of Coolant Accident2022-08-31031 August 2022 License Amendment Request for Addition of Analytical Methodology to the Core Operating Limits Report for a Full Spectrum Loss of Coolant Accident L-22-188, Response to Request for Additional Information Regarding Steam Generator Inspection Report- Fall 2021 Refueling Outage2022-08-22022 August 2022 Response to Request for Additional Information Regarding Steam Generator Inspection Report- Fall 2021 Refueling Outage L-22-191, Spent Fuel Storage Cask Registration2022-08-17017 August 2022 Spent Fuel Storage Cask Registration 2023-09-14
[Table view] Category:License-Monthly Operating Report
MONTHYEARL-05-125, August 2005 Monthly Operating Report for Beaver Valley Power Station, Units 1 and 22005-09-0909 September 2005 August 2005 Monthly Operating Report for Beaver Valley Power Station, Units 1 and 2 L-05-119, June 2005 Monthly Operating Report for Beaver Valley Power, Units 1 and 22005-07-0808 July 2005 June 2005 Monthly Operating Report for Beaver Valley Power, Units 1 and 2 L-05-105, May 2005 Monthly Operating Report for Beaver Valley Power Station2005-06-0707 June 2005 May 2005 Monthly Operating Report for Beaver Valley Power Station L-05-088, April 2005 Monthly Operating Report for Beaver Valley, Units 1 & 22005-05-0606 May 2005 April 2005 Monthly Operating Report for Beaver Valley, Units 1 & 2 L-05-064, March 2005 Monthly Operating Report for Beaver Valley Power Station2005-04-0808 April 2005 March 2005 Monthly Operating Report for Beaver Valley Power Station L-05-044, February 2005 Monthly Operating Report for Beaver Valley, Units 1 & 22005-03-0707 March 2005 February 2005 Monthly Operating Report for Beaver Valley, Units 1 & 2 L-05-024, January 2005 Monthly Operating Report for Beaver Valley, Units 1 and 22005-02-0808 February 2005 January 2005 Monthly Operating Report for Beaver Valley, Units 1 and 2 L-05-004, December 2004 Monthly Operating Report for Beaver Valley Power Station Units 1 and 22005-01-0707 January 2005 December 2004 Monthly Operating Report for Beaver Valley Power Station Units 1 and 2 L-04-157, November 2004 Monthly Operating Report for Beaver Valley Power Station2004-12-0707 December 2004 November 2004 Monthly Operating Report for Beaver Valley Power Station L-04-137, October, 2004 Monthly Operating Report for Beaver Valley Power Station2004-11-0808 November 2004 October, 2004 Monthly Operating Report for Beaver Valley Power Station L-04-133, September 2004 Monthly Operating Report for Beaver Valley Units 1 and 22004-10-0707 October 2004 September 2004 Monthly Operating Report for Beaver Valley Units 1 and 2 L-04-120, August 2004 Monthly Operating Report for Beaver Valley Power Station, Units 1 & 22004-09-0808 September 2004 August 2004 Monthly Operating Report for Beaver Valley Power Station, Units 1 & 2 L-04-111, July 2004 Monthly Operating Report for Beaver Valley Units 1 and 22004-08-0606 August 2004 July 2004 Monthly Operating Report for Beaver Valley Units 1 and 2 L-04-096, June 2004 Monthly Operating Report for Beaver Valley Power Station, Units 1 & 22004-07-0808 July 2004 June 2004 Monthly Operating Report for Beaver Valley Power Station, Units 1 & 2 L-04-079, May 2004 Monthly Operating Report for Beaver Valley Power Station2004-06-0707 June 2004 May 2004 Monthly Operating Report for Beaver Valley Power Station L-04-063, April 2004 Monthly Operating Report for Beaver Valley, Units 1 and 22004-05-0707 May 2004 April 2004 Monthly Operating Report for Beaver Valley, Units 1 and 2 L-04-052, March 2004 Monthly Operating Report for Beaver Valley, Units 1 & 22004-04-0707 April 2004 March 2004 Monthly Operating Report for Beaver Valley, Units 1 & 2 L-04-031, February 2004 Monthly Operating Report for Beaver Valley, Units 1 and 22004-03-0808 March 2004 February 2004 Monthly Operating Report for Beaver Valley, Units 1 and 2 L-04-014, January 2004 Monthly Operating Report for Beaver Valley, Units 1 and 22004-02-0606 February 2004 January 2004 Monthly Operating Report for Beaver Valley, Units 1 and 2 L-03-201, November 2003 Monthly Operating Report for Beaver Valley Units 1 and 22003-12-0505 December 2003 November 2003 Monthly Operating Report for Beaver Valley Units 1 and 2 L-03-184, October 2003 Monthly Operating Report for Beaver Valley, Units 1 & 22003-11-0707 November 2003 October 2003 Monthly Operating Report for Beaver Valley, Units 1 & 2 L-03-156, September 2003 Monthly Operating Report for Beaver Valley Units 1 and 22003-10-0808 October 2003 September 2003 Monthly Operating Report for Beaver Valley Units 1 and 2 L-03-141, August 2003 Monthly Operating Report for Beaver Valley Units 1 & 22003-09-0808 September 2003 August 2003 Monthly Operating Report for Beaver Valley Units 1 & 2 L-03-121, July 2003 Monthly Operating Report for Beaver Valley, Units 1 & 22003-08-0707 August 2003 July 2003 Monthly Operating Report for Beaver Valley, Units 1 & 2 L-03-107, June 2003 Monthly Operating Report for Beaver Valley, Units 1 & 22003-07-0808 July 2003 June 2003 Monthly Operating Report for Beaver Valley, Units 1 & 2 L-03-096, May 2003 Monthly Operating Report for Beaver Valley, Units 1 & 22003-06-0606 June 2003 May 2003 Monthly Operating Report for Beaver Valley, Units 1 & 2 L-03-077, April 2003 Monthly Operating Report for Beaver Valley, Units 1 and 22003-05-0606 May 2003 April 2003 Monthly Operating Report for Beaver Valley, Units 1 and 2 L-03-058, March 2003 Monthly Operating Report for Beaver Valley Power Station2003-04-0707 April 2003 March 2003 Monthly Operating Report for Beaver Valley Power Station L-03-043, February 2003 Monthly Operating Report for Beaver Valley Power Station, Units 1 & 22003-03-10010 March 2003 February 2003 Monthly Operating Report for Beaver Valley Power Station, Units 1 & 2 L-03-027, January 2003 Monthly Operating Report for Beaver Valley Power Station2003-02-0707 February 2003 January 2003 Monthly Operating Report for Beaver Valley Power Station L-02-116, November 2002 Monthly Operating Report for Beaver Valley Units 1 & 22002-12-0606 December 2002 November 2002 Monthly Operating Report for Beaver Valley Units 1 & 2 L-02-111, October 2002 Monthly Operating Report for Beaver Valley Units 1 & 22002-11-0707 November 2002 October 2002 Monthly Operating Report for Beaver Valley Units 1 & 2 L-02-104, September 2002 Monthly Operating Report for Beaver Valley2002-10-0707 October 2002 September 2002 Monthly Operating Report for Beaver Valley L-02-096, August 2002 Monthly Operating Report for Beaver Valley Units 1 & 22002-09-0606 September 2002 August 2002 Monthly Operating Report for Beaver Valley Units 1 & 2 L-02-085, July 2002 Monthly Operating Report for Beaver Valley Units 1 & 22002-08-0707 August 2002 July 2002 Monthly Operating Report for Beaver Valley Units 1 & 2 L-02-074, June 2002 Monthly Operating Report for Beaver Valley Units 1 & 22002-07-0808 July 2002 June 2002 Monthly Operating Report for Beaver Valley Units 1 & 2 L-02-071, May 2002 Monthly Operating Report for Beaver Valley Units 1 & 22002-06-0707 June 2002 May 2002 Monthly Operating Report for Beaver Valley Units 1 & 2 L-02-056, April 2002 Monthly Operating Report for Beaver Valley Power Station2002-05-0707 May 2002 April 2002 Monthly Operating Report for Beaver Valley Power Station L-02-037, March 2002 Monthly Operating Report for Beaver Valley, Units 1 & 22002-04-0505 April 2002 March 2002 Monthly Operating Report for Beaver Valley, Units 1 & 2 L-02-026, February 2002 Monthly Operating Report for Beaver Valley Units 1 & 22002-03-0707 March 2002 February 2002 Monthly Operating Report for Beaver Valley Units 1 & 2 2005-09-09
[Table view] |
Text
FENO C ._~
Beaver Valley Power Station
- P. O.Box4 Shippingport, PA 15077 L-05-024 February 8, 2005 Beaver Valley Power Station Unit I - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. NPF-73 Monthly Operating Rep ort U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:
In accordance with NRC Generic Letter 97-02, "Revised Contents of the Monthly Operating Report', .and Unit I and 2 Technical, Specification 6.9.4, the "Monthly Operating Report'" is submitted for Unit 1 and Unit 2 for the month of January, 2005. This information has also been inputted into the INPO Consolidated Data Entry (CDE) System. No regulatory commitments are contained in this submittal.
Respectfully, W. Pearce Vice-President BVPS DTJ/slp Encli Dsures ; > . t * .;.
.-~~ ~~~~. I' .:
'*1**'.
- I cc:; NRC.Regional Office , -. ,
- King of Prussia, PA-l;o. ; . . . .
, .. ~ .. 1, :' . :
frjvf/
OPERATING DATA REPORT DOCKET NO. 50-334 UNIT NAME Beaver Valley 1
.DATE Febr-uary 01,2005 .
COMPLETED BY David T. Jones ;
TELEPHONE 724-682-4962 REPORTING PERIO January 2005
- 1. Design Electrical Rating 835.00
- 2. Maximum Denendable Canacitv IMWe-Netl R81 .00
- - This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical ; 744.00 744.00 176,907.14
- 4. Number of Hours Generator On-line 744.00 744.00 174,361.14
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net ectrcal Energy Generated (MWHrs) _ 627,660.00 627,660.00 131,947,579.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments NONE.
1 2 Reason: Method:
A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)
F Administration G Operational Error (Explain)
H Other (Explain)
SUMMARY
The Unit began the report period operating at a nominal value of 100% output. On 1/24/05 at 0047 hours5.439815e-4 days <br />0.0131 hours <br />7.771164e-5 weeks <br />1.78835e-5 months <br />, the Unit began to reduce thermal power to less than 2652 MWt due to an inoperable Leading Edge Flow Meter (LEFM). A corresponding reduction in electrical output of approximately 8 MWe was achieved at 0130 hours0.0015 days <br />0.0361 hours <br />2.149471e-4 weeks <br />4.9465e-5 months <br /> on 1/24/05. Upon repair and return of the LEFM to operable status, the Unit commenced to return to full electrical and thermal power at 0024 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> on 1/28/05. Full power was achieved at 0120 hours0.00139 days <br />0.0333 hours <br />1.984127e-4 weeks <br />4.566e-5 months <br /> on 1/28/05. The Unit continued to operate at a nominal value of 100% output for the remainder of the report period.
Page 1 of 1
I OPERATING DATA REPORT DOCKET NO. 50-412 UNIT NAME Beaver Valle&y2 DATE FebruaryT01,2 5 COMPLETED BY David T. Jones TELEPHONE 724-682-4962 REPORTING PERIO January 2005
- 1. Design Electrical Rating 836.00
- 2. Maximum Dependable Capacity (MWe-Net) 831.00
- This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 744.00 127,136.48
- 4. Number of Hours Generator On-line 744.00 744.00 126,392.38
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical Energy Generated (MWHrs) _
627,916.00 627,916.00 99,762,146.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No. Date S Scheduled (Hours) Reason 1 Down 2 Comments NONE.
1 2 Reason: Method:
A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)
F Administration G Operational Error (Explain)
H Other (Explain)
SUMMARY
The Unit operated at a nominal value of 100% output for the entire report period.
Page 1 of 1
Text
FENO C ._~
Beaver Valley Power Station
- P. O.Box4 Shippingport, PA 15077 L-05-024 February 8, 2005 Beaver Valley Power Station Unit I - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. NPF-73 Monthly Operating Rep ort U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:
In accordance with NRC Generic Letter 97-02, "Revised Contents of the Monthly Operating Report', .and Unit I and 2 Technical, Specification 6.9.4, the "Monthly Operating Report'" is submitted for Unit 1 and Unit 2 for the month of January, 2005. This information has also been inputted into the INPO Consolidated Data Entry (CDE) System. No regulatory commitments are contained in this submittal.
Respectfully, W. Pearce Vice-President BVPS DTJ/slp Encli Dsures ; > . t * .;.
.-~~ ~~~~. I' .:
'*1**'.
- I cc:; NRC.Regional Office , -. ,
- King of Prussia, PA-l;o. ; . . . .
, .. ~ .. 1, :' . :
frjvf/
OPERATING DATA REPORT DOCKET NO. 50-334 UNIT NAME Beaver Valley 1
.DATE Febr-uary 01,2005 .
COMPLETED BY David T. Jones ;
TELEPHONE 724-682-4962 REPORTING PERIO January 2005
- 1. Design Electrical Rating 835.00
- 2. Maximum Denendable Canacitv IMWe-Netl R81 .00
- - This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical ; 744.00 744.00 176,907.14
- 4. Number of Hours Generator On-line 744.00 744.00 174,361.14
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net ectrcal Energy Generated (MWHrs) _ 627,660.00 627,660.00 131,947,579.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments NONE.
1 2 Reason: Method:
A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)
F Administration G Operational Error (Explain)
H Other (Explain)
SUMMARY
The Unit began the report period operating at a nominal value of 100% output. On 1/24/05 at 0047 hours5.439815e-4 days <br />0.0131 hours <br />7.771164e-5 weeks <br />1.78835e-5 months <br />, the Unit began to reduce thermal power to less than 2652 MWt due to an inoperable Leading Edge Flow Meter (LEFM). A corresponding reduction in electrical output of approximately 8 MWe was achieved at 0130 hours0.0015 days <br />0.0361 hours <br />2.149471e-4 weeks <br />4.9465e-5 months <br /> on 1/24/05. Upon repair and return of the LEFM to operable status, the Unit commenced to return to full electrical and thermal power at 0024 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> on 1/28/05. Full power was achieved at 0120 hours0.00139 days <br />0.0333 hours <br />1.984127e-4 weeks <br />4.566e-5 months <br /> on 1/28/05. The Unit continued to operate at a nominal value of 100% output for the remainder of the report period.
Page 1 of 1
I OPERATING DATA REPORT DOCKET NO. 50-412 UNIT NAME Beaver Valle&y2 DATE FebruaryT01,2 5 COMPLETED BY David T. Jones TELEPHONE 724-682-4962 REPORTING PERIO January 2005
- 1. Design Electrical Rating 836.00
- 2. Maximum Dependable Capacity (MWe-Net) 831.00
- This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 744.00 127,136.48
- 4. Number of Hours Generator On-line 744.00 744.00 126,392.38
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical Energy Generated (MWHrs) _
627,916.00 627,916.00 99,762,146.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No. Date S Scheduled (Hours) Reason 1 Down 2 Comments NONE.
1 2 Reason: Method:
A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)
F Administration G Operational Error (Explain)
H Other (Explain)
SUMMARY
The Unit operated at a nominal value of 100% output for the entire report period.
Page 1 of 1