Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20216G0881999-09-19019 September 1999 Proposed Tech Specs Pages,Changing TS 4.18.5.a.9 & Associated Bases for One Cycle of Operation Through End of Cycle 16 for Suppl Use of OTSG Repair Roll Technology ML20216G0721999-09-17017 September 1999 Proposed Tech Specs,Revising Once Through SG Tubing Surveillance Requirements to Provide Alternate Repair Criteria for Volumetric Integranular Attack ML20212F5851999-09-17017 September 1999 Proposed Tech Specs Pages,Changing TS by Revising Curie Limits for Radioactive Gas Storage Tanks ML20211P0061999-09-0707 September 1999 Proposed TS in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria ML20211B3291999-08-19019 August 1999 Proposed TS 4.18.3.a.4 Clarification Supporting Tube End Cracking Alternative Repair Criteria ML20211C1701999-08-18018 August 1999 Proposed Tech Specs Revising ESAS Low RCS Pressure Setpoint to Ensure That TS Adequately Bounds Safety Analysis ML20211C4101999-08-18018 August 1999 Proposed Tech Specs Removing Requiremets for Tube Repair (Sleeving) & Clarifying Requirements for Preservice & ISI of Tubes to Facilitate Replacement of Original SGs ML20210K5121999-07-29029 July 1999 Proposed Tech Specs,Revising Requirements Associated with Plant Station Batteries & DC Sources to 125 Vdc Switchyard Distribution Sys ML20210K3571999-07-29029 July 1999 Proposed Tech Specs Revising SRs Pertaining to ISI Requirements for SG Tube Circumferential Cracking at top-of-tubesheet During 2P99 Planned mid-cycle Outage ML20209H5811999-07-14014 July 1999 Proposed Tech Specs Revising RB Structural Integrity Requirements Re ISI Reporting for Containment Structures, Tendons & Anchorages ML20209H8701999-07-14014 July 1999 Proposed Tech Specs 6.2.2 & 6.2.2.h,replacing Functional Description of Operations Staff Middle Manager with Ref to Functional Description Assistant Operations Manager & Revising TS Table 6.2-1 Item 5 & TS 6.2.2.f ML20209H9721999-07-14014 July 1999 Proposed Tech Specs Changes for Elimination of Programmatic Requirements Associated with PASS & Regulatory Relief from PASS Requirements of NUREG-0737 & RG 1.97 ML20195D2371999-06-0101 June 1999 Proposed Tech Specs Re Surveillance Requirements & Applicable Bases Relevant to ISI Requirements for Portions of once-through SG (OTSG) Tubes Adjacent to Primary Cladding Region of tube-to Tubesheet Roll ML20206T2651999-05-14014 May 1999 Proposed Tech Specs Revising SG Tubing SRs ML20206Q1281999-05-10010 May 1999 Proposed Tech Specs Bases,Page B 2-2,discussing Guidance to Be Used When Applying Later Editions & Addendas of ASME Code to RCS Components ML20205P4081999-04-0909 April 1999 Proposed Tech Specs Changes,Revising Reactor Bldg Structural Integrity Requirements ML20205P6291999-04-0909 April 1999 Proposed Tech Specs Changes,Revising Battery Requirements ML20205P3731999-04-0909 April 1999 Revised Proposed TS Page 5-1 Re Design Features Conversion ML20205P6931999-04-0909 April 1999 Proposed Tech Specs Change,Adding Specification 3.0.6 & Associated Bases to ANO-2 ML20207C0631999-02-25025 February 1999 Proposed Tech Specs Change Revising Action 2 Associated with Table 3.3-1, Reactor Protective Instrumentation. Change Adds Footnote to Action 2 Allowing Startup with Functional Units Associated with Channel D Excore Inoperable ML20207M7561999-02-24024 February 1999 Proposed Tech Specs,Allowing Startup & Continued Operation of Plant with Channel D Detector Until New Detector Is Installed During mid-cycle Outage Scheduled for Nov 1999 ML20198K1341998-12-17017 December 1998 Corrected Tech Specs Pages to 980629 Application for Amend to License NPF-6 ML20198A3661998-12-0808 December 1998 Proposed Tech Specs B3/4 6-3 & B3/4 6-4,deleting All Requirements Associated with Sodium H Addition Sys & Adding New Requirements for Trisodium Phosphate to Be Stored in Containers Located on Floor of Cb ML20196B4381998-11-24024 November 1998 Proposed Tech Specs Pages,Changing Administrative Controls Section to Implement Consolidated QA Plan Manual & Clarifying Responsibilities on STA Position on Shift ML20153D8491998-09-17017 September 1998 Proposed Tech Specs 2.2.1,3.3.1.1 & 3.3.2.1 Re Operating Bypass Setpoint ML20236Y5081998-08-0606 August 1998 Proposed Tech Specs Section 3.3.4.B Re Sodium Hydroxide Tank Limits ML20236Y5251998-08-0606 August 1998 Proposed Tech Specs Section 3.1.3.2,revising Action Requirements for CEA Position Indicator Channels ML20236Y5951998-08-0606 August 1998 Proposed Tech Specs,Revising Requirements Associated W/Units 1 & 2 Control Room Emergency Ventilation Sys ML20236Q2781998-07-13013 July 1998 Proposed Tech Specs Re Safety Limits & Limiting Safety Settings ML20236G6921998-06-29029 June 1998 Proposed Tech Specs,Revising TS 3.4.2 & TS 3.4.12 Re Reactor Coolant Sys Safety Valves & Low Temp Overpressure Protection ML20236G5421998-06-29029 June 1998 Proposed Tech Specs,Revising Surveillance Testing Requirements for Unit 2 Direct Current Electrical Distribution Sys ML20236G4911998-06-29029 June 1998 Proposed Tech Specs Re MSSVs & Pressurizer Safety Valves ML20236G5631998-06-29029 June 1998 Proposed Tech Specs,Revising Table 3.3-4 to Provide Range of Acceptable Values for 4160 Volt Bus Loss of Voltage Values ML20217M2621998-04-30030 April 1998 Proposed Tech Specs Re DG Load Rejection Testing ML20217N6141998-04-30030 April 1998 Proposed Tech Specs 1.6.1,revising Definition of Quadrant Power Tilt ML20217M4871998-04-28028 April 1998 Proposed Tech Specs Changing Order of Channel Rotation During Outage for Scheduling Flexibility,While Still Requiring Rotation Schedule to Be Established for Operating Cycle ML20217P8141998-04-0101 April 1998 Proposed Tech Specs Re Upper Tubesheet Volumetric Indications to Remain in Svc for Cycle 15 ML20216J7841998-03-17017 March 1998 Proposed Tech Specs Bases Change Concerning Plant Protection Sys Matrix Logic Testing ML20203D1061998-02-18018 February 1998 Proposed Tech Specs Revising Surveillance Testing Requirements for Emergency Feedwater Sys ML20202G9771998-02-0909 February 1998 Proposed Tech Specs Pages,Allowing Use of Repair Roll Technology (Reroll) for Upper Tubesheet Region of SGs ML20197A8421997-12-12012 December 1997 Proposed Tech Specs Re Establishment of Alternate Repair Criteria for Outer Diameter Intergranular Attack in Upper Tubesheet of Unit 1 SGs ML20211C6441997-09-23023 September 1997 Proposed Tech Specs,Modifying RPS & ESFAS Trip Setpoint & Allowable Values for SG Low Pressure ML20211C8911997-09-23023 September 1997 Proposed Tech Specs Reducing Min Required Reactor Coolant Sys Flow Rate Requirements Until ANO-2 SGs Are Replaced ML20151J3371997-07-28028 July 1997 Proposed Tech Specs,Modifying Actions Associated W/Ts Table 3.3-1 for Reactor Protective Instrumentation & Table 3.3-3 for Esfa Sys Instrumentation ML20149K0551997-07-21021 July 1997 Proposed Tech Specs,Revising Surveillance Testing Requirements for Facility EFW Sys as Specified in Specification 4.7.1.2 ML20141C5641997-06-18018 June 1997 Proposed Tech Specs Changes Restoring Table 2 to Table II & Revision to One of Offsite Dose Calculation Manual, Pages Previously Submitted.Also Includes Amended Pages Modified to Amends Issued Since Change Request Submitted ML20141A8001997-05-0808 May 1997 Proposed Tech Specs 3/4.3.1 & 3/4.3.2 Requesting Removal of Reference to CE NPSD-576 ML20138H8521997-05-0202 May 1997 Proposed Tech Specs,Submitting Rev to Original TS Change Request to Reduce Limit Specified in Section 3.1.6.3.b for Leakage Through SG Tubes of Any One Sg,Per SG Tube Insp Surveillance Requirements ML20138D6411997-04-24024 April 1997 Proposed Tech Specs Revising Requirements for Sample Scope Initial Size & Expansion for Inservice Insp of Steam Generator Tube Sleeves ML20141H2621997-04-18018 April 1997 Proposed Tech Specs,Permitting Delay of Scheduled three-yr Inspections of Flywheels on All Four RCPs Until Completion of 2R13 Refueling Outage,Scheduled for Winter of 1998-99 1999-09-07
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20217N3171999-10-19019 October 1999 Rev 1,change 024-01-0 to OP-1903.011, Emergency Response Notifications ML20217J7641999-10-0505 October 1999 Rev 1 to Unit 1 Technical Requirement Manual, Replacing Index Page ML20216G0881999-09-19019 September 1999 Proposed Tech Specs Pages,Changing TS 4.18.5.a.9 & Associated Bases for One Cycle of Operation Through End of Cycle 16 for Suppl Use of OTSG Repair Roll Technology ML20212F5851999-09-17017 September 1999 Proposed Tech Specs Pages,Changing TS by Revising Curie Limits for Radioactive Gas Storage Tanks ML20216G0721999-09-17017 September 1999 Proposed Tech Specs,Revising Once Through SG Tubing Surveillance Requirements to Provide Alternate Repair Criteria for Volumetric Integranular Attack ML20211P0061999-09-0707 September 1999 Proposed TS in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria ML20211B3291999-08-19019 August 1999 Proposed TS 4.18.3.a.4 Clarification Supporting Tube End Cracking Alternative Repair Criteria ML20211C4101999-08-18018 August 1999 Proposed Tech Specs Removing Requiremets for Tube Repair (Sleeving) & Clarifying Requirements for Preservice & ISI of Tubes to Facilitate Replacement of Original SGs ML20211C1701999-08-18018 August 1999 Proposed Tech Specs Revising ESAS Low RCS Pressure Setpoint to Ensure That TS Adequately Bounds Safety Analysis ML20210N5541999-08-0404 August 1999 Rev 28,Permanent Change 4 to OP-1903.061, Communication Equipment Test ML20210N5571999-08-0404 August 1999 Rev 23,Permanent Change 5 to OP-1903.011, Emergency Response/Notifications ML20210K5121999-07-29029 July 1999 Proposed Tech Specs,Revising Requirements Associated with Plant Station Batteries & DC Sources to 125 Vdc Switchyard Distribution Sys ML20210K3571999-07-29029 July 1999 Proposed Tech Specs Revising SRs Pertaining to ISI Requirements for SG Tube Circumferential Cracking at top-of-tubesheet During 2P99 Planned mid-cycle Outage ML20209H5811999-07-14014 July 1999 Proposed Tech Specs Revising RB Structural Integrity Requirements Re ISI Reporting for Containment Structures, Tendons & Anchorages ML20209H8701999-07-14014 July 1999 Proposed Tech Specs 6.2.2 & 6.2.2.h,replacing Functional Description of Operations Staff Middle Manager with Ref to Functional Description Assistant Operations Manager & Revising TS Table 6.2-1 Item 5 & TS 6.2.2.f ML20209H9721999-07-14014 July 1999 Proposed Tech Specs Changes for Elimination of Programmatic Requirements Associated with PASS & Regulatory Relief from PASS Requirements of NUREG-0737 & RG 1.97 ML20195D2371999-06-0101 June 1999 Proposed Tech Specs Re Surveillance Requirements & Applicable Bases Relevant to ISI Requirements for Portions of once-through SG (OTSG) Tubes Adjacent to Primary Cladding Region of tube-to Tubesheet Roll ML20206T2651999-05-14014 May 1999 Proposed Tech Specs Revising SG Tubing SRs ML20206Q1281999-05-10010 May 1999 Proposed Tech Specs Bases,Page B 2-2,discussing Guidance to Be Used When Applying Later Editions & Addendas of ASME Code to RCS Components ML20206J8021999-05-0404 May 1999 PC-03 to Procedure/Work Plan 1904-002, Offsite Dose Projections Rdacs Computer Method ML20205P6931999-04-0909 April 1999 Proposed Tech Specs Change,Adding Specification 3.0.6 & Associated Bases to ANO-2 ML20205P3731999-04-0909 April 1999 Revised Proposed TS Page 5-1 Re Design Features Conversion ML20205P6431999-04-0909 April 1999 Revised Proposed Technical Requirement Manual Pages ML20205P4081999-04-0909 April 1999 Proposed Tech Specs Changes,Revising Reactor Bldg Structural Integrity Requirements ML20205P6291999-04-0909 April 1999 Proposed Tech Specs Changes,Revising Battery Requirements ML20207C0631999-02-25025 February 1999 Proposed Tech Specs Change Revising Action 2 Associated with Table 3.3-1, Reactor Protective Instrumentation. Change Adds Footnote to Action 2 Allowing Startup with Functional Units Associated with Channel D Excore Inoperable ML20207M7561999-02-24024 February 1999 Proposed Tech Specs,Allowing Startup & Continued Operation of Plant with Channel D Detector Until New Detector Is Installed During mid-cycle Outage Scheduled for Nov 1999 ML20198K1341998-12-17017 December 1998 Corrected Tech Specs Pages to 980629 Application for Amend to License NPF-6 ML20198A3661998-12-0808 December 1998 Proposed Tech Specs B3/4 6-3 & B3/4 6-4,deleting All Requirements Associated with Sodium H Addition Sys & Adding New Requirements for Trisodium Phosphate to Be Stored in Containers Located on Floor of Cb ML20196B4381998-11-24024 November 1998 Proposed Tech Specs Pages,Changing Administrative Controls Section to Implement Consolidated QA Plan Manual & Clarifying Responsibilities on STA Position on Shift ML20196C9761998-11-24024 November 1998 Rev 1 to Unit 2 Technical Requirements Manual ML20154D6681998-10-0101 October 1998 Rev 28 to Procedure/Work Plan 1904.002, Offsite Dose Projections Rdacs Computer Method ML20153D8491998-09-17017 September 1998 Proposed Tech Specs 2.2.1,3.3.1.1 & 3.3.2.1 Re Operating Bypass Setpoint ML20153H1651998-08-12012 August 1998 Rev 0 to ANO Units 1 & 2 Technical Requirements Manual ML20236Y5251998-08-0606 August 1998 Proposed Tech Specs Section 3.1.3.2,revising Action Requirements for CEA Position Indicator Channels ML20236Y5081998-08-0606 August 1998 Proposed Tech Specs Section 3.3.4.B Re Sodium Hydroxide Tank Limits ML20236Y5951998-08-0606 August 1998 Proposed Tech Specs,Revising Requirements Associated W/Units 1 & 2 Control Room Emergency Ventilation Sys ML20236Q2781998-07-13013 July 1998 Proposed Tech Specs Re Safety Limits & Limiting Safety Settings ML20236G6921998-06-29029 June 1998 Proposed Tech Specs,Revising TS 3.4.2 & TS 3.4.12 Re Reactor Coolant Sys Safety Valves & Low Temp Overpressure Protection ML20236G5421998-06-29029 June 1998 Proposed Tech Specs,Revising Surveillance Testing Requirements for Unit 2 Direct Current Electrical Distribution Sys ML20236G5631998-06-29029 June 1998 Proposed Tech Specs,Revising Table 3.3-4 to Provide Range of Acceptable Values for 4160 Volt Bus Loss of Voltage Values ML20236G4911998-06-29029 June 1998 Proposed Tech Specs Re MSSVs & Pressurizer Safety Valves ML20199F7211998-05-22022 May 1998 Rev 8 to Simulator Mod Control,Training Desk Guide 6.3 ML20217N6141998-04-30030 April 1998 Proposed Tech Specs 1.6.1,revising Definition of Quadrant Power Tilt ML20217M2621998-04-30030 April 1998 Proposed Tech Specs Re DG Load Rejection Testing ML20217M4871998-04-28028 April 1998 Proposed Tech Specs Changing Order of Channel Rotation During Outage for Scheduling Flexibility,While Still Requiring Rotation Schedule to Be Established for Operating Cycle ML20217P8141998-04-0101 April 1998 Proposed Tech Specs Re Upper Tubesheet Volumetric Indications to Remain in Svc for Cycle 15 ML20216J7841998-03-17017 March 1998 Proposed Tech Specs Bases Change Concerning Plant Protection Sys Matrix Logic Testing ML20203D1061998-02-18018 February 1998 Proposed Tech Specs Revising Surveillance Testing Requirements for Emergency Feedwater Sys ML20202G9771998-02-0909 February 1998 Proposed Tech Specs Pages,Allowing Use of Repair Roll Technology (Reroll) for Upper Tubesheet Region of SGs 1999-09-07
[Table view] |
Text
=. . - _ . - - .
1 r, .
.l
) ;!
i ANO-1 TECHNICAL SPECIFICATION
, PROPOSED CHANGE PAGES l.
t
+
t I
h l
l 8911060415 891026 PDR ADOCK.05000313 P PDC
e t
i ..
, The Degraded Voltage Monitoring relay settings are based on the short term s starting voltage protection as well as long term running voltage i protection. The 4.16 KV undervoltage relay setpoints are based on the I allowable starting voltage plus maximum system voltage drops to the motor terminals, which allows approximately 78% of motor rated voltage at the 1 motor terminals. The 460V undervoltage relay setpoint is based on long i term motor voltage requirements plus the maximum feeder voltage drop allowance resulting in a 92% setting of motor rated voltage.
The OPERABILITY of the accident monitoring instrumentation ensures that sufficient information is availatile on selected plant parameters to monitor
- and assess these variables during and following an accident. This capability is consistent with the recommendation of Regulatory Guide 1.97,
" Instrumentation for Light-Water-Cooled Nuclear Power Plants to Assess Plant Conditions During and Following an Accident," December 1975 and NUREG-0578, "TMI-2 Lessons Learned Task Force Status Report and Short-Term Recommendations."
The OPERABILITY of the chlorine detection system ensures that sufficient capability is available to promptly detect and initiate protective action in the event of an accidental chlorine release. This capability is required to protect control room personnel and is consistent with the recommendations of Regulatory Guide 1.95, " Protection of Nuclear Power Plant Control Room Operators against an Accidental Chlorine Release,"
February 1975.
The subcooled margin monitors (SMM), core-exit thermocouples (CET), Reactor Vessel Level Monitoring System (RVLMS), and Hot Leg Level Measurement System (HLLMS) are a result of the Inadequate Core Cooling (ICC) instrumentation required by Item II.F.2 NUREG-0737. The function of the ICC instrumentation is to increase the ability of the plant operators to diagnose the approach to and recovery from ICC. Additionally, they aid in tracking reactor coolant inventory. These instruments are included in the Technical Specifications at the request of NRC Generic Letter 83-37 and are not required by the accident analysis, nor to bring the plant to cold shutdown conditions.
REFERENCE FSAR, Section 7.1 l
l l
l Amendmant No. 60, 69, 91, 116 43b 1'
. . . - .. ,__;.
7 7;
', -s ; e. .. q
. v.
Table 3.5.1-1 (cont'd) ,
3 1 Po OTHER SAFETY RELATED SYSTEMS-E (cont'd) 1 -2 3 -4 5
. Po .
5 No. of Operator action-z channels Min.- Min. if conditions of-P No. of for sys-~ operable degree of column 3 or 4- ~
g Functional Unit channels- tem trip channels- redundancy' cannot be met _
M
- 13. In core Thermocouples 6/ core quadrant N/A 2/ core quadrant 0 Note 22 (core-exit thermocouples)
- 14. Reactor Vessel Level Monitoring System 2 N/A 1 0 Note 27 (RVLMS)
- 15. Hot Leg Level Measurement System (HLLMS) 2 N/A 1 0 - Note 27-C, S
s
..m. .,mm._%_ ., . ,_m-----ma-A--- a-- -
wy _. ,,g .gpg Y T-"-Tw* M "J6 "'-W t'"wT-
l Table 3.5.1-1 (cont'd) .
$ 23. With the number of operable Electronic (SCR) Trip relays one less than the total number of Electronic E (SCR) Trip relays in a channel, restore the inoperable Electronic (SCR) Trip relay to operable status in
$ 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or place the SCRs associated with the inoperable Electronic (SCR) Trip relay in trip in the next 3 hour. With two or more Electronic (SCR) Trip relays inoperable, place all Electronic (SCR) Trip relays 2: associated with that channel in trip in the next hour. This requirement does not apply to the Electronic <
. Trip channels associated with Group 8 Regulating Power Supply.
b 24. With the number of OPERABLE channels one less than the Total Number of Channels, STARTUP and/or POWER OPERATIGN may proceed provided the following conditions are satisfied:
- a. Within 1 hour:
- 1. Place the inoperable channel in the tripped condition, or
- 2. Remove power supplied to the control rod trip device associated with the inoperable channel.
- b. One additional channel may be bypassed for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for surveillance testing and the inoperable channel above may be bypassed for up to 30 minutes in any 24-hour period when necessary to test the 3
trip breaker associated with the logic of the channel being tested. The inoperable channel above j jp shall not be bypassed to test the logic of a channel of the trip system associated with the inoperable channel.
- 25. With one of the Control Rod Drive Trip Breaker diverse trip features (undervoltage or shunt trip attachment) inoperable, restore it to OPERABLE status in 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or place the breaker in trip in the next hour.
- 26. Interrupts motor power to the Safety Groups of control rods only.
- 27. The channel operability of the RVLMS is defined as a minimum of three sensors in the upper plerum region and two sensors in the dome region operable. The channel operability of the HLLMS is defined as a minimum of one wide range and any two of the narrow range transmitters in the same channel operable.
With the number of OPERABLE channels one less than the Minimum Operable Channets, operation may continue. A Special Report must be prepared and submitted to the NRC, pursuant to Specification 6.12.5, within 30 days describing the cause of the inoperability and plan and schedule for restoring both channels to OPERABLE status during the next scheduled refueling outage.
-1
~~:
Table 4.1-1 (Cont. ) .
% Channel Description Check -Test Calibrate Remarks E
5 d. SG A High Range Level S M -R 5 High-high z
? e. SG B High Range Level S M R en High-high in 57. Containment High Range D M R
. Radiation Monitors
. 58. Containment Pressure-High M NA R
- 59. Containment Water Level-Wide M NA R Range U
" 60. Low Temperature Overpressure NA R R Protection Alarm Logic
- 61. Core-exit Thermocouples M NA R
, k 62. Electronic (SCR) Trip Relays NA M NA
- 63. RVLMS M NA R
- 64. HLLMS M NA R NOTE:
S - Each Shift T/W - Twice per Week R - Once every 18 months W - Weekly Q- Quarterly PC - Prior to going Critical if not M - Monthly P- Prior to each done within previous 31 days D - Daily startup if not done NA - Not Applicable previous week B/M - Every 2 months
gcq ..} . > '
~
n
- t. , q ,
\
>.\
0: -
~
a.
l
'.i .: h .- Inoperable' Fire Detection Instrumentation, Specification 3.5.5.2.. -
u
'3
.i.. Inoperable Fire Suppression Systems, Specifications 3.17.2, 3.18.2, -;
and 3.19.2. '
J ji Degraded.' Auxiliary Electrical Systems, Specification 3.7.2.H. -,
[
- k. . Inoperable' Inadequate' Core Cooling (ICC) Instrumentation, Specification Table 3,5.1-1, Items.14 and 15.
' ']
i 3
L ,
a-l' t 2
i a.', , 4 y ;
I 1 I
,.- . ~
;
r .
1 L l i,. i n i
- s .
4 l 9 '
s
' } r i
j.
l 1
4 l
l
- t. ,
.i t
i
;
a f
i, P
1 4
jf Z
Amendment'No. 118 146b w w wa.w, ap-. S Y t tT -e"y'.--*-r"" -T t '*7 T "7g 'm we?-T'*w'm T w' T D'yv'a-*T-"- -TWh'
IT.r ;'~
.,, a l.
j.
,4'
- f. -
L l
ANO-2 TECHNICAL SPECIFICATION PROPOSED CHANGE PAGES 2
l i,
i 1
l:
i i'
l l
l l
.(
.. f
~n TABLE 3.3-10 (Con't) - - ;
y POST-ACCIDENT MONITORING INSTRUMENTATION E
m MINIMUM
' CHANNELS E INSTRUMENT OPERABLE Z
m 13. In Core Thermcouples (Core-Exit Thermocouples). 2/ core quadrant
- 14. Reactor Vessel Level Monitoring System (RVLMS) 1*
1 4
ss Y
8 a ___
E a
it 8
e 5
- The channel operability of the RVLMS is defined as a minimum of two sensors in the upper plenum region g and one sensor in the dome region operable. If both channels are inoperable, operation may continue.
A Special Report must be prepared and submitted to the NRC, pursuant to Specification 6.9.2, within 30 days describing the cause of the inoperability and plan and schedule for restoring both channels to OPERABLE status during the next scheduled refueling outage.
1
~ _ _ . . , _ _ . . , . . _ . . _ . . ., . . . - -_. . , , , .
, ?==73 _ ;
- . 2-TABLE 4.3-10 (Con't)
POST-ACCIDENT MONITORING INSTRUMENTATION SURVEILLANCE REQUIREMENTS ^
E
$ CHANNEL CHANNEL INSTRUMENT CHECK CALIBRATION-E 13. In Core Thermocouples (Core-Exit Thermocouples) M R m 14. Reactor Vessel Level Monitoring System (RVLMS) M R R
s
. O 3
- E
- &
a e
- 4 +
7;" . -. ,
y c ,
.. ;
' ADMINISTRATIVE CONTROLS' I) 1. Radiological Environmental Monitoring Sample Analysis, Specification 3.12.1.
m.. Unplanned Offsite Release during one hour period of 1) more than 1
'L curie of radioactive material in liquid effluents, 2) more than 150 curies of noble gas in gaseous effluents, or 3) more than 0.05 curies of radioiodine in gaseous effluents. This report shall be submitted within 30 days of the occurrence of the event and shall include the following information:
- 1. Description of the occurrence.
- 2. Identify the cause(s) of exceeding the limit (s).
3 .. Explain corrective action (s) taken to mitigate occurrence.
- 4. Defino action (s) taken to prevent recurrence.
5.~ Summary of the consequence (s) of occurrence,
- n. Inoperable Reactor Vessel Level Monitoring System (RVLMS),
Specification 3.3, Table 3.3-10 Item 14.
SEMI-ANNUAL RADIOACTIVE EFFLUENT RELEASE REPORT
- 6.9.3 Routine radioactive effluent release reports covering the operating of the unit during the previous 6 months of operations shall be submitted within 60 days after January 1 and July 1 of each year.
*A single submittal may be made for a multiple unit station. The submittal .
should combine those sections that are common to all units at the station; however, for units with separate radwaste system, the submittal shall specify the releases of radioactive material from each unit.
l ARKANSAS-UNIT 2 6-19a Amendment No. 91, 94