Letter Sequence Other |
---|
TAC:MC6285, Increase Flexibility in Mode Restraints, Steam Generator Tube Integrity, Addition of New Tech Spec on RCS Boron Limits and Revisions to Tech Spec 3.3.1 to Address Rwfs, Implement 10 CFR 50, Appendix J, Option B, Provide Actions for One Steam Supply to Turbine Driven Afw/Efw Pump Inoperable, Changes to Reflect Revision of 10 CFR 50.55A, Elimination of Hydrogen Recombiners and Change to Hydrogen and Oxygen Monitors, TSTF-1, Allow Time for Stabilization After Reducing Power Due to Qptr Out of Limit, Correct Bases Change Made by TSTF-283, TSTF-21, TSTF-38 (Approved, Closed) TAC:MC6286, Increase Flexibility in Mode Restraints, Steam Generator Tube Integrity, Addition of New Tech Spec on RCS Boron Limits and Revisions to Tech Spec 3.3.1 to Address Rwfs, Implement 10 CFR 50, Appendix J, Option B, Provide Actions for One Steam Supply to Turbine Driven Afw/Efw Pump Inoperable, Changes to Reflect Revision of 10 CFR 50.55A, Elimination of Hydrogen Recombiners and Change to Hydrogen and Oxygen Monitors, TSTF-1, Allow Time for Stabilization After Reducing Power Due to Qptr Out of Limit, Correct Bases Change Made by TSTF-283, TSTF-21, TSTF-38 (Approved, Closed) TAC:MC6579, Increase Flexibility in Mode Restraints, Steam Generator Tube Integrity, Addition of New Tech Spec on RCS Boron Limits and Revisions to Tech Spec 3.3.1 to Address Rwfs, Implement 10 CFR 50, Appendix J, Option B, Provide Actions for One Steam Supply to Turbine Driven Afw/Efw Pump Inoperable, Changes to Reflect Revision of 10 CFR 50.55A, Elimination of Hydrogen Recombiners and Change to Hydrogen and Oxygen Monitors, TSTF-1, Allow Time for Stabilization After Reducing Power Due to Qptr Out of Limit, Correct Bases Change Made by TSTF-283, TSTF-21, TSTF-38 (Approved, Closed) TAC:MC6612, Increase Flexibility in Mode Restraints, Steam Generator Tube Integrity, Addition of New Tech Spec on RCS Boron Limits and Revisions to Tech Spec 3.3.1 to Address Rwfs, Implement 10 CFR 50, Appendix J, Option B, Provide Actions for One Steam Supply to Turbine Driven Afw/Efw Pump Inoperable, Changes to Reflect Revision of 10 CFR 50.55A, Elimination of Hydrogen Recombiners and Change to Hydrogen and Oxygen Monitors, TSTF-1, Allow Time for Stabilization After Reducing Power Due to Qptr Out of Limit, Correct Bases Change Made by TSTF-283, TSTF-21, TSTF-38 (Approved, Closed) TAC:MC6614, Increase Flexibility in Mode Restraints, Steam Generator Tube Integrity, Addition of New Tech Spec on RCS Boron Limits and Revisions to Tech Spec 3.3.1 to Address Rwfs, Implement 10 CFR 50, Appendix J, Option B, Provide Actions for One Steam Supply to Turbine Driven Afw/Efw Pump Inoperable, Changes to Reflect Revision of 10 CFR 50.55A, Elimination of Hydrogen Recombiners and Change to Hydrogen and Oxygen Monitors, TSTF-1, Allow Time for Stabilization After Reducing Power Due to Qptr Out of Limit, Correct Bases Change Made by TSTF-283, TSTF-21, TSTF-38 (Approved, Closed) TAC:MC6626, Increase Flexibility in Mode Restraints, Steam Generator Tube Integrity, Addition of New Tech Spec on RCS Boron Limits and Revisions to Tech Spec 3.3.1 to Address Rwfs, Implement 10 CFR 50, Appendix J, Option B, Provide Actions for One Steam Supply to Turbine Driven Afw/Efw Pump Inoperable, Changes to Reflect Revision of 10 CFR 50.55A, Elimination of Hydrogen Recombiners and Change to Hydrogen and Oxygen Monitors, TSTF-1, Allow Time for Stabilization After Reducing Power Due to Qptr Out of Limit, Correct Bases Change Made by TSTF-283, TSTF-21, TSTF-38 (Approved, Closed) TAC:MC6783, Increase Flexibility in Mode Restraints, Steam Generator Tube Integrity, Addition of New Tech Spec on RCS Boron Limits and Revisions to Tech Spec 3.3.1 to Address Rwfs, Implement 10 CFR 50, Appendix J, Option B, Provide Actions for One Steam Supply to Turbine Driven Afw/Efw Pump Inoperable, Changes to Reflect Revision of 10 CFR 50.55A, Elimination of Hydrogen Recombiners and Change to Hydrogen and Oxygen Monitors, TSTF-1, Allow Time for Stabilization After Reducing Power Due to Qptr Out of Limit, Correct Bases Change Made by TSTF-283, TSTF-21, TSTF-38 (Approved, Closed) TAC:MC6792, Increase Flexibility in Mode Restraints, Steam Generator Tube Integrity, Addition of New Tech Spec on RCS Boron Limits and Revisions to Tech Spec 3.3.1 to Address Rwfs, Implement 10 CFR 50, Appendix J, Option B, Provide Actions for One Steam Supply to Turbine Driven Afw/Efw Pump Inoperable, Changes to Reflect Revision of 10 CFR 50.55A, Elimination of Hydrogen Recombiners and Change to Hydrogen and Oxygen Monitors, TSTF-1, Allow Time for Stabilization After Reducing Power Due to Qptr Out of Limit, Correct Bases Change Made by TSTF-283, TSTF-21, TSTF-38 (Approved, Closed) |
Results
Other: L-07-086, Implementation of Beaver Valley, Units 1 & 2, Improved Technical Specification Amendment Nos. 278 (Unit 1) and 161 (Unit 2), ML060940413, ML060940429, ML061220200, ML070240291, ML070390057, ML070390061, ML070390530
|
MONTHYEARML0609404132006-03-0303 March 2006 ITS Conversion SE - BVPS Doc. Table M Project stage: Other ML0609404162006-03-0303 March 2006 ITS Conversion SE - BVPS Doc Table L Project stage: Acceptance Review ML0609404102006-03-30030 March 2006 Improved TS Conversion Safety Evaluation Project stage: Approval ML0609404112006-03-30030 March 2006 ITS Conversion SE - BVPS Doc Table a Project stage: Acceptance Review ML0609404222006-03-30030 March 2006 ITS Conversion SE - BVPS Doc Table La Project stage: Acceptance Review ML0609404292006-03-30030 March 2006 ITS Conversion SE - BVPS Doc Table R Project stage: Other ML0609405152006-03-30030 March 2006 Issuance of Safety Evaluation by the Technical Specification Branch for the Conversion to the Improved Technical Specifications Project stage: Approval L-05-027, Supplement to License Amendment Request Nos. 296 and 169, Improved Standard Technical Specification Conversion2006-04-19019 April 2006 Supplement to License Amendment Request Nos. 296 and 169, Improved Standard Technical Specification Conversion Project stage: Supplement ML0612202002006-05-0909 May 2006 Beyond Scope Item No. 38 (TAC No'S. MC6791 and MC6792) Project stage: Other L-06-112, Supplement to License Amendment Request Nos. 296 and 169, Improved Standard Technical Specification Conversion2006-07-10010 July 2006 Supplement to License Amendment Request Nos. 296 and 169, Improved Standard Technical Specification Conversion Project stage: Supplement ML0630000862006-10-24024 October 2006 Supplement to License Amendment Request Nos. 296 and 169, Improved Standard Technical Specification Conversion Project stage: Supplement L-06-149, Improved Technical Specification (ITS) Conversion License Amendment Request2006-10-24024 October 2006 Improved Technical Specification (ITS) Conversion License Amendment Request Project stage: Request L-06-162, Supplement to License Amendment Request Nos. 296 and 169, Improved Standard Technical Specification Conversion2006-12-0707 December 2006 Supplement to License Amendment Request Nos. 296 and 169, Improved Standard Technical Specification Conversion Project stage: Supplement ML0636203822007-01-0404 January 2007 (BVPS-1 and 2) - Draft Safety Evaluation for the Conversion to the Improved Technical Specifications with Beyond-Scope Issues Project stage: Draft Approval ML0636204052007-01-0404 January 2007 (BVPS-1 and 2), Draft Safety Evaluation Project stage: Draft Approval L-07-010, License Amendment Request Nos. 296 and 169, Improved Standard Technical Specification Conversion, Draft Amendment and Safety Evaluation Comments2007-02-0101 February 2007 License Amendment Request Nos. 296 and 169, Improved Standard Technical Specification Conversion, Draft Amendment and Safety Evaluation Comments Project stage: Draft Request ML0702402912007-02-0505 February 2007 Environmental Assessment and Finding of No Significant Impact for the Proposed Conversion to the Improved Technical Specifications (TAC Nos. MC6285, MC6286, MC6579-MC6612, MC6614-MC6626, MC6783-MC6792) Project stage: Other ML0701605932007-02-21021 February 2007 ITS Conversion Amendment and Safety Evaluation Project stage: Approval ML0703900192007-02-21021 February 2007 BVPS Doc Table a Project stage: Acceptance Review ML0703900242007-02-21021 February 2007 BVPS Doc Table L Project stage: Acceptance Review ML0703900512007-02-21021 February 2007 BVPS Doc Table La Project stage: Acceptance Review ML0703900572007-02-21021 February 2007 BVPS Doc Table M Project stage: Other ML0703900612007-02-21021 February 2007 BVPS Doc Table R Project stage: Other ML0703902842007-02-21021 February 2007 Improved Technical Specifications Project stage: Acceptance Review ML0703905302007-02-21021 February 2007 BVPS Operating License Project stage: Other L-07-086, Implementation of Beaver Valley, Units 1 & 2, Improved Technical Specification Amendment Nos. 278 (Unit 1) and 161 (Unit 2)2007-06-28028 June 2007 Implementation of Beaver Valley, Units 1 & 2, Improved Technical Specification Amendment Nos. 278 (Unit 1) and 161 (Unit 2) Project stage: Other 2006-05-09
[Table View] |
|
---|
Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML24057A0782024-03-0101 March 2024 Amendments to Indemnity Agreements - Enclosure 2 ML24057A0772024-03-0101 March 2024 Conforming License Amendments - Enclosure 1 ML23198A3592023-10-0202 October 2023 Issuance of Amendment Nos. 322 and 212 Analytical Methodology to the Core Operating Limits Report for a Full Spectrum Loss of Coolant Accident (EPID L-2022-LLA-0129) - Nonproprietary ML23237B4412023-09-29029 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Federal Register Notice, Direct and Indirect License Transfer Issuance Order ML23237B4282023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Enclosure 2, Draft Conforming License Amendments ML23237B4302023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Enclosure 4, Safety Evaluation for Transfer of Licenses and Draft Conforming License Amendments (EPID L-2023-LLM-0000) (Public) ML23102A1472023-05-22022 May 2023 Issuance of Amendment Nos. 321 and 211 Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time ML23019A0032023-03-16016 March 2023 Issuance of Amendment Nos. 320 and 210 Adoption of Technical Specifications Task Force (Tstf) Traveler Tstf-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML23062A5212023-03-0606 March 2023 Issuance of Amendment No. 319 Revise Technical Specification (TS) 3.5.2, ECCS Operating, Limiting Condition for Operation (LCO) 3.5.2, ML22277A8142022-10-0707 October 2022 Correction of Errors in Safety Evaluation Associated with License Amendment Nos. 315 and 205 Regarding Changes to the Emergency Preparedness Plan ML22210A0102022-09-16016 September 2022 Energy Harbor Fleet- Issuance of Amendments Regarding Adoption of TSTF 554, Revise Reactor Coolant Leakage Requirements ML22222A0862022-09-0101 September 2022 Issuance of Amendment Nos. 317 and 208 Revise Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start and Bus Separation Instrumentation ML22140A2092022-06-28028 June 2022 Issuance of Amendment No. 207 Correct TS 3.1.7 Change Made by TSTF-547 ML22095A2352022-05-10010 May 2022 Issuance of Amendment Nos. 316 and 206 Revise Technical Specification 5.6.3, Core Operating Limits Report (COLR) ML21286A7822022-05-0606 May 2022 Issuance of Amendment Nos. 315 and 205 Regarding Changes to the Emergency Plan ML22077A1342022-05-0202 May 2022 Issuance of Amendment Nos. 314 and 204 Revise Technical Specifications to Adopt TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ML21320A3592021-11-23023 November 2021 Correction to License Page 4 ML21197A0092021-11-0101 November 2021 Issuance of Amendment Nos. 313 and 203 Reactor Coolant System, Pressure and Temperature Limits Report ML21214A2752021-10-15015 October 2021 Issuance of Amendment Nos. 312 and 202 Atmospheric Dump Valves ML21153A1762021-06-30030 June 2021 Issuance of Amendment No. 201 Revision of Technical Specifications Related to Steam Generator Tube Inspection, and Repair Methods ML21075A1132021-04-16016 April 2021 Issuance of Amendment Nos. 311, 200, and 302 to Incorporate the Applicable Standard Technical Specification 5.2.2, Unit Staff, Into the Technical Specifications ML21070A0002021-03-22022 March 2021 Issuance of Amendment 310, Revise Technical Specification 5.5.5.1, Unit 1 SG Program, to Defer Spring 2021 Refueling Outage Steam Generator Inspections to Fall 2022 Refueling Outage ML20346A0222021-03-10010 March 2021 Issuance of Amendment Nos. 309 and 199 to Change Technical Specifications to Implement New Surveillance Methods for the Heat Flux Hot Channel Factor ML20335A0522021-02-18018 February 2021 Issuance of Amendment Nos. 308 and 198 to Modify Certified Fuel Handler Related Technical Specifications for Permanently Defueled Condition ML21034A3892021-02-18018 February 2021 Correction to Amendment Nos. 307 and 197 to Add Containment Sump Technical Specifications to Address Generic Safety Issue 191 Issues ML21014A3042021-02-0505 February 2021 Correction to Amendment Nos. 306 and 196 to Remove License Conditions B and C Related to the Irradiated Fuel Management Plans ML20345A2362021-01-28028 January 2021 Issuance of Amendment Nos. 307 and 197 to Add Containment Sump Technical Specifications to Address GSI-191 Issues ML21014A1142021-01-12012 January 2021 Correction Letter Notification from Licensee ML20335A0232020-12-28028 December 2020 Issuance of Amendment Nos. 306 and 196 to Remove License Conditions B and C Related to the Irradiated Fuel Management Plans ML20285A2662020-10-21021 October 2020 Correction to Safety Evaluation for Amendment Nos. 305 and 195 Issued September 23, 2020, Modify Primary and Secondary Coolant Activity Technical Specifications ML20213A7312020-09-23023 September 2020 Issuance of Amendment Nos. 305 and 195 to Modify Primary and Secondary Coolant Activity Technical Specifications ML20080H7112020-03-23023 March 2020 Correction Letter for Conforming License Amendments Nos. 304 and 194, Order Approving Transfer of Licenses and Conforming License Amendments ML20030A4402020-02-27027 February 2020 Issuance of Amendment Nos. 304, 194, 299, and 187; Order Approving Transfers of Facility Operating Licenses and Independent Spent Fuel Storage Installation General Licenses and Conforming Amendments ML19326A7592019-12-0202 December 2019 Firstenergy Nuclear Operating Company - Non-Proprietary, Letter & Encl 2-5, Order Approving Direct and Indirect Transfer of Licenses and Draft Conforming Amendments for Beaver Valley Units 1 and 2, Davis-Besse Unit 1, and Perry Unit 1 ML18348B2062019-02-25025 February 2019 Issuance of Amendment No. 193 Revise Steam Generator Technical Specifications ML18179A4672018-07-30030 July 2018 FENOC-Beaver Valley Power Station, Unit No. 1 and 2; Davis-Besse Nuclear Power Station, Unit 1, and Perry Nuclear Power Plant, Unit 1 - Issuance of Amendments Request to Adopt TSTF-529, Clarify Use and Application Rules ML18099A2322018-04-18018 April 2018 Correction of an Error in the Renewed Facility Operating License No. DPR-66 Associated with License Amendment No. 301 CAC No. MF3301; EPID L-2013-LLF-0001) ML18022B1162018-03-0101 March 2018 Issuance of Amendment Nos. 302 and 191 Regarding the Use of Optimized Zirlo Fuel Rod Cladding (CAC Nos. MF9580 and MF9581; EPID L-2017-LLA-0201) ML17291A0812018-01-22022 January 2018 Issuance of Amendments Transition to NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (CAC Nos. MF3301 and MF3302; EPID L-2013-LLF-0001) ML18016A1032018-01-19019 January 2018 Correction of Errors in Safety Evaluation Associated with License Amendment Nos. 300 and 189 (CAC Nos. MF8448 and MF8449; EPID L-2016-LLA-0011 and EPID L-2017-LRO-0069) ML17216A5702017-10-12012 October 2017 Issuance of Amendments Emergency Action Level Scheme Changed Based on NEI 99-01, Revision 6 (CAC Nos. MF8448 and MF8449; EPID L-2016-LLA-0011) ML17221A2802017-08-16016 August 2017 Issuance of Amendments to Adopt Technical Specifications Task Force (TSTF) Traveler 547, Revision 1 ML17157B2842017-06-0707 June 2017 Correction to Conforming Amendment No. 187 Order to Transfer License ML17115A1232017-05-30030 May 2017 Issuance of Amendment Application for Order to Transfer License and Conforming Amendment ML17081A5092017-05-11011 May 2017 ISFSI, Davis-Besse ISFSI, Perry Nuclear Power Plant, Perry Nuclear Power Plant ISFSI - Issuance of Amendments Re. Application to Revise Technical Specifications to Adopt TSTF-545 Revision 3 ML17081A4332017-04-14014 April 2017 Nonproprietary, Order Approving Transfer of License and Conforming Amendment ML16040A0842016-06-0707 June 2016 FENOC, Beaver Valley Power Station, Unit Nos. 1 and 2; and Davis-Besse Nuclear Power Station, Unit No. 1 - Issuance of Amendments Revision to Technical Specification 5.3.1, Unit Staff Qualifications ML15294A4392015-12-16016 December 2015 Issuance of Amendments License Amendment Request to Revise Steam Generator Technical Specifications (CAC Nos. MF6054 and 6055) ML15302A4332015-12-0101 December 2015 Issuance of Amendments Request to Change Cyber Security Implementation Plan Milestone 8 Completion Date ML15208A2852015-07-28028 July 2015 Correction to Amendment Nos. 294 and 182 Regarding Modification of Emergency Preparedness Plan Regarding the Emergency Planning Zone Boundary 2024-03-01
[Table view] |
Text
- 3a -
transactions shall have no effect on the license for the BVPS Unit 2 facility throughout the term of the license. (b) Further, the licensees are also required to notify the NRC in writing prior to any change in: (i) the term or conditions of any lease agreements
executed as part of these transactions; (ii) the BVPS Operating
Agreement, (iii) the existing property insurance coverage for BVPS
Unit 2, and (iv) any action by a lessor or others that may have adverse
effect on the safe operation of the facility. C. This license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations set forth in 10 CFR Chapter 1 and is subject to all
applicable provisions of the Act and to the rules, regulations, and orders of the
Commission now or hereafter in effect; and is subject to the additional conditions
specified or incorporated below: (1) Maximum Power Level FENOC is authorized to operate the facility at a steady state reactor core power level of 2900 megawatts thermal. (2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 161, and the Environmental Protection Plan contained in
Appendix B, both of which are attached hereto are hereby incorporated in the
license. FENOC shall operate the facility in accordance with the Technical
Specifications and the Environmental Protection Plan.
Amendment No. 161
(8) Detailed Control Room Design Review (DCRDR)
Deleted (9) Safety Parameter Display System (SPDS)
Deleted (10) Fire Protection Modifications (Section 9.5.1 of SER Supplement 6)
Deleted (11) Additional Conditions The Additional Conditions contained in Appendix D, as revised through Amendment No. 161, are hereby incorporated into this license. FENOC shall
operate the facility in accordance with the Additional Conditions. (12) Steam Generator Surveillance Interval Extension Deleted D. Exemptions The following exemptions are authorized by law and will not endanger life or property or the common defense and security, and certain special circumstances are present. With
the granting of these exemptions, the facility will operate, to the extent authorized herein, in conformity with the application, as amended, the provisions of the Act, and the rules
and regulations of the Commission. (1) The facility requires an exemption from the requirements of General Design Criterion (GDC) 4, Appendix A to 10 CFR 50. The staff has described in detail in
Supplement 4 and Supplement 5 to the Safety Evaluation Report the technical
basis and "special circumstances" associated with this exemption. The staff's
environmental assessment was published on March 27, 1987 (52 FR 9979).
Therefore, pursuant to 10 CFR 50.12(a)(1), 10 CFR 50.12(a)(2)(ii) and (iv),
Beaver Valley Power Station, Unit 2 is exempt from the requirements of GDC 4, Appendix A to 10 CFR 50 with respect to the dynamic loading effects associated
with the postulated pipe breaks described in detail in Section 3.6.3 of
Supplement 4 to the Safety Evaluati on Report. These dynamic loading effects include pipe whip, jet impingement, and break-associated dynamic transients.
Specifically, this eliminates the need to install jet impingement barriers and pipe
whip restraints associated with postulated pipe breaks in the pressurizer surge
line, reactor coolant bypass system,
Amendment No. 161 APPENDIX D ADDITIONAL CONDITIONS OPERATING LICENSE NO. NPF-73 FirstEnergy Nuclear Operating Company, FirstE nergy Nuclear Generation Corp., Ohio Edison Company, and The Toledo Edison Company shall comply with the following conditions on the
schedules noted below:
Amendment
Number Additional Condition Implementation Date 161 Schedule for New and Revised Surveillance Requirements (SRs)
The schedule for performing SRs that are new or revised in
Amendment No. 161 shall be as follows:
For SRs that are new in this amendment, the first performance is due at the end of the first surveillance interval, which begins
on the date of implementation of this amendment.
For SRs that existed prior to this amendment, whose intervals of performance are being reduced, the first reduced
surveillance interval begins upon completion of the first
surveillance performed after implementation of this
amendment.
For SRs that existed prior to this amendment, whose intervals of performance are being extended, the first extended
surveillance interval begins upon completion of the last
surveillance performed prior to implementation of this
amendment.
For SRs that existed prior to this amendment that have modified acceptance criteria, the first performance subject to
the modified acceptance criteria is due at the end of the first
surveillance interval that began on the date the surveillance
was last performed prior to the implementation of this
amendment.
The amendment
shall be implemented
within 150 days
from date of
issuance 161 Relocation of Certain Technical Specification Requirements
License Amendment No. 161 authorizes the relocation of certain
Technical Specifications to other licensee-controlled documents.
Implementation of this amendment shall include relocation of the
requirements to the specified documents, as described in
(1) Sections 4D and 4E of the NRC staff's Safety Evaluation, and
(2) Table LA, Removed Detail Changes, and Table R, Relocated
Specifications, attached to the NRC staff's Safety Evaluation, which is enclosed in this amendment.
The amendment
shall be implemented
within 150 days
from date of
issuance
4 Amendment No. 161
(3) FENOC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess and use at any time any byproduct, source and special nuclear material
as sealed neutron sources for reactor startup, sealed sources for reactor
instrumentation and radiation monitoring equipment calibration, and as fission
detectors in amounts as required;
(4) FENOC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess and use in amounts as required any byproduct, source, or special
nuclear material without restriction to chemical or physical form, for sample
analysis or instrument calibration or associated with radioactive apparatus or
components;
(5) FENOC, pursuant to the Act and 10 CFR Parts 30, and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by
the operation of the facility.
C. This amended license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter 1: Part 20, Section
30.34 of Part 30, Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50, and
Section 70.32 of Part 70; and is subject to all applicable provisions of the Act and to the
rules, regulations, and orders of the Commission now or hereafter in effect; and is
subject to the additional conditions specified or incorporated below:
(1) Maximum Power Level
FENOC is authorized to operate the facility at a steady state reactor core power level of 2900 megawatts thermal.
(2) Technical Specifications
The Technical Specifications contained in Appendix A, as revised through Amendment No. 278, are hereby incorporated in the license. The licensee shall
operate the facility in accordance with the Technical Specifications.
(3) Auxiliary River Water System
(Deleted by Amendment No. 8)
Amendment No. 278
(6) Systems Integrity
FENOC shall implement a program to reduce leakage from systems outside containment that would or could contain highly radioactive fluids during a serious
transient or accident to as low as practical levels. This program shall include the
following:
- 1. Provisions establishing preventive maintenance and periodic visual inspection requirements, and
- 2. Integrated leak test requirements for each system at a frequency not to exceed refueling cycle intervals.
(7) Iodine Monitoring
FENOC shall implement a program whic h will ensure the capability to accurately determine the airborne iodine concentration in vital areas under accident
conditions. This program shall include the following:
- 1. Training of personnel,
- 2. Procedures for monitoring, and
- 3. Provisions for maintenance of sampling and analysis equipment.
(8) Backup Method for Determining Subcooling Margin
FENOC shall implement a program whic h will ensure the capability to accurately monitor the Reactor Coolant System subcooling margin. This program shall
include the following:
- 1. Training of personnel, and
- 2. Procedures for monitoring.
(9) Steam Generator Surveillance Interval Extension
Deleted per License Amendment No. 278.
Amendment No. 278
- 6a -
(10) Additional Conditions
The Additional Conditions contained in Appendix C, as revised through Amendment No. 278, are hereby incorporated into this license. FENOC shall operate the facility
in accordance with the Additional Conditions.
D. Physical Protection
FENOC shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans
including amendments made pursuant to prov isions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the
authority 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contains
Safeguards Information protected under 10 CFR 73.21 is entitled: "Beaver Valley Power
Station (BVPS) Physical Security Plan" submitted by letter September 9, 2004, and
supplemented September 30, 2004, and October 14, 2004.
E. All work and activities in connection with this project shall be performed pursuant to the provisions of the Commonwealth of Pennsylvania Clean Streams Acts of June 24, 1913, as
amended and of June 22, 1937, as amended, and in accordance with all permits issued by
the Department of Environmental Resources of the Commonwealth of Pennsylvania.
F. This amended license is effective as of the date of issuance and shall expire at midnight on January 29, 2016.
FOR THE NUCLEAR REGULATORY COMMISSION
ORIGINAL SIGNED BY R. S. BOYD Roger S. Boyd, Director Division of Project Management Office of Nuclear Reactor Regulation
Date of Issuance: July 2, 1976
Amendment No. 278 APPENDIX C ADDITIONAL CONDITIONS OPERATING LICENSE NO. DPR-66
FirstEnergy Nuclear Operating Company and FirstEner gy Nuclear Generation Corp. shall comply with the following conditions on the schedules noted below:
Amendment
Number Additional Condition Implementation Date 278 Schedule for New and Revised Surveillance Requirements (SRs)
The schedule for performing SRs that are new or revised in
Amendment No. 278 shall be as follows:
For SRs that are new in this amendment, the first performance is due at the end of the first surveillance interval, which begins
on the date of implementation of this amendment.
For SRs that existed prior to this amendment, whose intervals of performance are being reduced, the first reduced
surveillance interval begins upon completion of the first
surveillance performed after implementation of this
amendment.
For SRs that existed prior to this amendment, whose intervals of performance are being extended, the first extended
surveillance interval begins upon completion of the last
surveillance performed prior to implementation of this
amendment.
For SRs that existed prior to this amendment that have modified acceptance criteria, the first performance subject to
the modified acceptance criteria is due at the end of the first
surveillance interval that began on the date the surveillance
was last performed prior to the implementation of this
amendment.
The amendment
shall be implemented
within 150 days
from date of
issuance 278 Relocation of Certain Technical Specification Requirements
License Amendment No. 278 authorizes the relocation of certain
Technical Specifications to other licensee-controlled documents.
Implementation of this amendment shall include relocation of the
requirements to the specified documents, as described in
(1) Sections 4D and 4E of the NRC staff's Safety Evaluation, and
(2) Table LA, Removed Detail Changes, and Table R, Relocated
Specifications, attached to the NRC staff's Safety Evaluation, which is enclosed in this amendment.
The amendment
shall be implemented
within 150 days
from date of
issuance
4 Amendment No. 278