ML11357A010
ML11357A010 | |
Person / Time | |
---|---|
Site: | Indian Point |
Issue date: | 12/23/2011 |
From: | Riverkeeper |
To: | Atomic Safety and Licensing Board Panel |
SECY RAS | |
Shared Package | |
ML11357A006 | List: |
References | |
RAS 21644, 50-247-LR, 50-286-LR, ASLBP 07-858-03-LR-BD01 | |
Download: ML11357A010 (24) | |
Text
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit #Contentions Addressed by ExhibitExhibit NameRIVR00001AllRiverkeeper Hearing Exhibit List ("RIV Exhibit List")RIV000002RK-TC-2Riverkeeper Initial Statement of Position Regarding Contention RK-TC Flow Accelerated Corrosion ("RK-TC-2 SOP")RIV000003RK-TC-2Pre-Filed Testimony of Joram Hopenfeld in Support of RK-TC-2 ("Hopenfeld Testimony RK-TC-2")RIV000004RK-TC-2Curriculum Vitae of Joram Hopenfeld ("Hopenfeld CV")RIV000005RK-TC-2Report of Joram Hopenfeld in Support of RK-TC-2 ("Hopenfeld RK-TC-2 Report")RIV000006RK-TC-2NRC Information Notice No 86-106, "Feed Water Line Break," December 16, 1986 ("NRC IN 86-106")RIV000007RK-TC-2NRC Bulletin 87-01, "Thinning Pipe Walls in Nuclear Plants," July 9, 1987
("NRC Bulletin 87-01")RIV000008RK-TC-2NRC Information Notice 1991-019, "Steam Generator Feed Water Distribution Piping Damage," March 12, 1991 ("NRC IN 1991-019")RIV000009RK-TC-2Monitoring Report 5-93-0042, Steam Generator Feedring Nozzle Through Wall Erosion, June 15, 1993 ("NRC MR 5-93-0042")RIV000010RK-TC-2NRC Information Notice 1997-084, "Rupture of Extraction Steam Piping,"
December 11, 1997 ("NRC IN 1997-084")RIV000011RK-TC-2NRC Information Notice 2006-008, "Secondary Piping Rupture at Mihama Power Station in Japan," March 16, 2006 ("NRC IN 2006-008")
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit #Contentions Addressed by ExhibitExhibit NameRIV000012RK-TC-2EPRI, Recommendations for an Effective Flow-Accelerated Corrosion Program, NSAC-202L-R3 ("EPRI NSAC-202L-R3")RIV000013RK-TC-2Safety Evaluation by the Office of Nuclear Reactor Regulations Related to Amendment No. 229 to Facility Operating License No. DPR-28 Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear Operations, Inc. (Vermont Power Station, Docket No. 50-571), at § 2.8.7.1, p. 190, ADAMS Accession No. ML060050028 ("VY Safety Eval")RIV000014RK-TC-2Aging Management Program Evaluation Report - Non-Class 1 Mechanical, IP-RPT-06-LRD07, Revision 5, March 18, 2009 ("AMP Eval Report Rev 5")RIV000015RK-TC-2EN-DC-315, Revision 3, Flow Accelerated Corrosion Program (March 1, 2010)
("Entergy FAC Program")RIV00016ARK-TC-2Graphs excerpted from CHECWORKS Reports ("CHECWORKS Wear Graphs Part 1")RIV00016BRK-TC-2Graphs excerpted from CHECWORKS Reports ("CHECWORKS Wear Graphs Part 2")RIV000017RK-TC-2V.K. Chexal, W.H. Layman, & J.S. Horowitz, Tackling the Single-Phase Erosion Corrosion Issue, To Be Presented at the American Power Conference April 18-20, 1988, Chicago Illinois (EPRI) ("Chexal APC")
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit #Contentions Addressed by ExhibitExhibit NameRIV000018RK-TC-2CHECWORKS TM Steam/Feedwater Application, Guidelines for Plant Modeling and Evaluation of Component Inspection Data, 1009599, Final Report, September 2004, IPECPROP00000271, at p.6-7 (IPECPROP00000334)
("CHECWORKS Proprietary Report 1009599")RIV000019RK-TC-2Rudolf H. Hausler, Flow Assisted Corrosion (FAC) and Flow Induced Localized Corrosion: Comparison and Discussion, at 1, 8 (RHH Rebuttal, June 2, 2008, Vermont Yankee License Renewal Proceeding, 06-849-03-LR ("Hausler VY Testimony")RIV000020RK-TC-2CSI, Technologies, Inc., Indian Point Unit 3 CHECWORKS SFA Model, Calculation No. 0705.100-01, Revision 2, August 2, 2011, at p.26 (excerpt re: LCF) ("IP3 CHECWORKS SFA Model Aug 2011")RIV000021RK-TC-2CSI, Technologies, Inc., Indian Point Unit 3 CHECWORKS SFA Model, Calculation No. 0705.100-01, Revision 2, August 2, 2011, Appendix K -
Components with Negative Time to Tcrit, IPEC00238096 ("CHECWORKS SFA Model Aug 2011 App K")RIV000022RK-TC-2Statement by Dr. F. Peter Ford, transcript of January 26, 2005 meeting of the ACRS Subcommittee on Thermal Hydraulics (January 26, 2005), at 198, ADAMS Accession No. ML050400613 ("2005 ACRS Transcript")
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit #Contentions Addressed by ExhibitExhibit NameRIV000023RK-TC-2NUREG/CR-6936, PNNL 16186,Probabilities of Failure and Uncertainty Estimate Information for Passive Components - a Literature Review (May 2007) ("NUREG/CR-6936")RIV000024RK-TC-2Entergy Engineering Report, Operating Experience Review Report, IP-RPT-06-LRD05, Rev. 3 (2008), IPEC00186046 ("Entergy Op Ex Rev Report")RIV000025RK-TC-2Daily DER Report, DER-01-01522, April 25, 2001, IPEC00020501 ("DER Report")RIV000026RK-TC-2Entergy Operations, Inc, Condition Report List, IPEC00185743 ("Condition Report List 1")RIV000027RK-TC-2Entergy Operations, Inc., Condition Report List, IPEC00092551 ("Condition Report List 2")RIV000028RK-TC-2Entergy Condition Report CR-IP2-2001-10525, IPEC00092616 ("Entergy CR-IP2-2001-10525")RIV000029RK-TC-2Entergy Condition Report CR-IP3-2006-02270, IPEC00025699 ("Entergy CR-IP3-2006-02270")RIV000030RK-TC-2Transcript of Meeting of Advisory Committee on Reactor Safeguards (Sept. 10, 2009), ADAMS Accession No. ML092670114, at 90-96 ("ACRS Mtg Transcript Sept 2009")
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit #Contentions Addressed by ExhibitExhibit NameRIV000031RK-TC-2Lynn R. Sykes, John G. Armbruster, Won-Young Kim, & Leonardo Seeber, Observations and Tectonic Setting of Historic and Instrumentally Located Earthquakes in the Greater New York City-Philadelphia Area, Bulletin of the Seismological Society of America, Vol. 98, No. 4, pp. 1696-1719, August 2008 ("Sykes Study")RIV000032RK-TC-2Generic Issue 199 (GI-199), Implications of Updated Probabilistic Seismic Hazard Estimates in Central and Eastern United States on Existing Plants Safety/Risk Assessment, August 2010, at Appendix D ("Seismic Sore-Damage Frequencies) ("NRC GI-199")RIV000033RK-TC-2Bill Dedman, What are the odds? US nuke plants ranked by quake risk, March 17, 2011 ("Dedman Article")RIV000034RK-TC-1BDr.Hopenfeld Pre-filed Testimony RIV000035RK-TC-1BDr. Hopenfeld ReportRIV000036RK-TC-1BWestinghouse "EnvFat User's Manual Version 1" IPECPROP00056785RIV000037RK-TC-1BOfficial Transcript, ACRS Subcommittee, 12/6/2006RIV000038RK-TC-1BNRC IN 2011-04RIV000039RK-TC-1BEntergy Nuclear Vt. Yankee, Affidavit of Kenneth C. Chang, 5/12/08RIV000040RK-TC-1BTaylor, EPRI R & D Status Report, Jan/Feb 1983RIV000041RK-TC-1BEntergy, Table of Environmental Correction Actions for Metal Fatigue, 11/6/07 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit #Contentions Addressed by ExhibitExhibit NameRIV000042RK-TC-1BDC Cook Charging Nozzle LR Fatigue Evaluations, IPECPROP00061294RIV000043RK-TC-1BDiablo Canyon Unit 1 Insurge/Outsurge Eval, IPECPROP00061179RIV000044RK-TC-1BNRC Bulletin 88-08RIV000045RK-TC-1BNRC Bulletin 88-08 Supp. 1RIV000046RK-TC-1BNRC Bulletin 88-08 Supp. 2RIV000047RK-TC-1BNRC IN 97-46RIV000048RK-TC-1BFinal Report of the NESC-Thermal Fatigue Project, EUR22763RIV000049RK-TC-1BEntergy Indian Point U3, FAC, 3RF13 Outage, 2005RIV000050RK-TC-1BWestinghouse, WCAP-14950, IPECPROP00059247RIV000051RK-TC-1BKwang Chu Kim, Journal of Mechanical Science/Technology, 2008RIV000052A-DRK-TC-1BCombustion Engineering, Inc., CENC-1110RIV000053RK-TC-1BCombustion Engineering, Inc., CENC-1122RIV000054RK-TC-1B letter from P. Bessette to D. Brancato, 10/18/11RIV000055RK-TC-1BWestinghouse CN-PAFM-09-64, IPECPROP00058077RIV000056RK-TC-1BSystems Standard Design Criteria, IPECPROP00059698RIV000057RK-TC-1BRAI Indian Point U2 and U3 LRA, 2/10/11RIV000058RK-TC-1BResponse to RAI, Indian Point U2 and U3, 3/28/11 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit #Contentions Addressed by ExhibitExhibit NameRIV000059RK-EC-3/CW-EC-1Riverkeeper and Clearwater Initial Statement of Position Regarding Consolidated Contention RK-EC-3/CW-EC-1 (Spent Fuel Pool Leaks) ("RK-EC-3-CW-EC-1 SOP")RIV000060RK-EC-3/CW-EC-1Testimony of Arnold Gundersen on Consolidated Contention RK-EC-3/CW-EC Spent Fuel Pool Leaks ("Gundersen Testimony")RIV000061RK-EC-3/CW-EC-1Testimony of Gillian Stewart on Consolidated Contention RK-EC-3/CW-EC-1
- Spent Fuel Pool Leaks ("Stewart Testimony")RIV000062RK-EC-3/CW-EC-1Curriculum Vitae of Arnold Gundersen ("Gundersen CV")RIV000063RK-EC-3/CW-EC-1Curriculum Vitae of Gillian Stewart ("Stewart CV")RIV000064RK-EC-3/CW-EC-1NUREG-1437, Revision 1, Generic Environmental Impact Statement for License Renewal of Nuclear Plants (July 2009) Draft Report for Comment
("GEIS Update")RIV000065RK-EC-3/CW-EC-1U.S. EPA, Radionuclides in Drinking Water: A Small Entity Compliance Guide (February 2002)RIV000066RK-EC-3/CW-EC-1GZA, GeoEnvironmental, Inc., Hydrogeologic Site Investigation Report, Indian Point Energy Center, January 7, 2008, IPEC00195418 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit #Contentions Addressed by ExhibitExhibit NameRIV000067RK-EC-3/CW-EC-1Indian Point Nuclear Generating Units 1 & 2 - NRC Inspection Report Nos. 05000003/2007010 and 05000247/2007010, EA-08-088, May 13, 2008RIV000068RK-EC-3/CW-EC-1Entergy, Groundwater Investigation Executive Summary, Indian Point Energy Center, Buchanan, NY (January 2008)RIV000069RK-EC-3/CW-EC-1Indian Point Nuclear Generating Unit 2 - NRC Special Inspection Report No. 05000247/2005011, March 16, 2006RIV000070RK-EC-3/CW-EC-1Indian Point Energy Center Status Report (Sept. 6, 2007)RIV000071RK-EC-3/CW-EC-1In the Matter of Entergy Nuclear Indian Point 2, LLC, and Entergy Nuclear Indian Point 3, LLC, and Entergy Nuclear Operations Inc's Joint Application for CWA § 401 Water Quality Certification, Prefiled Testimony of Matthew J.
Barvenik, Issue for Adjudication No. 3 - Radiological Materials (July 22, 2011)RIV000072RK-EC-3/CW-EC-1E-mail from Michael Rutkoske to Steven Verrochi (Entergy), Re: SFP Exams - What's Next? (Nov. 19, 2005), IPEC00065830RIV000073RK-EC-3/CW-EC-1Entergy, U2 SFP Leak Monitoring Wells and Underground Piping (3/31/06),
IPEC00063518RIV000074RK-EC-3/CW-EC-1Entergy, Problem Development Sheet - Groundwater, IPEC00207416 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit #Contentions Addressed by ExhibitExhibit NameRIV000075RK-EC-3/CW-EC-1E-mail from Ronald Sachatello to Donald Mayer (Entergy), Joseph Adler (TLG), Gary Hinrichs (Entergy), Re: IS THE POOL LEAK OFF COLLECTION BOX EFFECTIVE?, IPEC00063351RIV000076RK-EC-3/CW-EC-1GZA, GeoEnvironmental, Inc. Final IPEC Quarterly Long-Term Groundwater Monitoring Report, Quarter Two 2010 (Report No. 10) (February 15, 2011),
IPEC00227561RIV000077RK-EC-3/CW-EC-1Entergy Chart of Leak Locations, I PEC00059360RIV000078RK-EC-3/CW-EC-1IPEC Site Management Manual, IP-SMM, CY-110, Rev. 1, 8.6 RGWMP Quarterly Integrated Review Checklist (Quarter 1, 2009), IPEC00225217RIV000079RK-EC-3/CW-EC-1Annie Correal, Indian Pt. Broken Pipe Spurs Safety Worries, THE NEW YORK TIMES (March 1, 2009)RIV000080RK-EC-3/CW-EC-1IPEC Site Management Manual, IP-SMM, CY-110, Rev. 3, 8.6 RGWMP Quarterly Integrated Review Checklist (Quarter 1, 2010), IPEC00225219RIV000081RK-EC-3/CW-EC-1IPEC Site Management Manual, IP-SMM, CY-110, Rev. 1, 8.6 RGWMP Quarterly Integrated Review Checklist (Quarter 2, 2010), IPEC00225223RIV000082RK-EC-3/CW-EC-1Entergy, Nuclear Management Manual, EN-MA-125, Rev. 4, Attachment 9.1, Initial Investigation, Troubleshooting Plan for H-3 Investigation, Storm Drain System A, March/April 2009, IPEC00194517 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit #Contentions Addressed by ExhibitExhibit NameRIV000083RK-EC-3/CW-EC-1IPEC Site Management Manual, IP-SMM, CY-110, Rev. 3, 8.6 RGWMP Quarterly Integrated Review Checklist (Quarter 4, 2010), IPEC00233519RIV000084RK-EC-3/CW-EC-1IPEC Site Management Manual, IP-SMM, CY-110, Rev. 4, 10.7 RGWMP Quarterly Integrated Review Checklist (Quarter 1, 2011), IPEC00233515RIV000085RK-EC-3/CW-EC-1Indian Point Nuclear Generating Unit 3 - NRC Integrated Inspection Report 05000286/2011004 (November 7, 2011)RIV000086RK-EC-3/CW-EC-1Entergy correspondence, e-mails regarding approach to groundwater contamination, IPEC00067228, IPEC00065510, IPEC00130549, IPEC00062936RIV000087RK-EC-3/CW-EC-1Potential Sources of Tritium at IPEC & Inspection Method, IPEC00065506RIV000088RK-EC-3/CW-EC-1Supplemental Report of the Public Oversight Panel Regarding the Comprehensive Reliability Assessment of the Vermont Yankee Nuclear Power Plant, July 20, 2010RIV000089RK-EC-3/CW-EC-1GAO Report to Congressional Requesters, Nuclear Regulatory Commission, Oversight of Underground Piping Systems Commensurate with Risk, but Proactive Measures Could Help Address Future Leaks, GAO-11-563 (June
2011)RIV000090RK-EC-3/CW-EC-1Entergy Groundwater Well Data, Quarter 2, 2011, IPEC00225100 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit #Contentions Addressed by ExhibitExhibit NameRIV000091RK-EC-3/CW-EC-1Liquid Radioactive Release Lessons Learned Task Force Final Report, U.S. NRC (September 1, 2006)RIV000092RK-EC-3/CW-EC-1Coastal Fish & Wildlife Habitat Rating Form, Haverstraw BayRIV000093RK-EC-3/CW-EC-1National Research Council, Health Risks from Exposure to Low Levels of Ionizing Radiation: BEIR VII - Phase 2 (2006)RIV000094RK-EC-3/CW-EC-1Entergy E-mail from David Winslow (GZA) to Donald Mayer (Entergy), G. Hinrichs (Entergy), Re: Remedial Report (May 19, 2006), IPEC00064221RIV000095RK-EC-3/CW-EC-1Groundwater Investigation '06 Quarter 4 Activities and Results, IPEC00063899RIV000096RK-EC-3/CW-EC-1Entergy E-mail from Kathleen McMullin (Entergy) to various, Re: IPEC Status Report for Dec. 21RIV000097RK-EC-3/CW-EC-1Entergy Document, "Unit 1 Status for ENC Presentation notes," "Groundwater Status," IPEC00062939RIV000098RK-EC-3/CW-EC-1Letter from Kathryn Sutton (Counsel for Entergy) to Deborah Brancato (Riverkeeper), Re: Entergy Nuclear Operations, Inc. (Indian Point Nuclear Generating Units 2 and 3), Docket Nos. 50-247-LR and 50-286-LR (June 24, 2011)
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit #Contentions Addressed by ExhibitExhibit NameRIV000099RK-EC-3/CW-EC-1In the Matter of Entergy Nuclear Indian Point 2, LLC, and Entergy Nuclear Indian Point 3, LLC, and Entergy Nuclear Operations Inc's Joint Application for CWA § 401 Water Quality Certification, Combined Prefiled Rebuttal Testimony of Thomas C. Esselman, Ph.D., Matthew J. Barvenik, and Owen Hoffman, Ph.D., Radiological - Issue for Adjudication No. 3 (October 4, 2011)RIV000100RK-EC-3/CW-EC-1E-mail From Dara Gray (Entergy) to J. Noggle (NRC) (Jan. 24, 2007), Re:
Historical Sr Data (Exhibit RIV000100)
RIV000101RK-EC-3/CW-EC-1Haverstraw Water Supply Project DEIS, Draft EIS Chapter 2 Exhibit Submission DateDec. 22, 2011Dec. 22, 2011Dec. 22, 2011Dec. 22, 2011Dec. 22, 2011Dec. 22, 2011Dec. 22, 2011Dec. 22, 2011Dec. 22, 2011Dec. 22, 2011Dec. 22, 2011 Exhibit Submission DateDec. 22, 2011Dec. 22, 2011Dec. 22, 2011Dec. 22, 2011Dec. 22, 2011Dec. 22, 2011Dec. 22, 2011 Exhibit Submission DateDec. 22, 2011Dec. 22, 2011Dec. 22, 2011Dec. 22, 2011Dec. 22, 2011 Exhibit Submission DateDec. 22, 2011Dec. 22, 2011Dec. 22, 2011Dec. 22, 2011Dec. 22, 2011Dec. 22, 2011Dec. 22, 2011Dec. 22, 2011 Exhibit Submission DateDec. 22, 2011Dec. 22, 2011Dec. 22, 2011Dec. 22, 2011Dec. 22, 2011Dec. 22, 2011Dec. 22, 2011Dec. 22, 2011Dec. 22, 2011Dec. 22, 2011Dec. 22, 2011 Exhibit Submission DateDec. 22, 2011Dec. 22, 2011Dec. 22, 2011Dec. 22, 2011Dec. 22, 2011Dec. 22, 2011Dec. 22, 2011Dec. 22, 2011Dec. 22, 2011Dec. 22, 2011Dec. 22, 2011Dec. 22, 2011Dec. 22, 2011Dec. 22, 2011Dec. 22, 2011Dec. 22, 2011Dec. 22, 2011 Exhibit Submission DateDec. 22, 2011Dec. 22, 2011Dec. 22, 2011Dec. 22, 2011Dec. 22, 2011Dec. 22, 2011Dec. 22, 2011Dec. 22, 2011 Exhibit Submission DateDec. 22, 2011Dec. 22, 2011Dec. 22, 2011Dec. 22, 2011Dec. 22, 2011Dec. 22, 2011Dec. 22, 2011Dec. 22, 2011 Exhibit Submission DateDec. 22, 2011Dec. 22, 2011Dec. 22, 2011Dec. 22, 2011Dec. 22, 2011Dec. 22, 2011Dec. 22, 2011Dec. 22, 2011 Exhibit Submission DateDec. 22, 2011Dec. 22, 2011Dec. 22, 2011Dec. 22, 2011Dec. 22, 2011Dec. 22, 2011Dec. 22, 2011Dec. 22, 2011 Exhibit Submission DateDec. 22, 2011Dec. 22, 2011Dec. 22, 2011Dec. 22, 2011Dec. 22, 2011Dec. 22, 2011Dec. 22, 2011Dec. 22, 2011 Exhibit Submission DateDec. 22, 2011Dec. 22, 2011Dec. 22, 2011