CP-2009-03 - Final Exam Submittal Letter
ML091050283
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 03/04/2009
From: Flores R, Madden F W
Luminant Generation Co, Luminant Power
To: McKernon T O
NRC Region 4
References
50-445/09-301, 50-446/09-301, CP-200900355, TXX-09041
Download: ML091050283 (2)


Text

Rafael Flores Luminant Power Senior VIC. Preside nt P O B-J X 1002 & Chie f Nuclear Officer 6322 North FM 56

'afiwl.llores@ lurlllni1nl tom Glen Rose TX 76043 Luminant T 254 89 7 55 c ,0 C 8175 <}0403 F 25 ; 3;-66S;2 c Ref: 10 CFR 55.40 TXX-09041 March 4, 2009 u.s. Nuclear Regulatory Regional Admini strator, Region 612 East Lamar Boulevard, Suite Arlington, Texas ATTN: Mr. T.

COMANCHE PEAK STEAM ELECTRIC STATION DOCKET NOS. 50-445

& 50-446 TRANSMITIAL OF LICENSED OPERATOR EXAMINATION MATERIALS REFERENCE1) NRC letter from R yan Lantz to M. R. Blevins dated December 8,2008 2) NUREG-I021, Revision 9, Examiner Standard ES-201

Dear Mr. McKernon:

Enclosed please find the written and operational examinations for the initial operator licensing e xaminations scheduled for the week of March 30, 2009 at Comanche Peak Nuclear Power Plant (CPNPP) as reque sted in Reference

1. These examinations were developed based on the guidance in Reference 2. The enclo sures with this letter contain sensitive information which should be withh eld from public disclosure until after the examinations are complete.

Signed reactor operator and senior operator license applications certifying the completion of all required training will be submitted by March 13, 2009. If there are any question s concerning this submittal, contact Mr. Garry W. Struble at (254) 897-6628 or Mr. Eldon Thomas at (254) 897-5276.

A member of the STARS (Strateg ic Teaming and R es ource Sharing) AlliancCallaway ' Comanche Peak

  • Diablo Cany on
  • Palo Verde* SanOn ofre
  • South Texas Project* Wolf U.S. Nuclear Regulatory Commi ssion T XX-09041 Page 2 JRW Enclosures c -B.S. Mallett , Region IV clo R. Lantz, Region IV clo B. Singal, NRR clo Resident Inspectors, CPSES clo Luminant Generation Company Rafael Flores By , Director, Oversight

& Regulatory Affairs