3 Initial Exam 2009-301 Draft Administrative JPMs
ML093270185
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 11/18/2009
From:
Division of Nuclear Materials Safety II
To:
Progress Energy Co
References
50-302/09-301
Download: ML093270185 (46)


Text

CRYSTAL RIVER UNIT 3 JPM COVER SHEET ADMIN JPM #COl NRC 2009 SROONlY DETERMINE.ACTIONS FOR PRIMARY TO SECONDARY lEAKAGE PREPARED BY: Alan Kennedy Date: 07/09/09 VALIDATED BY: Rop 1 Taylor Date: 07/15/09 APPROVAL BY: Lawrence 1 Vansicklen Date: 07/20109 (Nuclear Training Supervisor)

CONCURRED BY: Mike Kelly Date: 07/20109 (Operations Representative) " Validation is not required for minor enhancements, procedure revisions that do not affect the JPM or individual step changes that do not affect the flow of the JPM. Operations concurrence is required for new JPMs and changes that affect the flow, critical steps or time critical steps of the JPM. Operations concurrence is not required for changes that are required due to a procedure revision. ( CRYSTAL RIVER UNIT 3 JPM COVER SHEET ADMIN JPM #COI NRC 2009 SRO ONLY DETERMINE.

ACTIONS FOR PRIMARY TO SECONDARY LEAKAGE PREPARED BY: Alan Kennedy Date: 07/09/09 VALIDATED BY: Rop I Taylor Date: 07/15/09 APPROVAL BY: Lawrence I Vansicklen Date: 07/20109 (Nuclear Training Supervisor)

CONCURRED BY: Mike Kelly Date: 07/20109 (Operations Representative) " Validation is not required for minor enhancements, procedure revisions that do not affect the JPM or individual step changes that do not affect the flow of the JPM. Operations concurrence is required for new JPMs and changes that affect the flow, critical steps ot time critical steps of the JPM. Operations concurrence is not required for changes that are required due to a procedure revision.

ADMINISTRATIVE JOB PERFORMANCE MEASURE JPM#: Admin C01 -NRC 2009 [Bank #3200] Task: Determine actions for primary to secondary leakage. Alternate Path: DYES PRA Top Critical Action: IZI NO DYES IZI NO Safety Function:

4 . KIA Rating/Importance:

G2.1.25 Task Number: Position:

035A2.01 1150401010 IZISRO ONLY R03.9 R04.5 DRO/SRO SR04.2 SR04.6 DNLO/RO/SRO Task Standard:

Determine actions for primary to secondary leakage Preferred Evaluation Location:

Preferred Evaluation Method: D SIM D PLANT IZI ADMIN IZI PERFORM D SIMULATE

References:

CP-152, Rev. 19 Validation Time: 20 minutes Time Critical:

DYES IZI NO Candidate:

_____________

_ Time Start: Printed Name Time Finish: ---,-------

Performance Rating: D SAT D UNSAT Performance Time: -----Examiner:


Printed Name Signature Date Comment: ________________________________________________________

__ 112112008 Page 2 of8 Admin CO 1 (NRC 2009) H:\NRC -2009\JPM\Admin\Admin COl (NRC 2009) [Bank #320D] Rev l.docx ( ADMINISTRATIVE JOB PERFORMANCE MEASURE JPM#: Admin C01 -NRC 2009 [Bank #320D] Task: Determine actions for primary to secondary leakage. Alternate Path: DYES PRA Top Critical Action: C8J NO DYES Safety Function:

4 " KIA Rating/Importance:

G2.1.25 035A2.01 Task Number: 1150401010 Position:

C8JSRO ONLY R03.9 R04.5 DRO/SRO SRO 4.2 SRO 4.6 DNLO/RO/SRO Task Standard:

Determine actions for primary to secondary leakage Preferred Evaluation Location:

Preferred Evaluation Method: D SIM D PLANT C8J ADMIN C8J PERFORM D SIMULATE

References:

CP-152, Rev. 19 Validation Time: 20 mintJtes Time Critical:

DYES C8J NO Candidate:

Time Start: Printed Name Time Finish: ______ _ Performance Rating: D SAT D UNSAT Performance Time: -----Examiner:


Printed Name Signature Date Comment ________________________________________________________

__ 112112008 Page 2 of8 Admin CO I (NRC 2009) H:\NRC -2009\JPM\Admin\Admin COl (NRC 2009) [Bank #320D] Rev l.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE SIMULATOR OPERATOR SETUP INSTRUCTIONS:

1. NA SIMULATOR OPERATOR INSTRUCTIONS:
1. NA TOOLS / EQUIPMENT

/ PROCEDURES NEEDED: 1. Calculator

2. Copies ofCP-152, Revision 19 3. ITS available as reference, if needed 112112008 Page 3 of8 Admin CO I (NRC 2009) H:\NRC;, -2009\JPM\Admin\Admin COl (NRC 2009) [Bank #320D] Rev I.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE ( SIMULATOR OPERATOR SETUP INSTRUCTIONS:
1. NA SIMULATOR OPERATOR INSTRUCTIONS:
1. NA TOOLS / EQUIPMENT

/ PROCEDURES NEEDED: 1. Calculator

2. Copies ofCP-152, Revision 19 3. ITS available as reference, if needed ( ( 112112008 Page 3 of8 Admin COl (NRC 2009) H:\NRC;, -2009\JPM\Admin\Admin COl (NRC 2009) [Bank #320D] Rev l.docx

( ( ADMINISTRATIVE JOB PERFORMANCE MEASURE READ TO THE OPERATOR INITIAL CONDITIONS You are the Control Room Supervisor.

The time is now 1300. The plant is at 100% power. ARP-1 A is in operation by itself. RM-G26 is off scale high. Due to recent calibrations of RM-A 12, an RM-A 12 conversion table is NOT yet available.

RM-A 12 background is 45 cpm per CH-266. RM-A 12 conversion factor is 0.0065 per CH-266. RM-A 12 readings have been the following:

0900 800 cpm 1000 800 cpm 1100 810 cpm 1200 14000 cpm 1300 21500 cpm INITIATING CUES , Determine what, if any, actions are required, and list your findings below. 112112008 Page 4 0[8 Admin COl (NRC 2009) H:\NRC -2009\JPM\Admin\Admin COl (NRC 2009) [Bank #320D] Rev l.docx ( ( ADMINISTRATIVE JOB PERFORMANCE MEASURE READ TO THE OPERATOR INITIAL CONDITIONS You are the Control Room Supervisor.

The time is now 1300. The plant is at 100% power. ARP-1 A is in operation by itself. RM-G26 is off scale high. Due to recent calibrations of RM-A 12, an RM-A 12 conversion table is NOT yet available.

RM-A 12 background is 45 cpm per CH-266. RM-A 12 conversion factor is 0.0065 per CH-266. RM-A 12 readings have been the following:

0900 800 cpm 1000 800 cpm 1100 810 cpm 1200 14000 cpm 1300 21500 cpm INITIATING CUES , Determine what, if any, actions are required, and list your findings below. 112112008 Page 4 of8 Admin COl (NRC 2009) H:\NRC -2009\JPM\Admin\Admin COl (NRC 2009) [Bank #320D] Rev l.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE START TIME: ___ _ STEP 1: Candidate obtains a copy of CP-152. STANDARD:

N/A EXAMINER NOTE: Provide candidate with a copy of CP-152. COMMENTS:

STEP 2: Candidate uses CP-152, Enclosure 1, to calculate primary to secondary leak rate. STANDARD:

CP-152, Enclosure 1, may be used due to NOT having a table available for the current RM-A 12 conditions.

COMMENTS:

See the attached key for leak rates associated with each of the given RM-A 12 count rates. STEP 3: Candidate determines that Action Level 3 is applicable.

STANDARD:

Candidate determines Action Level 3 is applicable due to primary leakage being greater than 75 gpm, with an increase of greater than 30 gpd in the hour since the initial rise. COMMENTS:

112112008 Page 5 of8 H:\NRC -2009\JPM\Admin\Admin CO I (NRC 2009) [Bank #320D] Rev I.docx SAT UNSAT SAT UNSAT SAT UNSAT Admin COl (NRC 2009) ADMINISTRATIVE JOB PERFORMANCE MEASURE START TIME: ___ _ STEP 1: Candidate obtains a copy of CP-152. STANDARD:

N/A EXAMINER NOTE: Provide candidate with a copy of CP-152. COMMENTS:

STEP 2: Candidate uses CP-152, Enclosure 1, to calculate primary to secondary leak rate. STANDARD: ( CP-152, Enclosure 1, may be used due to NOT having a table available for the " current RM-A 12 conditions.

\, COMMENTS:

See the attached key for leak rates associated with each of the given RM-A 12 count rates. STEP 3: Candidate determines that Action Level 3 is applicable.

STANDARD:

Candidate determines Action Level 3 is applicable due to primary leakage being greater than 75 gpm, with an increase of greater than 30 gpd in the hour since the initial rise. COMMENTS:

1/2112008 Page 5 of8 H:\NRC -2009\JPM\Admin\Admin COl (NRC 2009) [Bank #320D] Rev I.docx SAT UNSAT SAT UNSAT SAT UNSAT Admin CO I (NRC 2009) c: ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 4: Candidate determines actions are required.

STANDARD:

Candidate determines that, as a minimum, the following actions are required per section 4.8.1 of CP-152. 4.8.1.1 4.8.1.2 4.8.1.3 4.8.1.4 4.8.1.5 4.8.1.6 4.8.1.7 4.8.1°.8 VERIFY increased leakage using RM-G26 or RM-G27. Evaluate spikes or rapid changes in leak rate. NOTIFY SM, MSO, and PGM of changing primary to secondary leakage conditions.

MONITOR RM-A12 every 15 minutes AND OBTAIN leak rate in gpd within 15 minutes. Reduce power to 50% in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, and be in Mode 3 in the next 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> if leakage greater than 75 gpd with the leak rate increasing at greater than 30 gpd/hr. NA PERFORM applicable steps of Action Level 1. Administratively TAG Aux Steam from Units 1 & 2 by hanging Caution Tags. EXAMINER NOTE: Candidate may summarize the actions by stating that the actions of CP-152, Action Level 3, are required.

COMMENTS:

TERMINATION CRITERIA:

Correct Action Level determined per CP-152. END OF TASK ,. Critical Step Basis: Required actions to mitigate a primary to secondary leak. SAT UNSAT STOP TIME: __ 1I2112008 Page 6of8 Admin COl (NRC 2009) H:\NRC -2009\JPM\Admin\Admin CO I (NRC 2009) [Bank #320D] Rev I.docx ( ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 4: Candidate determines actions are required.

STANDARD:

Candidate determines that, as a minimum, the following actions are required per section 4.8.1 of CP-152. 4.8.1.1 4.8.1.2 4.8.1.3 4.8.1.4 4.8.1.5 4.8.1.6 4.8.1.7 4.8.1'.8 VERIFY increased leakage using RM-G26 or RM-G27. Evaluate spikes or rapid changes in leak rate. NOTIFY SM, MSO, and PGM of changing primary to secondary leakage conditions.

MONITOR RM-A12 every 15 minutes AND OBTAIN leak rate in gpd within 15 minutes. Reduce power to::; 50% in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, and be in Mode 3 in the next 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> if leakage greater than 75 gpd with the leak rate increasing at greater than 30 gpd/hr. NA PERFORM applicable steps of Action Level 1. Administratively TAG Aux Steam from Units 1 & 2 by hanging Caution Tags. EXAMINER NOTE: Candidate may summarize the actions by stating that the actions of CP-152, Action Level 3, are required.

COMMENTS:

TERMINATION CRITERIA:

Correct Action Level determined per CP-152. END OF TASK Critical Step Basis: Required actions to mitigate a primary to secondary leak. SAT UNSAT STOP TIME: __ 112112008 Page 60f8 Admin CO 1 (NRC 2009) H:INRC -2009lJPMIAdmin\Admin CO 1 (NRC 2009) [Bank #320D] Rev l.docx c ADMINISTRATIVE JOB PERFORMANCE MEASURE ANSWER KEY RM-A 12 CONVERSION TO GPD ENCLOSURE 1 (Page 1 of 6) Example: [( 1000 cpm .) -( gpd 30 cpm ) = 970 cpm 1 x (_0= . ..:..00=70...::2:.....-...1)

= 6.98 Gross Background Net Count Rate Conv. F actor* Leak Rate

  • RM-A 12 gpd per cpm conversion factor and average background count rate are recorded on Enclosure 2 of CH-266, Primary to Secondary Leak Rate Monitoring, which a copy is located in Control Room. NOTE Calculated Primary to Secondary leak rate may be obtained from CH-266 Operator aid posted in Control Room. If leak rate is obtained from Operator aid, then only time, gross cpm, and leak rate need to be logged. Time [( 800 cpm) -( 45 cpm) = ( 755 cpm)] x ( 0.0065 )= 4.91 gpd 0900 Gross Background Net Cony. Factor* Leak Rate [( 800 cpm) -( 45 cpm) = ( 765 cpm)] x ( 0.0065 )= 4.91 gpd 1000 Gross Background Net Cony. Factor* Leak Rate [( 810 cpm) -( 45 cpm) = ( 755 cpm)] x ( 0.0065 )= 4.97 gpd 1100 Gross Background Net Cony. Factor* Leak Rate [( 14000 cpm) -( 45 cpm) = ( 13955 cpm)] x ( 0.0065 )= 90.71 gpd 1200 Gross
  • Background Net Cony. Factor* Leak Rate [( 21500 cpm) -( 45 cpm) = ( 21455 cpm)] x ( 0.0065 )= 139.46 gpd 1300 Gross Background Net Cony. Factor* Leak Rate [( cpm) -( cpm) = ( cpm)] x ( )= gpd , Gross Background Net Cony. Factor* Leak Rate [( cpm) -( cpm) = ( cpm)] x ( )= gpd Gross Background Net Cony. Factor* Leak Rate [( cpm) -( cpm) = ( cpm)] x ( )= gpd Gross Background Net Cony. Factor* Leak Rate [( cpm) -( cpm) = ( cpm)] x ( )= gpd Gross Background Net Cony. Factor* Leak Rate [( cpm) -( cpm) = ( cpm)] x ( )= gpd Gross Background Net Cony. Factor* Leak Rate [( cpm) -( cpm) = ( cpm)] x ( )= gpd Gross Background Net Cony. Factor* Leak Rate 112112008 Page 7 of8 Admin COl (NRC 2009) H:\NRC -2009\JPM\Admin\Admin CO I (NRC 2009) [Bank #320D] Rev I.docx ( ( ADMINISTRATIVE JOB PERFORMANCE MEASURE ANSWER KEY RM-A 12 CONVERSION TO GPD ENCLOSURE 1 (Page 1 of 6) Example: [( 1000 cpm ) -( gpd 30 cpm ) = 970 cpm J x (_=0.-=-00.=....:7'-=2'---')

= 6.98 Gross Background Net Count Rate Conv.Factor*

Leak Rate

  • RM-A12 gpd per cpm conversion factor and average background count rate are recorded on Enclosure 2 of CH-266, Primary to Secondary Leak Rate Monitoring, which a copy is located in Control Room. NOTE Calculated Primary to Secondary leak rate may be obtained from CH-266 Operator aid posted in Control Room. If leak rate is obtained from Operator aid, then only time, gross cpm, and leak rate need to be logged. Time [( 800 cpm) -( 45 cpm) = ( 755 cpm)] x ( 0.0065 )= 4.91 gpd 0900 Gross Background Net Cony. Factor' Leak Rate [( 800 cpm) -( 45 cpm) = ( 765 cpm)] x ( 0.0065 )= 4.91 gpd 1000 Gross Background Net Cony. Factor' Leak Rate [( 810 cpm) -( 45 cpm) = ( 755 cpm)] x ( 0.0065 )= 4.97 gpd 1100 Gross Background Net Cony. Factor' Leak Rate [( 14000 cpm) -( 45 cpm) = ( 13955 cpm)] x ( 0.0065 )= 90.71 gpd 1200 Gross . Background Net Cony. Factor' Leak Rate [( 21500 cpm) -( 45 cpm) = ( 21455 cpm)] x ( 0.0065 ) = 139.46 gpd 1300 Gross Background Net Cony. Factor' Leak Rate [( cpm) -( cpm) = ( cpm)] x ( )= gpd , Gross Background Net Cony. Factor' Leak Rate [( cpm) -( cpm) = ( cpm)] x ( )= gpd Gross Background Net Cony. Factor' Leak Rate [( cpm) -( cpm) = ( cpm)] x ( )= gpd Gross Background Net Cony. Factor' Leak Rate [( cpm) -( cpm) = ( cpm)] x ( )= gpd Gross Background Net Cony. Factor' Leak Rate [( cpm) -( cpm) = ( cpm)] x ( )= gpd Gross Background Net Cony. Factor' Leak Rate [( cpm) -( cpm) = ( cpm)] x ( )= gpd Gross Background Net Cony. Factor' Leak Rate 112112008 Page7of8 Admin COl (NRC 2009) H:\NRC -2009\JPM\Admin\Admin COl (NRC 2009) [Bank #320D] Rev l.docx

( ADMINISTRATIVE JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETpRNED TO EXAMINER UPON COMPLETION OF TASK) INITIAL CONDITIONS You are the Control Room Supervisor.

The time is now 1300. The plant is at 100% power. ARP-1 A is in operation by itself. RM-G26 is off scale high. Due to recent calibrations of RM-A 12, an RM-A 12 conversion table is NOT yet available.

RM-A 12 background is 45 cpm per CH-266. RM-A 12 conversion factor is 0.0065 per CH-266. RM-A12 readings have been the following:

0900 800 cpm 1000 800 cpm 1100 810 cpm 1200

  • 14000 cpm 1300 21500 cpm INITIATING CUES Determine what, if any, actions are required, and list your findings below. ( ( ADMINISTRATIVE JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE TO EXAMINER UPON COMPLETION OF TASK) INITIAL CONDITIONS You are the Control Room Supervisor.

The time is now 1300. The plant is at 100% power. ARP-1 A is in operation by itself. RM-G26 is off scale high. Due to recent calibrations of RM-A 12, an RM-A 12 conversion table is NOT yet available.

RM-A 12 background is 45 cpm per CH-266. RM-A 12 conversion factor is 0.0065 per CH-266. RM-A12 readings have been the following:

0900 1000 1100 1200 1300 INITIATING CUES 800 cpm 800 cpm 810 cpm

  • 14000 cpm 21500 cpm Determine what, if any, actions are required, and list your findings below.

( CRYSTAL RIVER UNIT 3 JPM COVER SHEET ADMIN JPM #C02 NRC 2009 RO&SRO PERFORM A TIME TO BOIL / CORE UNCOVERY CALCULATION PREPARED BY: Alan Kennedy Date: 07/09/09 VALIDATED BY: Rop 1 Taylor Date: 07/15109 APPROVAL BY: Lawrence 1 Vansicklen Date: 07120109 (Nuclear Training Supervisor)

CONCURRED BY: Mike Kelly Date: 07/20109 (Operations Representative)

Validation is not required for minor enhancements, procedure revisions that do not affect the JPM or individual step changes that do not affect the flow of the JPM. Operations concurrence is required for new JPMs and changes that affect the flow, critical steps or time critical steps of the JPM. Operations concurrence is not required for changes that are required due to a procedure revision. ( CRYSTAL RIVER UNIT 3 JPM COVER SHEET ADMIN JPM #C02 NRC 2009 RO&SRO PERFORM A TIME TO BOIL / CORE UNCOVERY CALCULATION PREPARED BY: Alan Kennedy Date: 07/09/09 VALIDATED BY: Rop 1 Taylor Date: 07115109 APPROV AL BY: Lawrence 1 Vansicklen Date: 07120109 (Nuclear Training Supervisor)

CONCURRED BY: Mike Kelly Date: 07/20109 (Operations Representative)

Validation is not required for minor enhancements, procedure revisions that do not affect the JPM or individual step changes that do not affect the flow of the JPM. Operations concurrence is required for new JPMs and changes that affect the flow, critical steps or time critical steps of the JPM. Operations concurrence is not required for changes that are required due to a procedure revision.

( ADMINISTRATIVE JOB PERFORMANCE MEASURE . JPM#: Admin C02 -NRC 2009 [Modified]

Task: Operate the plant within the guidelines specified for Mode 5 outages and reduced reactor coolant system RCS inventory operations.

Alternate Path: DYES PRA Top Critical Action: [gJNO DYES Safety Function:

4 K/ A Rating/Importance:

G2.1.23 025AA1.02 Task Number: 1190102001 RO Position:

DSROONLY R04.3 R03.8 [gJRO/SRO SRO 4.4 SRO 3.9 DNLO/RO/SRO Task Standard:

Perform a time to boil/core uncovery calculation.

Preferred Evaluation Location:

Preferred Evaluation Method: D SIM D PLANT [gJ ADMIN [gJPERFORM DSIMULATE

References:

OP-103H, Rev. 9 Validation Time: 20 minutes Time Critical:

D YES [gJ NO Candidate:


Time Start: _______ _ Printed Name Time Finish: _______ _ Performance Rating: D SAT DUNSAT Performance Time: __________

_ Examiner:


Printed Name Signature Date Comment: ------------------------------------------------------------

7/20/20095/28/20095:39 AM Page 2 of 10 Admin C02 (NRC 2009) H:\NRC -2009\JPM\Admin\Admin CO2 (NRC 2009) [Modified].docx ( ( ADMINISTRATIVE JOB PERFORMANCE MEASURE . JPM#: Admin C02 -NRC 2009 [Modified]

Task: Operate the plant within the guidelines specified for Mode 5 outages and reduced reactor coolant system RCS inventory operations.

Alternate Path: DYES DYES PRA Top Critical Action: Safety Function:

4 KIA Rating/Importance:

G2.1.23 025AA1.02 Task Number: 1190102001 RO R04.3 R03.8 Position:

DSROONLY SRO 4.4 SRO 3.9 DNLO/RO/SRO Task Standard:

Perform a time to boil/core uncovery calculation.

Preferred Evaluation Location:

Preferred Evaluation Method: D SIM D PLANT ADMIN D SIMULATE

References:

OP-103H, Rev. 9 Validation Time: 20 minutes Time Critical:

D YES NO Candidate:

Time Start: ----------------

Printed Name Time Finish: ----------------

Performance Rating: D SAT DUNSAT Performance Time: -----------

Examiner:


Printed Name Signature Date Comment: __________________________________________________________

__ 7/20/20095/28/20095:39 AM Page 2 of 10 Admin C02 (NRC 2009) H:\NRC -2009\JPM\Admin\Admin C02 (NRC 2009) [ModifiedJ.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE SIMULATOR SETUP INSTRUCTIONS NA SIMULATOR OPERATOR INSTRUCTIONS NA TOOLS/EQUIPMENTIPROCEDURES NEEDED 1. OP-103H, Rev. 9 Consumable copies 2. Calculator 7120/20095128120095:39 AM Page 3 of 10 Admin C02 (NRC 2009) H:\NRC -2009\JPM\Admin\Admin C02 (NRC 2009) [Modified].docx ADMINISTRATIVE JOB PERFORMANCE MEASURE I, SIMULATOR SETUP INSTRUCTIONS NA SIMULATOR OPERATOR INSTRUCTIONS NA TOOLS/EQUIPMENT/PROCEDURES NEEDED 1. OP-I03H, Rev. 9 Consumable copies 2. Calculator ( 7/20/20095/28/20095:39 AM Page 3 of 10 Admin C02 (NRC 2009) H:\NRC -2009\IPM\Admin\Admin C02 (NRC 2009) [Modified].docx

( ADMINISTRATIVE JOB PERFORMANCE MEASURE READ TO THE OPERATOR INITIAL CONDITIONS You are the Chief Nuclear Operator Plant is in MODE 5 following a core reload 77 new fuel assemblies were loaded in the core RCS temperature is 120 0 F RCS pressure is 35 psig RCS level is 154 feet Plant was shutdown at 0800 on 08/03/09 Current date and time is 0800 on 08/29/09 INITIATING CUES The CRS has directed you to determine the current time to boil AND current time to core uncovery for these conditions.

Time to Boil = Time to Core Uncovery = 7/20/20095128/20095:39 AM Page 4 of 10 Admin C02 (NRC 2009) H:\NRC -2009\JPM\Admin\Admin C02 (NRC 2009) [Modified].docx ( ( ADMINISTRATIVE JOB PERFORMANCE MEASURE READ TO THE OPERATOR INITIAL CONDITIONS You are the Chief N uc1ear Operator Plant is in MODE 5 following a core reload 77 new fuel assemblies were loaded in the core RCS temperature is 120 0 F RCS pressure is 35 psig RCS level is 154 feet Plant was shutdown at 0800 on 08/03/09 Current date and time is 0800 on 08/29/09 INITIATING CUES The CRS has directed you to determine the current time to boil AND current time to core uncovery for these conditions.

Time to Boil = Time to Core Uncovery = 7/20/20095/28/20095:39 AM Page 4 of 10 Admin CO2 (NRC 2009) H:\NRC -2009\JPM\Admin\Admin C02 (NRC 2009) [Modified].docx

( STEP 1: STANDARD:

ADMINISTRATIVE JOB PERFORMANCE MEASURE TIME START Locate correct procedure.

Candidate obtains a copy of OP-l 03H, Reactor Coolant System and Spent Fuel Pool Decay Heat Tables and Figures. ----SAT ____ _

__ EXAMINER NOTE: Provide candidate with a copy of OP-I03H when requested.

COMMENTS:

STEP 2: STANDARD:

COMMENTS:

STEP 3: STANDARD:

COMMENTS:

Record RCS temperature, RCS level, shutdown date and time and current date and time. Determine number of burned fuel assemblies in SAT -----the core and the number of days shutdown.

Transfer data to Enclosure

1. UNSAT ___ _ Candidate accurately transfers data from Cue Sheet to Enclosure
1. Step 3.1 Determine the Decay Heat Correction Factor for number of days shutdown.
  • Candidate accurately determines number of days shutdown and the Decay Heat Correction Factor from Table 16. Number of days shutdown is 26. Correction factor is 3.3979. Rounding to 3.4 is acceptable.

SAT _____ _ UNSAT __ _ 7/20120095/28/20095:39 AM Page 5 of 10 Admin C02 (NRC 2009) H:\NRC -2009\JPM\Admin\Admin CO2 (NRC 2009) [Modified].docx ( ( ( STEP 1: STANDARD:

ADMINISTRATIVE JOB PERFORMANCE MEASURE TIME START Locate correct procedure.

Candidate obtains a copy of OP-1 03H, Reactor Coolant System and Spent Fuel Pool Decay Heat Tables and Figures. -----SAT ___ _ UNSAT __ _ EXAMINER NOTE: Provide candidate with a copy of OP-I03H when requested.

COMMENTS:

STEP 2: STANDARD:

COMMENTS:

STEP 3: STANDARD:

COMMENTS:

Record RCS temperature, RCS level, shutdown date and time and current date and time. Determine number of burned fuel assemblies in SAT -----the core and the number of days shutdown.

Transfer data to Enclosure

1. UNSAT __ _ Candidate accurately transfers data from Cue Sheet to Enclosure
1. Step 3.1 Determine the Decay Heat Correction Factor for number of days shutdown .* Candidate accurately determines number of days shutdown and the Decay Heat Correction Factor from Table 16. Number of days shutdown is 26. Correction factor is 3.3979. Rounding to 3.4 is acceptable.

SAT ___ _ UNSAT __ _ 7/20/20095/28/20095:39 AM Page 5 of 10 Admin CO2 (NRC 2009) H:\NRC -2009\JPM\Admin\Admin C02 (NRC 2009) [Modified].docx ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 4: Step 3.2 SAT Determine the Fuel Assembly Correction Factor. UNSAT STANDARD:

Candidate accurately determines the Fuel Assembly Correction Factor. 177 (total fuel assemblies) divided by 100 (burned fuel assemblies in core) = 1.77 Correction factor is 1.77. Rounding to 1.8 is acceptable . COMMENTS: . , STEP 5: Step 3.3 SAT Determine the Overall Correction Factor. UNSAT STANDARD:

Candidate accurately determines the Overall Correction Factor. 3.3979 (DH Correction Factor) x 1.77 (fuel assembly correction factor) = 6.01 Correction factor is 6.01. Rounding to 6.0 is acceptable.

COMMENTS:

STEP 6: Step 7.0 SAT Determine*RCS condition.

UNSAT . STANDARD:

Using data from the cue sheet the candidate accurately determines that the RCS is intact and not vented. COMMENTS:

7/20/20095/28/20095:39 AM Page 6 of 10 Admin C02 (NRC 2009) H:\NRC -2009\JPM\Admin\Admin C02 (NRC 2009) [Modified].docx ADMINISTRATIVE JOB PERFORMANCE MEASURE ( STEP 4: Step 3.2 SAT Determine the Fuel Assembly Correction Factor. UNSAT STANDARD:

Candidate accurately determines the Fuel Assembly Correction Factor. 177 (total fuel assemblies) divided by 100 (burned fuel assemblies in core) = 1.77 Correction factor is 1.77. Rounding to 1.8 is acceptable . COMMENTS: . , STEP 5: Step 3.3 SAT Determine the Overall Correction Factor. UNSAT STANDARD:

Candidate accurately determines the Overall Correction Factor. ( 3.3979 (DH Correction Factor) x 1.77 (fuel assembly correction factor) = 6.01 Correction factor is 6.01. Rounding to 6.0 is acceptable.

COMMENTS:

STEP 6: Step 7.0 SAT Determine RCS condition.

UNSAT , STANDARD:

Using data from the cue sheet the candidate accurately determines that the RCS is intact and not vented. COMMENTS: ( 7/20/20095/28/20095:39 AM Page 6 of 10 Admin C02 (NRC 2009) H:\NRC -2009\JPM\Admin\Admin C02 (NRC 2009) [Modified].docx STEP 7: STANDARD: , COMMENTS:

STEP 8: ADMINISTRATIVE JOB PERFORMANCE MEASURE Step 7.1 Obtain the Time to Boil from Table 3. Using data from the cue sheet the candidate accurately determines the Time to Boil from Table 3. Time to Boil is 26.94 minutes. Rounding to 27 minutes is acceptable.

Steps 7.2 and 7.3 Per the cue sheet these steps are not required.

STANDARD:

NA EXAMINER NOTE: There are no adverse consequences if candidate performs these calculations.

COMMENTS:

STEP 9: STANDARD:

COMMENTS:

Step 7.4 Obtain the Time to Core Uncovery from Table 15. Using data from the cue sheet the candidate accurately determines the Time to Core Uncovery from Table 15. Time to Core Uncovery is 363.17 minutes. Rounding to 363 minutes is acceptable.

SAT ___ _ UNSAT __ _ SAT ___ _ UNSAT __ _ SAT ___ _ UNSAT __ _ 7120/20095128/20095:39 AM Page 7 oflO Admin C02 (NRC 2009) H:\NRC -2009\JPM\Admin\Admin

'C02 (NRC 2009) [Modified].docx ( ( STEP 7: STANDARD: , COMMENTS:

STEP 8: ADMINISTRATIVE JOB PERFORMANCE MEASURE Step 7.1 Obtain the Time to Boil from Table 3. Using data from the cue sheet the candidate accurately detennines the Time to Boil from Table 3. Time to Boil is 26.94 minutes. Rounding to 27 minutes is acceptable.

Steps 7.2 and 7.3 Per the cue sheet these steps are not required.

STANDARD:

NA EXAMINER NOTE: There are no adverse consequences if candidate performs these calculations.

COMMENTS:

STEP 9: STANDARD:

COMMENTS:

Step 7.4 Obtain the Time to Core Uncovery from Table 15. Using data from the cue sheet the candidate accurately detennines the Time to Core Uncovery from Table 15. Time to Core Uncovery is 363.17 minutes. Rounding to 363 minutes is acceptable.

SAT ___ _ UNSAT __ _ SAT ___ _ UNSAT __ _ SAT ___ _ UNSAT __ _ 7/20/20095/28/20095:39 AM Page 7 oflO Admin CO2 (NRC 2009) H:\NRC -2009\JPM\Admin\Admin

'C02 (NRC 2009) [Modified].docx ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 10: Step 7.5 Critical Step Apply the Overall Correction Factor to detennine current Time to Basis: Accurate Boil. time that boiling will occur. STANDARD:

Candidate accurately detennines the current Time to Boil. SAT 6.0 I.(Overall Correction Factor) x 26.94 (Time to Boil) = UNSAT 161.91 minutes. , Using rounded values for all calculations:

6.0 (Overall Correction Factor) x 27.0 (Time to Core Uncovery)

= 162 minutes. Values between 158 minutes and 165 minutes are acceptable. (approximately 2% error band) COMMENTS:

STEP 11: Steps 7.6 and 7.7 SAT Per the cue sheet these steps are not required.

UNSAT STANDARD:

NA * , EXAMINER NOTE: There are no adverse consequences if candidate performs these calculations.

COMMENTS:

7/20/20095/28120095:39 AM Page 8 oflO Admin C02 (NRC 2009) H:\NRC -2009\JPM\Admin\Admin C02 (NRC 2009) [Modified].docx AD MINI S TRA TIVE JOB PERFORMANCE MEASURE ( STEP 10: Step 7.5 Critical Step Apply the Overall Correction Factor to determine current Time to Basis: Accurate Boil. time that boiling will occur. STANDARD:

Candidate accurately determines the current Time to Boil. SAT 6.01.(Overall Correction Factor) x 26.94 (Time to Boil) = UNSAT 161.91 minutes . . Using rounded values for all calculations:

6.0 (Overall Correction Factor) x 27.0 (Time to Core Uncovery)

= 162 minutes. Values between 158 minutes and 165 minutes are acceptable. (approximately 2% error band) COMMENTS: ( STEP 11: Steps 7.6 and 7.7 SAT Per the cue sheet these steps are not required.

UNSAT STANDARD:

NA * . EXAMINER NOTE: There are no adverse consequences if candidate performs these calculations.

COMMENTS:

7/20/20095/28/20095:39 AM Page 8 oflO Admin C02 (NRC 2009) H:\NRC -2009\JPM\Admin\Admin C02 (NRC 2009) [Modified].docx ADMINISTRATIVE JOB PERFORMANCE MEASURE ( STEP 12: Step 7.8 Critical Step Apply the Overall Correction Factor to determine current Time to Basis: Accurate Core Uncovery.

time that core uncovery will

  • occur. STANDARD:

Candidate accurately determines the current Time to Core

  • Uncovery . SAT 6.01 (Overall Correction Factor) x 363.17 (Time to Core Uncovery)

= 2182.65 minutes. UNSAT Using rounded values for all calculations:

6.0 (Overall Correction Factor) x 363.0 (Time to Core Uncovery)

= 2178 minutes. Values between 2156 minutes and 2204 minutes are acceptable. (approximately 1 % error band) COMMENTS:

  • , TERMINATION CUE: Candidate accurately determines current Time to Boil and Time to Core Uncovery.

END OF TASK TIME STOP 7/20/20095/28/20095:39 AM Page 9 oflO Admin C02 (NRC 2009) H:\NRC " 2009\JPM\Admin\Admin C02 (NRC 2009) [Modified].docx ADMINISTRATIVE JOB PERFORMANCE MEASURE ( STEP 12: Step 7.8 Critical Step Apply the Overall Correction Factor to determine current Time to Basis: Accurate Core Uncovery.

time that core uncovery will . occur. STANDARD:

Candidate accurately determines the current Time to Core , Uncovery.

SAT 6.01 (Overall Correction Factor) x 363.17 (Time to Core Uncovery)

= 2182.65 minutes. UNSAT Using rounded values for all calculations:

6.0 (Overall Correction Factor) x 363.0 (Time to Core Uncovery)

= 2178 minutes. Values between 2156 minutes and 2204 minutes are acceptable. (approximately 1 % error band) COMMENTS: . , TERMINATION CUE: Candidate accurately determines current Time to Boil and Time to Core Uncovery.

END OF TASK TIME STOP ( 7/20/20095/28/20095:39 AM Page 9 of 10 Admin CO2 (NRC 2009) H:\NRC -2009\lPM\Admin\Admin CO2 (NRC 2009) [Modified].docx

( CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK) READ TO THE OPERATOR INITIAL CONDITIONS You are the Chief Nuclear Operator Plant is in MODE 5 following a refueling outage 77 new fuel assemblies were loaded in the core RCS temperature is 120° F RCS pressure is 12 psig RCS level is i 54 feet Plant was shutdown at 0800 on 08/03/09 Current date and time is on 08/29109 , INITIATING CUES The CRS has directed you to determine the current time to boil AND current time to core uncovery for these conditions.

Time to Boil =. Time to Core Uncovery = ( ( ( CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK) READ TO THE OPERATOR INITIAL CONDITIONS You are the Chief Nuclear Operator Plant is in MODE 5 following a refueling outage 77 new fuel assemblies were loaded in the core RCS temperature is 120 0 F RCS pressure is 12 psig RCS level is 154 feet Plant was shutdown at 0800 on 08/03/09 Current date and time is on 08/29109 , INITIATING CUES The CRS has directed you to determine the current time to boil AND current time to core uncovery for these conditions.

Time to Boil = Time to Core Uncovery =

( CRYSTAL RIVER UNIT 3 JPM COVER SHEET ADMIN JPM #ECI NRC 2009 RO&SRO Perform a Monthly NI Imbalance Comparison PREPARED BY: Alan Kennedy Date: 07/09/09 VALIDATED BY: Rop 1 Taylor Date: 07/15/09 APPROVAL BY: Lawrence 1 Vansicklen Date: 07/20109 (Nuclear Training Supervisor)

CONCURRED BY: Mike Kelly Date: 07/20109 (Operations Representative)

Validation is not required for minor enhancements, procedure revisions that do not affect the JPM ?r individual step changes that do not affect the flow of the JPM. Operations concurrence is required for new JPMs and changes that affect the flow, critical steps or time critical steps of the JPM. Operations concurrence is not required for changes that are required due to a procedure revision. ( ( (" CRYSTAL RIVER UNIT 3 JPM COVER SHEET ADMIN JPM #ECI NRC 2009 RO&SRO Perform a Monthly NI Imbalance Comparison PREPARED BY: Alan Kennedy Date: 07/09/09 VALIDATED BY: Rop I Taylor Date: 07/15/09 APPROVAL BY: Lawrence I Vansicklen Date: 07/20109 (Nuclear Training Supervisor)

CONCURRED BY: Mike Kelly Date: 07/20109 (Operations Representative)

Validation is not required for minor enhancements, procedure revisions that do not affect the JPM or individual step changes that do not affect the flow of the JPM. , Operations concurrence is required for new JPMs and changes that affect the flow, critical steps or time critical steps of the JPM. Operations concurrence is not required for changes that are required due to a procedure revision.

JPM#: ADMINISTRATIVE JOB PERFORMANCE MEASURE Admin EC1 -NRC 2009 [Bank #286] C Task: Perform a Monthly NI Imbalance Comparison, SP-312BI SRO -Perform safety and technical reviews of plant procedures.

Alternate Path: DYES PRA Top Critical Action:" Safety Function:

NA IZl NO DYES IZl NO KIA Rating/lmportance:

G2.2.12 RO 3.7 SRO 4.1 Task Number: 0150202004 I RO 1190101029 I SRO Position:

DSROONLY IZlRO/SRO DNLO/RO/SRO Task Standard:

Perform a Monthly Nllmbalance Comparison, SP-312B SRO -Perform safety and technical reviews of plant procedures.

Preferred Evaluation Location:

Preferred Evaluation Method D SIM D PLANT IZl ADMIN IZl PERFORM D SIMULATE (

References:

.

SP-312B, Rev. 9 Validation Time: 25 I 5 minutes Time Critical:

DYES IZl NO Candidate:

Time Started: _____ _ Printed Name Time Finished:

_____ _ Performance Rating: D SAT D UNSAT Performance Time: ____ _ Examiner:

_______ -___ ----Printed Name Signature Date Comment: l 112115/28/20096:33 AM Page 2 of 11 Admin ECl (NRC 2009) H:\NRC -2009\JPM\Admin\Admin ECl (NRC 2009) [Bank #286].docx ( JPM#: ADMINISTRATIVE JOB PERFORMANCE MEASURE Admin EC1 -NRC 2009 [Bank #286] Task: Perform a Monthly Nllmbalance Comparison, SP-312BI SRO -Perform safety and technical reviews of plant procedures.

Alternate Path: DYES PRA Top Critical Action:" Safefy Function:

NA [gJ NO DYES KIA Rating/Importance:

G2.2.12 RO 3.7 SRO 4.1 Task Number: 0150202004 I RO 1190101029/SRO Position:

OSRO ONLY [gJRO/SRO ONLO/RO/SRO Task Standard:

Perform a Monthly Nllmbalance Comparison, SP-312B SRO -Perform safety and technical reviews of plant procedures.

Preferred Evaluation Location:

Preferred Evaluation Method o SIM 0 PLANT [gJ ADMIN [gJ PERFORM 0 SIMULATE (

References:

SP-312B, Rev. 9 Validation Time: 25 I 5 minutes Time Critical:

0 YES [gJ NO Candidate:

Time Started: -------Printed Name Time Finished:

_____ _ Performance Rating: 0 SAT 0 UNSAT Performance Time: ____ _ Examiner:


Printed Name Signature Date Comment: ( 112115128120096:33 AM Page 2 of II Admin ECI (NRC 2009) H:\NRC -2009\JPM\Admin\Admin ECI (NRC 2009) [Bank #286].docx ADMINISTRATIVE JOB PERFORMANCE MEASURE TOOLS/EQUIPMENT/PROCEDURES NEEDED: Copy of SP-312B, Rev 9 ITS -Reference Calculator INITIAL CONDITIONS:

You are the Reactor Operator.

READ TO THE OPERATOR The plant is in normal power operation.

SP-312B, Monthly Nllmbalance Comparison, is required.

The Tag Status Verification Sheet has been completed; all instruments are within their allowable calibration frequency.

The plant has been at steady state conditions for > 15 minutes. The plant computer is out of service. Control Console NI power is as follows: NI-5 -52% NI-6 -53% NI-7 -53% NI-8 -52% PT-138 has been completed.

Incore imbalance is -4.8% RTP. SP-312D has been completed.

Thermal power is 1340 MWT. INITIATING CUE: You are requested to perform SP-312B (voltage readings are attached).

Return Enclosures 1 & 2 with completed JPM. SROs only: Upon completion of the above, evaluate your results and list actions, if any, required per Technical Specifications.

Include applicable time requirements.

D No ITS actions required, or

  • Per ITS _______ (ITS number) the actions below must be completed within ______ hours. 112115/28/2009 6:33 AM Page 3 of 11 Admin ECI (NRC 2009) H:\NRC -2009\JPM\Admin\Admin ECI (NRC 2009) [Bank #286].docx ADMINISTRATIVE JOB PERFORMANCE MEASURE TOOLS/EQUIPMENT/PROCEDURES NEEDED: ( Copy of SP-312B, Rev 9 ITS -Reference Calculator ( .* READ TO THE OPERATOR INITIAL CONDITIONS:

You are the Reactor Operator.

The plant is in normal power operation.

SP-312B, Monthly Nllmbalance Comparison, is required.

The Tag Status Verification Sheet has been completed; all instruments are within their allowable calibration frequency.

The plant has been at steady state conditions for> 15 minutes. The plant computer is out of service. Control Console NI power is as follows: NI-5 -52% NI-6 -53% NI-7 -53% NI-8 -52% PT-138 has been completed.

Incore imbalance is -4.8% RTP. SP-312D has been completed.

Thermal power is 1340 MWT. INITIATING CUE: You are requested to perform SP-312B (voltage readings are attached).

Return Enclosures 1 & 2 with completed JPM. SROs only: Upon completion of the above, evaluate your results and list actions, if any, required per Technical Specifications.

Include applicable time requirements.

D No ITS actions required, or . Per ITS _______ (ITS number) the actions below must be completed within hours. ------112115/28/20096:33 AM Page 3 of 11 Admin EC 1 (NRC 2009) H:\NRC -2009\JPM\Admin\Admin EC1 (NRC 2009) [Bank #286].docx

( ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 1: Provide candidate with copy of SP-312B. STANDARD:

COMMENTS:

STEfS 2: (step 4.2.1 & 4.2.2) Have the craft personnel connect the DVM to the Delta Flux Amplifier Module (DFAM) "Eout" jack for NI-5 through NI-8. Measure and record the voltage readings (from the DVMs of step 4.2.1), for each Power Range NI Channel on Enclosure

2. STANDARD:

N/A EXAMINER NOTE: Voltage readings are supplied for this JPM. COMMENTS:

STEP. 3: (step 4.2.3) Using the conversion factors of Enclosure 2, convert the voltage readings to %RTP imbalance.

STANDARD:

Candidate accurately converts voltages to %RTP imbalance.

Values recorded must agree within +/- 0.25% of the value given on the JPM key. COMMENTS:

112115/28/20096:33 AM Page 4 of 11 H:\NRC -2009\JPM\Admin\Admin EC1 (NRC 2009) [Bank #286].docx Critical Step Basis: Accurate calculation required to determine

%RTP imbalance.

SAT __ _ UNSAT __ Admin EC1 (NRC 2009) ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 1: ( Provide candidate with copy of SP-312B. ( " ( STANDARD:

COMMENTS:

STEfS 2: (step 4.2.1 & 4.2.2) Have the craft personnel connect the DVM to the Delta Flux Amplifier Module (DFAM) "Eout" jack for NI-5 through NI-S. Measure and record the voltage readings (from the DVMs of step 4.2.1), for each Power Range NI Channel on Enclosure

2. STANDARD:

N/A EXAMINER NOTE: Voltage readings are supplied for this JPM. COMMENTS:

STER 3: (step 4.2.3) Using the conversion factors of Enclosure 2, convert the voltage readings to %RTP imbalance.

STANDARD:

Candidate accurately converts voltages to %RTP imbalance.

Values recorded must agree within +/- 0.25% of the value given on the JPM key. COMMENTS:

112115/28/2009 6:33 AM Page 4 of II H:\NRC -2009\JPM\Admin\Admin ECI (NRC 2009) [Bank #286ldocx Critical Step Basis: Accurate calculation required to determine

%RTP imbalance.

SAT __ _ UNSAT __ Admin ECI (NRC 2009)

ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 4: (step 4.2.4) Record the NI Imbalance values for NI-5, NI-6, NI-7, and NI-8 (from Enclosure SAT __ _ 2) on Enclosure 1 under Column A designated "NI Imbalance" (APlo) UNSAT __ STANDARD:

Candidate accurately transfers data from Enclosure 2 to Enclosure

1. COMMENTS:

STEP 5: (step 4.2.5) SAT __ _ Using PT-138, Hand Axial.Power Imbalance Calculations, determine the In-Core Imbalance.

UNSAT __ STAr-lDARD:

N/A EXAMINER NOTE: This information is supplied in the cue. COMMENTS:

STEP 6: (step 4.2.6) Record the Incore Imbalance determined in Step 4.2.5 on Enclosure 1 under Column B designated as "Incore Imbalance (APh)". STANDARD:

Candidate accurately transfers data from the initial conditions (supplied) to Enclosure

1. COMMENTS:

112115/28120096:33 AM Page 5 of 11 H:\NRC -2009\JPM\Admin\Admin ECI (NRC 2009) [Bank #286].docx SAT __ _ UNSAT __ Admin ECI (NRC 2009) I \ ( ( ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 4: (step 4.2.4) Record the NI Imbalance values for NI-5, NI-6, NI-7, and NI-8 (from Enclosure

2) on Enclosure 1 under Column A designated "NI Imbalance" (APl o) STANDARD:

Candidate accurately transfers data from Enclosure 2 to Enclosure

1. COMMENTS:

STEP 5: (step 4.2.5) SAT __ _ UNSAT __ SAT __ _ Using PT-138, Hand Axial,Power Imbalance Calculations, determine the In-Core Imbalance.

UNSAT __ STAt-JDARD:

N/A EXAMINER NOTE: This information is supplied in the cue. COMMENTS:

STEP 6: (step 4.2.6) Record the Incore Imbalance determined in Step 4.2.5 on Enclosure 1 under Column B designated as "Incore Imbalance (API,)". STANDARD: Candidate accurately transfers data from the initial conditions (supplied) to Enclosure

1. COMMENTS:

112115/28/2009 6:33 AM Page 5 of II H:INRC -20091JPMIAdminlAdmin ECI (NRC 2009) [Bank #286].docx SAT __ _ UNSAT __ Admin ECI (NRC 2009)

ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 7: (step 4.2.7) ( Using SP-312D, Backup Heat Balance Calculations, determine the thermal power. STANDARD:

N/A EXAMINER NOTE: This information is supplied in the cue. COMMENTS:

STEP 8: (step 4.2.8) SAT __ _ UNSAT __ SAT __ _ Record the value for the thermal power determined in Step 4.2 7 on Enclosure 1 under Column C designated as "Thermal Power (TP)". UNSAT __ STANDARD:

Candidate accurately transfers data from information supplied in initial ( conditions to enclosure

1. ( COMMENTS:

STEP 9: (step 4.2.9) Complete Enclosure 1 and notify the SSO/CRS of the results.

  • STANDARD:

Candidate accurately calculates values indicated on Enclosure 1 and notifies CRS/SSO of results (completes cue sheet). EXAMINER NOTE: Critical Step Basis: Accurate calculation required to determine Imbalance error. Values recorded must agree within +/- 0.25% of the value given on the JPM SAT __ _ key. UNSAT __ COMMENTS:

112115/2812009 6:33 AM Page 6 of II Admin ECI (NRC 2009) H:\NRC -2009\JPM\Admin\Admin ECI (NRC 2009) [Bank #286].docx ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 7: (step 4.2.7) ( Using SP-312D, Backup Heat Balance Calculations, determine the thermal power. STANDARD:

N/A EXAMINER NOTE: This information is supplied in the cue. COMMENTS:

STEP 8: (step 4.2.8) SAT __ _ UNSAT __ SAT __ _ Record the value for the thermal power determined in Step 4.2 7 on Enclosure 1 under Column C designated as "Thermal Power (TP)". UNSAT __ STANDARD:

Candidate accurately transfers data from information supplied in initial ( conditions to enclosure

1. COMMENTS:

STEP 9: (step 4.2.9) Complete Enclosure 1 and notify the SSO/CRS of the results. . STANDARD:

Candidate accurately calculates values indicated on Enclosure 1 and notifies CRS/SSO of results (completes cue sheet). EXAMINER NOTE: Critical Step Basis: Accurate calculation required to determine Imbalance error. Values recorded must agree within +/- 0.25% of the value given on the JPM SAT __ _ key. UNSAT __ COMMENTS:

112115/28/20096:33 AM Page 6 of II Admin EC I (NRC 2009) H:\NRC -2009\JPM\Admin\Admin ECI (NRC 2009) [Bank #286].docx ADMINISTRATIVE JOB PERFORMANCE MEASURE TERMINATION CRITERIA:

Accurate Imbalance error determined.

RO -END OF TASK STEP 10: SRO ONLY (Step 5.2.1) If Imbalance Error (Enclosure 1), is greater than 2.5% RTP for any NI Channel, then immediately inform the SSO/CRS and refer to ITS SR 3.3.1.3. (Step 5.2.2) If NI recalibration is required, then SP-113G, Power Range Nuclear Instrument Gain Adjustment, is to be used to perform the calibration. (Step 5.2.3) If NI recalibration is required, then reperform this procedure within one hour after the calibration is completed.

STANDARD:

Candidate determines that no result exceeds 2.5% and therefore no ITS Conditions apply. ( COMMENTS:

TERMINATION CRITERIA:

  • Correct ITS actions determined.

SRO -END OF TASK ( Critical Step Basis: Correct ITS actions required to be determined.

SAT __ _ UNSAT __ 11211512812009 6:33 AM Page 7 of 11 Admin ECI (NRC 2009) H:\NRC -2009\JPM\Admin\Admin ECI (NRC 2009) [Bank #286].docx ADMINISTRATIVE JOB PERFORMANCE MEASURE TERMINATION CRITERIA:

Accurate Imbalance error determined.

RO -END OF TASK STEP 10: SRO ONLY (Step 5.2.1) If Imbalance Error (Enclosure 1), is greater than 2.5% RTP for any NI Channel, then immediately inform the SSO/CRS and refer to ITS 8R 3.3.1.3. (Step 5.2.2) If NI recalibration is required, then SP-113G, Power Range Nuclear Instrument Gain Adjustment, is to be used to perform the calibration. (Step 5.2.3) If NI recalibration is required, then reperform this procedure within one hour after the calibration is completed.

STANDARD:

Candidate determines that no result exceeds 2.5% and therefore no ITS Conditions apply. ( COMMENTS:

TERMINATION CRITERIA:

  • Correct ITS actions determined.

SRO -END OF TASK ( Critical Step Basis: Correct ITS actions required to be determined.

SAT __ _ UNSAT __ 112115/28/2009 6:33 AM Page 7 of 11 Admin ECI (NRC 2009) H:\NRC -2009\JPM\Admin\Admin ECI (NRC 2009) [Bank #286].docx ADMINISTRATIVE JOB PERFORMANCE MEASURE ANSWER KEY MONTHLY NI AXIAL POWER IMBALANCE TO INCORE AXIAL POWER IMBALANCE CORRELATION A B C NI INCORE THERMAL RPS IMBALANCE IMBALANCE POWER CHANNEL DETECTOR (APIo) (API!) --Lrn A B C D D(NI-x = D(NI-5 = D(NI-6 = D(NI-7) = D(NI-8 = NI-5 -4.88 %RTP -4.8 %RTP 1340 MWth NI-6 -4.63 %RTP -4.8 %RTP 1340 MWth NI-7 -4.25 %RTP -4.8 %RTP 1340 MWth NI-8 -5.00 %RTP -4.8 %RTP 1340 MWth Imbalance Error Calculations (Values From Columns A, B, and C above) A -B 1 X (2609 / C.) = Imbalance Error, % RTP 1 -4.88 -(-4.8) 1 X (2609 / 1340 ) = 0.16 %RTP 1 -4.63 -(-4.8) 1 X (2609 / 1340 ) = 0.33 %RTP 1 -4.25 -(-4.8) 1 X (2609 / 1340 ) = 1.07 %RTp* 1-5.0 -(-4.8) 1 X (2609 / 1340 ) = 0.39 %RTP IF Imbalance Error for any NI Channel is greater than 2.5% RTP, THEN immediately inform the CRS/SSO AND refer to ITS SR 3.3.1.3. Performed By:

Date: (_ Verified By: Date: ---------------------

112115/28120096:33 AM Page 8 of 11 H:\NRC -2009\JPM\Admin\Admin ECI (NRC 2009) [Bank #286].docx Admin ECI (NRC 2009) ( ( ADMINISTRATIVE JOB PERFORMANCE MEASURE ANSWER KEY MONTHLY NI AXIAL POWER IMBALANCE TO INCORE AXIAL POWER IMBALANCE CORRELATION A B C NI INCORE THERMAL RPS IMBALANCE IMBALANCE POWER CHANNEL DETECTOR (APIo) (API I) ---Lm A NI-5 -4.88 %RTP -4.8 % RTP 1340 MWth B NI-6 -4.63 %RTP -4.8 % RTP 1340 MWth C NI-7 -4.25 %RTP -4.8 % RTP 1340 MWth D NI-8 -5.00 %RTP -4.8 % RTP 1340 MWth Imbalance Error Calculations (Values From Columns A, B, and C above) D(NI-x = I A -B I X (26091 C ) = Imbalance Error, % RTP D(NI-5 = I -4.88 -(-4.8) I X (2609/1340 ) = 0.16 % RTP D(NI-6 = I -4.63 -(-4.8) I X (2609/1340 ) = 0.33 % RTP D(NI-7) = I -4.25 -(-4.8) I X (2609/1340 ) = 1.07 % RTP D(NI-8 = 1-5.0 -(-4.8) I X (2609/1340 ) = 0.39 % RTP IF Imbalance Error for any NI Channel is greater than 2.5% RTP, THEN immediately inform the CRS/SSO AND refer to ITS SR 3.3.1.3. Performed By: Date: ----------------------

Verified By: Date: ----------------------

112115/28/2009 6:33 AM Page 8 of 11 H:INRC -20091JPMIAdminlAdmin ECI (NRC 2009) [Bank #286].docx Admin ECI (NRC 2009)

ADMINISTRATIVE JOB PERFORMANCE MEASURE ANSWER KEY NI POWER IMBALANCE MEASUREMENT DFAM Channel Time "EOUT" * -..JAM NI-5 0300 -4.61 VDC PM NI-6 0300 -..JAM -4.63VDC PM NI-7 0300 -..JAM -4.66VDC PM NI-8 0300 -..JAM -4.60VDC PM NI Power Imbalance Calculations NI Imbalance Equation:

NI Imbalance

(%RTP) = (-12.5 %RTPIVDC x VDC) -62.5 %RTP Example: NI-5 DFAM "bOUT" is measured at -2.5 VDC NI-5 Imbalance

= (-12.5 %RTPIVDC x -2.5VDC) -62.5 %RTP NI-5 Imbalance

= (+31.25 %RTP) -62.5 %RTP NI-5 Imbalance

= -31.25 %RTP Calculations:

NI-5 %RTP = (-12.5 %RTPIVDC x -4.61 VDC) -62.5 %RTP = -4.88 %RTP NI-6 %RTP = (-12.5 %RTPIVDC x -4.63 VDC) -62.5 %RTP = -4.63 %RTP NI-7 %RTP = (-12.5 %RTPIVDC x -4.66 VDC) -62.5 %RTP = -4.25 %RTP NI-8 %RTP = (-12.5 %RTP/VDC x -4.60 VDC) -62.5 %RTP = -5.0 %RTP Date Performed By ------Verified By 1121/5/2&/20096:33 AM Page 9 of 11 H:\NRC -2009\JPM\Admin\Adrnin ECI (NRC 2009) [Bank #286].docx Date ----Admin ECI (NRC 2009) ( ( ADMINISTRATIVE JOB PERFORMANCE MEASURE ANSWER KEY NI POWER IMBALANCE MEASUREMENT DFAM Channel Time "EouT" * -VAM NI-S 0300 -4.61 VDC PM NI-6 0300 -VAM -4.63VDC PM NI-7 0300 -VAM 4.66VDC PM NI-8 0300 -VAM -4.60VDC PM NI Power Imbalance Calculations NI Imbalance Equation:

NI Imbalance

(%RTP) = (-12.S %RTP/VDC x VDC) -62.S %RTP Example: NI-S DFAM "bOUT" is measured at -2.S VDC NI-S Imbalance

= (-12.S %RTP/VDC x -2.SVDC) -62.S %RTP NI-S Imbalance

= (+31.2S %RTP) -62.S %RTP NI-S Imbalance

= -31.2S %RTP Calculations:

NI-S %RTP = (-12.S %RTP/VDC x -4.61 VDC) -62.S %RTP = -4.88 %RTP NI-6 %RTP = (-12.S %RTP/VDC x -4.63 VDC) -62.S %RTP = -4.63 %RTP NI-7 %RTP = (-12.S %RTP/VDC x -4.66 VDC) -62.S %RTP = -4.2S %RTP NI-8 %RTP = (-12.S %RTP/VDC x -4.60 VDC) -62.S %RTP = -S.O %RTP Performed By Verified By 112115/2&/2009 6:33 AM Page 9 of II H:\NRC -2009\JPM\Admin\Admin ECI (NRC 2009) [Bank #286].docx Date Date ----Admin ECI (NRC 2009) c ADMINISTRATIVE JOB PERFORMANCE MEASURE (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF TASK) , INITIAL CONDITIONS:

  • You are the Reactor Operator.

The plant is in normal power operation.

SP-312B, Monthly NI Imbalance Comparison, is required.

The Tag Status Verification Sheet has been completed; all instruments are within their allowable calibration frequency.

The plant has been at steady state conditions for> 15 minutes. The plant computer is out of service. Control Console NI power is as follows: NI-5 -52% NI-6 -53% NI-7 -53% NI-8 -52% PT-138 has been completed.

Incore imbalance is -4.8% RTP. SP-312D has been completed.

Thermal power is 1340 MWT. INITIATING CUE: You are requested to perform SP-312B (voltage readings are attached).

Return Enclosures 1 & 2 with completed JPM. SROs only: Upon completion of the above, evaluate your results and list actions, if any, required per Technical Specifications.

Include applicable time requirements

.. o No ITS actions required, or Per ITS _______ (ITS number) the actions below must be completed within ______ hours. 112115/28/20096:33 AM Page 10 ofll Admin ECI (NRC 2009) H:\NRC -2009\JPM\Admin\Admin ECI (NRC 2009) [Bank #286].docx ( ADMINISTRATIVE JOB PERFORMANCE MEASURE (TO BE RETURNED TO THE EXAMINER UPO,N COMPLETION OF TASK) INITIAL CONDITIONS: . You are the Reactor Operator.

The plant is in normal power operation.

SP-312B, Monthly Nllmbalance Comparison, is required.

The Tag Status Verification Sheet has been completed; all instruments are within their allowable calibration frequency.

The plant has been at steady state conditions for> 15 minutes. The plant computer is out of service. Control Console N I power is as follows: N 1-5 -52% NI-6 -53% NI-7 -53% NI-8 -52% PT-138 has been completed.

Incore imbalance is -4.8% RTP. SP-312D has been completed.

Thermal power is 1340 MWT. INITIATING CUE: You are requested to perform SP-312B (voltage readings are attached).

Return Enclosures 1 & 2 with completed JPM. SROs only: Upon completion of the above, evaluate your results and list actions, if any, required per Technical Specifications.

Include applicable time requirements.

D No ITS actions required, or Per ITS _______ (ITS number) the actions below must be completed within ______ hours. 112115/28/2009 6:33 AM Page 10 of II Admin ECI (NRC 2009) H:\NRC -2009\JPM\Admin\Admin ECI (NRC 2009) [Bank #286].docx

( DVMID# Cal Due Date 112115/28/20096:33 AM ADMINISTRATIVE JOB PERFORMANCE MEASURE NI POWER IMBALANCE MEASUREMENT DFAM Channel Time * "EouT" NI-5 0300 ...JAM -4.61 VDC PM NI-6 0300 ...JAM PM -4.63VDC NI-7 0300 ...JAM -4.66VDC PM NI-8 0300 ...JAM -4.60VDC PM TI-4020 05/09/2010 Page 11 of 11 H:\NRC -2009\JPM\Admin\Admin ECI (NRC 2009) [Bank #286].docx Admin ECI (NRC 2009) ( ( ( DVMID# Cal Due Date 112115/2812009 6:33 AM ADMINISTRATIVE JOB PERFORMANCE MEASURE NI POWER IMBALANCE MEASUREMENT DFAM Channel Time * "EOUT" NI-5 0300 ..JAM -4.61 VDC PM NI-6 0300 ..JAM -4.63VDC PM NI-7 0300 ..JAM -4.66VDC PM NI-8 0300 ..JAM -4.60VDC PM TI-4020 05/09/2010 Page 11 of 11 H:\NRC -2009\JPM\Admin\Admin Eel (NRC 2009) [Bank #286].docx Admin EC1 (NRC 2009)

CRYSTAL RIVER UNIT 3 JPM COVER SHEET ADMIN JPM #RCl NRC 2009 RO/SRO CALCULATE THE MAXIMUM PERMISSIBLE STAY TIME WITHIN EMERGENCY DOSE LIMITS PREP AREDIREVIEWED BY:

Date: 07/09/09 VALIDATED BY: _____

__ ,...__--Date: 07115/09 APPROVALBY:

_____

___ __ . Date: 07120109 * (Nuclear Training Supervisor)

CONCURRED BY: ____

Date: 07/20109 (Operations Representative)

Validation is not required for minor enhancements, procedure revisions that do not affect the JPM or individual step changes that do not affect the flow of the JPM. Operations concurrence is required for new JPMs changes that affect the flow, critical steps or time critical steps of the JPM. Operations concurrence is not required for changes that are required due to a procedure revision. ( CRYSTAL RIVER UNIT 3 JPM COVER SHEET ADMIN JPM #RCI NRC 2009 RO/SRO CALCULATE THE MAXIMUM PERMISSIBLE STAY TIME WITHIN EMERGENCY DOSE LIMITS PREPARED/REVIEWED BY:

_____ _ Date: 07/09/09 VALIDATED BY: _____ ....:.R=o=p-'-/....:.T=.ay'-='-lo=r'---

______ _ Date: 07115/09 APPROVALBY:

_____

___ __ . Date: 07120/09 * (Nuclear Training Supervisor)

CONCURRED BY: ____

______ __ Date: 07/20/09 (Operations Representative)

Validation is not required for minor enhancements, procedure revisions that do not affect the JPM or individual step changes that do not affect the flow of the JPM. Operations concurrence is required for new JPMs and changes that affect the flow, critical steps or time critical steps of the JPM. Operations concurrence is not required for changes that are required due to a procedure revision.

c ADMINISTRATIVE JOB PERFORMANCE MEASURE JPM #: Admin RC1-NRC 2009 [Modified]

Task: Comply with plant radiation exposure criteria.

Alternate Path: D YES [gj NO PRA Top Critical Action: D YES [gj NO Safety Function:

NA KIA Rating/Importance:

G2.3.4 RO 3.2 SRO 3.7 Task Number: 1190102008

-RO Position:

DSROONLY [gjRO/SRO DNLOIRO/SRO Task Standard:

Calculate the maximum permissible stay time within Emergency Dose Limits (+/- 5 minutes) Preferred Evaluation Location:

Preferred Evaluation Method: D SIM D PLANT [gj ADMIN [gj PERFORM . D SIMULATE c

References:

EM-202, Rev 85 Validation Time: 5 minutes Time Critical:

DYES[gjNO

================================================

Candidate:

Time Start: -----------------------------

Printed Name Time Finish: ____ _ Performance Rating: D SAT D UNSAT Performance Time: ____ _ Examiner:


Printed Name Signature Date Comment: ---------------------------------------------------------. 5/28/2009 8:09 AM Page 2 of7 Admin RCI (NRC 2009) H:\NRC -2009\JPM\Admin\Admin RCI (NRC 2009) [Modified].docx ( ADMINISTRATIVE JOB PERFORMANCE MEASURE JPM #: Admin RC 1-NRC 2009 [Modified]

Task: Comply with plant radiation exposure criteria.

Alternate Path: DYES [gJ NO PRA Top Critical Action: DYES [gJ NO Safety Function:

NA KIA Rating/Importance:

G2.3.4 RO 3.2 SRO 3.7 Task Number: 1190102008

-RO Position:

DSROONLY [gJRO/SRO DNLO/RO/SRO Task Standard:

Calculate the maximum permissible stay time within Emergency Dose Limits (+/- 5 minutes) Preferred Evaluation Location:

Preferred Evaluation Method: D SIM D PLANT [gJ ADMIN [gJPERFORM DSlMULATE ,

References:

EM-202, Rev 85 Validation Time: 5 minutes Time Critical:

DYES [gJNO ===========================================================================

Candidate:

Time Start: -------------------------------Printed Name Time Finish: -----Performance Rating: D SAT D UNSAT Performance Time: ----------

Examiner:

/ ------------------------------



Printed Name Signature Date Comment: ---------------------------------------------------------------

5/28/20098:09 AM Page 2 of7 Admin RCI (NRC 2009) H:\NRC -2009\JPM\Admin\Admin RCI (NRC 2009) [Modified].docx

( ( ADMINISTRATIVE JOB PERFORMANCE MEASURE SIMULATOR OPERATOR SETUP INSTRUCTIONS

1. None SIMULATOR OPERATOR INSTRUCTIONS
1. None TOOLS/EQUIPMENT/PROCEDURES NEEDED 1. 2. EM-202, Rev 85 Calculator 5/28/20098:09 AM Reference Page 3 of7 H:\NRC -2009\JPM\Admin\Adniin RCI (NRC 2009) [Modified].docx Admin RC I (NRC 2009) ( ( ADMINISTRATIVE JOB PERFORMANCE MEASURE SIMULATOR OPERATOR SETUP INSTRUCTIONS
1. None SIMULATOR OPERATOR INSTRUCTIONS
1. None TOOLS/EQUIPMENT/PROCEDURES NEEDED 1. 2. EM-202, Rev 85 Calculator 5/28/20098:09 AM Reference Page 3 of7 H:\NRC -2009\JPM\Admin\Admin RCI (NRC 2009) [Modified].docx Admin RCI (NRC 2009)

ADMINISTRATIVE JOB PERFORMANCE MEASURE READ TO THE OPERATOR INITIAL CONDITIONS You are the Balance of Plant operator.

An emergency event is in pr.ogress.

Emergency Dose Limits (EDL) are in effect. The PPO has received 1.62 Rem TEDE this year. The lise of High Pressure Aux Spray will increase the pressure reduction rate AND is required to protect valuable plant equipment.

The Emergency Coordinator has approved this evolution.

The following tasks are to be performed to align High Pressure Aux Spray: # TASK TIME DOSE RATE 1 Open MUV-273 22 minutes 5.31 Rlhr 2 Open DHV-95 7 minutes 19.75 Rlhr 3 Open DHV-126 3.65 Rlhr Note: Assume no dose is received while traveling between tasks. INITIATING CUES The PPO has completed tasks 1 and 2 in the times listed above. How long does he have to complete Task #3 without exceeding his Emergency Dose Limit? 5/28120098:09 AM Page 4 of7 Admin RCI (NRC 2009) H:\NRC -2009\JPM\Admin\AdminRCI (NRC 2009) [Modified].docx ( ( ADMINISTRATIVE JOB PERFORMANCE MEASURE READ TO THE OPERATOR INITIAL CONDITIONS You are the Balance of Plant operator.

An emergency event is in pr.ogress.

Emergency Dose Limits (EDL) are in effect. The PPO has received 1.62 Rem TEDE this year. The use of High Pressure Aux Spray will increase the pressure reduction rate AND is required to protect valuable plant equipment.

The Emergency Coordinator has approved this evolution.

The following tasks are to be performed to align High Pressure Aux Spray: # TASK TIME DOSE RATE 1 Open MUV-273 22 minutes 5.31 Rlhr 2 OpenDHV-95 7 minutes 19.75 Rlhr 3 Open DHV-126 3.65 Rlhr Note: Assume no dose is received while traveling between tasks. INITIATING CUES The PPO has completed tasks 1 and 2 in the times listed above. How long does he have to complete Task #3 without exceeding his Emergency Dose Limit? 5/28/20098:09 AM Page 4 of7 Admin RCI (NRC 2009) H:\NRC -2009\JPM\Admin\Admin RCI (NRC 2009) [Modified].docx ADMINISTRATIVE JOB PERFORMANCE MEASURE Note: Candidate may perform these steps in a different order. Note: Candidate should understand the following:

1. EDL is 10 Rem for this event (may use EM-202 as a reference).
2. Current exposure for the year is not counted toward the EDL. TIME START ___ _ STEP 1: Determine dose received w4ile performing Task #1. , STANDARD:

Candidate determines dose received while performing Task #1. 5.31 Rlhr X 1hr/60 min X 22 min = 1.95 R EXAMINER NOTE: If JPM is not performed in the simulator then provide candidate with a copy of EM-202, Duties of the Emergency Coordinator.

COMMENTS:

STEP 2: Determine dose received wItile performing Task #2. STANDARD:

Candidate determines dose received while performing Task #2. 19.75 R/hr X 1hr/60 min X 7 min = 2.30 R COMMENTS:

SAT UNSAT SAT UNSAT 5128/2009 8:09 AM Page 5 of7 Admin RCI (NRC 2009)

-2009\JPM\Admin\Admin RCI (NRC 2009) [Modified].docx ( ( ADMINISTRATIVE JOB PERFORMANCE MEASURE Note: Candidate may perform these steps in a different order. Note: Candidate should understand the following:

1. EDL is 10 Rem for this event (may use EM-202 as a reference).
2. Current exposure for the year is not counted toward the EDL. TIME START ___ _ STEP 1: Determine dose received w4ile performing Task #1. e STANDARD:

Candidate determines dose received while performing Task #1. 5.31 Rlhr X 1hr/60 min X 22 min = 1.95 R EXAMINER NOTE: If JPM is not performed in the simulator then provide candidate with a copy of EM-202, Duties of the Emergency Coordinator.

COMMENTS:

STEP 2: Determine dose received wHile performing Task #2. STANDARD:

Candidate determines dose received while performing Task #2. 19.75 Rlhr X 1hr/60 min X 7 min = 2.30 R COMMENTS:

SAT UNSAT SAT UNSAT 5/28/2009 8:09 AM Page 5 of7 Admin RC I (NRC 2009) H:\NR,C -2009\]PM\Admin\Admin RCI (NRC 2009) [ModifiedJ.docx

( ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 3: Determine dose remaining for EDL. STANDARD:

Candidate determines dose remaining for EDL. 10.0 R -1.95 R -

R = 5.75 R COMMENTS: , STEP 4: Determine the time available for the PPO to complete Task #3 without exceeding the EDL. STANDARD:

Candidate determines

(+/- 5 minutes) the time available for the PPO to complete Task #3 without exceeding the EDL. Available Dose = 5.75 R Dose Rate 3.65 R/hr = 1.58 hr X 60 min = 94.8 min 1hr COMMENTS:

TERMINATION CUE: Time limit determined.

END OF TASK TIME STOP SAT UNSAT Critical Step Basis: Required calculation for maximum stay time. SAT UNSAT 5/28/2009 8:09 AM Page 6 of7 Admin RCI (NRC 2009) H:\NRC -2009\JPM\Admin\Admin RCI (NRC 2009) [Modified].docx ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 3: ( Determine dose remaining for EDL. ( ( STANDARD:

Candidate determines dose remaining for EDL. 10.0 R -1.95 R -

R = 5.75 R COMMENTS: , STEP 4: Determine the time available for the PPO to complete Task #3 without exceeding the EDL. STANDARD:

Candidate determines

(+/- 5 minutes) the time available for the PPO to complete Task #3 without exceeding the EDL. Available Dose = 5.75 R Dose Rate 3.65 Rlhr = 1.58 hr X 60 min = 94.8 min 1 hr COMMENTS:

TERMINATION CUE: Time limit determined.

END OF TASK TIME STOP SAT UNSAT Critical Step Basis: Required calculation for maximum stay time. SAT UNSAT 5/28/2009 8:09 AM Page 6 of7 Admin RCI (NRC 2009) H:\NRC -2009\JPM\Admin\Admin RCI (NRC 2009) [Modified].docx ADMINISTRATIVE JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK) INITIAL CONDITIONS

  • You are the Balance of Plant operator.

An emergency event is in progress.

Emergency Dose Limits (EDL) are in effect. The PPO has received 1.62 Rem TEDE this year. The use of High Pressure Aux Spray will increase the pressure reduction rate AND is required to protect valuable plant equipment.

The Emergency Coordinator has approved this evolution.

The following tasks are to be performed to align High Pressure Aux Spray: # TASK TIME DOSE RATE 1 Open MUV-273 22 minutes 5.31 R/hr 2 OpenDHV-95 7 minutes 19.75 Rlhr 3 Open DHV-126 3.65 R/hr Note: Assume no dose is received while traveling between tasks. INITIATING CUES The PPO has completed tasks 1 and 2 in the times listed above. How long does he have to complete Task #3 without exceeding his Emergency Dose Limit? ( ADMINISTRATIVE JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK) INITIAL CONDITIONS f You are the Balance of Plant operator.

An emergency event is in progress.

Emergency Dose Limits (EDL) are in effect. The PPO has received 1.62 Rem TEDE this year. The use of High Pressure Aux Spray will increase the pressure reduction rate AND is required to protect valuable plant equipment.

The Emergency Coordinator has approved this evolution.

The following tasks are to be performed to align High Pressure Aux Spray: # TASK TIME DOSE RATE 1 Open MUV-273 22 minutes 5.31 Rlhr 2 OpenDHV-95 7 minutes 19.75 Rlhr 3 Open DHV -126 3.65 Rlhr Note: Assume no dose is received while traveling between tasks. INITIATING CUES The PPO has completed tasks 1 and 2 in the times listed above. How long does he have to complete Task #3 without exceeding his Emergency Dose Limit?

CRYSTAL RIVER UNIT 3 JPM COVER SHEET ADMIN JPM #EPI NRC 2009 ALTERNATE PATH TIME CRITICAL RO/SRO Performed in Simulator COMPLETE THE STATE OF FLORIDA NOTIFICATION MESSAGE FORM FOR NUCLEAR POWER PLANTS PREPARED BY: __________

______ __ Date: 07/09/09 VALIDATED BY: Rop 1 Taylor Date: 07115/09 APPROVAL BY: __________

__ Date: 07/20109 (Nuclear Training Supervisor)

CONCURRED BY: __________

________ __ Date: 07/20109 (Operations Representative)

Validation is not required for minor enhancements, procedure revisions that do not affect the JPM or individual step changes that do not affect the flow of the lPM . . Operations concurrence is required for new JPMs and changes that affect the flow, critical steps or time qitical steps of the lPM. Operations concurrence is not required for changes that are required due to a procedure revision. ( CRYSTAL RIVER UNIT 3 JPM COVER SHEET ADMIN JPM #EPI NRC 2009 ALTERNATE PATH TIME CRITICAL RO/SRO Performed in Simulator COMPLETE THE STATE OF FLORIDA NOTIFICATION MESSAGE FORM FOR NUCLEAR POWER PLANTS PREPARED BY: __________

________ __ Date: 07/09/09 VALIDATED BY: Rop 1 Taylor Date: 07115/09 APPROVAL BY: __________

__ Date: 07120109 (Nuclear Training Supervisor)

CONCURRED BY: __________

________ __ Date: 07/20109 (Operations Representative)

Validation is not required for minor enhancements, procedure revisions that do not affect the JPM or individual step changes that do not affect the flow of the lPM. Operations concurrence is required for new JPMs and changes that affect the flow, critical steps or time steps of the lPM. Operations concurrence is not required for changes that are required due to a procedure revision.

ADMINISTRATIVE JOB PERFORMANCE MEASURE JPM #: Admin EPI -NRC 2009 [BANK] Task:. Complete a notification to the State Warning Point. Alternate Path: [2;J YES D NO PRA Top Critical Action: DYES [2;J NO Safety Function:

NA . KIA Rating/Importance:

G2.4.43 RO 3.2 SRO 3.8 Task Number: 1150402005 Position:

DSROONLY [2;JRO/SRO DNLO/RO/SRO Task Standard:

Complete the State of Florida Notification form and make required notifications per EM-202. Preferred Evaluation Location:

Preferred Evaluation Method: D SIM D PLANT [2;J ADMIN [2;J PERFORM D SIMULATE

References:

EM-202, Rev 85 Validation Time: 10 minutes Time Critical:

[2;J YES D NO Candidate:

Time Start: ----------------------------

Printed Name Time Finish: ______________

__ Performance Rating: D SAT D UNSAT Performance Time: _____ _ Examiner:

_____________________________________________________

/ ____ __ Printed Name Signature Date Comment: __________________________________________________________

__ 7/9/2009 10:43 PM Page 2 of 10 Admin EPI (NRC 2009) H:\NRC -2009\JPM\Admin\Admin EPI (NRC 2009) [BANK] Rev l.docx ( ( ADMINISTRATIVE JOB PERFORMANCE MEASURE JPM #: Admin EPI -NRC 2009 [BANK] Task: Complete a notification to the State Warning Point. Alternate Path: [Sj YES D NO PRA Top Critical Action: DYES [Sj NO Safety Function:

NA , KIA Rating/Importance:

G2.4.43 RO 3.2 SRO 3.8 Task Number: 1150402005 Position:

DSROONLY [SjRO/SRO DNLO/RO/SRO Task Standard:

Complete the State of Florida Notification form and make required notifications per EM-202. Preferred Evaluation Location:

Preferred Evaluation Method: D SIM D PLANT [Sj ADMIN [SjPERFORM D SIMULATE

References:

EM-202, Rev 85 Validation Time: 10 minutes Time Critical:

[SjYES DNO Candidate:

Time Start: ----------------------------

Printed Name Time Finish: ______________

_ Performance Rating: D SAT D UNSAT Performance Time: -----Examiner:

/

Printed Name Signature Date Comment: ____________________________________________________

_ 7/9/2009 10:43 PM Page 2 of 10 Admin EP 1 (NRC 2009) H:\NRC -2009\JPM\Admin\Admin EPI (NRC 2009) [BANK] Rev I.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE ( SIMULATOR SETUP INSTRUCTIONS NA SIMULATOR OPERATOR INSTRUCTIONS Do not answer the SHRD phone when called. TOOLS/EQUIPMENTIPROCEDURES NEEDED 1. EM-202, Rev 85 2. Consumable copies ofEM-202, Enclosure 2 7/9/2009 10:43 PM .

  • Page 3 of 10 Admin EPI (NRC 2009) H:\NRC -2009\JPM\Admin\Admin EPI (NRC 2009) [BANK] Rev l.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE SIMULATOR SETUP INSTRUCTIONS NA SIMULATOR OPERATOR INSTRUCTIONS Do not answer the SHRD phone when called. TOOLS/EQUIPMENT/PROCEDURES NEEDED 1. EM-202, Rev 85 2. Consumable copies ofEM-202, Enclosure 2 7/9/200910:43 PM. Page 3 of 10 Admin EP1 (NRC 2009) H:\NRC -2009\JPM\Admin\Admin EP1 (NRC 2009) [BANK] Rev l.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE SRO ONLY CUE SHEET READ TO THE OPERATOR INITIAL CONDITIONS You are the Senior Operator.

A Site Area Emergency has been declared due to a SGTR concurrent with a loss of condenser vacuum at time NOW. No Protective Action Recommendations at this time. The event has not been terminated.

INITIATING CUES Using the above information complete Steps 1. 2.4.5 and 11 of the Florida Nuclear Plant Emergency Notification Form AND make required notifications per EM-202. . This JPM is Time Critical.

7/9/2009 10:43 PM Page 4 of 10 Admin EPI (NRC 2009) H:\NRC -2009\JPM\Admin\Admin EPI (NRC 2009) [BANK] Rev l.docx ( ADMINISTRATIVE JOB PERFORMANCE MEASURE SRO ONLY CUE SHEET READ TO THE OPERATOR INITIAL CONDITIONS You are the Senior Operator.

A Site Area Emergency has been declared due to a SGTR concurrent with a loss of condenser vacuum at time NOW. No Protective Action Recommendations at this time. The event has not been terminated.

INITIATING CUES Using the above information complete Steps 1. 2. 4. 5 and 11 of the Florida Nuclear Plant Emergency Notification Form AND make required notifications per EM-202. This JPM is Time Critical.

7/9/2009 10:43 PM Page 4 of 10 Admin EPI (NRC 2009) H:\NRC -2009\JPM\Admin\Admin EPI (NRC 2009) [BANK] Rev l.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE RO ONLY CUE SHEET READ TO THE OPERATOR INITIAL CONDITIONS You are the Reactor Operator.

A Site Area Emergency has been declared.

INITIATING CUES Using the Florida Nuclear Plant Emergency Notification Form provided make required notifications per EM-202. This JPM is Time Critical.

7/9/2009 10:43 PM Page 5 of 10 Admin EPI (NRC 2009) H:\NRC -2009\JPM\Admin\Admin EPI (NRC 2009) [BANK] Rev l.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE RO ONLY CUE SHEET READ TO THE OPERATOR INITIAL CONDITIONS You are the Reactor Operator.

A Site Area Emergency has been declared.

INITIATING CUES Using the Florida Nuclear Plant Emergency Notification Form provided make required notifications per EM-202. This JPM is Time Critical.

7/9/2009 10:43 PM Page 5 of 10 Admin EPI (NRC 2009) H;\NRC -2009\JPM\Admin\Admin EPI (NRC 2009) [BANK] Rev l.docx

( ( ADMINISTRATIVE JOB PERFORMANCE MEASURE TIME START ___ _ STEP 1 IS SRO ONLY STEP 1: Candidate completes the Florida Nuclear Plant Emergency Notification Form. STANDARD:

EXAMINER NOTE: COMMENTS:

Candidate completes the notification form correctly.

Per the cue only steps 1, 2, 4, 5 and 11 need to be completed.

Critical information on this form includes sections 4, 5 and 11. Leaving any other section blank does not constitute failure of this step. STEP 2 IS SRO AND RO STEP 2: Candidate makes required notifications.

STANDARD:

EXAMINER NOTE: EXAMINER NOTE: EXAMINER CUE: COMMENTS:

Candidate makes required notifications.

When the SHRD phone goes unanswered the candidate will use the commercial telephone system to contact SWPT. Page 3 of Enclosure 2 contains the instructions for using an alternate communication network. When candidate attempts to call SWPT on the commercial line then time critical requirement is met. Terminate the JPM when candidate attempts to call SWPT from the commercial line. Critical Step (required critical information)

SAT UNSAT Critical Step (15 minute notification required)

SAT UN SAT 7/9/2009 10:43 PM Page 6 of 10 Admin EPI (NRC 2009) H:\NRC -2009\JPM\Admin\Admin EPI (NRC 2009) [BANK] Rev l.docx ( ( ADMINISTRATIVE JOB PERFORMANCE MEASURE TIME START ____ _ STEP 1 IS SRO ONLY STEP 1: Candidate completes the Florida Nuclear Plant Emergency Notification Form. STANDARD:

EXAMINER NOTE: COMMENTS:

Candidate completes the notification form correctly.

Per the cue only steps 1, 2, 4, 5 and 11 need to be completed.

Critical information on this form includes sections 4,5 and 11. Leaving any other section blank does not constitute failure of this step. STEP 2 IS SRO AND RO STEP 2: Candidate makes required notifications.

STANDARD:

EXAMINER NOTE: EXAMINER NOTE: EXAMINER CUE: COMMENTS:

Candidate makes required notifications.

When the SHRD phone goes unanswered the candidate will use the commercial telephone system to contact SWPT. Page 3 of Enclosure 2 contains the instructions for using an alternate communication network. When candidate attempts to call SWPT on the commercial line then time critical requirement is met. Terminate the JPM when candidate attempts to call SWPT from the commercial line. Critical Step (required critical information)

SAT UNSAT Critical Step (15 minute notification required)

SAT UN SAT 7/9/200910:43 PM Page 6 of 10 Admm EPI (NRC 2009) H:\NRC -2009\JPM\Admin\Admin EPI (NRC 2009) [BANK] Rev l.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE TERMINATION CRITERIA:

When candidate attempts notification to SWPT using the commercial phone line this JPM may be terminated.

END OF TASK TIME STOP ____ _ 7/9/2009 10:43PM Page 7 of 10 Admin EPI (NRC 2009) H:\NRC -2009\JPM\Admin\Admin EPI (NRC 2009) [BANK] Rev I.docx ( ( ADMINISTRATIVE JOB PERFORMANCE MEASURE TERMINATION CRITERIA:

When candidate attempts notification to SWPT using the commercial phone line this JPM may be terminated.

END OF TASK TIME STOP ____ _ 7/912009 10:43 PM Page 7 of 10 Admin EPI (NRC 2009) H:\NRC -2009\JPM\Admin\Admin EPI (NRC 2009) [BANK] Rev l.docx

( CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK) SRO ONLY CUE SHEET INITIAL CONDITIONS You are the Senior Reador Operator.

A Site Area Emergency has been declared due to a SGTR concurrent with a loss of condenser vacuum at time NOW. No Protective ActionRecommendations at this time. The event has not been terminated.

INITIATING CUES Using the above information complete Steps 1. 2. 4. 5 and 11 of the Florida Nuclear Plant Emergency Notification Form AND make required notifications per EM-202. This JPM is Time Critical.

CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK) SRO ONLY CUE SHEET INITIAL CONDITIONS You are the Senior Reador Operator.

A Site Area Emergency has been declared due to a SGTR concurrent with a loss of condenser vacuum at time NOW. No Protective Action Recommendations at this time. The event has not been terminated.

INITIATING CUES ( Using the above information complete Steps I. 2. 4. 5 and 11 of the Florida Nuclear Plant Emergency Notification Form AND make required notifications per EM-202. This JPM is Time Critical. (

( CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK) RO ONLY CUE SHEET INITIAL CONDITIONS You are the Reactor Operator.

An Unusual Event has been declared.

INITIATING CUES Using the Florida Nuclear Plant Emergency Notification Form provided make required notifications per EM-202. This JPM is Time Critical. ( CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK) RO ONLY CUE SHEET INITIAL CONDITIONS You are the Reactor Operator.

An Unusual Event has been declared.

INITIATING CUES Using the Florida Nuclear Plant Emergency Notification Form provided make required notifications per EM-202. This JPM is Time Critical.

RO ONLY DATA SHEET f"LORIDA NUCLEAR PLANT EMERGENCY NOTIFICATION FORM HIS IS CRYSTAL RIVER UNIT 3. A. 0 This is a Drill B. C8:J This is an Emergency I HAVE A MESSAGE.

0 STATE 0 CITRUS 0 LEVY 0 RADIATION CONTROL -ORLANDO (M-F ONLY) ARE ON LINE. ( ,. 't..ldte:

B. Contact Time: C. Reported By: (Name) _________

_ '. Message Number: __ . 0 Initial' New Classification OR E. Reported From: 0 Control Room 0 TSC 0 EOF o Update ITE: C8:J CR UNIT 3 o SL UNIT 1 o SL UNIT2 o TP UNIT3 o TP UNIT4 MERGENCY CLASSIFICATION:

,. C8:J EMERGENCY DECLARATION:

A. C8:J Notification of Unusual Event C. 0 Site Area Emergency B. 0 EMERGENCY TERMINATION:

B. 0 Alert D. 0 General Emergency Date: __ , __ , __ Time: .EASON FOR EMERGENCY DECLARATION:

A. 0 EAL Number(s):

OR B. 0

Description:

,COITIONAL INFORMATION OR UPDATEf A. 0 None OR B. 0

Description:

lEATHER DATA: A. Wind direction from ___ degrees B. Downwind Sectors affected _______ _ .ELEASE STATUS: A. 0 None (Go to Item 11) B. 0 In Progress C. 0 Has occurred, but stopped &plEASE SIGNIFICANCE CATEGORY: (at the Site Boundary)

B. 0 Release is within Normal Operating Limits D. 0 Protective Action Guide Range J Under evaluation C. 0 Non-Significant (Fraction of PAG Range) E. 0 Liquid release (no actions required)

\ UTILITY RECOMMENDED PROTECTIVE ACTIONS FOR THE PUBLIC: A. C8:J No utility recommended actions at this time. B. 0 Utility recommends the following protective actions; EVACUATEZONES:

_________

_ SHELTER ZONES: AND consider issuance of Potassium Iodide (KI). If form is completed in the Control Room, go to Item 15. If completed in the TSC or EOF, CONTINUE with Item 12. PLANT CONDITIONS:

A. Reactor Shutdown?

C. Containment Intact? DYES DYES o NO o NO B. Core Adequately Cooled? 0 YES o NO D. Core Condition:

0 Stable o Degrading WEATHER DATA: A. Wind Speed ___ MPH (m'sec x 2.24 = MPH) B. Stability Class __ ADDITIONAL RELEASE INFORMATION:

A. 0 Not Applicable (Go to Item 15) Distance 1 Mile (Site Boundary) 2 Miles 5 Miles 10 Miles Projected Thyroid Dose (CDE) for __ Hour(s) B. _______ mrem D. mrem F. _______ mrem H. _______ mrem Projected Total Dose (TEDE) for __ Hour(s) C. mrem E. _______ mrem G. mrem I. _______ mrem IAGE RECEIVED BY: (Name) ______ _ Date: __ , __ ,__ Time: ___ _ THiS IS CRYSTAL RIVER UNIT 3. o This Is A Drill o This Is An Emergency END OF MESSAGE HIS IS CRYSTAL RIVER UNIT 3. URJ;:: D STATE D CITRUS ( .. l..Idte:

'. Message Number: __ . D Initial' New Classification ITE: CRUNIT3 MERGENCY CLASSIFICATION:

RO ONLY DATA SHEET f'LORIDA NUCLEAR PLANT EMERGENCY NOTIFICATION FORM A. D This is a Drill B. This is an Emergency I HAVE A MESSAGE. D LEVY D RADIATION CONTROL -ORLANDO (M-F ONLY) ARE ON LINE. B. Contact Time: ___ _ OR C. Reported By: (Name) _________

_ E. Reported From: D Control Room D TSC D EOF D Update D SL UNIT 1 D SL UNIT2 D TP UNIT 3 D TP UNIT 4 A. Notification of Unusual Event C. D Site Area Emergency B. D Alert D. D General Emergency

.. EMERGENCY DECLARATION:

B. D EMERGENCY TERMINATION:

Date: __ , __ , __ Time: .EASON FOR EMERGENCY DECLARATION:

A. DEAL Number(s):

OR B. D

Description:

.DDITIONAL INFORMATION OR A. D None OR B. D

Description:

lEATHER DATA: A. Wind direction from ___ degrees B. Downwind Sectors affected _______ _ .ELEASE STATUS: A. D None (Go to Item 11) B. D In Progress C. D Has occurred, but stopped EASE SIGNIFICANCE CATEGORY: (at the Site Boundary)

B. D Release is within Normal Operating Limits D. D Protective Action Guide Range j Under evaluation

c. D Non-Significant (Fraction of PAG Range) E. D Liquid release (no actions required)

\ UTILITY RECOMMENDED PROTECTIVE ACTIONS FOR THE PUBLIC: A. No utility recommended actions at this time. B. D Utility recommends the following protective actions; EVACUATEZONES:

__________

_ SHELTER ZONES: AND consider issuance of Potassium Iodide (KI). If form is completed in the Control Room, go to Item 15. If completed in the TSC or EOF, CONTINUE with Item 12. PLANT CONDITIONS:

A. Reactor Shutdown?

C. Containment Intact? DYES DYES D NO D NO B. Core Adequately Cooled? DYES D NO D. Core Condition:

D Stable D Degrading WEATHER DATA: A. Wind Speed ___ MPH (m'sec x 2.24 = MPH) B. Stability Class __ ADDITIONAL RELEASE INFORMATION:

A. D Not Applicable (Go to Item 15) Distance 1 Mile (Site Boundary) 2 Miles 5 Miles 10 Miles Projected Thyroid Dose (CDE) for __ Hour(s) B. _______ mrem D. mrem F. mrem H. mrem Projected Total Dose (TEDE) for __ Hour(s) C. mrem E. _______ mrem G. mrem I. mrem r( iAGE RECEIVED BY: (Name) ______ _ Date: __ , __ ,__ Time: ___ _ nils IS CRYSTAL RIVER UNIT 3. D This Is A Drill D This Is An Emergency END OF MESSAGE