Letter Sequence Other |
---|
|
|
MONTHYEARML1101105712010-12-20020 December 2010 Operator Licensing Retake Exam - Draft Operating Exam (Sections a and B) (Folder 2) Project stage: Draft Other ML1101105612010-12-20020 December 2010 Operator Licensing Operating Test Retake Exam - Draft Outlines (Folder 2) Project stage: Draft Other ML1101105382010-12-22022 December 2010 Op Retake Exam - NRC Comments on Draft Licensee-Developed Exam (Operating Tests) (Folder 2) Project stage: Draft Other ML1102506292011-01-10010 January 2011 Op Retake Exam - Final Operating Exam (Sections a and B) (Folder 3) Project stage: Acceptance Review ML1102506112011-01-10010 January 2011 Operator Licensing Retake Operating Test Exam - Final Outlines (Folder 3) Project stage: Other ML1101202592011-01-12012 January 2011 Initial Operator Licensing Operating Retake Test Approval - Calvert Cliffs Nuclear Power Plant Project stage: Other ML1107703732011-02-0707 February 2011 Op Retake Exam - Final Qa/Related Forms (Folder 1) Project stage: Other 2011-01-10
[Table View] |
|
---|
Category:License-Operator
MONTHYEARRS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23179A1242023-06-14014 June 2023 Final QA Related Forms ML22221A0302022-08-0202 August 2022 Administrative Files ML22221A0432022-08-0202 August 2022 Quality Checklists ML24016A1582022-08-0202 August 2022 NRC Exam Seating Chart for Written Exam Administered on July 20, 2022 RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML21252A0452021-09-15015 September 2021 Requalification Program Inspection ML22073A1172021-06-21021 June 2021 2021 Final Written Exam Original Modified Questions ML21187A3082021-06-16016 June 2021 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML21193A3162021-06-16016 June 2021 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML21193A3212021-06-16016 June 2021 Draft Written Examination and Operating Test Outlines (Folder 2) ML21187A3102021-06-16016 June 2021 Final Operating Test (Sections a, B, and C) (Folder 3) ML21187A3072021-06-16016 June 2021 Draft Written Examination (Folder 2) ML21202A1642021-06-16016 June 2021 Handouts to Applicants (Folder 3) ML21193A2982021-06-16016 June 2021 Miscellaneous Exam Material (Folder 1) ML21193A3072021-06-16016 June 2021 Final Qa/Related Form - ES-401-6 (Folder 1) ML21193A3692021-06-16016 June 2021 Final Written Examination and Operating Test Outlines (Folder 3) ML21189A2882021-06-16016 June 2021 Final Qa/Related Forms (Folder 1) ML21193A3122021-06-16016 June 2021 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML21105A4352021-04-20020 April 2021 March 10, 2021, NRC Generic Fundamentals Examination Results for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML21187A3092021-03-29029 March 2021 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML21074A3242021-03-15015 March 2021 LLC - Licensed Operator Positive Fitness-For-Duty Test ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20105A1222020-04-14014 April 2020 March 4, 2020, NRC Generic Fundamentals Examination Results for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML21025A1432020-02-0707 February 2020 ES-401-6 (Folder 1) ML20057E5602020-02-0707 February 2020 Final Operating Test (Sections a, B, and C) (Folder 3) ML20057E5592020-02-0707 February 2020 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML20274A0832020-02-0707 February 2020 Draft Written Examination (Folder 2) ML21025A4142020-02-0707 February 2020 Original Questions for Modified Questions ML21025A0732020-02-0707 February 2020 Final QA Related Forms (Folder 1) ML20274A1052020-02-0707 February 2020 Draft Written Examination and Operating Test Outlines (Folder 2) ML20274A1362020-02-0707 February 2020 Final Written Examination and Operating Test Outlines (Folder 3) ML20274A0922020-02-0707 February 2020 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML20279A3312020-02-0707 February 2020 Handouts to Applicants (Folder 3) ML20274A0942020-02-0707 February 2020 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML20274A0662020-02-0707 February 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19157A0962019-06-0606 June 2019 Senior Reactor and Reactor Operator Initial License Examinations RS-19-053, Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations2019-05-16016 May 2019 Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations IR 05000317/20193012019-05-0606 May 2019 NRC Initial and Retake Operator Licensing Examination Report Er 05000317/2019301 and 05000318/2019301 ML18312A3882018-11-0707 November 2018 Senior Reactor and Reactor Operator Initial and Retake License Examinations ML18311A1292018-10-0101 October 2018 Handouts to Applicants (Folder 3) ML18311A1142018-08-0202 August 2018 Examination Approval Letter (Folder 1) ML18214A4482018-08-0202 August 2018 Initial Operator Licensing Written Examination Approval: Calvert Cliffs Nuclear Power Plant Units 1 and 2 RS-18-057, Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-25025 April 2018 Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML18311A1132017-12-14014 December 2017 NRC Corporate Notification Letter (Folder 1) RS-17-070, Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations2017-05-0303 May 2017 Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations IR 05000317/20173012017-03-13013 March 2017 Initial Operator Licensing Examination Report 05000317/2017301 and 05000318/2017301 ML17069A4052017-02-0909 February 2017 Op Test Retake - Draft Operating Exam (Section a, Section B) (Folder 2) 2023-06-16
[Table view] Category:Part 55 Examination Related Material
MONTHYEARRS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23179A1242023-06-14014 June 2023 Final QA Related Forms ML24016A1582022-08-0202 August 2022 NRC Exam Seating Chart for Written Exam Administered on July 20, 2022 ML22221A0302022-08-0202 August 2022 Administrative Files ML22221A0432022-08-0202 August 2022 Quality Checklists RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML22073A1172021-06-21021 June 2021 2021 Final Written Exam Original Modified Questions ML21193A2982021-06-16016 June 2021 Miscellaneous Exam Material (Folder 1) ML21193A3122021-06-16016 June 2021 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML21193A3072021-06-16016 June 2021 Final Qa/Related Form - ES-401-6 (Folder 1) ML21202A1642021-06-16016 June 2021 Handouts to Applicants (Folder 3) ML21187A3072021-06-16016 June 2021 Draft Written Examination (Folder 2) ML21193A3212021-06-16016 June 2021 Draft Written Examination and Operating Test Outlines (Folder 2) ML21189A2882021-06-16016 June 2021 Final Qa/Related Forms (Folder 1) ML21193A3692021-06-16016 June 2021 Final Written Examination and Operating Test Outlines (Folder 3) ML21187A3082021-06-16016 June 2021 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML21193A3162021-06-16016 June 2021 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML21187A3102021-06-16016 June 2021 Final Operating Test (Sections a, B, and C) (Folder 3) ML21187A3092021-03-29029 March 2021 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML21025A4142020-02-0707 February 2020 Original Questions for Modified Questions ML20274A1362020-02-0707 February 2020 Final Written Examination and Operating Test Outlines (Folder 3) ML21025A0732020-02-0707 February 2020 Final QA Related Forms (Folder 1) ML20279A3312020-02-0707 February 2020 Handouts to Applicants (Folder 3) ML20274A0922020-02-0707 February 2020 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML21025A1432020-02-0707 February 2020 ES-401-6 (Folder 1) ML20274A1052020-02-0707 February 2020 Draft Written Examination and Operating Test Outlines (Folder 2) ML20274A0832020-02-0707 February 2020 Draft Written Examination (Folder 2) ML20057E5602020-02-0707 February 2020 Final Operating Test (Sections a, B, and C) (Folder 3) ML20274A0662020-02-0707 February 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML20057E5592020-02-0707 February 2020 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML20274A0942020-02-0707 February 2020 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19157A0962019-06-0606 June 2019 Senior Reactor and Reactor Operator Initial License Examinations RS-19-053, Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations2019-05-16016 May 2019 Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations IR 05000317/20193012019-05-0606 May 2019 NRC Initial and Retake Operator Licensing Examination Report Er 05000317/2019301 and 05000318/2019301 ML18312A3882018-11-0707 November 2018 Senior Reactor and Reactor Operator Initial and Retake License Examinations ML18311A1292018-10-0101 October 2018 Handouts to Applicants (Folder 3) ML18214A4482018-08-0202 August 2018 Initial Operator Licensing Written Examination Approval: Calvert Cliffs Nuclear Power Plant Units 1 and 2 ML18311A1142018-08-0202 August 2018 Examination Approval Letter (Folder 1) RS-18-057, Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-25025 April 2018 Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML18311A1132017-12-14014 December 2017 NRC Corporate Notification Letter (Folder 1) RS-17-070, Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations2017-05-0303 May 2017 Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations IR 05000317/20173012017-03-13013 March 2017 Initial Operator Licensing Examination Report 05000317/2017301 and 05000318/2017301 ML17072A3982017-02-0909 February 2017 Op Test Retake - Post Exam Comments and Technical References, and Resolution (Folder 1) ML17069A4032017-02-0909 February 2017 Op Test Retake - NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML17069A4072017-02-0909 February 2017 Op Test Retake -Final Operating Test Sections a & B) (Folder 3) ML17069A4052017-02-0909 February 2017 Op Test Retake - Draft Operating Exam (Section a, Section B) (Folder 2) ML17069A4062017-02-0909 February 2017 Op Test Retake - Final Outlines (Folder 3) 2023-06-16
[Table view] |
Text
Examination Preparation Checklist Form ES-201-1 Facility:
Calvert Date of Examination:
Jan. 2011 JV/4 Developed by: Written -Facility NRC 1/ Operating
-FaCility}( NRC Target Date* Task Description (Reference) 1.:; '. h,iI.IL-180 Examination administration date confirmed (C.1.a; C.2.a and b) r' "0 NRC examiners and facility contact assigned (C.1.d; C.2.e) E:
.'. ,.\lZ: -120 Facility contact briefed on security and other requirements (C.2.c) MJI -120 Corporate notification letter sent (C.2.d) I tI!; [-901 Reference material due (C.1.e; C.3.c; Attachment 3)] I T IES3C 14 N/,A,{-75} Integrated examination outline(s) due, including Forms ES-201-2, ES-201-3'4lES-301-1, ES-301-2, ES-301-5, ES-D-1's, ES-401-1/2, ES-401-3, and ES-401-4, as applicable (C.1.e and f; IF {-70}
outline(s) reviewed by NRC and feedback provided to licensee (C.2.h; {-45} Proposed examinations (including written, walk-through JPMs, scenarios, as applicable), supporting documentation (including Forms ES-301-3, ES-301-4, ES-301-5, ES-301-6, and ES-401-6, and any ES-201-3 updates), and reference materials due (C.1.e, f, g and h; -30 Preliminary license applications (NRC Form 398's) due (C.1.1; \.kL Final license applications due and Form ES-201-4 prepa . . ES-202) Examination approved by NRC supervisor for facility licensee review ;1/1f" (C.2.h, C.3.f) . -14 Examinations reviewed with facility licensee (C.1.j; C.2.f and h; C.3.g) !'It---7 Written examinations and operating tests approved by NRC (C.2.i; -7 Final applications reviewed; 1 or 2 (if >10) applications audited to confirm qualifications I eligibility; and examination approval and waiver letters sent (C.2.i; Attachment 5; ES-202, C.2.e; ES-204) I -7 Proctoring/written exam administration guidelines reviewed with facility licensee (C.3.k) -7 Approved scenarios, job performance measures, and distributed to NRC examiners Jl
- Target dates are generally based on facility-prepared examinations and are keyed to the examination identified in the corporate notification letter. They are for planning purposes and may be adjusted on a case basis in coordination with the facility
[Applies only] {Does not apply} to examinations prepared by the ES-201, Page 25 of 28 Examination Outline Quality Checklist Form ES-201-2 Facility:
Calvert Date of Examination:
January Task Description
- 1. a. Verify that the ouUine(s) fit(s) the appropriate model, in accordance with ES-401. W R b. Assess whether the oulline was systematically and randomly prepared in accordance with Section D.1 of ES-401 and whether all KIA categories are appropriately sampled. T c. Assess whether the outline over-emphasizes any systj:lms, evolutions, or generic topics. T E d. Assess whether the justifications for deselected or rejected KIA statements are appropriate.
N a. Using Form ES-301-5, verify that the proposed scenario sets cover the required number of normal evolutions, instrument and component failures, technical specifications, S and major transients.
I M Assess whether there are enough scenario sets (and spares) to test the projected number L U and mix of applicants in accordance with the expected crew composition and rotation schedule without compromising exam integrity, and ensure that each applicant can be tested using A at least one new or significantly modified scenario, that no scenarios are duplicated T from the applicants' audit test(s), and that scenarios will not be repeated on subsequent days. o c. To the extent possible, assess whether the outline(s) conform(s) with the qualitative R and quantitative criteria specified on Form ES-301-4 and described in Appendix D. 3. a. Verify that the systems walk-through outline meets the criteria specified on Form ES-301-2:
(1) the outline(s) contain(s) the required number of control room and in-plant tasks W distributed among the safety functions as specified on the form f (2) task repetition from the last two NRC examinations is within the limits specified on the form T (3) no tasks are duplicated from the applicants' audit testes) (4) the number of new or modified tasks meets or exceeds the minimums specified on the form (5) the number of alternate path, low-power, emergency, and RCA tasks meet the criteria on the form. b. Verify that the administrative outline meets the criteria specified on Form ES-301-1:
(1) the tasks are distributed among the topics as specified on the form (2) at least one task is new or significantly modified (3) no more than one task is repeated from the last two NRC licensing examinations
- c. Determine if there are enough different outlines to test the projected number and mix of applicants and ensure that no items are duplicated on subsequent days. 4. a. Assess whether plant-specific priorities (including PRA and IPE insights) are covered in the appropriate exam sections.
G E b. Assess whether the 10 CFR 55.41/43 and 55.45 sampling is appropriate.
N c. Ensure that KIA importance ratings (except for plant-specific priorities) are at least 2.5. E R d. Check for duplication and overlap among exam sections.
A e. Check the entire exam for balance of coverage.
L f. Assess whether the exam fits the appropriate job level (RO or SRO). Jeff Lofton a. Author b. Facility Reviewer (*) c. NRC Chief Examiner (#) 5; 1.1< (J/
- d. NRC Supervisor a b* N/A t-Jk N/A NIr' ;fit N/A N'" ,Nk N/A tJlr tvJf N/A f.l4 N/A N.... M Date 11/11/2010 Note: # Independent NRC reviewer initial items in Column "c"; chief examiner concurrence required.
- Not applicable for NRC-prepared examination outlines ES-201, Page 26 of 28 ES*201 Examination Security Agreement Form ES-201-3 1. Pre-Examination I acknowledge that I have acquired specialized knowledge about the NRC licensing examinations scheduled for the week(s) of /-1,-'la" as of the date of my signature.
I agree that I will not knowingly divulge any information about these examinations to any persons who have not been authorized by the NRC chief examiner.
I understand that I am not to instruct, evaluate, or provide performance feedback to those applicants scheduled to be administered these licensing examinations from this date until completion of examination administration, except as specifically noted below and authorized by the NRC (e.g., acting as a simulator booth operator or communicator is acceptable if the individual does not select the training content or provide direct or indirect feedback).
Furthermore, I am aware of the physical security measures and requirements (as documented in the facility licensee's procedures) and understand that violation of the conditions of this agreement may result in cancellation of the examinations and/or an enforcement action against me or the facility licensee.
I will immediately report to facility management or the NRC chief examiner any indications or suggestions that examination security may have been compromised.
- 2. Post-Examination To the best of my knowledge, I did not divulge to any unauthorized persons any information concerning the NRC licensing examinations administered during the week(s) of 1-/7-41Otf' From the date that I entered into this security agreement until the completion of examination administration, I did not instruct, evaluate, or provide performance feedback to those applicants who were administered these licensing examinations, except as specifically noted below and authorized by the NRC. PRINTED NAME JOB TITLE I RESPONSIBILITY DATE SIGNATURE (2) DATE NOTE 7Xvr.;"el;:(l 2 =-'¥3. _ 6>-0], 4. ( &;</htIt f(JJhtOtf1:>tL t2. .2.10 5.
£x&\4:, Vu I td4v Lmlk7 6. -1'( J@G'l 'I"'sNJC.l'lI.I' _ 7. t:fiiiP( VAUOh(lc tV !.::..}::ll 8.(: b,bfl}Q,6i>/
&/4.,; "At Ib:7/fl.,A/
/ .. Ii ! fW! 6 () 9. Mic","",e\
S........ l l/qill 10.khl...1.
14.__________________________________
_ 15. NOTES: ES-201, r 27 of 28 Operating Test Quality Checklist Form ES-301-3 Facilitv:
Calvert Date of Examination:
Jan. 2011 OperatinQ Test Number: 2011 Initials 1. General Criteria a b* C# The operating test conforms with the previously approved outline; changes are consistent with samplinQ requirements (e.Q., 10 CFR 55.45, operational importance, safety function distribution). a-There is no day-to-day repetition between this and other operating tests to be administered N/A Nt'" tJA during this examination. l<f d' Ij>lThe operating test shall not duplicate items from the applicants' audit test(s). (see Section D.1.a.) Overlap with the written examination and between different parts of the operating test is within N/A acceptable limits. /1/.4 It appears that the operating test will differentiate between competent and less-than-competent v;l applicants at the designated license level. r 2. Walk-Through
Each JPM includes the following, as applicable:
- references and tools, including associated procedures
- reasonable and validated time limits (average time allowed for completion) and specific
- designation if deemed to be time-critical by the facility operationally important specific performance criteria that } detailed expected actions with exact criteria and nomenclature
-system response and other examiner cues -statements describing important observations to be made by the applicant
-criteria for successful completion of the task -identification of critical steps and their associated performance standards
-restrictions on the sequence of steps, if applicable Ensure that any changes from the previously approved systems and administrative walk-through outlines (Forms ES-301-1 and 2) have not caused the test to deviate from any of the acceptance criteria (e.g., item distribution, bank use, repetition from the last 2 NRC examinations) specified r on those forms and Form ES-201-2.
- 3. Simulator ----The associated simulator operating tests (scenario sets) have been reviewed in accordance with N/A Nt-M4 Form ES-301-4 and a copy is attached. Date Author Jeff Lofton 11/11/2010 tf/t/ '-' f., v b. Facility Reviewer(*)
Chris J'ones {-'-Ii c. NRC Chief Examiner (#)
5;(k ( Ilto/,f fIa.".,sell/ oCO Lt.!;I/" NRC
/
- The facility signature is not applicable for NRC-developed tests. # Independent NRC reviewer initial items in Column "c"; chief examiner concurrence required.
ES-301, Page 24 of 27