ML11234A259

From kanterella
Revision as of 10:52, 30 April 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
2011/06/28 Davis-Besse Lr - FW: DB Conference Call Request
ML11234A259
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 06/28/2011
From:
Office of Nuclear Reactor Regulation
To:
References
Download: ML11234A259 (3)


Text

1 Davis-BesseNPEm Resource From: CuadradoDeJesus, Samuel Sent: Tuesday, June 28, 2011 1:52 PM To: custerc@firstenergycorp.com

Subject:

RE: FW: DB Conference Call requestWill do From: custerc@firstenergycorp.com

[1]

Sent: Tuesday, June 28, 2011 1:31 PM To: CuadradoDeJesus, Samuel

Subject:

Re: FW: DB Conference Call request Sam, Please schedule this call for sometime after 1300 hrs. I have multiple telecoms on other issues in the morning tomorrow.

Cliff Custer FENOC Project Manager License Renewal Work: (724) 682-7139 BPR: (412) 305-4981

From: "CuadradoDeJesus, Samuel" <Samuel.CuadradoDeJesus@nrc.gov

> To: "'dorts@firstenergycorp.com'" <dorts@firstenergycorp.com

> Cc: "'custerc@firstenergycorp.com'" <custerc@firstenergycorp.com

> Date: 06/28/2011 01:19 PM

Subject:

FW: DB Conference Call request

Steve: Below is the concern our technical staff would like to discuss in a Teleconference call. This will probably be a separate teleconference call from the one I just sent on OTI. I'll also try to have this one tomorrow.

From: Sun, Robert Sent: Tuesday, June 28, 2011 9:23 AM To: CuadradoDeJesus, Samuel Cc: Elizabeth Trillo; Klos, John

Subject:

DB Conference Call request Hi Sam, Can you please set up a conference call for myself and Liz Trillo (contractor with the Center) with Davis Besse to discuss their response to RAI B.2.4-4 (received 6/24/11). The issue that we have is described below:

LRA Tables 3.2.2-1, 3.2.2-3, 3.2.2-4, 3.3.2-5, 3.3.2-7, 3.3.2-8, 3.3.2-11, 3.3.2-14, 3.3.2-16, 3.3.2-18, 3.3.2-23, 3.3.2-24, 3.3.2-25, 3.3.2-26, 3.3.2-31, 3.4.2-1 include AMR line items for both loss of material and for cracking in stainless steel bolts exposed to air with steam or water leakage (external) managed by the Bolting Integrity Program. In these same tables, a third related AMR line item exists for loss of preload in stainless steel bolts exposed to air-indoor uncontrolled (external). Based on the response to RAI B.2.4-4 (6/24/11), it appears that the bolts described in the 3 coupled line items are the same components, and thus all expected aging effects (Loss of material, cracking, loss of preload) are 2accounted for, however it is not clear as a result of the different environments listed for these line items in the LRA. If all 3 coupled line items described the same component, then why are different environments used?

Another possibility is that the 3 coupled line items describe components with some but not complete overlap, where certain bolts are managed for LOM, cracking and LOP, and others are only managed for LOP. If this were the case, then additional clarification or LRA updates would still be needed since LOM is still an expected aging effect for stainless steel bolting in an air-indoor uncontrolled (external) environment (see GALL item V.E.EP-70)



The information contained in this message is intended only for the personal and confidential use of the recipient(s) named above. If the reader of this message is not the intended recipient or an agent responsible for delivering it to the intende d recipient, you are hereby notif ied that you have received this document in error and that any review, dissemination, distribution, or copying of this message is strictly prohibited. If you have received this communication in error, please notify us immediately, and delete the original message.

Hearing Identifier: Davis_BesseLicenseRenewal_Saf_NonPublic Email Number: 74 Mail Envelope Properties (Samuel.CuadradoDeJesus@nrc.gov20110628135100)

Subject:

RE: FW: DB Conference Call request Sent Date: 6/28/2011 1:51:59 PM Received Date: 6/28/2011 1:51:00 PM From: CuadradoDeJesus, Samuel Created By: Samuel.CuadradoDeJesus@nrc.gov Recipients: "custerc@firstenergycorp.com" <custerc@firstenergycorp.com> Tracking Status: None Post Office: Files Size Date & Time MESSAGE 3415 6/28/2011 1:51:00 PM

Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received: