ML13204A116

From kanterella
Revision as of 16:52, 11 April 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
SLC Manual Update
ML13204A116
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 06/26/2013
From: Beaver B
Duke Energy Corp
To:
Office of Nuclear Reactor Regulation
References
DUK131770042
Download: ML13204A116 (7)


Text

W$POSITION OF THE ORIGINAL DOCUMENT WILL PRIORITY Normal THE TRANSMITTAL SIGNATURE UNLESS RECIPIEN OTHERWISE IDENTIFIED BELOW 1) 02546 WC LIBRARY -MG01WC 2) 03044 MCG DOC CNTRL MISC MAN MG05DM 3)4)5)6)03379 D E CALDWELL MG01MM 03447 DON R MILLER MG01RP 03614 MCG OPS PROCEDURE GP MG010P 03744 OPS TRNG MGR. MG03OT BE TO IT IS Duke Energy DOCUMENT TRANSMITTAL FORM REFERENCE MCGUIRE NUCLEAR STATION SELECTED LICENSEE COMMITMENTS MANUAL (SLC)QA CONDITION

[: Yes E No OTHER ACKNOWLEDGEMENT REQUIRED N Yes IF QA OR OTHER ACKNOWLEDGEMENT REQUIRED, PLEASE ACKNOWLEDGE RECEIPT BY RETURNING THIS FORM TO: Duke Energy McGuire DCRM MGO2DM 13225 Hagers Ferry Road Huntersville, N.C. 28078 Date: 06/26113 Document Transmittal

  1. DUK131770042
7) 03759 U S NUC REG WASHINGTON, DC 8) 04809 MCG PLANT ENG. LIBR. MG05SE 9) 09460 W C SPENCER MG01RP 10) 09665 JON H THOMPSON, USNRC RECORD RETENTION
  1. 581188 Rec'd By Page 2 of 2 DOCUMENT NO SLC MEMORANDUM

[1 pg.]SLC 16.7.3 [2 pgs.]LIST OF EFFECTIVE SECTIONS [3 pgs.]QACOND NA NA NA REV #/ DATE 136 05/06/13 136 05/06/13 118 05/06/13 DISTR CODE MADM-03A 1 V1 2 X 3 v1 4 V1 5 V1 Date 6-7 -8 9 10 11 V2 V1i Vi Vi ýVi 12 13 14 15 TOTAL 24 REMARKS: PLEASE UPDATE ACCORDINGLY.

REPRO: 3 HOLE PUNCH COPIES RECIPIENT

  1. 03044 PREVIOUSLY COMPLETED S D CAPPS VICE PRESIDENT MCGUIRE NUCLEAR STATION BY: BCBEAVER MG01RC BCB/BRG May 6, 2013 MEMORANDUM To: All McGuire Nuclear Station Selected Licensee Commitments (SLC) Manual Holders

Subject:

McGuire SLC Manual Update Please revise your copy of the manual as follows: REMOVE INSERT List of Effective Sections (Rev 117)SLC 16.7.3 (entire section) (Rev 134)List of Effective Sections (Rev 118)SLC 16.7.3 (entire section) (Rev 136)Revisions may skip numbers due to Regulatory Compliance Filing System.Please call me if you have questions.

Bonnie Beaver Regulatory Compliance 980-875-4180 I

SELECTED LICENSEE COMMITMENTS (SLC)LOES SLCs ARE REVISED PER SECTION SECTION T REVISION NUMBER DATE 16.1 REVISION 32 12/2/02 16.2 REVISION 134 3/6/13 16.3 REVISION 134 3/6/13 16.4 Not Issued 16.5.1 REVISION 115 0308/10 16.5.2 REVISION 0 12/14/99 16.5.3 REVISION 0 12/14/99 16.5.4 REVISION 55 3/23/04 16.5.5 REVISION 0 12/14/99 16.5.6 DELETED -REVISION 120 12/30/10 16.5.7 REVISION 53 1/13/04 16.5.8 REVISION 0 12/14/99 16.5.9 REVISION 108 06/10/09 16.5.10 REVISION 134 3/6/13 16.6.1 REVISION 0 12/14/99 16.6.2 DELETED -REVISION 43 6/11/03 16.6.3 REVISION 134 3/6/13 16.6.4 REVISION 27 06/12/02 16.7.1 REVISION 134 3/6/13 16.7.2 REVISION 134 3/6/13 16.7.3 REVISION 136 4/26/13 16.7.4 REVISION 134 3/6/13 16.7.5 REVISION 134 3/6/13 16.7.6 REVISION 134 3/6/13 16.7.7 REVISION 134 3/6/13 16.7.8 REVISION 134 3/6/13 16.7.9 REVISION 134 3/6/13 16.7.10 REVISION 134 3/6/13 16.7.11 REVISION 134 3/6/13 16.8.1 REVISION 135 3/18/13 16.8.2 REVISION 0 12/14/99 16.8.3 REVISION 121 12/30/10 16.9.1 REVISION 134 3/6/13 16.9.2 REVISION 134 3/6/13 16.9.3 REVISION 134 3/6/13 16.9.4 REVISION 134 3/6/13 16.9.5 REVISION 134 3/6/13 16.9.6 REVISION 134 3/6/13 16.9.7 REVISION 133 12/23/12 16.9.8 REVISION 134 3/6/13 16.9.9 REVISION 101 4/02/08 16.9.10 DELETED -REVISION 13 2/26/01 16.9.11 REVISION 22 2/25/02 16.9.12 REVISION 101 4/02/08 McGuire Units 1 and 2 I Revision 118 SELECTED LICENSEE COMMITMENTS (SLC)LOES SLCs ARE REVISED PER SECTION SECTION REVISION NUMBER DATE 16.9.13 DELETED -REVISION 13 2/26/01 16.9.14 REVISION 22 2/25/02 16.9.15 REVISION 134 3/6/13 16.9.16 REVISION 111 09/09/09 16.9.17 REVISION 86 1/17/07 16.9.18 REVISION 0 12/14/99 16.9.19 REVISION 134 3/6/13 16.9.20 REVISION 8 11/30/00 16.9.21 REVISION 0 12/14/99 16.9.22 REVISION 109 8/13/09 16.9.23 REVISION 134 3/6/13 16.9.24 DELETED -REVISION 74 6/27/05 16.9.25 REVISION 87 1/17/07 16.10.1 REVISION 56 4/6/04 16.11.1 REVISION 112 2/4/10 16.11.2 REVISION 134 3/6/13 16.11.3 REVISION 0 12/14/99 16.11.4 REVISION 134 3/6/13 16.11.5 REVISION 0 12/14/99 16.11.6 REVISION 112 2/4/10 16.11.7 REVISION 134 3/6/13 16.11.8 REVISION 0 12/14/99 16.11.9 REVISION 0 12/14/99 16.11.10 REVISION 134 3/6/13 16.11.11 REVISION 134 3/6/13 16.11.12 REVISION 67 2/28/05 16.11.13 REVISION 91 3/22/07 16.11.14 REVISION 21 1/17/02 16.11.15 REVISION 21 1/17/02 16.11.16 REVISION 134 3/6/13 16.11.17 REVISION 118 10/19/10 16.11.18 REVISION 0 12/14/99 16.11.19 REVISION 0 12/14/99 16.11.20 REVISION 0 12/14/99 16.12.1 REVISION 0 12/14/99 16.12.2 REVISION 0 12/14/99 16.13.1 REVISION 51 10/1/03 16.13.2 DELETED -REVISION 75 7/20/05 16.13.3 DELETED -REVISION 75 7/20/05 16.13.4 REVISION 134 3/6/13 16.14.1 REVISION 0 12/14/99 16.14.2 REVISION 104 3/18/09 McGuire Units 1 and 2 2 Revision 118 Meteorological Instrumentation 16.7.3 16.7 INSTRUMENTATION 16.7.3 Meteorological Instrumentation COMMITMENT APPLICABILITY:

The meteorological monitoring instrumentation channels shown in Table 16.7.3-1 shall be FUNCTIONAL.

At all times.REMEDIAL ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One or more required A. 1 Restore non-functional 7 days Meteorological channel(s) to monitoring channels FUNCTIONAL status.non-functional.

OR A.2 Prepare and submit a 17 days Special Report outlining the cause of the malfunction and plans for restoring the channel(s) to FUNCTIONAL status.TESTING REQUIREMENTS


NOTE--------------------------------

Refer to Table 16.7.3-1 to determine which TRs apply for each meteorological monitoring instrumentation.

TEST FREQUENCY TR 16.7.3.1 Perform CHANNEL CHECK. 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> TR 16.7.3.2 Perform a CHANNEL CALIBRATION.

6 months.TR 16.7.3.3 Perform a CHANNEL VERIFICATION.

Weekly McGuire Units 1 and 2 16.7.3-1 Revision 136 Meteorological Instrumentation 16.7.3 TABLE 16.7.3-1 METEOROLOGICAL MONITORING INSTRUMENTATION INSTRUMENT AND LOCATION REQUIRED TESTING CHANNELS REQUIREMENTS

1. Wind Speed 1.a Meteorological Tower Nominal 1 TR 16.7.3.1 Elev. 801.88' TR 16.7.3.2 TR 16.7.3.3 1.b Meteorological Tower Nominal 1 TR 16.7.3.1 Elev. 964.88' TR 16.7.3.2 TR 16.7.3.3 2. Wind Direction 2.a Meteorological Tower Nominal 1 TR 16.7.3.1 Elev. 801.88' TR 16.7.3.2 TR 16.7.3.3 2.b Meteorological Tower Nominal I TR 16.7.3.1 Elev. 964.88' TR 16.7.3.2 TR 16.7.3.3 3. Air Temperature

-Delta T 3.a Meteorological Tower Nominal 1 TR 16.7.3.1 Elev. 798.46' -962.22' TR 16.7.3.2 TR 16.7.3.3 McGuire Units 1 and 2 16.7.3-2 Revision 136 Meteorological Instrumentation 16.7.3 BASES The FUNCTIONALITY of the meteorological instrumentation ensures that sufficient meteorological data are available for estimating potential radiation doses to the public as a result of routine or accidental release of radioactive materials to the atmosphere.

This capability is required to evaluate the need for protective measures to protect the health and safety of the public and is consistent with the recommendations of Regulatory Guide 1.23,"Onsite Meteorological Programs," February 1972.TESTING REQUIREMENTS CHANNEL CHECK The daily channel check consists of a qualitative assessment, by observation, of each instrument channel's behavior based upon knowledge of current and previous weather conditions.

Each channel is verified to have power, indicating on scale, and updating normally.CHANNEL VERIFICATION The weekly channel verification combines a more extensive channel check with limited calibration checks and parameter adjustments as necessary.

Visual inspections, from the ground, of the wind speed cups and directional vanes are also performed.

CHANNEL CALIBRATION The semi-annual channel calibration encompasses the entire channel from the sensors to the data recorders.

Each sensor is lowered from the tower, inspected, and replaced if necessary.

A full calibration on each processor and data recorder is performed and replaced if necessary.

REFERENCES

1. Regulatory Guide 1.23, "Onsite Meteorological Programs," February 1972.2. UFSAR Section 2.3.3.McGuire Units 1 and 2 16.7.3-3 Revision 136