Issue date: 09/01/2015
From: Blamey A J
Division Reactor Projects II
To: Shea J W
Tennessee Valley Authority
References
IR 2015005
Download: ML15244B056 (7)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303

-1257 September 1

, 2015 Mr. Joseph W. Shea Vice President, Nuclear Licensing Tennessee Valley Authority 1101 Market Street, LP 3D

-C Chattanooga, TN 37402

-2801

SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR THE WATTS BAR NUCLEAR PLANT UNIT 1, NRC INSPECTION REPORT 005000390/2015005

Dear Mr. Shea

On August 13, 2015, the NRC completed its mid

-cycle performance review of Watts Bar Nuclear Plant Unit The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 20 1 4 through June 30, 20 1 This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facilit The NRC determined that overall, Watts Bar Nuclear Plant Unit 1 operated in a manner that preserved public health and safety and met all cornerstone objective The NRC determined the performance at Watts Bar Nuclear Plant Unit 1 during the most recent quarter was within the Licensee Response Column of the NRC

's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facilit The enclosed inspection plan lists the inspections scheduled through June 30 , 201 Routine inspections performed by resident inspectors are not included in the inspection pla The inspections listed during the second half of the inspection plan are tentative and may be revised at the end

-of-cycle performance revie The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issue The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any change This inspection plan does not include security related inspections, which will be sent via separate, non

-publicly available correspondenc In addition to the routine ROP baseline inspections at your facility, we also plan on conducting infrequently performed inspections which include: Inspection Procedure (IP) 43004, "Inspection of Commercial

-Grade Dedication Programs

," and an initial operator license examinatio J. Shea 2 In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC

's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading

-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 404-997-4415 with any questions you have regarding this lette

Sincerely,/RA/

Alan Blamey, Chief Reactor Projects Branch 6 Division of Reactor Projects Docket Nos.: 50

-390 License No NPF

-90

Enclosure:

Watts Bar Inspection/Activity Plan

(0 7/01/2015 - 06/30/2017)

cc distribution via ListServ

_________________________

XSUNSI REVIEW COMPLETE OFFICE RII:DRP RII:DRP RII:DRP SIGNATURE BDB3 CRK1 AJB3 NAME BBISHOP CKONTZ ABLAMEY DATE 8/25/2015 8/25/2015 8/31/2015 E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO YES NO J. Shea 3 Letter to Joseph Shea from Alan Blamey dated September 1, 2015

SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR THE WATTS BAR NUCLEAR PLANT UNIT 1, NRC INSPECTION REPORT 005000390/2015005 DISTRIBUTION

D. Gamberoni, RII L. Gibson, RII OE Mail RIDSNRRDIRS PUBLIC A. Adams, NRR

RidsNrrPMWattsBar Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)

Page 1 of 3 09/01/2015 10:35:16 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on SiteWatts BarInspection / Activity Plan 09/01/2015

-06/30/2017 ISFSI-ISFSI PAD CONCRETE PLACEMENT 1 1 IP On-Site Fabrication Of Components And Construction On An ISFSI 60853 09/21/2015 09/25/2015 RP-RP OCCUPATIONAL BASELINE WEEK 1 2 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 10/05/2015 10/09/2015 1 IP Occupational ALARA Planning and Controls71124.02 10/05/2015 10/09/2015 1 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 10/05/2015 10/09/2015 1 IP Occupational Dose Assessment71124.04 10/05/2015 10/09/2015 1 IP Radiation Monitoring Instrumentation71124.05 10/05/2015 10/09/2015 1 IP Performance Indicator Verification71151 10/05/2015 10/09/2015 ISI-UNIT 1 IN-SERVICE INSPECTION 1 1 IP Inservice Inspection Activities - PWR7111108P 10/12/2015 10/16/2015 RP-RP OCCUPATIONAL BASELINE WEEK 2 3 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 10/19/2015 10/23/2015 1 IP Occupational ALARA Planning and Controls71124.02 10/19/2015 10/23/2015 1 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 10/19/2015 10/23/2015 1 IP Occupational Dose Assessment71124.04 10/19/2015 10/23/2015 1 IP Radiation Monitoring Instrumentation71124.05 10/19/2015 10/23/2015 1 IP Performance Indicator Verification71151 10/19/2015 10/23/2015 EP-EP EXERCISE 8 1 IP Emergency Action Level and Emergency Plan Changes711140411/16/201511/20/2015 1 IP Exercise Evaluation - Hostile Action (HA) Event711140711/16/201511/20/2015 1 IP Performance Indicator Verification7115111/16/201511/20/2015 CDBI-COMPONENT DESIGN BASES INSPECTION 7 1 IP Component Design Bases Inspection7111121 02/01/2016 02/05/2016 1 IP Component Design Bases Inspection7111121 02/29/2016 03/04/2016 1 IP Component Design Bases Inspection7111121 03/14/2016 03/18/2016 1 IP Component Design Bases Inspection7111121 03/28/2016 04/01/2016OL EXAM-INITIAL LICENSE EXAM PREP 3 1 WATTS BAR JULY 2016 INITIAL EXAM AT POWER FACILITIES V23475 06/20/2016 06/24/2016OL EXAM-INITIAL LICENSE EXAM 3 1 WATTS BAR JULY 2016 INITIAL EXAM AT POWER FACILITIES V23475 07/18/2016 07/22/2016 MODS-PLANT MODIFICATIONS INSPECTION 3 1 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T 07/25/2016 07/29/2016 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedure Page 2 of 3 09/01/2015 10:35:16 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on SiteWatts BarInspection / Activity Plan 09/01/2015

-06/30/2017 MODS-PLANT MODIFICATIONS INSPECTION 3 1 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T 08/08/2016 08/12/2016 RP-RP PUBLIC RAD SAFETY BASELINE 4 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 08/01/2016 08/05/2016 1 IP Radioactive Gaseous and Liquid Effluent Treatment71124.06 08/01/2016 08/05/2016 1 IP Radiological Environmental Monitoring Program71124.07 08/01/2016 08/05/2016 1 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.08 08/01/2016 08/05/2016 1 IP Performance Indicator Verification71151 08/01/2016 08/05/2016 PI&R-PROBLEM IDENTIFICATION AND RESOLUTION 4 1 IP Problem Identification and Resolution71152B 10/31/201611/04/2016 1 IP Problem Identification and Resolution71152B11/14/201611/18/2016 EP-EP PROGRAM INSPECTION 4 1 IP A lert and Notification System Testing711140211/14/201611/18/2016 1 IP Emergency Preparedness Organization Staffing and Augmentation System711140311/14/201611/18/2016 1 IP Emergency Action Level and Emergency Plan Changes711140411/14/201611/18/2016 1 IP Correction of Emergency Preparedness Weaknesses and Deficiencies711140511/14/201611/18/2016 1 IP Performance Indicator Verification7115111/14/201611/18/2016 ISI-UNIT 1 IN-SERVICE INSPECTION & RVH EXAM 2 1 IP Inservice Inspection Activities - PWR7111108P 03/27/2017 03/31/2017 RP-RP OCCUPATIONAL INSPECTION WEEK 1 2 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 03/27/2017 03/31/2017 1 IP Occupational ALARA Planning and Controls71124.02 03/27/2017 03/31/2017 1 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 03/27/2017 03/31/2017 1 IP Occupational Dose Assessment71124.04 03/27/2017 03/31/2017 1 IP Radiation Monitoring Instrumentation71124.05 03/27/2017 03/31/2017 1 IP Performance Indicator Verification71151 03/27/2017 03/31/2017 SGISI-UNIT 1 SG IN-SERVICE INSPECTION 1 1 IP Inservice Inspection Activities - PWR7111108P 04/03/2017 04/07/2017 RP-RP OCCUPATIONAL INSPECTION WEEK 2 3 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 04/10/2017 04/14/2017 1 IP Occupational ALARA Planning and Controls71124.02 04/10/2017 04/14/2017 1 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 04/10/2017 04/14/2017 1 IP Occupational Dose Assessment71124.04 04/10/2017 04/14/2017 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedure Page 3 of 3 09/01/2015 10:35:16 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on SiteWatts BarInspection / Activity Plan 09/01/2015

-06/30/2017 RP-RP OCCUPATIONAL INSPECTION WEEK 2 3 1 IP Radiation Monitoring Instrumentation71124.05 04/10/2017 04/14/2017 1 IP Performance Indicator Verification71151 04/10/2017 04/14/2017 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.