Ltr 10/28/15 Monticello Nuclear Generating Plant Acknowledgment of Disputed Violation of NRC Inspection Report 05000263/2015007 (Bxj)
ML15301A814
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 10/28/2015
From: Christine Lipa
NRC/RGN-III/DRS/EB2
To: Gardner P
Northern States Power Co
References
EA-15-206, IR 2015007
Download: ML15301A814 (3)


See also: IR 05000263/2015007

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION III 2443 WARRENVILLE RD. SUIT

E 210 LISLE, IL 60532

-4352 October 28, 2015

EA-15-206 Mr. Peter A. Gardner

Site Vice President

Monticello Nuclear Generating Plant

Northern States Power Company, Minnesota

2807 West County Road 75

Monticello, MN 55362

-9637 SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT

ACKNOWLEDGMENT

OF DISPUTED VIOLATION OF NRC INSPECTION

REPORT 05000263/2015007

Dear Mr. Gardner: This letter acknowledges your letter sent to the U.S. Nuclear Regulatory Commission (NRC),

dated October 2, 2015, that provided a response to our inspection report issued on September 2, 2015, concerning activities conducted at your Monticello Nuclear Generating Plant. The letter we

received contested a Non

-Cited Violation (NCV) documented in Monticello

Inspection

Report 2015007. The contested NCV is

"Failure to Review for Suitability of Application Safety

-Related Relays Installed Beyond Their Service Life."

We are currently reviewing your basis for contesting

the above NCV. The NRC seeks to be thorough and timely in the review of licensee responses.

Accordingly, we will inform you as soon as we complete our evaluation.

In accordance with Title 10 of the Code of Federal Regulations

(10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy

of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide

Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading

-rm/adams.html

(the Public Electronic Reading Room).

Sincerely,

/RA/ Christine A. Lipa, Chief

Engineering Branch 2

Division of Reactor Safety

Docket No. 50

-263 License No. DPR

-22 cc: Distribution via LISTSERV

EA-15-206 Mr. Peter A. Gardner

Site Vice President

Monticello Nuclear Generating Plant

Northern States Power Company, Minnesota

2807 West County Road 75

Monticello, MN 55362

-9637 SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT

ACKNOWLEDGMENT

OF DISPUTED VIOLATION OF NRC INSPECTION

REPORT 05000263/2015007

Dear Mr. Gardner: This letter acknowledges your letter sent to the U.S. Nuclear Regulatory Commission (NRC), dated October 2, 2015, that provided a response to our inspection report issued on September 2, 2015, concerning activities conducted at your Monticello Nuclear Generating Plant. The letter we

received contested a Non

-Cited Violation (NCV) documented in Monticello

Inspection

Report 2015007. The contested NCV is

"Failure to Review for Suitability of Application Safety

-Related Relays Installed Beyond Their Service Life."

We are currently reviewing your basis for contesting

the above NCV. The NRC seeks to be thorough and timely in the review of licensee responses.

Accordingly, we will inform you as soon as we complete our evaluation.

In accordance with Title 10 of the Code of Federal Regulations

(10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy

of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide

Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading

-rm/adams.html

(the Public Electronic Reading Room).

Sincerely, /RA/ Christine A. Lipa, Chief

Engineering Branch 2

Division of Reactor Safety

Docket No. 50

-263 License No. DPR

-22 cc: Distribution via LISTSERV

DISTRIBUTION:

See next page

ADAMS Accession Number ML15301A814

Publicly Available

Non-Publicly Available

Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/enc

l "N" = No copy

OFFICE RIII RIII RIII RIII NAME ADunlop RSkokowski

CLipa DATE 10/26/15 10/26/15 10/28/15 OFFICIAL RECORD COPY

Letter to Mr. Peter A. Gardner from Ms. Christine A. Lipa dated

October 28, 2015.

SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT

ACKNOWLEDGMENT

OF DISPUTED VIOLATION OF NRC INSPECTION

REPORT 05000263/2015007

DISTRIBUTION

Janelle Jessie

RidsNrrDorlLpl3

-1 Resource

RidsNrrPMMonticello

RidsNrrDirsIrib Resource

Cynthia Pederson

Darrell Roberts

Richard Skokowski

Allan Barker Carole Ariano

Linda Linn

DRPIII DRSIII Jim Clay Carmen Olteanu

ROPreports.Resource@nrc.gov