Monthly Operating Rept for Jul 1982
ML20065C635
Person / Time
Site: Pilgrim
Issue date: 08/10/1982
From: Whitney G
BOSTON EDISON CO.
To:
Shared Package
ML20065C628 List:
References
NUDOCS 8209240260
Download: ML20065C635 (6)


Text

.

OPERATING DATA REPORT DOCKET NO. 50-293 DATE 08/10/82 COMPLETED BY G.G. Whitney TELEPHONE 617-746-7900 OPERATING STATUS Pilgrim I Notes

1. Unit Name:
2. Reporting Period: July, 1982 1998.
3. Licensed Thermal Power (MWr):
4. Nameplate Rating (Gross MWe):

678.

5. Design Electrical Rating (Net MWe): 655.
6. Maximum Dependable Capacity (Gross MWe): 690.
7. Maximum Dependable Capacity (Net MWe): 670.

S. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

None

9. Power Level To which Restricted. If Any (Net MWe): None
10. Reasons For Restrictions,if Any:

N/A This Month Yr. to.Date Cumulative

11. Hours in Reporting Period 744.0 5087.0 84527.0
12. Number Of Hours Reactor Was Critical 744.0 2814.4 58847.7
13. React < - Reserve Shutdown Hours 0.0 ,

0.0 0.0

14. Hours Generstor On.Line 744.0 2592.9 56870.8
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1449696.0 4570968.0 97388856.0 .
17. Gross Electrical Energy Generated (MWH) 503230.0 _, 1576870.0 32488104.0 IS. Net Electrical Energy Generated (MWH) 484281.0 1517953.0 31212437.0
19. Unit Service Factor 10C.0 51.0 67.3
20. Unit Availability Factor 100.0 51.0 67.3
21. Unit Capacity Factor (Using MDC Net) 97.2 44.5 -

55.1

22. Unit Capacity Factor (Using DER Net) 99.4 45.6 36.4 i
23. Unit Forced Outage Rate 0.0 5.9 9.9
24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each1:

None

25. If Shut Down At End Of Report Period. Estimated Date of Startup: Unit Operating
26. Units in Test Status IPrior to Commercial Operation): Forecast Achieved INITIA L CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION l 6209240gso gygg3o l DR ADOCK 05000293 S PDR l

. AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-293 Pilgrim I WIT DATE 08/10/82 COMPLETTD BY C'C' Whit""Y 617-746-7900

-- TEEPHONE JULY, 1982 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net)

! 666. 37 620.

665. gg 479.

3 664. 657.

3 39 663. .- 661.

4 20 y 663. 664.

664. ,, 663.

6 665. 663.

7 3, 665. 661.

S 664. ,3, 661.

l 9 10 663.' ,6 661.

l j gj 645. 659.

7 g, 659. ,y 661.

( g3 657. ,9 662.

14 656. 30 660.

654. 581.

15 16 654.

i i

INSTRUCTIONS -

On this format.!ist the ave age dany unit power level in MWe Net for each day in the reporung month. Compute to l the nearest wnoie megawatt.

l

  • (c/77 )

l l

o .

s DOCKET NO. 50-293 UNII SilUIDOWNS AND POWER REDUC 110NS Pilgrim I UNI T NAhlE DATE 08/10/82 COMPl.E TED BY G.G. Whitney REPORT ION 111 JULY

  • 1982 617-746-7900 TEUPilONE

~

c

-, ,!} [h Eicensee ,E -t, L Cause & Correceive No . l).? te g }y  % 2$$ Event {y f"3 gu At.fion to H

fE 5 g Report # vi o g Present Recurrence 6

24 82/07/17 5 0.0 B 5 NA HC HTEXCH Reduce load for condenser backwash and other maintenance.

d 1 2 3 4 F: Forced Reason: Method: Exhibit G - Instructions S: Scheduled A Equipmens Failur.e(Explain) 1 Manual for Preparation of Data Il Maintenance of Test ,

2-Manual Scram. Entey Sheets for 1.icent e C Refueling 3 Automatic Scram. Event Reporn (LER) File INUREG-

, D Reguhtory Restriction 4 Other (Explain) 0161)

E. Operator Training & License fixamination F Administrative 5 G-Operational Error (IIxplain) Exhibit I Same Source 19/77) Il Olher (Explain)

SUMMARY

OF OPERATIONS FOR h0 NTH OF JULY Unit was operating at 100% power until July 11' when power was reduced to 70%

to correct rod pattern due to control rod 22-39 being inserted to 00 due :o problems with rod. Rx power was returned to.100% at 0900 on July 11, 1982.

July 13, started trimming power over low tide to maintain condensere.T below 32 F. July 17, 1982, power was reduced to 50% to backwash and heat treat the

. condenser. Control Rod 22-39 was withdrawn to position 48 and unit was returned to 100% Rx power on July 19, 1982.

On July 20, power was reduced to 70% due to alans on Main Steam hi radiation caused when putting "C" demin on line.at.1535. Unit was returned to 100%

at 1925.

HPCI was declared inoR on July 21, 1982 and returned,to service en July 22, 1982.

July 31, power was reduced to 50% to backwash and heat treat condenser.

t SAFETY / RELIEF VALVE CHALLENGES MONTH OF JULY,~1982 Requirement: T.M.I. T.A.P. II.K.3.3

^

No safety / relief valve challenges foi the month of July, 1982.

e e

r REFUELING INFORMATION

~ ~

The following refueling information is included in the Monthly Report as requested in a letter to Mr. G. C. Andognini dated January 18, 1978:

For your convenience, the information supplied has been enumerated so that each number corresponds to equivalent notation utilized in the request.

1. The name of this facility is Pilgrim Nuclear Power Station, Docket Number 50-293.
2. Scheduled date for next Refueling Shutdown: September, 1983 ,I
3. Scheduled date for restart following refueling: November, 1983 .

4.

. 5. Due to their similarity, requests 4, 5, & 6 are responded to collectively:

6. The fuel, which had been Joaded during the 1981 scheduled refueling outage, is of the same P8x8R design, as loaded the previous outage con-sisting of 112 P8DRB282 assemblies and 60 PSDRB265 assemblies.
7. (a) There are 580 fuel assemblies in the core. ~

(b) There are' ~936 fuel assemblies in the speEt fuel pool.

8. (a) The station is presently licensed to store 2320 spent fuel assemblies.

The actual spent fuel storage capacity is 1770 fuel assemblies at present.

(b) The planned spent fuel storage capacity is 2320 fuel assemblies, i 9. With present spent fuel in storage, the spent fuel pool now has the capacity to accommodate an additional 834 fuel assemblies.

6 o

O L -

PTLGRIM NUCLEAR POWER STATION Month July 1982 MAJOR SAFETY RELATED MAINTENANCE

  • CORRECTIVE ACTION SYSTEM COMPONENT MALFUNCTION CAUSE MAINTENANCE I TO PREVENT RECURRENCE ASSCCIATED LER Fire Fire Detection Could not reset faulty replace switch isolated event 82-018/03L-0 Panel C-220 alarm switch SBGTS Stand By Gas Low flow Clogged Clean filters See Associated LER 82-019/03L-0 Treatment filters Service Circulating Main Condenser A T increasing Marine Backwash (twice) N/A N/A fouling HPCI Speed Control None None Installation of N/A N/A Ramp Generator i

e