Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217E3021999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Pilgrim Nuclear Station.With ML20216E6881999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Pilgrim Nuclear Power Station.With ML20210R3401999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Pilgrim Nuclear Power Station.With ML20209E6191999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Pilgrim Nuclear Power Station.With ML20195G8231999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Pnps.With ML20206J6611999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Pilgrim Nuclear Power Station.With ML20205L0221999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Pilgrim Nuclear Power Station.With ML20207H5451999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Pilgrim Nuclear Power Station.With ML20206Q2741998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Pilgrim Nuclear Power Station.With ML20197J3591998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Pilgrim Nuclear Power Station.With ML20195C9951998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Pilgrim Nuclear Power Station.With ML20154K0721998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Pilgrim Nuclear Power Station.With ML20151W8231998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Pilgrim Nuclear Power Station.With ML20237A9941998-07-31031 July 1998 Monthly Operating Rept for Pilgrim Nuclear Power Station ML20236P0151998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Pilgrim Nuclear Power Station ML20249A3741998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Pilgrim Nuclear Power Station.W/Undated Ltr ML20247H2081998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Pilgrim Nuclear Power Station ML20216G3911998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Pilgrim Nuclear Power Station ML20248L2241998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Pilgrim Nuclear Station ML20202G5251998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Pilgrim Nuclear Power Station ML20198L7701997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Pilgrim Nuclear Power Station ML20203D6101997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Pilgrim Nuclear Power Station BECO-LTR-97-111, Monthly Operating Rept for Oct 1997 for Pilgrim Nuclear Power Station1997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Pilgrim Nuclear Power Station ML20217H5621997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Pilgrim Nuclear Power Station ML20216J4131997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Pilgrim Nuclear Power Station ML20210J3321997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Pilgrim Nuclear Power Station ML20148K4161997-05-31031 May 1997 Monthly Operating Rept for Pilgrim Nuclear Power Station ML20141B9631997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Pilgrim Nuclear Power Station ML20137T5631997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Pilgrim Nuclear Power Station ML20136G7791997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Pilgrim Nuclear Power Station ML20138K5811997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Pilgrim Nuclear Power Station ML20133G5831996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Pilgrim Nuclear Power Station BECO-96-106, Monthly Operating Rept for Nov 1996 for Pilgrim Nuclear Power Station1996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-097, Monthly Operating Rept for Oct 1996 for Pilgrim Nuclear Power Station1996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Pilgrim Nuclear Power Station ML20128N2611996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-083, Monthly Operating Rept for Pilgrim Nuclear Power Station for Aug 1996 Ltr1996-08-31031 August 1996 Monthly Operating Rept for Pilgrim Nuclear Power Station for Aug 1996 Ltr ML20116L0841996-07-31031 July 1996 Monthly Operating Rept for Jul 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-066, Monthly Operating Rept for June 1996 for Pilgrim Nuclear Power Station1996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-056, Monthly Operating Rept for May 1996 for Pilgrim Nuclear Power Station1996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Pilgrim Nuclear Power Station ML20117E0961996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-034, Monthly Operating Rept for Mar 1996 for Pilgrim Nuclear Power Station1996-03-31031 March 1996 Monthly Operating Rept for Mar 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-023, Monthly Operating Rept for Feb 1996 for Pilgrim Nuclear Power Station1996-02-29029 February 1996 Monthly Operating Rept for Feb 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-008, Monthly Operating Rept for Jan 1996 for Pilgrim Nuclear Power Station1996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-004, Monthly Operating Rept for Dec 1995 for Pilgrim Nuclear Power Station1995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for Pilgrim Nuclear Power Station ML20095E7351995-11-30030 November 1995 Monthly Operating Rept for Nov 1995 for Pilgrim Nuclear Power Station Unit 1 BECO-LTR-95-116, Monthly Operating Rept for Oct 1995 for Pilgrim Nuclear Power Station1995-10-31031 October 1995 Monthly Operating Rept for Oct 1995 for Pilgrim Nuclear Power Station ML20093F5221995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for Pilgrim Nuclear Power Station BECO-LTR-95-097, Monthly Operating Rept for Aug 1995 for Pilgrim Nuclear Power Station1995-08-31031 August 1995 Monthly Operating Rept for Aug 1995 for Pilgrim Nuclear Power Station BECO-LTR-95-081, Monthly Operating Rept for July 1995 for Pilgrim Nuclear Power Station1995-07-31031 July 1995 Monthly Operating Rept for July 1995 for Pilgrim Nuclear Power Station BECO-LTR-95-071, Monthly Operating Rept for June 1995 for Pilgrim Nuclear Power Plant1995-06-30030 June 1995 Monthly Operating Rept for June 1995 for Pilgrim Nuclear Power Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217E3021999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Pilgrim Nuclear Station.With ML20212C2921999-09-16016 September 1999 SER Accepting Licensee Request for Relief from ASME Code Section XI Requirements as Endorsed by 10CFR50.55a for Containment Insp for Pilgrim Nuclear Power Station ML20216F3511999-09-0808 September 1999 ISI Summary Rept for Refuel Outage 12 at Pnps ML20216E6881999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Pilgrim Nuclear Power Station.With ML20210R3401999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Pilgrim Nuclear Power Station.With ML20209C4731999-07-0707 July 1999 Addendum to SE on Proposed Transfer of Operating License & Matls License from Boston Edison Co to Entergy Nuclear Generation Co ML20209H8251999-07-0101 July 1999 Provides Commission with Evaluation of & Recommendations for Improvement in Processes Used in Staff Review & Approval of Applications for Transfer of Operating Licenses of TMI-1 & Pilgrim Station ML20209E6191999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Pilgrim Nuclear Power Station.With ML20196H2451999-06-29029 June 1999 SER Denying Licensee Proposed Alternative in Relief Request PRR-13,rev 2.Staff Determined That Proposed Alternative Provides Insufficient Info to Determine Adequacy of Scope of Implementation ML20209A8901999-06-28028 June 1999 SER Accepting Licensee Proposed Alternative to Use Code Case N-573 for Remainder of 10-year Interval Pursuant to 10CFR50.55a(a)(3)(i) ML20209B9861999-06-23023 June 1999 Rev 13A to Pilgrim Nuclear Power Station COLR for Cycle 13 ML20217N9061999-06-21021 June 1999 Rept of Changes,Tests & Experiments for Period of 970422-990621 ML20195K3431999-06-15015 June 1999 Safety Evaluation Granting Licensee Request to Use Guidance of GL 90-05 to Repair Flaws in ASME Class 3 Salt Svc Water System Piping for Plant ML20195G8231999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Pnps.With ML20207E7471999-05-27027 May 1999 Safety Evaluation Granting Request Re Reduction of IGSCC Insp of Category D Welds Due to Implementation of HWC to License DPR-35 ML20206M1971999-05-11011 May 1999 SER Accepting Request for Approval to Repair Flaws in ASME Code Class 3 Salt Svc Water Piping at Plant ML20206J6611999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Pilgrim Nuclear Power Station.With ML20205L0221999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Pilgrim Nuclear Power Station.With ML20207J5471999-03-0909 March 1999 Training Simulator,1999 4-Yr Certification Rept ML20207F9401999-03-0101 March 1999 Long Term Program Semi-Annual Rept for Pilgrim Nuclear Power Station ML20207H5451999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Pilgrim Nuclear Power Station.With ML20196E2151998-12-31031 December 1998 1998 Annual Rept for Boston Edison & Securities & Exchange Commission Form 10-K Rept.With ML20206Q2741998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Pilgrim Nuclear Power Station.With ML20197J3591998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Pilgrim Nuclear Power Station.With ML20195C9951998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Pilgrim Nuclear Power Station.With ML20154K0721998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Pilgrim Nuclear Power Station.With ML20153D3901998-09-22022 September 1998 Safety Evaluation Granting 970707 Request to Use Guidance in GL 90-05 to Repair Flaws in ASME Class 3 Salt Svc Water Sys Piping for Pilgrim Nuclear Power Station ML20197C5011998-09-0404 September 1998 Rev 12C,Pages 4 & 5 to Pilgrim Nuclear Power Station Colr ML20197C5471998-08-31031 August 1998 Rev 12C to Pilgrim Nuclear Power Station Colr ML20151W8231998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Pilgrim Nuclear Power Station.With ML20237E2251998-08-26026 August 1998 Suppl & Revs to SE for Amend 173 for Pigrim Nuclear Power Station ML20237A9941998-07-31031 July 1998 Monthly Operating Rept for Pilgrim Nuclear Power Station ML20236U8201998-07-13013 July 1998 Rev 12B to Pilgrim Nuclear Power Station COLR (Cycle 12) ML20236P0151998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Pilgrim Nuclear Power Station ML20249A3741998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Pilgrim Nuclear Power Station.W/Undated Ltr ML20247H2081998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Pilgrim Nuclear Power Station ML20207B7601998-03-31031 March 1998 Final Rept, Pilgrim Nuclear Power Station Site-Specific Offsite Radiological Emergency Preparedenss Prompt Alert & Notification System Quality Assurance Verification, Prepared for FEMA ML20216G3911998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Pilgrim Nuclear Power Station ML20216J3741998-03-19019 March 1998 Safety Evaluation Accepting Licensee Request to Evaluate Elevated Tailpipe Temp on Safety Relief Valve SRV 203-3B ML20248L2241998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Pilgrim Nuclear Station ML20202G5251998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Pilgrim Nuclear Power Station ML20236M8511997-12-31031 December 1997 1997 Annual Rept for Boston Edison & Securities & Exchange Commission Form 10-K Rept ML20198L7701997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Pilgrim Nuclear Power Station ML20203D6101997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Pilgrim Nuclear Power Station ML20202D5761997-11-0808 November 1997 1997 Evaluated Exercise BECO-LTR-97-111, Monthly Operating Rept for Oct 1997 for Pilgrim Nuclear Power Station1997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Pilgrim Nuclear Power Station ML20217D6431997-10-0101 October 1997 Safety Evaluation Granting Request for Approval to Repair Flaws in Accordance W/Gl 90-05 for ASME Class 3 SSW Piping for Pilgrim ML20217H5621997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Pilgrim Nuclear Power Station ML20216J4131997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Pilgrim Nuclear Power Station ML20210J3321997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Pilgrim Nuclear Power Station 1999-09-08
[Table view] |
Text
._
OPERATING DATA REPORT DOCKET NO. 50-293 DATE 02-07-83 COMPLETED BY G.G. Whitney TELEPHONE 1-617-746-7900 OPERATING STATUS Pilgrim I Notes
- 1. Unit Name:
- 2. Reporting Period: January, 1983 1990
- 3. Licensed Thermal Power (MWt):
- 4. Nameplate Rating (Gross MWe): 678
- 5. Design Electrical Rating (Net MWe): 655
- 6. Sfaximum Dependable Capacity (Gross MWe):
690 670
- 7. Maximum Dependable Capacity (Net MWe):
- 8. if Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
None
- 9. Power Level To which Restricted,If Any (Net MWe): None
- 10. Reasons For Restrictions.If Any: N/A This Month Yr..to.Date Cumulatise
- 11. Hours in Reporting Period 744.0 744.0 88944.0
- 12. Number Of Hours Reactor Was Critical 744.0 744.0 62689.3 0.0 0.0 0.0
- 13. Reactor Resene Shutdown Hours
- 14. Hours Generator On.Line 744.0 744.0 bubZ$.Z 0.0 U.U U.u
- 15. Unit Resene Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH) 1449072.0 1449072.0 104162664.0
- 17. Gross Electrical Energy Generated (MWH1 507630.0 _ 507630.0 34834454.0
- 18. Net Electrical Energy Generated (MWH) 488596.0_ 488596.0 33470107.0
- 19. Unit Service Factor 100.0 100.0 68.2
- 20. Unit Availability Factor 100.0 100.0 68.2
- 21. Unit Capacity Factor (Using MDC Net) 98.0 98.0 56.2
- 22. Unit Capacity Factor IUsing DER Net) 100.3 100.3 57.5
- 23. Unit Forced Outage Rate 0.0 0.0 9.6
- 24. Shutdowns Scheduled Oser Next 6 Months (Type. Date,and Duration of Each):
None i
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup: Unit Operating
- 26. Units in Test Status tPrior to Commercial Operation): Forecast Achiesed INITIAL CRITICA LITY INITIA L ELECTRICITY CO\lMERCI AL OPERATION ----
'"/7D 8303150580 830214 PDR ADOCK 05000293 R PDR
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-293 UNIT Pilgrim I DATE 02/07/83 COMPLETED BY C.G. Whitney 1-617-746-7900 TELEPHONE MONTH January, 1983 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe. Net) (yw,.3,g y I 669 g7 656 2 669 13 669 3 19 66R 4 669 20 670 3 A7n 33 zgg 6 ,3 669 669 , 659 7
3 670 24 669 9 669 33 669 669 669 10
!! 670 27 669 12 669 , 668 13 669 39 547 670 664 g4 3g 15 669 3; 666 16 438 i INSTRUCTIONS On this format. list the average dany un-t power levelin MWe Net for each day in the reporting montn. Compute to the nearest whole megawatt.
10 /** )
V t
r DOCKET NO. 50-293 ,
' UNIT SIIUTI) OWNS AND POWER REDUCTIONS UNIT NAME Pilgrim I I) ATE WNN COMPLETED gy G.G. Whitney ,
' REPORT MONTil . January,1983 TELErilONE 1-617-746-7900 "t.
- .{ g 3 Licensee gg b., Cause & Corrective 3.!i
~
No. Ihte h H8 5 soc Event g3 1 Action to F
$E E jgg Report # mo g u Prevent Recurrence j 6 l
1 83/01/16 S 0.0 B 5 NA .. HF llTEXCil Load Reduction To Backwash !
l Nain Condenser And Test Turbine Stop Valves. ,
l j
r i
1
! 1 e
. pr i .
- ., o i.
s 1 .
) -
I 3 3 4 F: Forced Ressim: Metliod: Exhibit G-Instructitms 4
S: Scheduled A Equipment failure (Emplain) 1. Manual for Preparailun of Data R. Maintenance of Test 2-Manual Sesam. Entry Sheets for 1.lcensee
- C-Refueling 3 Automatic Scram. Eveni Report (LER) File INUREG ,
, D Regulatiny Resiriction 4-Other (Emplain) 0161)
E-Operator Training A License l'xaminalism F-Administrative 5 d
G. Operational Error (Esplain) Exhibit I Same Source l'8/77) Il-Other (Emplain)
/
REFUELING INFORMATION The following refueling information is included in the Monthly Report as requested in a letter to Mr. G. C. Andognini dated January 18, 1978:
For your convenience, the information supplied has been enumerated so that each number corresponds to equivalent notation utilized in the request.
- 1. The name of.this facility is Pilgrim Nuclear Power Station, Docket Number 50-293.
- 2. Scheduled date for next Refueling Shutdown: Sep tember,1983
- 3. Scheduled date for restart following refueling: November, 1983 4.
- 5. Due to their similarity, requests 4, 5, & 6 are responded to collectively:
- 6. The fuel, which had been loaded during the 1981 scheduled refueling outage, is of the same P8x8R design, as loaded the previous outage con-sisting of 112 P8DRB282 assemblies and 60 P8DRB265 assemblies.
- 7. (a) There are 580 fuel assemblies in the core.
(b) There are 936 fuel assemblies in the spent fuel pool.
- 8. (a) The station is presently licensed to store 2320 spent fuel assemblies.
The actual spent fuel storage capacity is 1770 fuel assemblies at present.
(b) The planned spent fuel storage capacity is 2320 fuel assemblies.
- 9. With present spent fuel in storage, the spent fuel pool now has the capacity to accommodate an additional 834 fuel assemblies.
.)
. w _ := ..
BOSTON EDISON COMPANY PILGRIM NUCLEAR POWER STATION Summary of Operations for JANUARY, 1983 The unit operated at 100% (MWE) until 1/2/83 when power was reduced for control rod exercises and returned to 100% the same day. Condensate demineralizers were worked on throughout the month.
On 1/5/83, reactor water sample isolation valve, A0-220-44, was found to be inoperable.
The redundant in-line valve, A0-220-45, was isolated and red tagged closed to comply with Technical Specifications (Ref: LER 83-001/03L-0). On 1/9/83, power was reduced to 90% for control rod exercises and returned to 100%.
On 1/15/83, power was reduced for condenser backwash, surveillances and to repair oil leaks on the "A" reactor feedwater pump.
On 1/6/83, control rod number 10-31, could not be withdrawn and was electrically disabled at position 00. The supply breaker for the "A" RPS was found to be overheated cnd a h scram was initiated until replacement was made. (Ref: LER 83-004/03L-0).
R2 turn to full power was made later the same day (1/16/83).
A reduction in power to 90% was made on 1/23/83 for control rod exercises and rod number 06-15 drifted to position 10. A further reduction to 70% was made, the rod withdrawn to position 48 and return to 100% was achieved.
A condenser backwash on 1/29/83 required a power reduction to 50% and control rod 10-31 was moved to position 48 and electrically disabled. Twenty five additional control rods were timed and the unit returned to 100% power.
SAFETY / RELIEF VALVE CHALLENGES FOR THE MONTH OF JANUARY, 1983
~
No safety / relief valve challenges occured during the month of-January, 1983.
(
i
Month Jrnu ry. 1983
' PILGRIM NUCLEAR POWER STATION
' MAJOR SAFETY RELATED MAINTENANCE l .
CORRECTIVE ACTION MALFUNCTION CAUSE MAINTENANCE TO PREVENT RECURRENCE ASSOCIATED LER SYSTEM COMPONENT RPS Supply Breaker Coil
- overheated Replaced changed Single pole replaced with 3 83-004/03L-0
- 5ACB1A pole. ,
CRD #10-31 Would not with- Worn Seals Changed direction,- Will change at next refuel
~
N/A U draw al solenoids and outage. .
friction tested. ,
4 -
, ' ,j CRD #06-15 Insert time too Normal ' Adjusted speed N/A -
N/A 1 fast wear control lC APRM Pr'oportional Setpoint drift Unknown at Recalibrated Monitor outputs and recalibrat< t 83-002/01T-0 outputs Amplifiers drift this time if necessary 260-8A+8B RWCS DPIS 1243 Setpoint drift Loose Recalibrated and None required 83-003/03L-0 .
' switch tightened screw
)' plate scres I .
RW Sample A0-220-44 Would not close Unknown. Closed inline Will repair at next drywell 83-001/03L-0 Isolation valve entry of sufficient duration .
Reactor Outer door Ripped rubber Wear Replaced seal N/A. N/A j Building seal seal '
Contain-
.) ment d
I ,
I !
l - T i
8 l . .
I,j < s 9 d