MONTHYEARML20217E3021999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Pilgrim Nuclear Station.With ML20216E6881999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Pilgrim Nuclear Power Station.With ML20210R3401999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Pilgrim Nuclear Power Station.With ML20209E6191999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Pilgrim Nuclear Power Station.With ML20195G8231999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Pnps.With ML20206J6611999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Pilgrim Nuclear Power Station.With ML20205L0221999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Pilgrim Nuclear Power Station.With ML20207H5451999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Pilgrim Nuclear Power Station.With ML20206Q2741998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Pilgrim Nuclear Power Station.With ML20197J3591998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Pilgrim Nuclear Power Station.With ML20195C9951998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Pilgrim Nuclear Power Station.With ML20154K0721998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Pilgrim Nuclear Power Station.With ML20151W8231998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Pilgrim Nuclear Power Station.With ML20237A9941998-07-31031 July 1998 Monthly Operating Rept for Pilgrim Nuclear Power Station ML20236P0151998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Pilgrim Nuclear Power Station ML20249A3741998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Pilgrim Nuclear Power Station.W/Undated Ltr ML20247H2081998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Pilgrim Nuclear Power Station ML20216G3911998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Pilgrim Nuclear Power Station ML20248L2241998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Pilgrim Nuclear Station ML20202G5251998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Pilgrim Nuclear Power Station ML20198L7701997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Pilgrim Nuclear Power Station ML20203D6101997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Pilgrim Nuclear Power Station BECO-LTR-97-111, Monthly Operating Rept for Oct 1997 for Pilgrim Nuclear Power Station1997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Pilgrim Nuclear Power Station ML20217H5621997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Pilgrim Nuclear Power Station ML20216J4131997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Pilgrim Nuclear Power Station ML20210J3321997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Pilgrim Nuclear Power Station ML20148K4161997-05-31031 May 1997 Monthly Operating Rept for Pilgrim Nuclear Power Station ML20141B9631997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Pilgrim Nuclear Power Station ML20137T5631997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Pilgrim Nuclear Power Station ML20136G7791997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Pilgrim Nuclear Power Station ML20138K5811997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Pilgrim Nuclear Power Station ML20133G5831996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Pilgrim Nuclear Power Station BECO-96-106, Monthly Operating Rept for Nov 1996 for Pilgrim Nuclear Power Station1996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-097, Monthly Operating Rept for Oct 1996 for Pilgrim Nuclear Power Station1996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Pilgrim Nuclear Power Station ML20128N2611996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-083, Monthly Operating Rept for Pilgrim Nuclear Power Station for Aug 1996 Ltr1996-08-31031 August 1996 Monthly Operating Rept for Pilgrim Nuclear Power Station for Aug 1996 Ltr ML20116L0841996-07-31031 July 1996 Monthly Operating Rept for Jul 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-066, Monthly Operating Rept for June 1996 for Pilgrim Nuclear Power Station1996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-056, Monthly Operating Rept for May 1996 for Pilgrim Nuclear Power Station1996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Pilgrim Nuclear Power Station ML20117E0961996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-034, Monthly Operating Rept for Mar 1996 for Pilgrim Nuclear Power Station1996-03-31031 March 1996 Monthly Operating Rept for Mar 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-023, Monthly Operating Rept for Feb 1996 for Pilgrim Nuclear Power Station1996-02-29029 February 1996 Monthly Operating Rept for Feb 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-008, Monthly Operating Rept for Jan 1996 for Pilgrim Nuclear Power Station1996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-004, Monthly Operating Rept for Dec 1995 for Pilgrim Nuclear Power Station1995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for Pilgrim Nuclear Power Station ML20095E7351995-11-30030 November 1995 Monthly Operating Rept for Nov 1995 for Pilgrim Nuclear Power Station Unit 1 BECO-LTR-95-116, Monthly Operating Rept for Oct 1995 for Pilgrim Nuclear Power Station1995-10-31031 October 1995 Monthly Operating Rept for Oct 1995 for Pilgrim Nuclear Power Station ML20093F5221995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for Pilgrim Nuclear Power Station BECO-LTR-95-097, Monthly Operating Rept for Aug 1995 for Pilgrim Nuclear Power Station1995-08-31031 August 1995 Monthly Operating Rept for Aug 1995 for Pilgrim Nuclear Power Station BECO-LTR-95-081, Monthly Operating Rept for July 1995 for Pilgrim Nuclear Power Station1995-07-31031 July 1995 Monthly Operating Rept for July 1995 for Pilgrim Nuclear Power Station BECO-LTR-95-071, Monthly Operating Rept for June 1995 for Pilgrim Nuclear Power Plant1995-06-30030 June 1995 Monthly Operating Rept for June 1995 for Pilgrim Nuclear Power Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217E3021999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Pilgrim Nuclear Station.With ML20212C2921999-09-16016 September 1999 SER Accepting Licensee Request for Relief from ASME Code Section XI Requirements as Endorsed by 10CFR50.55a for Containment Insp for Pilgrim Nuclear Power Station ML20216F3511999-09-0808 September 1999 ISI Summary Rept for Refuel Outage 12 at Pnps ML20216E6881999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Pilgrim Nuclear Power Station.With ML20210R3401999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Pilgrim Nuclear Power Station.With ML20209C4731999-07-0707 July 1999 Addendum to SE on Proposed Transfer of Operating License & Matls License from Boston Edison Co to Entergy Nuclear Generation Co ML20209H8251999-07-0101 July 1999 Provides Commission with Evaluation of & Recommendations for Improvement in Processes Used in Staff Review & Approval of Applications for Transfer of Operating Licenses of TMI-1 & Pilgrim Station ML20209E6191999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Pilgrim Nuclear Power Station.With ML20196H2451999-06-29029 June 1999 SER Denying Licensee Proposed Alternative in Relief Request PRR-13,rev 2.Staff Determined That Proposed Alternative Provides Insufficient Info to Determine Adequacy of Scope of Implementation ML20209A8901999-06-28028 June 1999 SER Accepting Licensee Proposed Alternative to Use Code Case N-573 for Remainder of 10-year Interval Pursuant to 10CFR50.55a(a)(3)(i) ML20209B9861999-06-23023 June 1999 Rev 13A to Pilgrim Nuclear Power Station COLR for Cycle 13 ML20217N9061999-06-21021 June 1999 Rept of Changes,Tests & Experiments for Period of 970422-990621 ML20195K3431999-06-15015 June 1999 Safety Evaluation Granting Licensee Request to Use Guidance of GL 90-05 to Repair Flaws in ASME Class 3 Salt Svc Water System Piping for Plant ML20195G8231999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Pnps.With ML20207E7471999-05-27027 May 1999 Safety Evaluation Granting Request Re Reduction of IGSCC Insp of Category D Welds Due to Implementation of HWC to License DPR-35 ML20206M1971999-05-11011 May 1999 SER Accepting Request for Approval to Repair Flaws in ASME Code Class 3 Salt Svc Water Piping at Plant ML20206J6611999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Pilgrim Nuclear Power Station.With ML20205L0221999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Pilgrim Nuclear Power Station.With ML20207J5471999-03-0909 March 1999 Training Simulator,1999 4-Yr Certification Rept ML20207F9401999-03-0101 March 1999 Long Term Program Semi-Annual Rept for Pilgrim Nuclear Power Station ML20207H5451999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Pilgrim Nuclear Power Station.With ML20196E2151998-12-31031 December 1998 1998 Annual Rept for Boston Edison & Securities & Exchange Commission Form 10-K Rept.With ML20206Q2741998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Pilgrim Nuclear Power Station.With ML20197J3591998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Pilgrim Nuclear Power Station.With ML20195C9951998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Pilgrim Nuclear Power Station.With ML20154K0721998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Pilgrim Nuclear Power Station.With ML20153D3901998-09-22022 September 1998 Safety Evaluation Granting 970707 Request to Use Guidance in GL 90-05 to Repair Flaws in ASME Class 3 Salt Svc Water Sys Piping for Pilgrim Nuclear Power Station ML20197C5011998-09-0404 September 1998 Rev 12C,Pages 4 & 5 to Pilgrim Nuclear Power Station Colr ML20197C5471998-08-31031 August 1998 Rev 12C to Pilgrim Nuclear Power Station Colr ML20151W8231998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Pilgrim Nuclear Power Station.With ML20237E2251998-08-26026 August 1998 Suppl & Revs to SE for Amend 173 for Pigrim Nuclear Power Station ML20237A9941998-07-31031 July 1998 Monthly Operating Rept for Pilgrim Nuclear Power Station ML20236U8201998-07-13013 July 1998 Rev 12B to Pilgrim Nuclear Power Station COLR (Cycle 12) ML20236P0151998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Pilgrim Nuclear Power Station ML20249A3741998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Pilgrim Nuclear Power Station.W/Undated Ltr ML20247H2081998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Pilgrim Nuclear Power Station ML20207B7601998-03-31031 March 1998 Final Rept, Pilgrim Nuclear Power Station Site-Specific Offsite Radiological Emergency Preparedenss Prompt Alert & Notification System Quality Assurance Verification, Prepared for FEMA ML20216G3911998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Pilgrim Nuclear Power Station ML20216J3741998-03-19019 March 1998 Safety Evaluation Accepting Licensee Request to Evaluate Elevated Tailpipe Temp on Safety Relief Valve SRV 203-3B ML20248L2241998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Pilgrim Nuclear Station ML20202G5251998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Pilgrim Nuclear Power Station ML20236M8511997-12-31031 December 1997 1997 Annual Rept for Boston Edison & Securities & Exchange Commission Form 10-K Rept ML20198L7701997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Pilgrim Nuclear Power Station ML20203D6101997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Pilgrim Nuclear Power Station ML20202D5761997-11-0808 November 1997 1997 Evaluated Exercise BECO-LTR-97-111, Monthly Operating Rept for Oct 1997 for Pilgrim Nuclear Power Station1997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Pilgrim Nuclear Power Station ML20217D6431997-10-0101 October 1997 Safety Evaluation Granting Request for Approval to Repair Flaws in Accordance W/Gl 90-05 for ASME Class 3 SSW Piping for Pilgrim ML20217H5621997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Pilgrim Nuclear Power Station ML20216J4131997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Pilgrim Nuclear Power Station ML20210J3321997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Pilgrim Nuclear Power Station 1999-09-08
[Table view] |
Text
'
f
~
OPERATING DATA REPORT DOCKET NO. 50-293 ,
DATE 05/ 13/83 COMPLETED BY G.G. Whitney TELEPHONE 617-746-7900 OPERATING STATUS Pilnrim 1 Notes
- 1. Unit Name:
- 2. Reporting Period: April, 1983 1998.
- 3. LicensedThermalPower(MWt):
l 4. Nameplate Rating (Gross MWe): 678.
- 5. Design Electrical Rating (Net MWe): 6ss. ,
- 6. Maximum Dependable Capacity (Gens MWe): 6on.
- 7. Maximum Dependable Capacity (Net MWe): 670.
- 8. If Changes Occur in Capacity Ratings (Items Number-3 Through 7) Since Last Report. Give Reasons:
None
- 9. Power Level To Which Restricted. lf Any (Net MWe): Mnno~
- 10. Reasons For Restrictions,if Any:
N/A his Month Yr..to.Date Cumulative
- 11. Hours in Reporting Period 719.0* 2879.0 91079.0 l'2. Number Of Hours Reactor Was Critical 705.4 2824.3 64769.6 0.0 0.0 0.0
- 13. Reactar Reserve Shutdown Hours
- 14. Hours Generator On.Line 686.3 2798.1 62677.3
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1300488.0 5'608328.0 108121920.0 ,
17 Gross Electrical Energy Generated (MWH) z49200.0 _ _ ,
1881910.0 36208734.0
- 18. Net Electrical Energy Genersted (MWH) 417136.0 1810979.0 34792490.0
- 19. Unit Service Factor 95.5 97.2 68.8
- 20. Unit Availability Factor 95.5 97.2 68.8
- 21. Unit Capacity Factor (Using MDC Net) 89.7 93.9 57.0
- 22. Unit Capacity Factor (Using DER Net) 91.8 96.0 58.3
- 23. Unit Forced Outage Rate ,
5.5 2.8 9.4
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duntion of Each):
Refuel Outage to commence January, 1984
- 25. If Shur Down At End Of Report Period. Estimated Date of Startup: Unit operating .
- 26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
- Day 11aht Savinns Time adjustment 8305170532 830513 PDR ADOCK 05000293 gnf773 R PDR
f i
DOCKET NO. 50-293
- UNIT SilU1 DOWNS AND POWER REI)UC110NS Pilgrim 1 UNIT NAME I) ATE 05 /13 f83 APRIL, 1983 COMPLETED fly' cA taienov REPORT MONiil TELErl10NE 617-746-790 1
.g ,
.! E 3 ..E t.lcensee E t, "L Cause & Correcilve No. Ihte g 3g % ,ye Event gg ~8 o
Action to
~
' F fE 5 j if, g Report # mU g Present Recunence c5 5 83/04/02 F 32.7 A 3 N/A IIF VALVEX liigh flux scram due to stator coolint ;
temp. valve problem.
6 83/04/17 F 0.0 11 5 N/A lill ZZZZZZ Extraction steam line repair
, 7 83/04/22 S 0.0 li 5 N/A IIH ZZZZZZ Extraction steam line inspection 1 s l
1 i l
t
~
i i
~
i
. I 2 3 4 F: Forced Reason: Methoil: Exhibit G Instructions S: Sclieduled A. Equipment Fallme(Emplain) 1 -Manual In: Preparailun of Data '
' R. Maintenance of Test 2-Manual Sciam. Entey Sheets for 1.icensee
- C-RcIncling 3 Automatic Sciam. Event Repini (LER) File INUHl'G-
, D Regulatory Restriction 4-Osher (Explain) 0161) i E-Operator Training & IJcense Examination 5-Power Reduction F-Administrative 5 G-Operational Enor (Emplain) Exhibly 1 - Same Source l 1
l'8/77) ll Other (Explain)
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-293 UNIT P41erim 1 DATE 05/11 /83 G.C. Whitney COMPLE'ITD BY TELEPHONE 617-746-7900 MON'DI April, 1983
~
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (Mwe Net) (ww,.Neg)
! 664. 17 498.
353. gg' ggn.
- 0. 39 664.
3 4 393. ,j 662.
5 597. 21 66s.
6 631. : 543.
632. 23 478.
7 g,f
3 632. 34 662. 25 665.
9 6ss- 26 665-10 666. ;; ggs_
II 665. ggs 12 3 665. ,9 665.
l 13 663. 30 665.
14 665. 3g N/A 15
~
16 665.
(
[
\
l INSTRUCTIONS -
On this format.!ist the average dany unit power levelin MWe. Net for esd. t.sy in the reporting month. Compute :o l
the nearest whole megswst:.
l l
to mi i
l
REFUELING INFORMATION The following refueling information is included in the Monthly Report as requested in an NRC letter to BECo dated January 18, 1978:
For your convenience, the information supplied has been enumerated so that each number corresponds to equivalent notation utilized in the request.
- 1. The name of this facility is Pilgrim Nuclear Power Station, Docket Number 50-293. ,
- 2. Scheduled date for next Refueling Shutdown: January, 1984
- 3. Scheduled date for restart following refueling: April, 1984 4.
- 5. Due to their similarity, requests 4, 5, & 6 are responded to collectively:
- 6. The fuel, which had been loaded during the 1981 scheduled refueling outage, is of the same P8x8R design, as loaded the previous autage consisting of 112 P8DRB282 assemblies and 60 P8DRB265 assemblies.
- 7. (a) There are 580 fuel assemblies in the core.
(b) There are 936 fuel assemblies in the spent fuel pool.
- 8. (a) The station is presently licensed to store 2320 spent fuel assemblies.
The actual spent fuel storage capacity is 1770 fuel assemblies at present.
(b) The planned spent fuel storage capacity is 2320 fuel assemblies.
- 9. With present spent fuel in storage, the spent fuel pool now has the capacity to accommodate an additional 834 fuel assemblies.
~. _ _ _ _ _ . . .__ - _ _ _ _ _ _
PILGRIM NUCLEAP POWER STATION OPERATIONAL
SUMMARY
FOR APRIL, 1983 Note: Reactor pressure is limited to 1030 psig due to safety / relief valve simmer margin considerations.
The unit was operating at 100% available reactor power on April 1, until power was reduced to 50% to backwash and heat treat the main condenser.
While at 50% power, 11 control rods were scram timed. On April 2, the stator cooling temperature control valve stayed full open causing turbine runback on high stator temperature which resulted in the unit scramming on high flux. While the unit was off line, it was found that "B" Recirculation Pump MG set field breaker would not trip. (Ref: LER 83-013/01T-0). After minor maintenance, the unit was restarted on April 3. The unit was synchronized onto the grid on April 4 and power was increased to 95%. On April 5, a turbine runback occurred due to stator cooling alarm and power was manually reduced to 50%. Power was subsequently increased to 95% and remained at that level while the investigation of the stator coolant system continued.
The unit returned to 100% power on April 8. A reduction to 70% was made on April 9 when two control rods drifted in during control rod exercises. A return to 100% power was achieved the same day. On April 13 RCIC was de-clared inoperable due to a motor failure on the 1301-17 MOV (Ref: LER 83-022/03L-0).
After the valve was repaired, the system was returned to service on April 15.
A leak in the extraction steam line for the 2nd point heater for the "A" train was found on April 16 and on April 17 power was reduced to 50% to repair the leak and backwash the main condenser. Following this maintenance, the unit was returned to 100% power. On April 20, HPCI was made inoperable for scheduled maintenance and was returned to service the same day.
On April 22, the extraction steam lines were inspected after power was reduced to 50% and while at reduced power, the main condenser was backwashed. On April 23, the unit was again at 100%. The "A" Standby Liquid Control pump was made inoperable for maintenance and was declared operable on April 30 when the unit output was reduced to 70% for control rod exercises. A return to 100% was made the same day.
i SAFETY / RELIEF VALVE CHALLENGES 1
MONTH OF APRIL, 1983 REQUIREMENT: T.A.P. II.K.3.3 There were no safety / relief valve challenges during the
- month of April, 1983.
l
- =_.-- - . - . _ _ _ _ _
PILGRIM NUCLEAR POWER STATION Honth' Aprilo 1983 4
~
, MAJOR SAFETY RELATED MAINTENANCE ,
CORRECTIVE ACTION SYSTEM COMPONENT MALFUNCTION CAUSE MAINTENANCE TO PREVSNT RECURRENCE ASSOCIATED LER 1 -
l RECIRC. MG Set Field Failed to trip Binding Cleaned and lub- Revising Breaker Overhaul 83-13/01T-0
. Breaker ricated Program and Procedures.
- CAC A0-5033B Would not close Excessive Rebuilt solenoid Test frequency increased to as- 83-21/03L-0
- in required time lubricant sure proper ' solenoid operation.
- in valve i
! operator I
lSBLC SBLC P207A Packing Leak Normal Replace packing None-routine maintenance None lRWCU H0-1201-204 Hi Steam Leak Normal Repacked- None-routine maintenance None pt. vent RCIC MO-1301-17 Breaker trip Packing Rebuild motor and Repacked valve 83-022/03L-0 (RCIC isolation: Icaking dir- overhauled actu-ectly onto ator vlv.operatot I
RCIC A0-1301-50 Packing leak Normal Replaced packing None-routine maintenance None !
- HPCI A0-2301-31 Steam leak Normal Replace stem seat None-routine maintenance None
] gasket and pack-ing i j
- HPCI M0-2301-5 Packing leak Normal Replaced packing None-routine maintenance None j HPCI Trap 2301-1 Steam leak Normal Replaced gasket None-routine maintenance None i
)EMERG. 'A' Diesel Fuel oil booster Metal con- Replaced belt con- Intend to issue.new mainten- To be issued. I DIESEL pump belt dis- nec'or t nector and rein- ance procedure. !
- GENERATOR connected 5 broke stalled belt l '
STRUCTURAL Personnel Door Bent seal strip Damaged Straightened seal None-routine maintenance None i and re-screwed to i casing.
j i o
, - -