ENGINE SYSTEMS, INC.
175 Freight Road Telephone: 252/977-2720 Rocky Mount, NC 27804 Fax: 252/446-1134 March 21, 2019 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001
Subject:
10CFR21 Reporting of Defects and Non-Compliance -
Engine Systems, Inc. Report No. 10CFR21-0124, Rev. 0 Excitation Transformers for Vickers Voltage Regulator System
Dear Sir:
The enclosed report (10CFR21-0124, Rev. 0) addresses .a reportable notification on excitation transformers for Vickers voltage regulator system. This is a follow-up to our interim report 10CFR21-0124-INT, Rev. 0 issued on January 24, 2019. Our evaluation determined that the deviation is reportable in accordance with 10CFR21 Part 21.
A copy of the report has been mailed to our affected nuclear customers.
- Please sign below, acknowledging receipt of this report, and return a copy to the attention of Document Control at the address above (or, fax to number 252/446-1134) within 10 working days after receipt.
Yours very truly, ENGINE SYSTEMS, INC.
~~4)~,L Susan Woolard Document Control Coordinator Please let us know if ANY of your mailing information changes - name of recipient, name of company/facility, address, etc. Mark the changes on this acknowledgment form and send to us by mail or FAX to the number above.
RECEIVED:---------
93 DATE:
Quality Performance With Pride
Jf ENGINE SYSTEMS, INC.
175 Freight Road, Rocky Mount, NC 27804 Telephone: 252/977-2720 Fax: 252/446-1134 Report No. 10CFR21-0124 Rev. 0: 03/21/19 10CFR21 REPORTING OF DEFECTS AND NON-COMPLIANCE COMPONENT: Excitation Transformers for Vickers Voltage Regulator System Part Number Device Description 8408213-ESI
- Power Current Transformer (PCT) 8408218-_ESI Saturable Reactor (Reactor) 8411387-ESI Excitation Power Transformer (EPT)
SYSTEM: Emergency Diesel Generator - Voltage Regulator System CONCLUSION: Reportable in Accordance with 10CFR21 Prepared By: _--="h'-1---_ _,...~~*______ __ Date: .3/i.d 11
<:J Engineering Manager Reviewed By: _ __..{A<-=- ___..._~--"--*-- "--------- Date:
Quality Assurance Manager \_
Quality Performance With Pride
Report No. 10CFR21-0124 Record of Revisions Page: 1 of 1 REV DATE PAGE DESCRIPTION 0 03/21/19 Initial issue.
- .1 Report No. 10CFR21-0124 Revision: 0 Date: 03/21/19 Page: 1 of 2
SUMMARY
On January 24, 2019, Engine Systems Inc. (ESI) issued interim report 10CFR21-0124-INT, rev.a regarding an identified deviation for which ESI was unable to complete an evaluation within the 60-day requirement. Per the interim report, ESI committed to complete the evaluation by March 22, 2019. The evaluation is now complete and the deviation is determined to be reportable in accordance with 10CFR Part 21.
Pursuant to 10 CFR 21.21 {d)(4), ESI is presenting the required information as follows:
(i) Name and address of the individual or individuals informing the Commission.
John Kriesel Dan Roberts Engineering Manager Quality Manager Engine Systems Inc. Engine Systems Inc.
175 Freight Rd. 175 Freight Rd.
Rocky Mount, NC 27804 Rocky Mount, NC 27804 (ii) Identification of the basic component supplied within the United States which fails to comply or contains a defect.
/ Excitation transformers of the following part numbers:
Part Number Device Description 8408213-ESI Power Current Transformer (PCT) 8408218-ESI Saturab/e Reactor (Reactor) 8411387-ESI Excitation Power Transformer (EPT)
(iii) Identification of the firm supplying the basic component which fails to comply or contains a defect.
Engine Systems Inc. (ES/)
(iv) Nature of the defect or failure to comply and the safety hazard which is created or could be created by such defect of failure to comply.
Part Number Device Description of Defect 8408213-ES/ PCT Insufficient core gap.
8408218-ESI Reactor Differences in coil winding and core lamination from original design.
8411387-ESI EPT Incorrect pofaritv.
Each of the devices listed above provide a specific function within the static exciter of a Vickers voltage regulator system. The exciter supplies DC excitation current to the generator field based on input from the voltage regulator. Failure of any one of the components to perform correctly will negatively impact excitation current supplied to the generator field which in turn directly affects generator output. Therefore, failure of any one of the components may prevent the emergency diesel generator from carrying its associated safety-related loads.
See Attachment 1 for additional discussion.
(v) The date on which the information of such defect or failure to comply was obtained.
December 6, 2018 a
(vi) In the case of basic component which contains a defect or fails to comply, the number and location of these components in use at, supplied for, being supplied for, or may be supplied for, manufactured, or being manufactured for one or more facilities or activities subject to the regulations in this part.
The list of customers to whom ES/ has supplied the transformers as dedicated, safety-related devices is listed in the table on page 2.
i Report No. 10CFR21-0124 Revision: 0 Date: 03/21/19 Page: 2 of 2 Part Number Device Customer Customer PO# Qty ESI Order C-of-C Date Florida Power & Light -
Turkey Point 02318321 /00032 3 3012629 01/06/2015 8408213-ESI PCT Northern States Power Company -
4000002229 9 8002765 08/30/2018 Monticello Dominion Virginia Power -
45936798 6 3010193 07/31/2013 Surry Power Station Florida Power & Light -
02313521/00013 1 3010993
- 10/18/2013 Turkey Point 8408218-ES I Reactor Florida Power & Light - 04/30/2014 (qty 3) 02318321 /00032 5 3012629 Turkey Point 08/01/2014 (qty 2)
Northern States Power Company -
4000002229 ,18 8002765 07/30/2018 Monticello Dominion Virginia Power -
4500013104 1 3010356 08/07/2013 Surry Power Station Florida Power & Light -
02313521/00013 1 3010993 10/18/2013 Turkey Point 8411387-ESI EPT Florida Power & Light -
02318321 /00032 2 3012629 08/01/2014 Turkey Point BMPC-KAPL 112732-18 1 3017417 12/27/2017 Northern States Power Company -
4000002229 9 8002765 08/31/2018 Monticello Table 1: List of Affected Customers (vii) The corrective action which has been, is being, or will be taken; the name of the individual or organization responsible for the action; and the length of time that has been or will be taken to complete the action.
PIN 8408213-ESI (PCT):
Return to ES/ for rework. The PCT requires additional insulating material to increase the core gap.
PIN 8408218-ES/ (Reactor}:
Return to ES/ for replacement.
PIN 8411387-ESI (EPT):
Return to ES/ for rework to have EPT primary terminal markings (H1 & H2) re-labeled.
ES/ will implement inspection and test requirements to ensure additional critical characteristics identified during this evaluation process are properly verified. The dedication package revisions to include these characteristics is expected to be complete within 60 days but in all cases prior to shipment of any new or reworked transformers of the above part numbers.
(viii) Any advice related to the potential defect or failure to comply about tfie facility, activity, or basic component that has been, is being, or will be given to purchasers or licensees.
See Attachment 1 for additional discussion.
Report No. 10CFR21-0124 Revision: 0, Attachment 1 Page: 1 of 3 ATTACHMENT 1 ADDITIONAL DISCUSSION ON EXCITER TRANSFORMERS (MAGNETICS) .
The Vickers voltage regulator system was original equipment supplied with many of the nuclear EDGs, primarily 1960s and 1970s vintage units. The Vickers exciter components went out of production approximately 20 years ago and ESI began a reverse engineering initiative in 2012 to offer customers replacements for their existing magnetics. This activity was performed in collaboration with a transformer manufacturer using available drawing and design information and disassembly inspection of sample units of the original design. The new transformer part numbers were given a "-ESI" suffix to denote they are made by a different manufacturer but kept the original base part number to maintain traceability to the original application.
ESI was notified on December 6, 2018 of a potential issue with exciter magnetics supplied to Monticello Nuclear Generating Plant. During system testing performed by Monticello at another vendor facility, issues with the static excitation system were identified which prevented proper control of the generator field current. This prompted the 1 OCFR21 evaluation that ultimately lead to this 10CFR21 report. Additional tests and inspections performed throughout ESl's evaluation determined that while many of the characteristics between the old and new magnetics are the same, key differences exist that caused the performance anomalies identified during Monticello system testing.
Within the voltage regulator system, the magnetics supply DC excitation current to the generator field based on input from the voltage regulator. A typical schematic is shown in Figure 1 below. The three components in question are the excitation power transformers (identified as EPT1, EPT2, & EPT3), power current transformers (identified as PCTA, PCTB, & PCTC) and saturable reactors (identified as L 1 through L6). The issues with each component, as well as outline drawings, are contained on the following pages.
Crtll#it/7 RArtO UJO/S FO,ie~Dtffl!/11,,1 51'1 Nx-*n,:.-30 Figure 1: Typical Vickers Voltage Regulator System Schematic
Report No. 10CFR21-0124 Revision: 0 Attachment 1 Page: 2 of 3 Excitation Power Transformer Three single-phase EPTs are wye connected on the primary and delta connected on the *secondary. Per the system design, EPT primary H1 should have the same polarity of EPT secondary X1. Contrary to this requirement, EPT primary H1 has the same polarity as secondary X3.
=*~~~==l-.,.,,.-,
- ~i*:fi!¥~~i~~f~'A,;t.~
- '**... "iI CI:]
XI X~ X.s SCHEMATIC
. :~ '*. ~ *,.
14-MAX---
Figure 2: EPT Outline Drawing Power Current Transformer Three single-phase PCTs provide a secondary voltage proportional to the primary current. The PCT, in conjunction with the EPT, provide the power to support generator field excitation. Certain characteristics of the PCT secondary voltage are determined by the magnitude of an air gap in the core construction. It has been determined the PCT supplied by ESI has a gap of 0.030" whereas the original design PCT has a gap of 0.080".
84-0821~
13 32.DII'.*
2 HOlE~
51 2 a-t~
---[--- - --l--1-- ~~---~,
H2 2[ DE.SCR\Pl"\ON
,............__+~: _j TUqNS Rf-1.."T\O: 4: l f'*
- !--a=.;=,=~-.
I I
I I
\..~OS I LUG!!. FOR 4 STUO Figure 3: PCT Outline Drawing
Report No. 1 OCFR21-0124 Revision: 0 'I,,
Attachment 1 Page: 3 of 3 Saturable Reactor In conjunction with a rectifier diode, the saturable reactor acts as a magnetic amplifier. Six of these magnetic amplifier assemblies are used in the rectifier bridge of the voltage regulator system. The reactor receives a bias and control current from the voltage regulator which varies the level of saturation in the reactor core. As the level of saturation changes, the reactor impedance varies which increases or decreases generator field voltage. It has been determined the saturable reactor supplied by ESI has coil winding and core winding differences from the originally supplied reactor that may cause subtle, but undesired performance differences.
II I(,,,
7 i'1 I
i
+
- .. J .
0,
'* . I
--"~-.?,-~-::Fqr* .
- r I
.: .. *1 T 10-f
- 4-
.: .- .: . I e: 1__* \ _., ___ *_,,,.._/
I *;
1..
- *-* . ; ----=J**.
,/
. ~
I t
Figure 4: Reactor Outline Drawing