Category:PRELIMINARY SAFETY ANALYSIS REPORT & AMENDMENTS (PSAR
MONTHYEARML19308D6551970-08-28028 August 1970 Suppl 5,Part 3 to PSAR for Crystal River 3 & 4, Rept of Tests on 1,170-Ton Prescon Tendons. ML19319D6981969-07-15015 July 1969 App 2C,Section 1,to Crystal River 3 & 4 PSAR, Plant Protection Against Hurricane Wave Action. ML19319D7211968-01-30030 January 1968 Suppl 2 to Crystal River 3 & 4 PSAR, Test Area Grouting Program. Prepared for Util on 680130 ML19319D6821967-08-10010 August 1967 Chapter 5 to Crystal River 3 & 4 PSAR, Containment Sys. Includes Revisions 1-10 ML19319D6931967-08-10010 August 1967 App 1A to Crystal River 3 & 4 PSAR, Technical Qualifications. ML19319D6921967-08-10010 August 1967 Chapter 15 to Crystal River 3 & 4 PSAR, Tech Specs. Tech Specs to Be Submitted at Later Date ML19319D6911967-08-10010 August 1967 Chapter 14 to Crystal River 3 & 4 PSAR, Safety Analysis. Includes Revisions 1-10 ML19319D6891967-08-10010 August 1967 Chapter 12 to Crystal River 3 & 4 PSAR, Conduct of Operations. Includes Revisions 1-10 ML19319D6881967-08-10010 August 1967 Chapter 11 to Crystal River 3 & 4 PSAR, Radwastes & Radiation Protection. Includes Revisions 1-10 ML19319D6871967-08-10010 August 1967 Chapter 10 to Crystal River 3 & 4 PSAR, Steam & Power Conversion Sys. Includes Revisions 1-10 ML19319D6861967-08-10010 August 1967 Chapter 9 to Crystal River 3 & 4 PSAR, Auxiliary & Emergency Sys. Includes Revisions 1-10 ML19319D6851967-08-10010 August 1967 Chapter 8 to Crystal River 3 & 4 PSAR, Electrical Sys. Includes Revisions 1-10 ML19319D6841967-08-10010 August 1967 Chapter 7 to Crystal River 3 & 4 PSAR, Instrumentation & Control. Includes Revisions 1-10 ML19319D6831967-08-10010 August 1967 Chapter 6 to Crystal River 3 & 4 PSAR, Engineered Safeguards. Includes Revisions 1-10 ML19319D6951967-08-10010 August 1967 App 2B to Crystal River 3 & 4 PSAR, Meteorology. Wind Diffusion Program Computer Printout ML19319D6811967-08-10010 August 1967 Chapter 4 to Crystal River 3 & 4 PSAR, Rcs. Includes Revisions 1-10 ML19319D6801967-08-10010 August 1967 Chapter 3 to Crystal River 3 & 4 PSAR, Reactor. Includes Revisions 1-10 ML19319D6791967-08-10010 August 1967 Chapter 2 to Crystal River 3 & 4 PSAR, Site & Environ. Includes Revisions 1-10 ML19319D6781967-08-10010 August 1967 Chapter 1 of Crystal River 3 & 4 PSAR, Introduction & Summary. Includes Revisions 1-10 ML19319D7081967-08-10010 August 1967 App 5A to Crystal River 3 & 4 PSAR, Structural Design Bases. ML19319D7011967-08-10010 August 1967 App 2E to Crystal River 3 & 4 PSAR, Groundwater. ML19319D7001967-08-10010 August 1967 App 2D to Crystal River 3 & 4 PSAR, Liquid Radwaste Discharge Limits. ML19319D6961967-08-10010 August 1967 App 2C to Crystal River 3 & 4 PSAR, Flood Studies & Hurricane Effects.Section 1, Plant Protection Against Hurricane Wave Action, & Section 2, Flood Studies for Crystal River, Encl ML19319D6901967-08-10010 August 1967 Chapter 13 to Crystal River 3 & 4 PSAR, Initial Tests & Operation. Includes Revisions 1-10 ML19319D7141967-08-10010 August 1967 App 5G to Crystal River 3 & 4 PSAR, Turbine-Generator Missiles. ML19319D7271967-08-10010 August 1967 Suppl 5 to Crystal River 3 & 4 PSAR, Rept of Tests on 1,170-Ton Prescon Tendons. ML19319D7261967-08-10010 August 1967 Supp1 4,Attachment 2,to Crystal River 3 & 4 PSAR, Guidance for Submittal of QA Program Description,Section 17 of PSAR, Draft ML19319D7251967-08-10010 August 1967 Supp1 4,Attachment 1,to Crystal River 3 & 4 PSAR, QA Program. ML19319D7231967-08-10010 August 1967 Suppl 4 to Crystal River 3 & 4 PSAR, Response to Part 2 of Attachment to Directorate of Reactor Licensing 690313 Ltr. QA Program Rept & 731003 Draft Guidance for Submittal of QA Program Description,Section 17 of PSAR Encl ML19319D7221967-08-10010 August 1967 Suppl 3 to Crystal River 3 & 4 PSAR, Voluntary Response to AEC 680308 Oral Inquiry. ML19319D7201967-08-10010 August 1967 Suppl 2 to Crystal River 3 & 4 PSAR, Excerpts from 'Foundation Grouting Rept,Unit 2.' ML19319D7191967-08-10010 August 1967 Supp1 2 to Crystal River 3 & 4 PSAR, Foundation Investigation. Prepared for Gilbert Associates,Inc ML19319D7171967-08-10010 August 1967 Suppl 2 to Crystal River 3 & 4 PSAR, Voluntary Response to AEC Oral Inquiry. Consultant Repts & Excerpt from Gilbert Associates,Inc Foundation Grouting Rept,Unit 2 Encl ML19319D7161967-08-10010 August 1967 Suppl 1 to Crystal River 3 & 4 PSAR, Response to AEC Directorate of Reactor Licensing 680119 Ltr. ML19319D7131967-08-10010 August 1967 App 5F to Crystal River 3 & 4 PSAR, Reactor Bldg Instrumentation. ML19319D7121967-08-10010 August 1967 App 5E to Crystal River 3 & 4 PSAR, Liner Plate Spec. ML19319D7111967-08-10010 August 1967 App 5D to Crystal River 3 & 4 PSAR, Qc. ML19319D7101967-08-10010 August 1967 App 5C to Crystal River 3 & 4 PSAR, Design Criteria for Reactor Bldg. ML19319D7091967-08-10010 August 1967 App 5B to Crystal River 3 & 4 PSAR, Design Program for Reactor Bldg. ML19319D7041967-08-10010 August 1967 App 2H to Crystal River 3 & 4 PSAR, Bedrock Solution Studies. ML19319D7031967-08-10010 August 1967 App 2G to Crystal River 3 & 4 PSAR, Engineering Geology & Foundation Studies. ML19319D7021967-08-10010 August 1967 App 2F to Crystal River 3 & 4 PSAR, General Geology - Regional Tectonics. ML19319D6991967-08-10010 August 1967 App 2C,Section 2,to Crystal River 3 & 4 PSAR, Flood Studies for Crystal River. ML19319D7291967-08-10010 August 1967 Suppl 6 to Crystal River 3 & 4 PSAR, Analysis & Design of Tendon Anchorage Zones. ML19319D6941967-05-0505 May 1967 App 2A to Crystal River 3 & 4 PSAR, Population & Land Use. ML19319D7151965-11-0202 November 1965 App 12A to Crystal River 3 & 4 PSAR, Fl Public Safety Emergency Procedures. Includes Excerpts of Fl Dept of Public Safety General Order 36 Re Possible Incident W/ Radioactive Matls 1970-08-28
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217G0191999-10-15015 October 1999 Safety Evaluation Concluding That Licensee Followed Analytical Methods Provided in GL 90-05.Grants Relief Until Next Refueling Outage,Scheduled to Start on 991001.Temporary non-Code Repair Must Then Be Replaced with Code Repair 3F1099-19, Part 21 Rept Re Damage on safety-grade Cable Provided to FPC by Bicc Brand-Rex Co.Damage Was Created During Cabling Process While Combining Three Conducters.Corrective Action Program Precursor Card PC99-2868 Was Initiated1999-10-13013 October 1999 Part 21 Rept Re Damage on safety-grade Cable Provided to FPC by Bicc Brand-Rex Co.Damage Was Created During Cabling Process While Combining Three Conducters.Corrective Action Program Precursor Card PC99-2868 Was Initiated ML20217B0931999-10-0606 October 1999 Part 21 Rept Re Damaged Safety Grade Electrical Cabling Found in Supply on 990831.Damage Created During Cabling Process While Combining Three Conductors Just Prior to Closing.Vendor Notified of Reporting of Issue ML20212L0881999-10-0404 October 1999 SER Accepting Licensee Requests for Relief 98-012 to 98-018 Related to Implementation of Subsections IWE & Iwl of ASME Section XI for Containment Insp for Crystal River Unit 3 ML20212J8631999-10-0101 October 1999 Safety Evaluation Supporting Licensee Proposed Alternatives to Provide Reasonable Assurance of Structural Integrity of Subject Welds & Provide Acceptable Level of Quality & Safety.Relief Granted Per 10CFR50.55a(g)(6)(i) ML20212E9031999-09-30030 September 1999 FPC Crystal River Unit 3 Plant Reference Simulator Four Year Simulator Certification Rept Sept 1995-Sept 1999 3F1099-02, Monthly Operating Rept for Sept 1999 for Crystal River,Unit 3.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Crystal River,Unit 3.With ML20212E6911999-09-21021 September 1999 Safety Evaluation Supporting Proposed EALs Changes for Plant Unit 3.Changes Meet Requirements of 10CFR50.47(b)(4) & App E to 10CFR50 ML20212C1501999-08-31031 August 1999 Non-proprietary Version of Rev 0 to Crystal River Unit 3 Enhanced Spent Fuel Storage Engineering Input to LAR Number 239 3F0999-02, Monthly Operating Rept for Aug 1999 for Crystal River,Unit 3.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Crystal River,Unit 3.With ML20211L1321999-08-31031 August 1999 EAL Basis Document ML20211B7291999-08-16016 August 1999 Rev 2 to Cycle 11 Colr ML20210P1111999-08-0505 August 1999 SER Accepting Evaluation of Third 10-year Interval Inservice Insp Program Requests for Relief for Plant,Unit 3 ML20210U5341999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Crystal River,Unit 3 ML20209F5601999-07-31031 July 1999 EAL Basis Document, for Jul 1999 ML20210U5411999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Crystal River,Unit 3 3F0799-01, Monthly Operating Rept for June 1999 for Crystal River,Unit 3.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Crystal River,Unit 3.With ML20210U5601999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for Crystal River,Unit 3 3F0699-07, Monthly Operating Rept for May 1999 for Crystal River,Unit 3.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Crystal River,Unit 3.With ML20195C6271999-05-28028 May 1999 Non-proprietary Rev 0 to Addendum to Topical Rept BAW-2346P, CR-3 Plant Specific MSLB Leak Rates ML20196L2031999-05-19019 May 1999 Non-proprietary Rev 0 to BAW-2346NP, Alternate Repair Criteria for Tube End Cracking in Tube-to-Tubesheet Roll Joint of Once-Through Sgs ML20210U5631999-04-30030 April 1999 Revised Monthly Operating Rept for Apr 1999 for Crystal River,Unit 3 3F0599-04, Monthly Operating Rept for Apr 1999 for Crystal River Unit 3.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Crystal River Unit 3.With ML20204D9661999-03-31031 March 1999 Non-proprietary Rev 1,Addendum a to BAW-2342, OTSG Repair Roll Qualification Rept 3F0499-04, Monthly Operating Rept for Mar 1999 for Crystal River Unit 3.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Crystal River Unit 3.With 3F0399-04, Special Rept 99-01:on 990310,discovered Containment Tendons That Required Grease Addition in Excess of Prescribed Limits During Recent Insp Activites.Six Tendons Were Refilled with Appropriate Amount of Grease1999-03-10010 March 1999 Special Rept 99-01:on 990310,discovered Containment Tendons That Required Grease Addition in Excess of Prescribed Limits During Recent Insp Activites.Six Tendons Were Refilled with Appropriate Amount of Grease 3F0399-03, Monthly Operating Rept for Feb 1999 for Crystal River Unit 3.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Crystal River Unit 3.With ML20203A4381999-02-0303 February 1999 Safety Evaluation Supporting EAL Changes for License DPR-72, Per 10CFR50.47(b)(4) & App E to 10CFR50 ML20206E9021998-12-31031 December 1998 Florida Progress Corp 1998 Annual Rept ML20206E9261998-12-31031 December 1998 Gainesville Regional Utilities 1998 Annual Rept 3F0199-05, Monthly Operating Rept for Dec 1998 for Crystal River Unit 3.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Crystal River Unit 3.With ML20206E9701998-12-31031 December 1998 Ouc 1998 Annual Rept. with Financial Statements from Seminole Electric Cooperative,Inc ML20206E9891998-12-31031 December 1998 Kissimmee Utility Authority 1998 Annual Rept 3F1298-13, Monthly Operating Rept for Nov 1998 for Crystal River,Unit 3.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Crystal River,Unit 3.With 3F1198-05, Monthly Operating Rept for Oct 1998 for Crystal River,Unit 3.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Crystal River,Unit 3.With ML20155F4071998-10-31031 October 1998 Rev 2 to Pressure/Temp Limits Rept ML20155J2701998-10-28028 October 1998 Second Ten-Year Insp Interval Closeout Summary Rept ML20206E9101998-09-30030 September 1998 City of Bushnell Fl Comprehensive Annual Financial Rept for Fiscal Yr Ended 980930 ML20206E9461998-09-30030 September 1998 Utilities Commission City of New Smyrna Beach,Fl Comprehensive Annual Financial Rept Sept 30,1998 & 1997 ML20206E9561998-09-30030 September 1998 City of Ocala Comprehensive Annual Financial Rept for Yr Ended 980930 ML20206E9811998-09-30030 September 1998 City of Tallahassee,Fl Comprehensive Annual Financial Rept for Yr Ended 980930 3F1098-06, Monthly Operating Rept for Sept 1998 for Crystal River Unit 3.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Crystal River Unit 3.With ML20195E3121998-09-30030 September 1998 Comprehensive Annual Financial Rept for City of Leesburg,Fl Fiscal Yr Ended 980930 3F0998-07, Monthly Operating Rept for Aug 1998 for Crystal River Unit 3.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Crystal River Unit 3.With 3F0898-02, Monthly Operating Rept for Jul 1998 for Crystal River,Unit 11998-07-31031 July 1998 Monthly Operating Rept for Jul 1998 for Crystal River,Unit 1 ML20236W6501998-07-31031 July 1998 Emergency Action Level Basis Document ML20236V8801998-07-30030 July 1998 Control Room Habitability Rept ML20236Q4611998-06-30030 June 1998 SER for Crystal River Power Station,Unit 3,individual Plant Exam (Ipe).Concludes That Plant IPE Complete Re Info Requested by GL 88-20 & IPE Results Reasonable Given Plant Design,Operation & History 3F0798-01, Monthly Operating Rept for June 1998 for Crystal River Unit 31998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Crystal River Unit 3 ML20248F7441998-05-31031 May 1998 Reactor Vessel Working Group,Response to RAI Regarding Reactor Pressure Vessel Integrity 1999-09-30
[Table view] |